Teck Reports Unaudited Second Quarter Results for 2012
Published : July 25, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Dollar | Europe | Face Value | K Street | Report | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 25, 2012) -

All dollar amounts expressed in this news release are in Canadian dollars unless otherwise noted.

Teck Resources Limited (TSX: TCK.A and TCK.B, NYSE: TCK) reported second quarter adjusted profit of $312 million, or $0.53 per share, compared with $663 million or $1.12 per share in 2011.

"We are pleased with our operating results for the second quarter, with record quarterly copper production, a significant increase in coal sales compared with the last quarter and settlement of labour agreements at our Trail and Cardinal River operations. Notwithstanding these increases, commodity prices were lower due in part to uncertainty over global economic conditions, resulting in lower profits compared with the second quarter of last year. However, our balance sheet remains strong with $3.6 billion of cash, which positions us to continue advancing our longer term growth plans," said Don Lindsay, President and CEO.

Highlights and Significant Items

  • Gross profit before depreciation and amortization was $1.0 billion in the second quarter compared with $1.4 billion the second quarter of 2011.
     
  • Cash flow from operations, before working capital changes, was $725 million in the second quarter compared with $1.2 billion a year ago.
     
  • Profit attributable to shareholders was $268 million and EBITDA was $790 million in the second quarter.
     
  • To date we have reached agreements with our coal customers to sell 5.0 million tonnes of coal in the third quarter of 2012 and we expect to conclude additional sales over the course of the quarter. While prices for our premium coal have been agreed at US$225 per tonne, the average price for all products is approximately US$198 per tonne.
     
  • Our cash balance was $3.6 billion at June 30, 2012, after capital expenditures, investments and debt payments totaling $891 million in the second quarter.
     
  • New five-year labour agreements were ratified at our Trail Operations in the second quarter and at our Cardinal River Operations in early July.
     
  • We achieved record quarterly copper production of 90,000 tonnes in the second quarter, which reflects our share of significantly higher production from Antamina's major mill expansion.
     
  • Subsequent to quarter end, the Social and Environmental Impact Assessment for the Quebrada Blanca Phase 2 project was voluntarily withdrawn in response to comments from Chilean regulators and requests for additional information. We are working with the regulators to define the time frame for resubmission of the application.
     
  • We declared a $0.40 per share dividend on our Class A common shares and Class B subordinate voting shares, which was paid on July 3, 2012.

This management's discussion and analysis is dated as at July 24, 2012 and should be read in conjunction with the unaudited consolidated financial statements of Teck Resources Limited (Teck) and the notes thereto for the three months ended June 30, 2012 and with the audited consolidated financial statements of Teck and the notes thereto for the year ended December 31, 2011. In this news release, unless the context otherwise dictates, a reference to "the company" or "us," "we" or "our" refers to Teck and its subsidiaries. Additional information, including our annual information form and management's discussion and analysis for the year ended December 31, 2011, is available on SEDAR at www.sedar.com.

This document contains forward-looking statements. Please refer to the cautionary language under the heading "CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION" below.

Overview

We continue to make significant progress on our plan to increase copper and coal production. Copper production of 90,000 tonnes was a new quarterly record, with further increases expected in each of the next two quarters. Coal production was reduced by approximately 700,000 tonnes due to the nine-day Canadian Pacific Railway labour disruption which caused a complete shutdown of rail operations from our Elk Valley mines. However, material moved was maintained at our first quarter levels and this will benefit production in future periods.

Base metal prices weakened during the second quarter. Contract coal prices were weaker than those we experienced in the previous quarter, but coal sales volumes increased. Unit operating costs at our coal operations rose slightly as a result of the effect of lower production levels as we were forced to temporarily curtail production due to the rail strike.

Our strong cash flow, debt capacity and cash position of $3.6 billion, together with access to capital markets, should provide the financial capacity necessary to fund our attractive portfolio of growth projects.

Profit and Adjusted Profit*

Adjusted profit, which excludes the effect of certain transactions as described in the table below, was $312 million, or $0.53 per share, in the second quarter of 2012 compared with $663 million, or $1.12 per share, in the same period a year ago. The decline in adjusted profit was primarily due to significantly lower coal and metal prices. Also contributing to the lower adjusted profit were negative after-tax pricing adjustments of $53 million as a result of declining metal prices in the quarter compared with minimal adjustments in the second quarter of 2011. Partly offsetting these items was a 21% and 10% rise in coal and copper sales volumes, respectively.

Profit attributable to shareholders was $268 million, or $0.46 per share, in the second quarter compared with $756 million or $1.28 per share in the same period last year.

    Three months
ended June 30,
  Six months
ended June 30,
 
($ in millions) 2012   2011   2012   2011  
                           
Profit attributable to shareholders as reported $ 268   $ 756   $ 486   $ 1,217  
Add (deduct):                        
  Asset sale gains   (19 )   (113 )   (21 )   (121 )
  Foreign exchange (gains) losses   13     2     19     (5 )
  Derivative (gains) losses   12     (8 )   (47 )   (4 )
  Collective agreement charges   38     26     50     26  
  Financing items   -     -     329     -  
Adjusted profit $ 312   $ 663   $ 816   $ 1,113  
                         
Adjusted earnings per share $ 0.53   $ 1.12   $ 1.39   $ 1.88  

* Our financial results are prepared in accordance with International Financial Reporting Standards ("IFRS"). This news release refers to adjusted profit, adjusted earnings per share, EBITDA and gross profit before depreciation and amortization, which are not measures recognized under IFRS in Canada and do not have a standardized meaning prescribed by IFRS or Generally Accepted Accounting Principles ("GAAP") in the United States. For adjusted profit we adjust profit attributable to shareholders as reported to remove the effect of certain kinds of transactions in these measures. EBITDA is profit attributable to shareholders before net finance expense, income taxes, depreciation and amortization. Gross profit before depreciation and amortization is gross profit with depreciation and amortization added back. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. We disclose these measures, which have been derived from our financial statements and applied on a consistent basis, because we believe they are of assistance in understanding the results of our operations and financial position and are meant to provide further information about our financial results to investors.

Business Unit Results

Our business unit results are presented in the tables below.

Three Months ended June 30
($ in millions) Revenues Gross profit before depreciation and amortization Gross profit
  2012 2011 2012 2011 2012 2011
                         
Copper $ 731 $ 749 $ 342 $ 427 $ 255 $ 355
Coal   1,362   1,471   596   844   450   709
Zinc   467   576   54   156   30   133
Energy   1   -   -   -   -   -
Total $ 2,561 $ 2,796 $ 992 $ 1,427 $ 735 $ 1,197
                         

We achieved record copper production of 90,000 tonnes in the second quarter, an increase of 13% from the same period a year ago, reflecting our share of additional production from Antamina's mine expansion program and increased throughput at Highland Valley. Despite the record production and resulting 10% rise in copper sales volumes, gross profit before depreciation and amortization decreased by $85 million in the second quarter compared with a year ago as a result of a 14% decline in copper prices and increased unit costs. Operating costs rose in the quarter, reflecting higher costs for labour, energy and various consumables. Our average total cash unit costs of product sold, after by-product credits, in the second quarter of 2012 was US$1.74 per pound compared with US$1.56 per pound in the second quarter of 2011.

Gross profit before depreciation and amortization from our coal business unit decreased by $248 million in the second quarter compared to the same period a year ago as a result of significantly lower coal prices, despite increased sales volumes. Coal production was 5.7 million tonnes in the second quarter, similar to the same period a year ago. Approximately 700,000 tonnes of coal production was lost due to the Canadian Pacific Railway strike, which caused a complete shutdown of rail operations from the Elk Valley mines for a nine-day period. The reduction in production volume increased unit costs of production and costs of sales in the quarter. Sales volumes were 6.7 million tonnes compared with 5.6 million tonnes in the second quarter of 2011. The average coal price of US$202 per tonne in the second quarter decreased by 26% from the second quarter of last year. Coal prices last year had reached record high levels due to the combination of strong demand for seaborne, high-quality steelmaking coal and weather-related restrictions on the supply of coal from Australia. Total unit cost of sales in the second quarter, including depreciation and transportation charges, were similar to the same period last year.

Gross profit before depreciation and amortization from our zinc business unit decreased by $102 million in the second quarter compared with a year ago. This was primarily due to a one-time charge of $51 million ($38 million after-tax) related to the new labour agreement at Trail, lower metal prices and reduced sales volumes from Red Dog. Red Dog zinc production declined by 9% in the second quarter compared with the same period a year ago due to unplanned maintenance shutdowns. Refined zinc and lead production from Trail were similar to the same period a year ago. Zinc sales volumes in the second quarter from Red Dog decreased by 22% as a result of the timing of shipments, as customers had advanced shipments into the first quarter of 2012. Zinc and lead prices decreased 15% and 22%, respectively, in the second quarter of 2012 compared with the same period a year ago.

Revenues

Revenues from operations were $2.6 billion in the second quarter compared with $2.8 billion a year ago. Revenues from our copper business unit declined slightly from a year ago as lower copper prices were partially offset by higher sales volumes. Coal revenues decreased by $109 million compared with the second quarter of 2011 as a result of significantly lower coal prices despite a 21% increase in sales volumes. Revenues from our zinc business unit declined by $109 million from a year ago as a result of lower metal prices and a 22% decline in sales volumes from Red Dog.

Average Prices and Exchange Rates*

  Three months Six months
ended June 30, ended June 30,
  2012 2011 % Change 2012 2011 % Change
             
Copper (LME Cash - US$/pound) 3.57 4.14 -14% 3.67 4.26 -14%
Coal (realized - US$/tonne) 202 272 -26% 212 242 -12%
Zinc (LME Cash - US$/pound) 0.87 1.02 -15% 0.90 1.05 -14%
Silver (LME PM fix - US$/ounce) 29 38 -24% 31 35 -11%
Molybdenum (published price - US$/pound) 14 17 -18% 14 17 -18%
Lead (LME Cash - US$/pound) 0.90 1.16 -22% 0.92 1.17 -21%
Cdn/U.S. exchange rate (Bank of Canada) 1.01 0.97 +4% 1.01 0.98 +3%

* Except for coal prices, the average commodity prices disclosed above are based on published benchmark prices and are provided for information only. Our actual revenues are determined using commodity prices and other terms and conditions specified in our various sales contracts with our customers. The molybdenum price is the price published in Platts Metals Week.

Our year-to-date business unit results are presented in the table below:

Six Months ended June 30
($ in millions) Revenues Gross profit before depreciation and amortization Gross profit
  2012 2011 2012 2011 2012 2011
                         
Copper $ 1,484 $ 1,522 $ 708 $ 896 $ 540 $ 753
Coal   2,560   2,490   1,241   1,321   990   1,065
Zinc   1,062   1,150   173   323   123   276
Energy   2   -   1   -   -   -
Total $ 5,108 $ 5,162 $ 2,123 $ 2,540 $ 1,653 $ 2,094

BUSINESS UNIT RESULTS

The table below shows our production and sales of our major products.

  Units (000's) Production Sales
    Second Quarter   Year-to-date Second Quarter   Year-to-date
(note 1)   2012 2011   2012 2011 2012 2011   2012 2011
                       
Principal products                      
                       
  Copper                      
    Contained in concentrate tonnes 72 62   135 119 67 60   132 116
    Cathode tonnes 18 18   36 36 18 17   36 34
      90 80   171 155 85 77   168 150
                         
  Coal tonnes 5,707 5,756   11,972 10,135 6,716 5,566   12,021 10,517
                         
  Zinc                      
    Contained in concentrate tonnes 149 166   296 332 79 99   214 228
    Refined tonnes 69 71   143 143 69 72   145 145
                       
Other products                      
  Lead                      
    Contained in concentrate tonnes 24 22   47 43 - -   - -
    Refined tonnes 22 21   43 44 21 22   43 42
                         
  Molybdenum                      
    Contained in concentrate pounds 3,234 2,342   6,204 4,221 3,280 2,223   6,390 4,578
                       
  1. We include 100% of production and sales from our Highland Valley Copper, Quebrada Blanca and Carmen de Andacollo mines in our production and sales volumes, even though we own 97.5%, 76.5% and 90%, respectively, of these operations, because we fully consolidate their results in our financial statements. We include 22.5% of production and sales from Antamina, representing our proportionate equity interest in Antamina.

