Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Forum Uranium Corp.

Publié le 18 mai 2016

Rio Tinto Exploration Canada Identifies New Zone Of Anomalous Uranium Mineralization On Forum's 40% Owned Henday Property, Athabasca Basin

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Uranium |

Rio Tinto Exploration Canada Identifies New Zone Of Anomalous Uranium Mineralization On Forum's 40% Owned Henday Property, Athabasca Basin

Vancouver, B.C., May 18, 2016 - FDC: TSX-V- Forum Uranium Corp. ('Forum') announces that Rio Tinto Exploration ('RTX') has completed a 15 hole, 5,340 metre drill program on three target areas at its 40% owned Henday Property, located northeast of Rio Tinto's Roughrider uranium deposit nearby the AREVA/Denison McClean Lake mill in Saskatchewan's Athabasca Basin. Six holes were drilled in the Hollow Lake target area, 6 holes in the Elephant target area, and 3 holes in the Epitaph target area. Whole rock assay highlights from the winter drill program are listed in Tables 1, 2 and 3 from these three target areas. A plan map with drill-hole locations is shown as Figure 1 below.

Hollow Lake: five out of six holes intersected significant alteration. One hole, 16HDY007 intersected anomalous uranium mineralization in two discrete 0.3m uranium-bearing fractures at 177.4m and 182.4m, respectively (Figure 2). Assay results indicate the fracture at 177.4m contains 523 parts per million (ppm) uranium total digestion (UTD), whereas the fracture at 182.4m contains 469ppm UTD. Both intervals are hosted in pelitic gneiss within a 20m interval of pervasive argillization, strong illite, weak hematite, and moderate to strong black chlorite alteration as well as 2.2m of elevated uranium (187--275ppm UTD, Table 2). Four holes drilled within a 200m zone of 16HDY007 have rotated bedding, quartz dissolution, and local silicification of Athabasca sandstone along with moderate to strong argillization, moderate hematite alteration and moderate to strong black chlorite alteration. These factors make the Hollow Lake area a priority target for follow-up work.

Ken Wheatley, Forum's VP of Exploration commented, 'The size and strength of the alteration intersected at the Hollow Lake target suggest that uranium bearing fluids have migrated through significant structures in the area. Further work is required to determine the control of uranium mineralization and the potential areas for where it may have been deposited. We are very pleased with the positive results and quality of work from this first pass drill campaign by our partner on this project.'

Hole ID From (m) To (m) U B As Cu Mo Ni Pb
16HDY013 153.5 154.0 0.52 946 1.27 2.13 2.92 0.65 3.92
16HDY013 154.0 154.5 0.76 1000 2.33 3.23 6.23 1.03 6.6
16HDY013 154.5 155.0 0.44 254 4.3 3.5 2.56 1.89 4.1
16HDY013 155.0 155.5 1.04 56 4.34 15.9 2.8 1.59 2.74
Sandstone results above, basement results below.
16HDY007 175.2 176.2 187 6.6 20.4 12.4 0.78 57.4 17
16HDY007 176.2 177.4 275 9.19 32 19.4 0.92 62.5 23.8
16HDY007 177.4 177.7 523 3.91 28 35.7 0.65 92.4 40.1
16HDY007 182.43 182.73 469 34.8 55.2 731 5.23 248 56.4
16HDY007 188 189 69.6 53.2 286 2160 52.2 174 612
16HDY007 191 192 102 39.2 95.6 163 6.79 103 70.3
16HDY011 260 261 48.2 1310 2210 330 240 2270 76.5
16HDY011 261 262 69.3 1190 2380 320 339 2480 112
16HDY013 198 198.5 10.2 31.5 50.7 766 18.3 49 1310
16HDY013 198.5 199 81.9 265 431 3340 442 464 1640
16HDY013 199.49 200 98 588 1180 1680 501 1320 171
16HDY013 211 212 20.4 292 1100 369 114 1170 44