REVENUES AND GROSS PROFIT

QUARTER ENDED JUNE, 30

Our revenue, gross profit before depreciation and amortization, and gross profit by business unit are summarized in the table below:

($ in millions) Revenues   Gross profit before depreciation and amortization Gross profit
  2012   2011   2012   2011 2012   2011
                     
Copper                                
  Highland Valley Copper $ 227   $ 250   $ 107   $ 136 $ 75   $ 114
  Antamina   207     184     148     134   141     129
  Quebrada Blanca   137     140     42     69   18     49
  Carmen de Andacollo   126     153     37     75   18     56
  Duck Pond   34     22     11     13   6     7
  Other   -     -     (3 )   -   (3 )   -
    731     749     342     427   255     355
                                 
Coal (note 1)   1,362     1,471     596     844   450     709
                                 
Zinc                                
  Trail   434     521     (7 )   79   (20 )   66
  Red Dog   75     110     57     75   46     65
  Other   2     5     4     2   4     2
  Inter-segment sales   (44 )   (60 )   -     -   -     -
    467     576     54     156   30     133
                                 
Energy   1     -     -     -   -     -
                                 
TOTAL $ 2,561   $ 2,796   $ 992   $ 1,427 $ 735   $ 1,197
  1. Our coal business unit represents our interest in six operating mines. We wholly own the Fording River, Coal Mountain, Line Creek and Cardinal River mines, and have a 95% partnership interest in the Elkview mine and an 80% interest in the Greenhills mine.

REVENUES AND GROSS PROFIT

SIX MONTHS ENDED JUNE 30

Our revenue, gross profit before depreciation and amortization, and gross profit by business unit are summarized in the table below:

($ in millions) Revenues   Gross profit before depreciation and amortization    Gross profit
  2012   2011   2012   2011 2012   2011
                     
Copper                                
  Highland Valley Copper $ 447   $ 460   $ 213   $ 252 $ 159   $ 213
  Antamina   413     402     296     294   283     283
  Quebrada Blanca   273     283     86     151   37     108
  Carmen de Andacollo   281     310     95     168   54     129
  Duck Pond   68     67     21     31   10     20
  Other   2     -     (3 )   -   (3 )   -
    1,484     1,522     708     896   540     753
                                 
Coal (note 1)   2,560     2,490     1,241     1,321   990     1,065
                                 
Zinc                                
  Trail   929     1,006     33     156   8     131
  Red Dog   228     253     134     161   110     139
  Other   4     11     6     6   5     6
  Inter-segment sales   (99 )   (120 )   -     -   -     -
    1,062     1,150     173     323   123     276
                                 
Energy   2     -     1     -   -     -
                                 
TOTAL $ 5,108   $ 5,162   $ 2,123   $ 2,540 $ 1,653   $ 2,094
                                 
  1. Our coal business unit represents our interest in six operating mines. We wholly own the Fording River, Coal Mountain, Line Creek and Cardinal River mines, have a 95% partnership interest in the Elkview mine and an 80% joint venture interest in the Greenhills mine.

COPPER

Highland Valley Copper (97.5%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Tonnes milled (000's)   11,894     10,286     22,768     19,868  
                           
Copper                        
  Grade (%)   0.28     0.28     0.25     0.27  
  Recovery (%)   82.9     88.4     83.9     87.9  
  Production (000's tonnes)   27.3     25.8     47.4     47.2  
  Sales (000's tonnes)   25.6     26.6     48.7     46.8  
                           
Molybdenum                        
  Production (million pounds)   2.6     1.7     4.8     3.1  
  Sales (million pounds)   2.4     1.7     4.7     3.5  
                           
Cost of sales ($ millions)                        
  Operating costs $ 112   $ 106   $ 218   $ 192  
  Distribution costs $ 8   $ 8   $ 16   $ 16  
  Depreciation and amortization $ 32   $ 22   $ 54   $ 39  
                           
Gross profit summary ($ millions) (note 1)                        
  Before depreciation and amortization $ 107   $ 136   $ 213   $ 252  
  Depreciation and amortization   (32 )   (22 )   (54 )   (39 )
  After depreciation and amortization $ 75   $ 114   $ 159   $ 213  
  1. Results do not include a provision for the 2.5% non-controlling interest in Highland Valley Copper.

The decline in Highland Valley Copper's second quarter gross profit before depreciation and amortization was primarily due to lower copper prices. Copper sales volumes in the second quarter were slightly lower than the same period a year ago due to timing of shipments.

Copper production of 27,300 tonnes was 6% higher primarily as a result of higher throughput in the mill, partially offset by lower recovery. Throughput improvement projects are continuing to demonstrate strong results as the mill processed 16% more material than the same quarter last year. Molybdenum production was also strong in the quarter as a result of the additional throughput and higher feed grades.

Cost of sales in the second quarter were similar to the same quarter a year ago, with the benefits realized from improvement projects largely offsetting higher costs associated with the increased throughput. The mill modernization project is progressing, with detailed engineering now over 50% complete. Concrete work has started and steel erection will commence in the third quarter.

Antamina (22.5%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Tonnes milled (000's)                        
  Copper-only ore   7,796     5,811     14,182     10,783  
  Copper-zinc ore   4,499     3,442     8,275     7,759  
                           
      12,295     9,253     22,457     18,542  
Copper (note 1)                        
  Grade (%)   1.01     0.90     1.03     0.95  
  Recovery (%)   86.4     84.8     86.5     84.1  
  Production (000's tonnes)   106.9     69.1     201.7     145.5  
  Sales (000's tonnes)   100.6     72.4     194.9     152.7  
                           
Zinc (note 1)                        
  Grade (%)   1.84     2.38     1.85     2.27  
  Recovery (%)   79.9     85.9     79.7     85.3  
  Production (000's tonnes)   64.2     71.6     123.5     156.4  
  Sales (000's tonnes)   64.1     64.8     111.6     154.8  
                           
Molybdenum                        
  Production (million pounds)   3.0     2.7     6.4     4.9  
  Sales (million pounds)   3.2     2.3     7.6     4.9  
                           
Cost of sales (US$ millions)                        
  Operating costs $ 191   $ 133   $ 366   $ 273  
  Distribution costs $ 27   $ 19   $ 51   $ 44  
  Royalties and other costs (note 2) $ 47   $ 49   $ 103   $ 115  
  Depreciation and amortization $ 35   $ 27   $ 64   $ 53  
                           
Gross profit summary (our 22.5% share) ($ millions)                        
  Before depreciation and amortization $ 148   $ 134   $ 296   $ 294  
  Depreciation and amortization   (7 )   (5 )   (13 )   (11 )
  After depreciation and amortization $ 141   $ 129   $ 283   $ 283  
  1. Copper ore grades and recoveries apply to all of the processed ores. Zinc ore grades and recoveries apply to copper-zinc ores only.
  2. In addition to royalties paid by Antamina, we also pay a royalty in connection with the acquisition of our interest in Antamina equivalent to 7.4% of our share of cash flow distributed by the mine.

The increase in our 22.5% share of Antamina's gross profit before depreciation and amortization in the second quarter was primarily due to higher copper production and sales volumes as the benefits from the expansion project began to be realized. Higher sales volumes were partially offset by the significantly lower copper and zinc prices.

Tonnes milled in the second quarter were 33% higher than a year ago and averaged approximately 135,100 tonnes per day, which reflects Antamina's expanded mill capacity.

The mix of mill feed in the second quarter was 63% copper-only ore and 37% copper-zinc ore, similar to the same period a year ago. Copper production increased by 55% to 106,900 tonnes compared with 69,100 tonnes in the second quarter of 2011. The higher production was the result of the mill expansion, as well as higher head grades and improved recovery. Zinc production decreased to 64,200 tonnes from 71,600 tonnes in the same period a year ago due to lower zinc grades and recoveries. Molybdenum production rose slightly in the second quarter compared with a year ago as a result of higher throughput of copper-only ores with higher molybdenum grades.

Negotiations for a new collective labour agreement have commenced as the current agreement expired on July 23, 2012.

Quebrada Blanca (76.5%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Tonnes placed (000's)                        
  Heap leach ore   1,773     1,841     3,226     3,279  
  Dump leach ore   6,806     5,917     12,244     12,256  
                           
      8,579     7,758     15,470     15,535  
Grade (TCu%) (note 1)                        
  Heap leach ore   0.91     1.04     0.89     0.93  
  Dump leach ore   0.43     0.50     0.44     0.45  
                           
Production (000's tonnes)                        
  Heap leach ore   9.8     8.7     20.3     16.3  
  Dump leach ore   6.4     7.6     12.8     15.8  
      16.2     16.3     33.1     32.1  
                           
Sales (000's tonnes)   16.9     15.6     33.3     30.5  
                           
Cost of sales (US$ million)                        
  Operating costs $ 93   $ 72   $ 183   $ 131  
  Distribution costs $ 2   $ 1   $ 4   $ 3  
  Depreciation and amortization $ 23   $ 21   $ 48   $ 44  
                           
Gross profit summary ($ millions) (note 2)                        
  Before depreciation and amortization $ 42   $ 69   $ 86   $ 151  
  Depreciation and amortization   (24 )   (20 )   (49 )   (43 )
  After depreciation and amortization $ 18   $ 49   $ 37   $ 108  
  1. TCu% is the percent assayed total copper grade.
  2. Results do not include a provision for the 23.5% non-controlling interest in Quebrada Blanca.

Quebrada Blanca's gross profit before depreciation and amortization declined in the second quarter due to lower copper prices and higher operating costs, partly offset by higher sales volumes.

Cathode copper production in the second quarter of 16,200 tonnes was similar to the same period a year ago.

Operating costs increased by US$21 million in the second quarter compared with the same period a year ago partly due to higher costs for sulphuric acid and energy, the effect of higher sales volumes that rose 8%, and an increased use of mine consumables. In addition, labour costs rose, reflecting the new terms of the collective agreement ratified earlier in 2012.

Carmen de Andacollo (90%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Tonnes milled (000's)   4,063     3,562     7,961     7,285  
Copper                        
  Grade (%)   0.51     0.52     0.51     0.51  
  Recovery (%)   85.1     89.5     86.2     88.1  
  Production (000's tonnes)   17.7     16.7     35.3     33.0  
  Sales (000's tonnes)   15.2     14.9     32.0     28.9  
                           
Gold (note 1)                        
  Production (000's ounces)   11.8     13.1     24.7     26.7  
  Sales (000's ounces)   11.1     10.0     24.2     21.8  
                           
Copper cathode                        
  Production (000's tonnes)   0.8     1.4     2.4     3.4  
  Sales (000's tonnes)   0.7     1.6     2.7     3.6  
                           
Cost of sales (US$ million)                        
  Operating costs $ 82   $ 76   $ 173   $ 136  
  Distribution costs $ 6   $ 4   $ 12   $ 10  
  Depreciation and amortization $ 19   $ 20   $ 41   $ 40  
                           
Gross profit summary ($ millions) (note 2)                        
  Before depreciation and amortization $ 37   $ 75   $ 95   $ 168  
  Depreciation and amortization   (19 )   (19 )   (41 )   (39 )
  After depreciation and amortization $ 18   $ 56   $ 54   $ 129  
  1. Carmen de Andacollo processes 100% of gold mined, but 75% of the gold produced is for the account of Royal Gold Inc.
  2. Results do not include a provision for the 10% non-controlling interest in Andacollo.

The decrease in Carmen de Andacollo's second quarter gross profit before depreciation and amortization was primarily due to lower copper prices and higher operating costs.

Production in the second quarter rose by 6% to 17,700, which reflects additional mill throughput as a result of mill modification enhancements completed earlier this year. The 20,000 tonnes per day pre-crushing plant will be ramped-up during the third quarter, and is expected to further increase plant throughput.

Operating costs in the second quarter rose 8% from a year ago partly as result of higher labour costs, additional manpower levels and higher costs for energy.

The expansion study at Carmen de Andacollo has evaluated both additional grinding (SAG mill 2) and additional pre-crushing as ways to increase concentrator throughput. Further circuit configuration and economic evaluation for the expansion will be undertaken based on the performance of the new 20,000-tonnes-per-day pre-crushing plant during the second and third quarters of 2012. During this period we will continue infill drilling to evaluate the resource potential and continue our investigation of sources available for additional water required for the expansion. We will also continue metallurgical test work to finalize the molybdenum recovery circuit.

Duck Pond (100%)

Duck Pond's gross profit before depreciation and amortization was $11 million in the second quarter compared with $13 million in the same period a year ago. Copper and zinc production in the second quarter were 3,800 tonnes and 5,500 tonnes, respectively, compared with 3,700 tonnes and 5,900 tonnes, respectively, last year. Copper and zinc sales in the second quarter were 3,700 tonnes and 4,700 tonnes, respectively, compared with 1,900 tonnes and 3,200 tonnes, respectively, last year.

Copper Development Projects

Quebrada Blanca Phase 2

During the quarter we completed a feasibility study on our Quebrada Blanca hypogene project. The study estimates a capital cost for the development of the project of US$5.6 billion on a 100% basis (in January 2012 dollars, not including working capital or interest during construction), of which our funding share would be US$4.8 billion. The study contemplates the construction of a 135,000 tonne per day concentrator and related facilities connected to a new port facility by 165 kilometre concentrate and desalinated water pipelines.

As part of the ongoing project work plan for 2012, the Social Environmental Impact Assessment for the project was submitted to the Chilean regulatory authorities during the second quarter. This was subsequently voluntarily withdrawn in order to allow us to respond to comments and to provide additional information requested by the Chilean authorities in the most effective manner. We are currently reviewing the requests and comments of the regulators and after discussions with them to clarify their requirements, the application will be resubmitted. Discussions are ongoing with various potential suppliers for power to the project. We are also in discussions with the other shareholders of Quebrada Blanca concerning financing options for the hypogene project, which may include limited recourse project financing and, possibly, bringing in a new funding partner. A decision to proceed with development will depend on the outcome of these discussions and progress on permitting issues.

Relincho

The feasibility study is progressing on schedule and is expected to be complete by the end of the first quarter of 2013. Exploration and geotechnical drilling are ongoing and a new resource and reserve estimate is expected at the completion of the feasibility study. Based on the prefeasibility design, production would average 180,000 tonnes per year of copper and 6,000 tonnes per year of molybdenum over a 22-year mine life, with higher production in the first five years.

Galore Creek (50%)

The Galore Creek project team is currently executing a $25 million work program for 2012 which was previously approved by the partners. The 2012 work program includes approximately 25,000 meters of infill and geotechnical drilling, which commenced in the second quarter to support the advanced engineering work completed in the fourth quarter of 2011.

COAL

Teck Coal Partnership (100%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Production (000's tonnes)   5,707     5,756     11,972     10,135  
                           
Sales (000's tonnes)   6,716     5,566     12,021     10,517  
                           
Average sale price                        
  US$/tonne $ 202   $ 272   $ 212   $ 242  
  C$/tonne $ 203   $ 264   $ 213   $ 237  
                           
Operating expenses (C$/tonne)                        
  Cost of product sold $ 77   $ 80   $ 74   $ 78  
  Transportation $ 37   $ 33   $ 36   $ 33  
  Depreciation and amortization $ 22   $ 24   $ 21   $ 24  
                           
Gross profit summary ($ millions)                        
  Before depreciation and amortization $ 596   $ 844   $ 1,241   $ 1,321  
  Depreciation and amortization   (146 )   (135 )   (251 )   (256 )
  After depreciation and amortization $ 450   $ 709   $ 990   $ 1,065  

Gross profit before depreciation and amortization in the second quarter declined primarily due to significantly lower selling prices, partially offset by higher sales volumes than in the second quarter of 2011.

Coal production of 5.7 million tonnes in the second quarter was similar to the same quarter a year ago. Although our production capacity has increased in the past year, the Canadian Pacific Railway strike caused a complete shutdown of rail operations from the Elk Valley mines for a nine-day period. Due to limited storage capacity at most mines, the inability to ship coal immediately resulted in approximately 700,000 tonnes of lost production. A one-week delay in completing a two-week planned maintenance outage at our primary west coast port facility and start-up issues on the Elkview plant upgrade subsequent to commissioning also contributed to lower production this quarter.

The volume of material moved in the second quarter of 76.5 million banked cubic metres ("BCM") was 10% higher than the same quarter in 2011, and raw coal production has also significantly increased over last year's levels. Subject to market conditions for the remainder of the year, production is expected to remain within the current guidance of 24.5 to 25.5 million tonnes in 2012, in spite of the loss of 700,000 tonnes of production during the rail strike.

The average coal price of US$202 per tonne in the second quarter was 26% lower than the same period last year. Prices in the prior year period had reached record levels due to the combination of strong demand and reduced supply of high-quality steelmaking coal on the seaborne market. Prices have been agreed with the majority of the quarterly contract customers for the third quarter of 2012 based on pricing of approximately US$225 per tonne for our highest quality product. As of the date of this release, negotiated sales are approximately 5.0 million tonnes of coal for delivery in the third quarter at an average price of US$198 per tonne for all our products. We are still in pricing discussions with some of our quarterly contract customers and our third quarter sales will depend on market conditions over the balance of the quarter. Vessel nominations for quarterly contract tonnage are determined by customers and final sales for the quarter will depend on vessels arriving at port as scheduled, as well as on the level of additional sales.

Unit cost of product sold in the second quarter before transportation and depreciation charges was $77 per tonne compared with $73 per tonne in the same period a year ago before a $7 per tonne one-time labour charge and $70 per tonne in the first quarter of this year. The higher unit costs were primarily due to increased waste stripping activities, as strip ratios increased to 11.7 in the second quarter compared with 10.6 in the second quarter of 2011. Additional waste stripping took place while the rail strike prevented any rail shipments. The 2012 annual cost of product sold is expected to fall within our current guidance range of $72 to $78 per tonne for current production plans.

Unit transportation costs increased by $4 per tonne compared with the same quarter a year ago partly due to higher port costs and increased ocean freight costs as a higher portion of our sales being made is inclusive of ocean freight. The rate under a new port services agreement for westbound coal into our primary west coast port facility increased starting in April 2012. A number of opportunities have been undertaken to utilize different coal terminals in North America as a means of supplementing capacity during the planned outages, which are required to complete expansion programs at the Vancouver terminals, and as a risk reduction measure. These include Pacific Coast Terminals in Port Moody and the Port of Quebec. The additional costs incurred to ship to these alternative locations also contributed to the higher transportation costs in the second quarter. Annual unit transportation costs are expected to remain within the range of $34 to $38 per tonne.

Depreciation and amortization decreased by $2 per tonne due to the significant increase in coal reserves recorded in 2011 as a result of our drilling program.

Execution of our coal growth strategy continued during the quarter and $57 million was invested in expansion capital, mainly related to the Quintette re-opening project, a shovel purchase at Cardinal River, pre-stripping spending that will maximize Line Creek capacity, and the Neptune Bulk Terminals expansion project.

The feasibility study for the reopening of the Quintette mine in British Columbia is progressing with completion expected in the third quarter of this year. The Mines Act Permit Amendment ("MAPA") application was submitted in April and is being reviewed with the Provincial regulators in order to comply with the newly issued draft guidelines pertaining to caribou management plans. Permit approval is not expected before the first half of 2013. First coal production could occur approximately 12 months after receipt of this permit.

Work is ongoing to develop and implement selenium management plans for each of the six operating coal mines and the Quintette project. Permitting for current and future projects will depend on acceptable selenium management plans being developed and implemented. Water treatment is being planned at three mine sites in the Elk Valley, entailing expenditures of approximately $175 million over the next three years. Construction will commence later this year at the Line Creek Operation. In addition, an extensive applied research and development program focused on the development of long-term lower-cost methods of designing mines to reduce selenium generation has been initiated. Selenium management plans are not yet complete and additional costs could be incurred which may be significant.

Neptune Bulk Terminals, of which we have a 46% ownership interest, will further expand its annual coal throughput capacity by an additional six million metric tonnes within the existing footprint. Neptune's annual coal handling capacity is currently nine million tonnes. This will be increased to 12.5 million tonnes with the addition of a second stacker reclaimer, already in the fabrication phase, in the spring of 2013. This next expansion phase is expected to take terminal capacity to 18.5 million tonnes per year. The proposed upgrades will include a second railcar dumper and associated conveying system, a new rail track within the existing rail loop, and the replacement of a ship loader and foundation reinforcement of the loading berth. The feasibility study for this expansion is expected to be completed in the third quarter.

ZINC

Trail (100%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Metal production                        
  Zinc (000's tonnes)   69.5     71.6     143.5     143.5  
  Lead (000's tonnes)   21.7     21.2     42.7     43.7  
  Silver (million ounces)   5.2     5.6     10.6     11.0  
                           
Metal sales                        
  Zinc (000's tonnes)   68.5     71.6     144.7     144.7  
  Lead (000's tonnes)   21.0     22.6     42.7     42.4  
  Silver (million ounces)   5.1     5.5     10.6     10.9  
                           
                           
Cost of sales ($ millions)                        
  Concentrates $ 254   $ 324   $ 582   $ 620  
  Operating costs $ 161   $ 93   $ 261   $ 180  
  Distribution costs $ 26   $ 25   $ 53   $ 50  
  Depreciation and amortization $ 13   $ 13   $ 25   $ 25  
                         
Gross profit (loss) summary ($ millions)                        
  Before depreciation and amortization $ (7 ) $ 79   $ 33   $ 156  
  Depreciation and amortization   (13 )   (13 )   (25 )   (25 )
After depreciation and amortization $ (20 ) $ 66   $ 8   $ 131  

Trail's second quarter gross profit before depreciation and amortization and a one-time labour charge of $51 million related to a new five-year agreement, was $44 million. This was significantly lower than the same period a year ago due mainly to lower metal prices and reduced sales volumes. Production and sales at Trail were not affected by the Canadian Pacific Railway strike.

Second quarter refined zinc production was lower than the same period a year ago as a result of planned annual maintenance shutdowns for both zinc roasters. Refined zinc production was slightly higher than sales volumes in the quarter, as inventory levels were replenished after strong sales in the first quarter of 2012 had outpaced production. Production of lead was slightly higher compared to same quarter last year due to continuing improved KIVCET feed rates. Silver production, however, did not benefit from the improved rates due to a temporary buildup of in-process inventory which is expected to be drawn down in the next quarter.

Concentrate purchase costs in the second quarter were lower than the same period a year ago, reflecting lower prices for metals, particularly silver. Operating costs, before the $51 million labour settlement charge, increased due to timing of non-routine maintenance expenses and higher costs for labour and operating supplies consistent with increased KIVCET throughput.

Construction of a new slag fuming furnace and settling furnace is scheduled to start-up in 2014 as early works activity continued with demolition and site preparation. Construction of the new acid plant remains on plan as ground-breaking commenced in June and the supply of major component equipment is on schedule for start-up targeted for late 2013.

Upper Columbia River Basin (Lake Roosevelt)

Teck American continued studies under the 2006 settlement agreement with the U.S. Environmental Protection Agency ("EPA") to conduct a remedial investigation on the Upper Columbia River in Washington State.

Discovery and motion proceedings continue in the Lake Roosevelt litigation involving Teck Metals Ltd. in the Federal District Court for the Eastern District of Washington. The first phase of the case, dealing with liability under CERCLA for cost recovery, is scheduled to be tried in September, 2012. In April, an order for summary judgement was issued, striking Teck Metals Ltd.'s defence of apportionment. We have sought leave to appeal the decision in the United States Court of Appeals for the Ninth Circuit.

There is no assurance that we will ultimately be successful in our defense of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required and damage to resources found, the cost of remediation may be material.

Red Dog (100%)

Operating results at the 100% level are summarized in the following table:

    Three months ended   Six months ended  
June 30,   June 30,  
    2012   2011   2012   2011  
                           
Tonnes milled (000's)   836     937     1,695     1,858  
                           
Zinc                        
  Grade (%)   18.8     18.6     18.3     18.7  
  Recovery (%)   82.5     81.9     83.1     82.1  
  Production (000's tonnes)   129.6     143.0     257.9     285.8  
  Sales (000's tonnes)   59.4     76.3     179.9     177.3  
                           
Lead                        
  Grade (%)   4.9     4.8     4.8     4.8  
  Recovery (%)   56.5     47.4     57.0     47.6  
  Production (000's tonnes)   23.4     21.3     46.8     42.5  
  Sales (000's tonnes)   -     -     -     -  
                           
Cost of sales (US$ millions)                        
  Operating costs $ 12   $ 17   $ 47   $ 41  
  Distribution costs $ 11   $ 14   $ 34   $ 33  
  Royalties (NANA) $ (6 ) $ 6   $ 12   $ 21  
  Depreciation and amortization $ 11   $ 10   $ 24   $ 22  
                           
Gross profit summary ($ millions)                        
  Before depreciation and amortization $ 57   $ 75   $ 134   $ 161  
  Depreciation and amortization   (11 )   (10 )   (24 )   (22 )
  After depreciation and amortization $ 46   $ 65   $ 110   $ 139  

Red Dog's gross profit declined in the second quarter as a result of lower zinc prices and a 22% decrease in zinc sales volumes.

Zinc production declined by 9% in the second quarter compared with the same period a year ago as a result of reduced mill throughput, partially offset by higher grades and recoveries. Mill throughput decreased by 11% primarily due to unplanned maintenance downtime and restricted operating rates in June, which resulted from pipe scale plugging powerhouse cooling lines and air compressors.

Zinc recovery was positively impacted by the commissioning of additional fine grinding capacity as well as enhancements to floatation technology. Lead recoveries improved due to less soluble lead in the feed from weathered, near-surface Aqqaluk ore. During the second quarter, mill feed was almost exclusively from the Aqqaluk pit compared with 60% of feed in the second quarter of 2011.

The 2012 shipping season commenced on July 12, 2012 with planned shipments of 1,000,000 tonnes of zinc concentrate and 163,000 tonnes of lead concentrate compared with 1,010,000 tonnes and 143,000 tonnes respectively, for the 2011 season.

In accordance with the agreements governing our development of the mine, the net proceeds of production royalty that we pay to NANA Development Inc. will increase to 30% in the fourth quarter of 2012 from the current 25%.

ENERGY

Fort Hills Project

Engineering studies are ongoing to update the design basis for the project and improve the accuracy of cost estimates to facilitate a project sanction decision by the partners in 2013. Suncor, operator of Fort Hills, has indicated that it is developing a cost-driven construction schedule and as a result, should the partners approve the sanction of phase one of the Fort Hills Project in 2013, production would not be expected to start before 2017.

Our share of 2012 Fort Hills spending is estimated at $220 million, including our ongoing earn-in commitments.

Frontier Project

The Frontier project has been designed for up to four production lines with a total capacity of approximately 277,000 barrels per day of bitumen. The first two production lines are planned to have a production capacity of 159,000 barrels per day. The Frontier project includes the development of Equinox as a satellite operation.

The previously announced transaction to acquire SilverBirch Energy Corporation through a plan of arrangement involving the spin out of the assets of SilverBirch, other than its 50% interest in the Frontier project and Equinox, closed on April 4, 2012. This created a simplified ownership structure for Frontier, provides an opportunity to explore new partnerships and other alternatives to move the project towards development. With this acquisition our total contingent resources, estimated as at December 31, 2011, for all of our oil sands projects increased by 67% to a total of 3.5 billion barrels of bitumen.

The Frontier project regulatory application was submitted to regulators in November 2011. Provincial and federal agencies are currently reviewing the application and compiling Supplemental Information Requests ("SIRs"). We anticipate receiving the final SIRs in the third quarter of 2012 and responding to these information requests in the fourth quarter of 2012. The Frontier project requires various provincial and federal regulatory reviews and conducting these reviews in parallel can streamline and improve the regulatory process while maintaining a thorough and rigorous review.

No field exploration activities are planned in 2012 and the focus will be on supporting the regulatory application review, consultations with stakeholders and ongoing engineering studies. There is no certainty that any portion of our contingent bitumen resources will be commercially viable.

Wintering Hills Wind Power Facility

During the first half of 2012, our share of the power generation from Wintering Hills was 49 GWhs. Expected power generation in 2012 is 80 GWhs, which will result in 50,000 tonnes of CO2 equivalent offsets.

OTHER COST AND EXPENSES

Financing expenses were $151 million in the second quarter compared with $135 million a year ago. The debt interest component of our financing expense increased from $91 million to $105 million in the quarter. The increase included $26 million of additional interest from the issuance of US$2 billion of notes in July, 2011. The effect of the higher debt was partly offset by the effect of liability management transactions implemented in the first quarter of 2012 that included the issuance of US$1 billion of new notes and the redemption of US$1.05 billion of our high-yield notes and reduced interest charges in the second quarter by $17 million. Finance charges also increased due to accretion of additional decommissioning and restoration provisions made in the third and fourth quarter of 2011.

Other operating expense, net of other income, was $107 million in the second quarter compared with $96 million of other income in the second quarter of 2011. Included in other operating expense was $84 million of negative price adjustments in the second quarter of 2012 primarily from declining copper prices. This compares with positive pricing adjustments of $6 million in the second quarter of 2011 and $94 million in the first quarter of this year. The most significant item in the second quarter of 2011 was a $110 million gain from the sale of our interest in the Carrapateena project.

The table below outlines our outstanding receivable positions, which were provisionally valued at March 2012, and our receivable positions provisionally valued at, June 30, 2012.

  Outstanding at Outstanding at
  March 31, 2012 June 30, 2012
(pounds in millions) Pounds US$/lb Pounds US$/lb
         
Copper 129 3.83 171 3.44
Zinc 146 0.91 93 0.84

Non-operating income, net of expenses, includes items that arise from financial and other matters and includes such items as foreign exchange, debt refinancing, realized gains or losses on marketable securities and gains and losses on the revaluation of fixed price call options on certain of our high-yield notes. In the second quarter of 2012, other non-operating expense was $8 million. This compares with $19 million of other income in the second quarter of 2011.

Income and resource taxes for the quarter were $147 million, or 34% of pre-tax earnings, which is higher than the Canadian statutory income tax rate of 25%. This was mainly due to the effect of resource taxes and higher tax rates in foreign jurisdictions. We are currently shielded from cash income taxes, but not resource taxes in Canada. We remain subject to cash taxes in foreign jurisdictions.

OPERATING CASH FLOW, FINANCIAL POSITION AND LIQUIDITY

Cash flow from operations, before changes in non-cash working capital items, was $725 million in the second quarter compared with $1.2 billion a year ago.

Changes in non-cash working capital items provided $43 million of cash in the second quarter compared with a use of cash of $586 million in the same period a year ago. In the second quarter of 2011, we had a substantial build-up in accounts receivable due to higher coal prices and timing of sales. In addition, production inventories rose as a result of higher cost of concentrates at Trail and timing of purchases.

Expenditures on property, plant and equipment were $404 million in the second quarter and included $198 million on sustaining capital and $206 million on major development projects. The largest components of sustaining expenditures were at our coal operations which totalled $78 million. Major development expenditures included $25 million each at Trail and Relincho, $35 million for Antamina's expansion, $33 million at the Quebrada Blanca hypogene project and $57 million at our coal operations. The expenditures at our coal operations are largely to enable us to incrementally expand production at existing operations.

In early April, we completed our acquisition of SilverBirch Energy Corporation for a net cash outlay of $432 million, which gave us full ownership of the Frontier oil sands project, including the Equinox property.

We have committed and unused bank credit facilities aggregating $1.1 billion, the majority of which mature in 2016.

OUTLOOK

We continue to experience volatile markets for our products. Commodity markets have historically been volatile, prices can change rapidly and customers can alter shipment plans. This can have a substantial impact on our business. Ongoing economic uncertainties in Europe and the United States and less robust growth rates in China, India and other emerging markets have impacted both demand and prices for some of our products. While we believe that the medium to longer term fundamentals for steelmaking coal, copper and zinc are quite favorable, the recent weakness in these markets may well persist over the near term. In the meantime, the Company's financial position is strong and we continuously monitor all aspects of our key markets as conditions evolve in order to be in a position to take whatever actions may be appropriate.

Capital Expenditures

Our forecast capital expenditures for 2012 are now expected to be approximately $2.1 billion, which is slightly lower than our previous guidance of $2.3 billion, and are summarized in the following table:

       
($ in millions) Sustaining Development Total
             
Copper $ 275 $ 835 $ 1,110
Coal   365   325   690
Zinc   165   80   245
Energy   -   70   70
Corporate   25   -   25
             
  $ 830 $ 1,310 $ 2,140

The amount and timing of actual capital expenditures is dependent upon being able to secure permits, equipment, supplies, materials and labour on a timely basis and at expected costs to enable the projects to be completed as currently anticipated. We may change capital spending plans for the balance of the year depending on commodity markets, our financial position, results of feasibility studies, and other factors.

We also expect to invest approximately $220 million as our share of costs for the Fort Hills oil sands project, including our earn-in commitments.

Foreign Exchange, Debt Revaluation and Interest Expense

The sales of our products are denominated in U.S. dollars, while a significant portion of our expenses are incurred in local currencies, particularly the Canadian dollar. Foreign exchange fluctuations can have a significant effect on our operating margins, unless such fluctuations are offset by related changes to commodity prices.

Our U.S. dollar denominated debt is subject to revaluation based on changes in the Canadian/U.S. dollar exchange rate. As at June 30, 2012, all of our U.S. dollar denominated debt is designated as a hedge against our U.S. dollar denominated foreign operations and working capital items. As a result, any foreign exchange gains or losses arising on our designated U.S. dollar debt are recorded in other comprehensive income.

FINANCIAL INSTRUMENTS AND DERIVATIVES

We hold a number of financial instruments and derivatives, the most significant of which are marketable securities, foreign exchange forward sales contracts, energy price option contracts, metal-related forward contracts, prepayment rights on certain senior debt notes and settlements receivable and payable. The financial instruments and derivatives are all recorded at fair values on our balance sheet with gains and losses in each period included in other comprehensive income and profit for the period as appropriate. Some of our gains and losses on metal-related financial instruments are affected by smelter price participation and are taken into account in determining royalties and other expenses. All are subject to varying rates of taxation depending on their nature and jurisdiction.

QUARTERLY EARNINGS AND CASH FLOW

(in millions, except for share data) 2012 2011 2010
    Q2   Q1   Q4   Q3   Q2   Q1   Q4   Q3   Q2
                                     
Revenues $ 2,561 $ 2,547 $ 2,972 $ 3,380 $ 2,796 $ 2,366 $ 2,716 $ 2,414 $ 2,198
Gross profit   735   918   1,212   1,571   1,197   897   1,127   926   848
EBITDA   790   781   1,304   1,660   1,461   1,034   1,013   921   888
Profit (note 1)   268   218   637   814   756   461   325   316   283
Earnings per share $ 0.46 $ 0.37 $ 1.08 $ 1.38 $ 1.28 $ 0.78 $ 0.55 $ 0.54 $ 0.48
Cash flow from operations $ 768 $ 644 $ 1,199   1,383   621   754   1,156   771   834
  1. Attributable to shareholders of the company.

OUTSTANDING SHARE DATA

As at July 24, 2012 there were 576,622,749 Class B subordinate voting shares and 9,353,470 Class A common shares outstanding. In addition, there were 7,016,935 director and employee stock options outstanding with exercise prices ranging between $4.15 and $58.80 per share. More information on these instruments and the terms of their conversion is set out in Note 21 of our 2011 year end financial statements.

The Toronto Stock Exchange ("TSX") has accepted our notice of intention to make a normal course issuer bid to purchase our Class B subordinate voting shares. Under the normal course issuer bid, we may purchase up to 20 million Class B subordinate voting shares during the period starting June 28, 2012 and ending on June 27, 2013, representing approximately 3.47% of the outstanding Class B subordinate voting shares, or 4.30% of the public float, as of June 15, 2012.

We will make any purchases through the facilities of the TSX, the New York Stock Exchange or any other exchanges or alternative trading systems in both Canada and the United States, if eligible, or by such other means as may be permitted under the TSX's regulations, including private agreements under an issuer bid exemption order or block purchases in accordance with the applicable regulations. Purchases made by way of private agreements under an issuer bid exemption order issued by a securities regulatory authority will be at a discount to the prevailing market price as provided in the exemption order. Daily purchases will be limited to 566,681 Class B subordinate voting shares in accordance with the TSX's rules, except pursuant to permitted exceptions. The actual number of Class B subordinate voting shares to be purchased and the timing of any such purchases will be determined by us from time to time as market conditions warrant. All repurchased shares will be cancelled. Security holders may obtain a copy of the notice of intention, without charge, by request directed to the attention of our Corporate Secretary, at our offices located at Suite 3300-550 Burrard Street, Vancouver, British Columbia, V6C 0B3.

INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. There have been no changes in our internal control over financial reporting during the quarter ended June 30, 2012 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws. All statements other than statements of historical fact are forward-looking statements. These forward-looking statements, principally under the heading "Outlook", but also elsewhere in this document, include estimates, forecasts, and statements as to management's expectations with respect to, among other things, our financial capacity necessary to fund growth projects, anticipated production at our business units and individual operations, profit and cash flow, sales volume and selling prices for our products (including settlement of coal contracts with customers), plans and expectations for our development projects, forecast operating costs, expected progress, costs and outcomes of our various projects and investments, including but not limited to those described in the discussions of our operations, the sensitivity of our earnings to changes in commodity prices and exchange rates, the impact of potential production disruptions, the impact of currency exchange rates, future trends for the company, progress in development of mineral properties, increased coal and copper production as a result of our expansion plans, timing of completion and results of our mill modernization program at Highland Valley Copper, our goals regarding the collective bargaining agreement at Antamina, expansion study at Carmen de Andacollo and expected ramp up of the pre-crushing plant, the statements under the heading "Copper Development Projects", including the expected resubmittal of the environment impact assessment for Quebrada Blanca Phase 2, the timing of permit approval, production and anticipated production levels from the Quintette coal mine, the statements under the heading "Energy" including the development of our Fort Hills, Frontier and Lease 421 Area oil sands projects, timing of final SIRs on our Frontier project and our responses thereto, capital expenditures and mine production costs, unit cost of product for coal, unit transportation costs, demand and market outlook for commodities, future commodity prices and treatment and refining charges, timing of completion of studies on our projects and the impact of measures to manage selenium discharges and costs and impacts related thereto, the timing of the construction of the new slag fuming furnace at our Trail operations. These forward-looking statements involve numerous assumptions, risks and uncertainties and actual results may vary materially.

These statements are based on a number of assumptions, including, but not limited to, assumptions regarding general business and economic conditions, interest rates, the supply and demand for, deliveries of, and the level and volatility of prices of, zinc, copper and coal and other primary metals and minerals as well as oil, and related products, the timing of the receipt of regulatory and governmental approvals for our development projects and other operations, our costs of production and production and productivity levels, as well as those of our competitors, power prices, continuing availability of water and power resources for our operations, market competition, the accuracy of our reserve estimates (including with respect to size, grade and recoverability) and the geological, operational and price assumptions on which these are based, conditions in financial markets, the future financial performance of the company, our ability to attract and retain skilled staff, our ability to procure equipment and operating supplies, positive results from the studies on our expansion projects, our coal and other product inventories, our ability to secure adequate transportation for our products, our ability to obtain permits for our operations and expansions, our ongoing relations with our employees and business partners and joint venturers. With respect to the Quebrada Blanca Phase 2, assumptions are based on receiving comments from all interested parties and our ability to address the comments in a satisfactory manner. The foregoing list of assumptions is not exhaustive. Events or circumstances could cause actual results to vary materially.

Factors that may cause actual results to vary materially include, but are not limited to, changes in commodity and power prices, changes in interest and currency exchange rates, acts of foreign governments and the outcome of legal proceedings, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, adverse weather conditions and unanticipated events related to health, safety and environmental matters), union labour disputes, political risk, social unrest, failure of customers or counterparties to perform their contractual obligations, changes in our credit ratings, unanticipated increases in costs to construct our development projects, difficulty in obtaining permits, inability to address concerns regarding permits of environmental impact assessments, and changes or further deterioration in general economic conditions.

Statements concerning future production costs or volumes, and the sensitivity of the company's earnings to changes in commodity prices and exchange rates are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labour disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in the cost of energy or supplies.

We assume no obligation to update forward-looking statements except as required under securities laws. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our Annual Information Form for the year ended December 31, 2011, filed on SEDAR and on EDGAR under cover of Form 40-F.

WEBCAST

Teck will host an Investor Conference Call to discuss its Q2/2012 financial results at 11:00 AM Eastern time, 8:00 AM Pacific time, on Wednesday, July 25, 2012. A live audio webcast of the conference call, together with supporting presentation slides, will be available at our website at www.teck.com. The webcast is also available at www.earnings.com. The webcast will be archived at www.teck.com.

Teck Resources Limited
Consolidated Statements of Income
(Unaudited)
 
  Three months ended   Six months ended  
June 30,   June 30,  
(Cdn$ in millions, except for share data) 2012   2011   2012   2011  
                         
Revenues $ 2,561   $ 2,796   $ 5,108   $ 5,162  
                         
Cost of sales   (1,826 )   (1,599 )   (3,455 )   (3,068 )
                         
Gross profit   735     1,197     1,653     2,094  
                         
Other operating expenses                        
  General and administration   (34 )   (32 )   (62 )   (62 )
  Exploration   (34 )   (23 )   (58 )   (39 )
  Research and development   (4 )   (1 )   (9 )   (8 )
  Other operating income (expense) (Note 3)   (107 )   96     (27 )   84  
                         
Profit from operations   556     1,237     1,497     2,069  
                         
Finance income   33     26     64     51  
Finance expense (Note 4)   (151 )   (135 )   (316 )   (266 )
Non-operating income (expense) (Note 5)   (8 )   19     (355 )   34  
Share of profit (losses) of associates   (1 )   2     (4 )   (1 )
Profit before tax   429     1,149     886     1,887  
                         
Provision for income and resource taxes   (147 )   (366 )   (363 )   (617 )
                         
Profit for the period $ 282   $ 783   $ 523   $ 1,270  
                         
Profit attributable to:                        
  Shareholders of the company $ 268   $ 756   $ 486   $ 1,217  
  Non-controlling interests   14     27     37     53  
                         
Profit for the period $ 282   $ 783   $ 523   $ 1,270  
                         
Earnings per share                        
  Basic $ 0.46   $ 1.28   $ 0.83   $ 2.06  
                         
  Diluted $ 0.46   $ 1.28   $ 0.83   $ 2.05  
                         
Weighted average shares outstanding (millions)   585.9     590.8     586.0     590.7  
                         
Shares outstanding at end of period (millions)   586.0     590.8     586.0     590.8  
   
Teck Resources Limited  
Consolidated Statements of Comprehensive Income  
(Unaudited)  
   
  Three months ended   Six months ended  
June 30,   June 30,  
(Cdn$ in millions) 2012   2011   2012   2011  
                         
Profit $ 282   $ 783   $ 523   $ 1,270  
                         
Other comprehensive income (loss) in the period                        
  Currency translation differences (net of taxes of $15, $(3), $(1) and $(19))   67     (14 )   21     (55 )
  Available-for-sale financial instruments (net of taxes of $17, $1, $(2) and $2)   (132 )   (24 )   10     (30 )
  Cash flow hedges (net of taxes of $nil, $nil, $nil and $1)   -     -     (1 )   (2 )
  Actuarial loss on retirement benefit obligations (net of taxes of $20, $20, $27 and $10)   (44 )   (46 )   (57 )   (22 )
                         
Total other comprehensive loss for the period   (109 )   (84 )   (27 )   (109 )
                         
Total comprehensive income for the period $ 173   $ 699   $ 496   $ 1,161  
                         
Other comprehensive income (loss) attributable to:                        
  Shareholders of the company   (111 )   (84 )   (26 )   (108 )
  Non-controlling interests   2     -     (1 )   (1 )
                         
    (109 )   (84 )   (27 )   (109 )
                         
Comprehensive income attributable to:                        
  Shareholders of the company   157     672     460     1,109  
  Non-controlling interests   16     27     36     52  
                         
  $ 173   $ 699   $ 496   $ 1,161  
                         
Teck Resources Limited  
Consolidated Statements of Cash Flows  
(Unaudited)  
   
      Three months ended
June 30,
  Six months ended
June 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
                         
Operating activities                        
  Profit $ 282   $ 783   $ 523   $ 1,270  
  Items not affecting cash                        
    Depreciation and amortization   257     230     470     446  
    Provision for deferred income and resource taxes   22     198     92     279  
    Share of loss (gain) of associates   1     (2 )   4     1  
    Gain on sale of investments and assets   (23 )   (126 )   (26 )   (136 )
    Unrealized loss (gain) on derivatives   13     2     (53 )   8  
    Foreign exchange loss (gains)   16     -     23     (10 )
    Loss on debt repurchase   -     -     414     -  
    Finance expense   151     135     316     266  
    Finance income   (33 )   (26 )   (64 )   (51 )
    Other   39     13     21     8  
        725     1,207     1,720     2,081  
  Net change in non-cash working capital items   43     (586 )   (308 )   (706 )
        768     621     1,412     1,375  
Investing activities                        
  Property, plant and equipment   (404 )   (272 )   (723 )   (498 )
  Financial investments and other assets   (41 )   (53 )   (209 )   (71 )
  Acquisition of SilverBirch Energy Corporation   (432 )   -     (432 )   -  
  Proceeds from the sale of investments and other assets   1     134     6     155  
        (876 )   (191 )   (1,358 )   (414 )
Financing activities                        
  Issuance of debt   -     -     983     -  
  Repayment of debt   (14 )   (11 )   (1,302 )   (78 )
  Debt interest paid   (93 )   (141 )   (231 )   (175 )
  Issuance of Class B subordinate voting shares   1     -     1     3  
  Purchase and cancellation of Class B subordinate voting shares   -     -     (6 )   -  
  Dividends paid   -     -     (235 )   (177 )
  Distributions to non-controlling interests   (11 )   (7 )   (17 )   (28 )
        (117 )   (159 )   (807 )   (455 )
                             
Effect of exchange rate changes on cash and cash equivalents   66     (3 )   (11 )   (24 )
Increase (decrease) in cash and cash equivalents   (159 )   268     (764 )   482  
                         
Cash and cash equivalents at beginning of period   3,800     1,046     4,405     832  
                         
Cash and cash equivalents at end of period $ 3,641   $ 1,314   $ 3,641   $ 1,314  
                             
Teck Resources Limited
Consolidated Balance Sheets
(Unaudited)
 
    June 30, December 31,
(Cdn$ in millions) 2012 2011
           
ASSETS        
           
Current assets        
  Cash and cash equivalents $ 3,641 $ 4,405
  Current income and resource taxes receivable   118   101
  Trade accounts receivable   1,148   1,242
  Inventories   1,846   1,641
      6,753   7,389
           
Financial and other assets   1,235   1,138
Investments in associates   743   715
Property, plant and equipment   23,786   23,150
Deferred income and resource tax assets   189   180
Goodwill   1,648   1,647
  $ 34,354 $ 34,219
LIABILITIES AND EQUITY        
           
Current liabilities        
  Trade accounts payable and other liabilities $ 1,324 $ 1,435
  Dividends payable (Note 6 (c))   234   235
  Current income and resource taxes payable   40   93
  Debt   343   359
           
      1,941   2,122
         
Debt   6,678   6,676
Deferred income and resource tax liabilities   5,422   5,342
Retirement benefit obligations   767   691
Other liabilities and provisions   1,406   1,495
           
Equity        
  Attributable to shareholders of the company   17,949   17,721
  Attributable to non-controlling interests   191   172
    18,140   17,893
  $ 34,354 $ 34,219
         
Teck Resources Limited  
Consolidated Statements of Changes in Equity  
(Unaudited)  
   
  Six months ended
June 30,
 
(Cdn$ in millions) 2012   2011  
               
Class A common shares $ 7   $ 7  
               
Class B subordinate voting shares            
Beginning of period   6,743     6,795  
  Share repurchases   (2 )   -  
  Issued on exercise of options   2     4  
             
End of period   6,743     6,799  
               
Retained earnings            
Beginning of period   10,858     8,840  
  Profit for the period attributable to shareholders of the company   486     1,217  
  Dividends declared   (234 )   (177 )
  Share repurchases   (4 )   -  
  Actuarial loss on retirement benefit obligations   (57 )   (22 )
             
End of period   11,049     9,858  
               
Contributed surplus            
Beginning of period   97     84  
  Share-based payment expense   7     7  
  Transfer to Class B subordinate voting shares on exercise of options   (1 )   (1 )
             
End of period   103     90  
               
Accumulated other comprehensive income (loss) attributable to shareholders of the company (Note 6(b))            
Beginning of period   16     47  
  Other comprehensive income (loss) before actuarial loss on retirement benefit obligations   31     (86 )
             
End of period   47     (39 )
             
Non-controlling interests            
Beginning of period   172     122  
  Profit for the period attributed to non-controlling interests   37     53  
  Other comprehensive loss   (1 )   (1 )
  Other   -     (3 )
  Dividends or distributions   (17 )   (28 )
             
End of period   191     143  
               
Total equity $ 18,140   $ 16,858  

The accompanying notes are an integral part of these financial statements.

Teck Resources Limited

Notes to Consolidated Financial Statements

(Unaudited)

1. BASIS OF PREPARATION

We prepare our financial statements in accordance with International Financial Reporting Standards ("IFRS") as issued by International Accounting Standards Board ("IASB"). These condensed interim consolidated financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting ("IAS 34"). These condensed interim consolidated financial statements follow the same accounting policies and methods of application as our most recent annual financial statements. Accordingly, they should be read in conjunction with our most recent annual financial statements. These condensed consolidated financial statements were approved for issue on July 24, 2012.

2. ACQUISITION

In April 2012, we completed our purchase of SilverBirch Energy Corporation ("SilverBirch") by way of a plan of arrangement for a net cash outlay of $432 million. Under the arrangement, substantially all of SilverBirch's assets, other than its 50% interest in the Frontier and Equinox oil sands projects, were transferred into SilverWillow Energy Corporation ("SilverWillow"). As part of the arrangement, we also transferred to SilverWillow our 50% interest in certain other oil sands leases that were jointly owned with SilverBirch. SilverBirch shareholders, with the exception of Teck, received $8.50 in cash and one share of a new company, SilverWillow Energy Corporation ("SilverWillow"), for each SilverBirch common share. Following completion of the purchase, we now own 100% of the Frontier and Equinox oil sands projects, as well as 4.7 million common shares (8.7%) of SilverWillow issued in connection with the arrangement.

We recorded the purchase at $493 million, which was the fair value of the consideration given up and was comprised of $415 million of cash paid to SilverBirch shareholders, $25 million in working capital contributed to SilverWillow, $12 million of oil sands leases contributed to SilverWillow, $40 million of SilverBirch shares that we owned prior to the transaction and $1 million in transactions fees.

We accounted for this transaction as an acquisition of assets and have allocated the cost to the assets based on their relative fair values at the date of purchase. No goodwill arose on this transaction. The oil sand leases acquired are recorded as exploration costs within property, plant and equipment. The shares of SilverWillow are recorded as investments in marketable securities, which are designated as available for sale financial assets and measured at fair value.

3. OTHER OPERATING INCOME (EXPENSE)

  Three months
ended June 30,
  Six months
ended June 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
                         
Gain on sale of operating assets $ 3   $ 125   $ 4   $ 130  
Commodity derivatives   (2 )   (6 )   (4 )   (13 )
Pricing adjustments (a)   (84 )   6     10     (22 )
Share-based compensation (Note 6(a))   (1 )   (10 )   (7 )   5  
Provision for closed properties   (9 )   (6 )   (8 )   (6 )
Other   (14 )   (13 )   (22 )   (10 )
                         
  $ (107 ) $ 96   $ (27 ) $ 84  

a) Pricing Adjustments

Sales and purchases of metals in concentrates and cathodes are recognized on a provisional pricing basis when title transfers and the rights and obligations of ownership pass to the customer, which usually occurs on shipment. However, the final pricing for the product sold and purchased is not determined at that time as it is contractually linked to market prices at a subsequent date. These arrangements have the characteristics of a derivative instrument as the value of our receivables and payables will vary as prices for the underlying commodities vary in the metal markets. These pricing adjustments result in gains (losses from purchases) in a rising price environment and losses (gains for purchases) in a declining price environment and are recorded as other operating income (expense). The profit impact of gains and losses on these financial instruments is mitigated by smelter price participation, royalty interests, taxes and non-controlling interests. It should be noted that while these effects arise on the sale of concentrates, we also purchase concentrates at our Trail refinery where the opposite effects occur.

4. FINANCE EXPENSE

  Three months
ended June 30,
  Six months
ended June 30,
 
(Cdn$ in millions) 2012   2011   2012   2011  
                         
Debt interest $ 105   $ 91   $ 226   $ 184  
Discount and financing fee amortization   4     6     9     11  
Pension interest accretion   24     26     49     49  
Decommissioning and restoration provision accretion   20     14     37     27  
Other   2     3     4     5  
Less capitalized interest   (4 )   (5 )   (9 )   (10 )
  $ 151   $ 135   $ 316   $ 266  

5. NON-OPERATING INCOME (EXPENSE)

  Three months
ended June 30,
  Six months
ended June 30,
(Cdn$ in millions) 2012   2011   2012   2011
                       
Foreign exchange gains (losses) $ (16 ) $ (1 ) $ (23 ) $ 8
Other derivative gains (losses)   (12 )   17     60     18
Debt repurchase and financing costs   -     -     (414 )   -
Gain on sale of investments   20     1     22     6
Other   -     2     -     2
  $ (8 ) $ 19   $ (355 ) $ 34

6. EQUITY

a) Share-Based Compensation

During the first and second quarters of 2012, we granted 1,524,821 Class B subordinate voting share options to employees. These options have a weighted average exercise price of $39.24, a term of 10 years and vest in equal amounts over three years. The weighted average fair value of Class B subordinate voting share options issued was estimated at $12.15 per share option at the grant date using the Black-Scholes option-pricing model. The option valuations were based on an average expected option life of 4 years, a risk-free interest rate of 1.38%, a dividend yield of 2.04% and an expected volatility of 43%.

During the first and second quarters of 2012, we issued 683,460 deferred and restricted share units to employees and directors. Deferred and restricted share units issued vest immediately for directors and vest in three years for employees. The total number of deferred and restricted share units outstanding at June 30, 2012 was 2,595,716.

A share-based compensation expense of $7 million (2011 - $5 million recovery) was recorded for the six months ended June 30, 2012 in respect of all outstanding share options and units.

b) Accumulated Other Comprehensive Income (Loss)

The components of accumulated other comprehensive income (loss) are:

    June 30,   December 31,  
(Cdn$ in millions) 2012   2011  
               
Currency translation adjustment $ 31   $ 10  
Unrealized gains on investments (net of tax of $(4) and $(2))   13     3  
Unrealized gains on cash flow hedges (net of tax of $nil and $nil)   -     1  
    $ 44   $ 14  
             
Accumulated other comprehensive income (loss) attributable to:            
  Shareholders of the company $ 47   $ 16  
  Non-controlling interests   (3 )   (2 )
    $ 44   $ 14  

c) Dividends of $0.40 per share were declared on our Class A common shares and Class B subordinate voting shares with a record date of June 15, 2012, and were paid on July 3, 2012.

7. SEGMENT INFORMATION

Based on the primary products we produce and our development projects, we have five reportable segments - copper, coal, zinc, energy and corporate - which is the way we report information to our Chief Executive Officer. The corporate segment includes all of our initiatives in other commodities, our corporate growth activities and groups that provide administrative, technical, financial and other support to all of our business units. Other operating expenses include general and administration costs, exploration, research and development, and other operating income (expense). Sales between segments are carried out at arm's length.

  Three months ended June 30, 2012  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
                         
Segment revenues 731   1,362   511   1   -   2,605  
Less: Inter-segment revenues -   -   (44 ) -   -   (44 )
                         
Revenues 731   1,362   467   1   -   2,561  
                         
Gross profit 255   450   30   -   -   735  
Other operating income (expenses) (88 ) -   (19 ) -   (72 ) (179 )
                         
Profit from operations 167   450   11   -   (72 ) 556  
                         
Net finance expense (2 ) (12 ) (5 ) -   (99 ) (118 )
Non-operating income (expenses) -   -   -   -   (8 ) (8 )
Share of losses of associates -   -   -   -   (1 ) (1 )
                         
Profit before tax 165   438   6   -   (180 ) 429  
                         
Capital expenditures 207   135   49   5   8   404  
                         
  Three months ended June 30, 2011  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
                         
Segment revenues 749   1,471   636   -   -   2,856  
Less: Inter-segment revenues -   -   (60 ) -   -   (60 )
                         
Revenues 749   1,471   576   -   -   2,796  
                         
Gross profit 355   709   133   -   -   1,197  
Other operating income (expenses) 106   -   2   -   (68 ) 40  
                         
Profit from operations 461   709   135   -   (68 ) 1,237  
                         
Net finance expense (2 ) (7 ) (6 ) -   (94 ) (109 )
Non-operating income (expenses) -   -   -   -   19   19  
Share of profit (loss) from associates -   -   -   2   -   2  
                         
Profit before tax 459   702   129   2   (143 ) 1,149  
                         
Capital expenditures 115   126   18   5   8   272  
                         
  Six months ended June 30, 2012  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
                         
Segment revenues 1,484   2,560   1,161   2   -   5,207  
Less: Inter-segment revenues -   -   (99 ) -   -   (99 )
                         
Revenues 1,484   2,560   1,062   2   -   5,108  
                         
Gross profit 540   990   123   -   -   1,653  
Other operating income (expenses) (30 ) (5 ) (10 ) -   (111 ) (156 )
                         
Profit from operations 510   985   113   -   (111 ) 1,497  
                         
Net finance expense (3 ) (18 ) (11 ) -   (220 ) (252 )
Non-operating income (expenses) -   -   -   -   (355 ) (355 )
Share of profit (loss) from associates -   -   -   (2 ) (2 ) (4 )
                         
Profit before tax 507   967   102   (2 ) (688 ) 886  
                         
Capital expenditures 321   280   72   37   13   723  
                         
Goodwill 446   1,202   -   -   -   1,648  
                         
Total assets 7,814   17,179   5,053   1,699   2,609   34,354  
                         
  Six months ended June 30, 2011  
(Cdn$ in millions) Copper   Coal   Zinc   Energy   Corporate   Total  
                         
Segment revenues 1,522   2,490   1,270   -   -   5,282  
Less: Inter-segment revenues -   -   (120 ) -   -   (120 )
                         
Revenues 1,522   2,490   1,150   -   -   5,162  
                         
Gross profit 753   1,065   276   -   -   2,094  
Other operating income (expenses) 78   -   (23 ) -   (80 ) (25 )
                         
Profit from operations 831   1,065   253   -   (80 ) 2,069  
                         
Net finance expense (3 ) (14 ) (10 ) -   (188 ) (215 )
Non-operating income (expenses) -   -   -   -   34   34  
Share of profit (loss) from associates -   -   -   -   (1 ) (1 )
                         
                         
Profit before tax 828   1,051   243   -   (235 ) 1,887  
                         
Capital expenditures 224   220   27   18   9   498  
                         
Goodwill 422   1,202   -   -   -   1,624  
                         
Total assets 7,040   16,705   2,881   1,083   2,156   29,865  

8. DEBT

a) Notes Issued

In February 2012, we issued US$500 million of senior unsecured notes due March 2019, and US$500 million of senior unsecured notes due March 2042. The 2019 notes bear interest at rate of 3.0% per annum and were issued at 99.705% of face value. The 2042 notes bear interest at rate of 5.20% per annum and were issued at 99.533% of face value. The 2019 and 2042 notes are callable at any time by repaying the greater of the principal amount plus accrued interest and the present value of the principal and interest amounts discounted at a comparable treasury yield plus a stipulated spread. The 2042 notes are callable at 100% at any time on or after September 1, 2041. Our obligation under these notes is guaranteed by our wholly owned subsidiary, Teck Metals Limited.

Net proceeds from these two issues were US$987 million after underwriting discounts and issue costs. The net proceeds, plus cash on hand, were used to finance the redemption described below.

b) Notes Redeemed

During the first quarter, we redeemed US$1.051 billion aggregate principal amount of outstanding notes. The notes redeemed were comprised of US$530 million of the 9.75% notes due 2014 and US$521 million of the 10.75% notes due 2019. The total payment, including the premium of the repurchase, was US$1.29 billion. We recorded an accounting charge of $414 million in the first quarter in connection with the redemption.

9. CONTINGENCIES

We consider provisions for all our outstanding and pending legal claims to be adequate. The final outcome with respect to actions outstanding or pending as at June 30, 2012, or with respect to future claims, cannot be predicted with certainty. Significant contingencies not disclosed elsewhere in the notes to our financial statements are as follows:

Upper Columbia River Basin (Lake Roosevelt)

Teck American continued studies under the 2006 settlement agreement with the U.S. Environmental Protection Agency to conduct a remedial investigation on the Upper Columbia River in Washington State.

Discovery and motion proceedings continue in the Lake Roosevelt litigation involving Teck Metals Ltd. in the Federal District Court for the Eastern District of Washington. The first phase of the case, dealing with liability under CERCLA for cost recovery, is scheduled to be tried in September, 2012. In April, an order for summary judgement was issued, striking Teck Metals Ltd.'s defence of apportionment. We have sought leave to appeal the decision in the United States Court of Appeals for the Ninth Circuit.

There is no assurance that we will ultimately be successful in our defense of the litigation or that we or our affiliates will not be faced with further liability in relation to this matter. Until the studies contemplated by the EPA settlement agreement and additional damage assessments are completed, it is not possible to estimate the extent and cost, if any, of remediation or restoration that may be required or to assess our potential liability for damages. The studies may conclude, on the basis of risk, cost, technical feasibility or other grounds, that no remediation should be undertaken. If remediation is required and damage to resources found, the cost of remediation may be material.

10. SEASONALITY OF SALES

Due to ice conditions, the port serving our Red Dog mine is normally only able to ship concentrates from July to October each year. As a result, zinc and lead concentrate sales volumes are generally higher in the third and fourth quarter of each year than in the first and second quarter.



Teck Resources Limited
Greg Waller
VP Investor Relations & Strategic Analysis
604.699.4014
or
Teck Resources Limited
Marcia Smith
SVP Sustainability and External Affairs
604.699.4616
www.teck.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Teck Resources Limited

PRODUCTEUR
CODE : TCK
ISIN : CA8787422044
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Teck est une société de production minière basée au Canada.

Teck est productrice d'argent, de charbon, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Chili, au Perou et au Salvador, en développement de projets d'argent, de cuivre, de molybdène, d'or, de plomb et de zinc au Canada, au Mexique, au Panama, en Australie et en Turquie, et détient divers projets d'exploration au Burkina Faso, au Canada, au Chili, au Honduras, au Mexique, au Perou, en Australie, en Argentine, en Chine, en Guyana et en Turquie.

Ses principaux projets en production sont HEMLO, RED DOG, DUCK POND, BOUNDARY - CARAMELIA, WILLIAMS, ELKVIEW COAL MINE (BALMER MINE), HIGHLAND VALLEY, WILLIAMS UNDERGROUND, DAVID BELL et WILLIAMS OPEN PIT au Canada, COLQUIJIRCA MINE, PEND OREILLE, ANTAMINA ZINC ORE et ANTAMINA au Perou, QUEBRADA BLANCA - HYPOGENE, HORN SILVER COMPLEX (SAN FRANCISCO), ANDACOLLO, QUEBRADA BLANCA MINE, CARMEN DE ANDACOLLO et ANDACOLLO HYPOGENE au Chili et SAN SEBASTIAN au Salvador, ses principaux projets en développement sont LENNARD SHELF et LENNARD SHELF en Australie, CERATTEPE en Turquie, EL LIMON et POGO au Mexique, GALORE CREEK au Canada et PETAQUILLA et PETAQUILLA COPPER au Panama et ses principaux projets en exploration sont PORACOTA, PICOTA et SILVER CLOUD au Perou, TAVSAN et ALTINTEPE en Turquie, AURBEL, BEACON NORTH, MAINSTREET, MERIDIAN, FUSE WEST, ADEL, MOUNT PLEASANT, PICKLE CROW, LOUVICOURT, HOMESTAKE RIDGE, GALORE CREEK - COPPER CANYON, KUDZ ZE KAYAH, FORDING RIVER, GREENHILLS, COAL MOUNTAIN, LINE CREEK, CARDINAL RIVER, SULLIVAN MINE, POLARIS MINE et AURBEL (DUMONT MINE) au Canada, LOS VERDES, MORELOS et LA VERDE PROJECT au Mexique, VREDELUS en Namibie, STONEPARK (LIMERICK) en Irlande, APOLLO HILL en Australie et TRUN en Bulgarie.

Teck est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,6 milliards US$ (17,2 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 26 juin 2020 à 10,00 US$, et son plus haut niveau récent le 14 janvier 2022 à 33,98 US$.

Teck possède 576 419 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Teck Resources Limited
05/07/2008Duluth Complex: A World-Class Value Play
31/01/2008 Comments on Red Dog and Highland Valley
Financements de Teck Resources Limited
15/07/2009Announces Closing of Private Placement
03/07/2009Announces C$1.74 Billion Private Placement
Attributions d'options de Teck Resources Limited
14/11/2012Announces 12.5% Dividend Increase
25/04/2012Announces Dividend
27/10/2011Announces 33% Dividend Increase
Nominations de Teck Resources Limited
26/07/2017Announces Appointment of Scott Maloney =?ISO-8859-1?Q?as=20V...
13/09/2013Announces Appointment of Andrew Golding =?ISO-8859-1?Q?=20as...
20/06/2013Announces Appointment of Dale Andres as =?ISO-8859-1?Q?=20Se...
20/06/2013Announces Appointment of Ian Kilgour as Executive Vice Presi...
03/04/2013Appoints New Vice President, Community and Government Relati...
09/10/2012Edward C. Dowling Appointed to Teck Board of Directors
01/06/2011Announces Retirement of General Manager, Trail Operations
01/06/2011New General Manager Appointed to Lead Teck's Trail Operation...
20/04/2011New Vice President Appointed to Lead Teck Asian Affairs
01/10/2008 Names Ray Reipas Vice President of Energy
29/06/2007Announces Appointment Of Tim Watson As Senior Vice President...
Rapports Financiers de Teck Resources Limited
27/07/2017(Port)Reports Unaudited Second Quarter Results for 2017
28/07/2016Reports Unaudited Second Quarter Results for 2016
29/06/2016Q2 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
27/04/2016Announces Dividend
26/04/2016(Port)Reports Unaudited First Quarter Results for 2016
01/04/2016Q1 2016 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
11/02/2016(Port)Reports Unaudited Fourth Quarter Results for 2015
05/01/2016Q4 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
22/10/2015(Port)Reports Unaudited Third Quarter Results for 2015
28/09/2015Q3 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/07/2015(Port)Reports Unaudited Second Quarter Results for 2015
24/06/2015Q2 2015 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
21/04/2015(Port)Reports Unaudited First Quarter Results for 2015
13/02/2014(Port)Reports Unaudited Fourth Quarter Results for 2013
20/01/2014Q4 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2013(Port)Reports Unaudited Third Quarter Results for 2013
30/09/2013Q3 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2013(Port)Reports Unaudited Second Quarter Results for 2013
27/06/2013Q2 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
23/04/2013(Port)Reports Unaudited First Quarter Results for 2013
03/04/2013Q1 2013 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
07/02/2013(Port)Reports Unaudited Fourth Quarter Results for 2012
16/01/2013Q4 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
24/10/2012(Port)Reports Unaudited Third Quarter Results for 2012
27/09/2012Q3 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/07/2012(Port)Reports Unaudited Second Quarter Results for 2012
28/06/2012Q2 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
25/04/2012(Port)Reports Unaudited First Quarter Results for 2012
28/03/2012Q1 2012 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
18/01/2012Q4 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
12/10/2011Q3 2011 Financial Results and Inves =?ISO-8859-1?Q?tors=27=2...
29/07/2011(Port)Reports Unaudited Second Quarter Results for 2011
08/02/2011Reports Unaudited Results for 2010
28/07/2010Reports Second Quarter Results for 2010
20/04/2010First Quarter Results for 2010
09/02/2010Fourth Quarter Results for 2009
13/01/2010Q4 2009 Financial Results February =?ISO-8859-1?Q?8,=202010=...
05/10/2009Q3 2009 Financial Results October 28
28/10/2009Reports Third Quarter Results for 2009
23/07/2009Reports Second Quarter Results for 2009
17/02/2009CORRECTION FROM SOURCE: Teck Reports Fourth Quarter Results ...
17/02/2009 Reports Fourth Quarter Results for 2008
23/01/2009Q4 2008 Financial Results February
24/07/2008Reports Second Quarter Results for 2008
05/07/2008Q2 2008 Financial Results July =?ISO-8859-1?Q?=2023,=202008=...
23/04/2008 Reports First Quarter Results for 2008
12/02/2008Reports Fourth Quarter Results for 2007
09/10/2007Q3 2007 Financial Results Octob =?ISO-8859-1?Q?er=2029,=2020...
31/07/2007 Reports Second Quarter Results for 2007
03/07/2007Q2 2007 Financial Results July =?ISO-8859-1?Q?=2030,=202007=...
Projets de Teck Resources Limited
19/10/2016to Acquire 100% of Teena/Reward Zinc Project
16/01/2016Alaska zinc mine sues municipality over new severance tax
07/10/20156:02 am Teck Resources enters long-term streaming agreement ...
27/08/2015Canada's Goldcorp, Teck team up to develop Chile mine projec...
22/06/2015Chile environmental regulator eyes sanctions for Teck copper...
27/04/20159:34 am Teck Resources announces acquisition of an additiona...
06/04/2015Teck Resources' Greenhills coal mine re-opens after fire
31/10/2013(Fort Hills)Announces Partners Proceeding with Fort Hills Oil Sands Proj...
09/06/2012(Port)Files Technical Report for Quebrada Blanca Phase 2 Project
07/06/2011(Carmen De Andacollo)Announces Temporary Production Interruption at Carmen de And...
15/04/2011(Carmen De Andacollo)Inaugurates New Concentrator at Carmen de Andacollo
08/04/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Operation Collective Agreement
03/04/2011(Elkview Coal Mine (balmer Mine))Announces Memorandum of Settlement Reached at its Elkview Op...
15/03/2011(Elkview Coal Mine (balmer Mine))Announces Tentative Collective Agreement at its Elkview Oper...
14/03/2011(Carrapateena)Announces Sale of Carrapateena Project
31/01/2011(Elkview Coal Mine (balmer Mine))Announces Labour Interruption at Its Elkview Operation
27/01/2011(Elkview Coal Mine (balmer Mine))Announces Elkview Strike Notice
02/07/2010(Greenhills)Provides Update on Incident
29/06/2010(Greenhills)Reports Serious Incident
24/02/2010(Line Creek)Line Creek Collective Agreement
21/01/2010(Highland Valley)! 7 Cent Jr. Hits Visible Copper Over 160 Meters Near Teck's...
15/01/2010(Red Dog)Comments on Red Dog Permit Appeal
05/01/2010(Antamina)Expansion at Antamina Mine
24/09/2009(Agi Dagi - Deli Zone) Proposed Sale of Turkish Gold Projects
13/08/2009(Andacollo)Possible Andacollo Permitting Delay
06/08/2009(Morelos)Proposed Sale of Morelos Gold Project
08/07/2009(Pogo)Closing of Pogo Sale
20/02/2009(Williams)Announces Sale of Hemlo Mines
15/12/2008(Pend Oreille) Announces Temporary Shutdown of Pend Oreille Zinc Mine
17/11/2008(Fort Hills)Fort Hills Energy Limited Partnership Defers Mine Decision U...
17/09/2008(Fort Hills Oil Sands)Fort Hills Energy Limited Partnership Releases Updated Cost ...
15/07/2008(Lennard Shelf)Lennard Shelf Operation Ceases Production
27/03/2008(Petaquilla)and Inmet Mining Announce Arrangements for Proceeding With P...
03/03/2008(Quebrada Blanca Mine) Reports New Billion Tonne Copper Resource at Quebrada Blanc...
31/12/2007(Elkview Coal Mine (balmer Mine))2007 Technical report
Communiqués de Presse de Teck Resources Limited
27/07/2017Announces Dividend
31/08/2016Teck Resources acquires 11.6% stake in Jet Gold
19/08/2016Top Analyst Upgrades and Downgrades: AK Steel, Allergan, Arc...
28/07/2016Teck Reports Unaudited Second Quarter Results for 2016
28/07/2016Teck Resources beats 2Q profit forecasts
27/07/2016Teck Announces Retirement of Vice President, Investor Relati...
06/05/2016Donates to Canadian Red Cross Fort McMurray Wildfire Relief ...
29/04/2016Reports Voting Results From Annual General Meeting
01/02/2016Freeport-McMoRan Burned Cash in 4Q15: Will 2016 Be Better?
25/01/2016Technical Coverage of Industrial Metals & Minerals Stocks --...
21/01/2016Teck Named to the Global 100 Most Sustainable Corporations L...
15/01/2016Teck Resources sues Alaska borough over tax hike
15/01/2016Teck Alaska Files Legal Complaint Over Severe Tax Hike
14/01/2016The Zacks Analyst Blog Highlights: Compañia de Minas Buenave...
05/01/2016Teck's Q4 2015 Financial Results and Investors' Conference C...
22/12/2015Teck Media and Investor Webcast Advisory - December 2, 2015
03/12/2015Teck Resources Geared Up to Face Bleak Coal Fundamentals
03/12/2015Could OPEC’s Meeting Negatively Impact Freeport-McMoRan?
02/12/2015Miner Teck says could monetize assets to raise cash if neede...
29/11/2015Teck Resources Ltd (USA) (TCK): Are Hedge Funds Right About ...
27/11/2015The 52-Week Low Club for Friday
26/11/2015Here is What Hedge Funds Think About Con-way Inc (CNW)
26/10/2015A Closer Look at Freeport-McMoRan’s 3Q15 Earnings
22/10/2015Teck Resources stock up as operating earnings outshine write...
22/10/2015Teck Resources reports 3Q loss
22/10/2015Teck Reports Unaudited Third Quarter Results for 2015
22/10/2015Teck Resources reports quarterly loss on C$2.2 bln charge
20/10/2015Teck Announces Appointment of Lawrence Watkins as Vice Presi...
12/10/2015Teck draws long-term upside play
08/10/2015After Freeport-McMoRan’s October Two-Month High, What Next?
07/10/2015Teck Announces Silver Streaming Agreement with Franco-Nevada
30/09/2015How is Rio Tinto Weathering the Copper and Coal Price Downtu...
28/09/2015Teck's Q3 2015 Financial Results and Investors' Conference C...
25/09/2015The 52-Week Low Club for Friday
20/09/2015Could Southern Copper Offer Stable Returns in Global Sell-Of...
14/09/2015Moody's cuts Teck Resources debt rating to junk
11/09/2015Capex Cut Could Help Improve Freeport-McMoRan’s Balance Shee...
10/09/2015Teck Named to Dow Jones Sustainability World Index
10/09/2015Anglo American seen likely to cut dividend as metal prices f...
01/09/2015Teck Media and Investor Webcast Advisory
28/08/2015Teck/Goldcorp to Merge Chilean Projects for Better Returns
27/08/2015Goldcorp Inc. (USA) (GG) And Teck Resources Ltd (USA) (TCK) ...
27/08/2015Goldcorp and Teck Combine El Morro and Relincho Projects in ...
19/08/2015How To Play Copper Long Term Amid A Low Prices Environment
18/08/2015The 'Elusive' Bottom Might Still Not Be In For Metals & Mini...
13/08/2015Freeport-McMoRan Continues to Trade Weakly: Investor Takeawa...
23/07/2015Miner Teck beats expectations, eyes further coal cutbacks
23/07/2015Teck Reports Unaudited Second Quarter Results for 2015
23/07/2015Teck Resources beats 2Q profit forecasts
14/07/2015Large trade bets on Teck rebound
09/07/2015Teck Announces Carmen de Andacollo Gold Stream
17/06/2015Copper Demand Takes a Hit as Car Sales Sputter in China
11/06/2015Dodge & Cox Buys 2 New Stocks
27/04/2015Chilean Refined Copper Production Falls to 2-Year Low
27/04/2015US Copper Demand Strong in Auto Sector, Appliances
27/04/2015Teck Announces Subscription to Erdene Placement
24/04/2015No Major Surprises in Freeport-McMoRan’s 1Q Earnings
24/04/2015Teck Reports Voting Results from Annual and Special Meeting
21/04/2015Teck Resources says China coal demand weakens; cuts dividend
21/04/2015CANADA STOCKS-TSX slides as resource shares drop, profit-tak...
21/04/20156:22 am Teck Resources misses by $0.06, misses on revs
21/04/2015Teck Announces Dividend
21/04/2015Teck Reports Unaudited First Quarter Results for 2015
21/04/2015Teck Resources cuts dividend by two-thirds on lower prices
17/04/2015What to Watch in the Week Ahead and on Monday, April 20
13/04/2015Gibson Energy to build 900,000 barrels of crude storage in A...
13/04/2015Teck Provides Update on Fort Hills Marketing and Logistics
05/04/2015Teck Reports Incident at Greenhills Operations
02/04/2015Why Freeport Investors Should Track China’s Automobile Indus...
02/04/2015Building Sales in China Fell Steeply in February 2015
01/04/2015Bull Market Excesses Hit the Chinese Copper Industry
01/04/2015Weakness Seen in Teck Resources (TCK): Stock Tumbles 10% - T...
01/04/2015CANADA STOCKS-TSX set to open higher
31/03/2015Movado and CBRE Group are big market movers
31/03/2015CANADA STOCKS-TSX steady as Teck decline offsets banks' rise
31/03/2015How China Became the Global Copper Giant
31/03/2015CANADA STOCKS-TSX set for lower open ahead of GDP data
31/03/2015PRESS DIGEST- Canada - March 31
25/03/2015Teck's Q1 2015 Financial Results and Investors' Conference C...
25/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
24/03/2015Ill Wind Blowing On Copper, Aluminum Producers
17/03/2015Teck Announces Appointment of Andrew Stonkus as Senior Vice ...
17/03/2015How is Freeport reacting to lower energy prices?
17/03/2015Lower energy prices a negative for Freeport-McMoRan
17/03/2015How lower copper prices impact Freeport-McMoRan
11/03/2015What part of Freeport’s financials should investors track?
10/03/2015How’s Freeport doing with its energy assets?
10/03/2015Why Freeport’s North American operations are so important
09/03/2015Freeport-McMoRan’s global mining portfolio
06/03/2015How Freeport is responding to regulatory changes in Indonesi...
06/03/2015Why asset sales won’t be easy for Freeport-McMoRan
06/03/2015An investor’s guide to Freeport-McMoRan
22/01/2014Named to the Global 100 Most Sustainable Corporations List
16/01/2014Media and Investor Audiocast Advisory
20/11/2013Announces Dividend
17/11/2013Uranium | Silver Market Review | Teck
13/11/2013Media and Investor Webcast Advisory
17/10/2013Acquires East Kootenay Lands
13/09/2013Named to Dow Jones Sustainability World Index
05/09/2013Announces Exercise of Strait Minerals Warrants
16/07/2013Copper Fox Metals and Teck Resources form Schaft Creek Joint...
26/06/2013Receives Regulatory Approval for Renewal of Share Buy-Back P...
11/06/2013Announces Subscription to Horizonte Minerals Share Placement
07/06/2013Announces Asset Exchange Agreement
07/06/2013Recognized for Corporate Citizenship and Social Responsibili...
09/05/2013Announces Subscription to True Gold Mining Share Placement
07/05/2013Media and Investor Webcast Advisory
27/04/2013(Port)Reports Voting Results from Annual General Meeting
24/04/2013Announces Dividend
16/04/2013Receives B=2EC=2E Ministry of Environment Area Based Managem...
03/04/2013UNICEF Canada and Teck Launch Partnership to =?ISO-8859-1?Q?...
20/02/2013Media and Investor Webcast Advisory
19/02/2013The Micronutrient Initiative, Government of Canada and Teck ...
23/01/2013Named to Global 100 Most Sustainable Corporations List
14/01/2013Media and Investor Webcast Advisory
09/11/2012Announces New Vice President Appointments
19/10/2012Announces Redemption of Notes
15/09/2012Named to Dow Jones Sustainability World Index
14/09/2012Announces Vice President Appointments
10/09/2012Announces Agreement as to Certain Facts in Upper Columbia Ri...
05/09/2012Media and Investor Webcast Advisory
16/08/2012Announces Subscription to Strait Minerals Share Placement
31/07/2012Announces Pricing of US$1.75 Billion Notes Offering
09/07/2012Announces Temporary Withdrawal of Quebrada Blanca Phase 2 SE...
06/07/2012(Cardinal River)Announces New Collective Agreement at Cardinal River Operati...
28/06/2012Marks Canada Day with Trans Canada Trail Investment
26/06/2012Receives Regulatory Approval for Renewal of Share Buy-Back P...
19/06/2012Announces Subscription to Horizonte Minerals Share Placement
09/06/2012Announces New Collective Agreement at Trail Operations and R...
01/06/2012Announces Tentative Collective Agreement at Trail Operations
15/05/2012=?ISO-8859-1?Q?The=20Micronutrient=20Initiative,=20Governmen...
10/05/2012Media and Investor Webcast Advisory
04/04/2012Announces Closing of SilverBirch Transaction
19/03/2012and China's Ministry of Agriculture Sign Agreement to Promot...
14/03/2012Media and Investor Advisory
23/02/2012Media and Investor Webcast Advisory
17/02/2012Announces Redemption of US$1.051 Billion Principal Amount of...
17/02/2012Announces Pricing of US$1.00 Billion Notes Offering
16/02/2012Announces Notes Offering
09/02/2012(Port)Reports Unaudited Results for 2011
08/02/2012Announces New Collective Agreement at its Quebrada Blanca Op...
27/01/2012and BASF Announce Partnership to Reduce Zinc Deficiency Thro...
18/01/2012Media and Investor Webcast Advisory
07/01/2012(Carmen De Andacollo)Announces New Collective Agreement at Carmen de Andacollo
20/12/2011Closes Strait Gold Placement
28/11/2011Media and Investor Webcast Advisory
22/09/2011(Highland Valley)Announces Major Upgrades at Trail and Highland Valley Operat...
06/09/2011Media and Investor Webcast Advisory
02/09/2011and Ridley Terminals Announce Coal Shipment Agreement
30/06/2011Announces Pricing of US$2.0 Billion Notes Offering
29/06/2011Announces Notes Offering
23/06/2011Receives Regulatory Approval for Share Buy-Back Program
20/06/2011s Coal Guidance
12/05/2011Reaches Agreement at Community Justice Forum
06/04/2011Announces Extension of its Odd Lot Selling Program
14/03/2011Announces Coal Production Guidance
04/03/2011Announces Coal Shipment Agreement with Westshore
24/02/2011Announces Odd Lot Selling Program
17/08/2010Notes Offering Closes
09/08/2010Increases Its Previously Announced Cash Tender Offer
04/08/2010Announces Pricing of US$750 Million of 7 and 30 Year Notes
16/07/2010Provides Additional Update on Greenhills Incident
21/06/2010Media & Investor Webcast Advisory
26/05/2010To Renew Debt Shelf Prospectus
20/05/2010Aqqaluk to Proceed
07/05/2010Media and Investor Webcast Advisory
22/04/2010Dividend
23/03/2010Annual Disclosure Documents
05/03/2010Waneta Dam Sale Closing
01/03/2010Confirms No Damage to Chilean Mines
17/02/2010Comments on Additional Permit Appeal at Red Dog
12/02/2010Agreement with Westshore on Coal Shipments
04/02/2010BCUC Approval of Waneta Dam Transaction
25/01/2010Closing of Andacollo Gold Royalty Transaction
08/12/2009Coal Production Guidance
23/09/2009Recognized for Outstanding Achievement in Mine Reclamation
31/07/2009Full Production at Trail and Update on Coal Sales
06/07/2009Secures Reduction in Rail Costs
25/06/2009Reports on Geotechnical Issues Identified at Highland Valley
23/06/2009Recognized for Excellence in Mine Safety and Mine Rescue & F...
22/06/2009Provides Coal Update
20/02/2009Sale of El Brocal
08/01/2009Announces Global Workforce Reduction of 13% and 2009 Coal Pr...
01/10/2008 Announces the Creation of Five Strategic Business Units and...
30/09/2008 Enters Into Definitive Credit Agreements
01/10/2008Announce Receipt of Final Order and Satisfaction of Closing ...
29/09/2008Provides Update on Financing for Fording Transaction
11/09/2008Named to Dow Jones Sustainability Index
02/08/2008Global Copper Corp=2E and Teck Cominco Limited Announce Clos...
29/07/2008Acquire Fording Canadian Coal Trust Assets
28/07/2008Global Copper Shareholders Approve Teck Cominco Transaction
11/06/2008Metals Ltd=2E and United Steelworkers Reach Contract Agreeme...
31/05/2008on Trail Incident From Teck Cominco Metals Limited
30/05/2008Statement From Teck Cominco Metals Limited
23/04/2008Announces Dividend
14/04/2008Acquire Global Copper Corp.
07/03/2008Receives Regulatory Approval For Share Buy-Back Program
08/01/2008U.S. Supreme Court Denies Teck Cominco's Petition for Review...
26/11/2007UPDATES PROGRESS AT THE ROCMEC 1 GOLD PROPERTY
21/11/2007Announces Dividend
31/10/2007 Files Shelf Prospectus
28/09/2007Completes Acquisition of Aur Resources
24/09/2007Increases Holding in Fording Canadian Coal Trust to 19.95%
20/09/2007Announces Acquisition of Additional 5% Interest in Fort Hill...
30/08/2007Commences Compulsory Acquisition of Remaining Aur Shares
22/08/2007Acquires Approximately 93% of Aur Resources Common Shares
13/08/2007European Commission Approval for Aur Resources Transaction
03/08/2007Announces Canadian Competition Approval for Aur Resources Tr...
14/07/2007Review Coroner's Inquest Jury Recommendations
03/07/2007CORRECTION FROM SOURCE: Teck Cominco Makes Friendly C$41 Per...
28/06/2007Announces Fort Hills Design Basis Approval
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
NYSE (TCK)TORONTO (TCK-B.TO)
33,98+1.01%33,57+1.60%
NYSE
US$ 33,98
14/01 16:10 0,340
1,01%
Cours préc. Ouverture
33,64 33,24
Bas haut
32,82 34,34
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  33,98 -%
Volume var. 1 mois
4 241 389 -%
24hGold TrendPower© : 22
Produit Coal - Copper - Gold - Lead - Molybdenum - Silver - Zinc
Développe Copper - Gold - Lead - Molybdenum - Silver - Zinc
Recherche Coal - Copper - Gold - Lead - Molybdenum - Silver - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202217,90%34,7828,66
202158,79%29,9217,31
20204,25%9,9410,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :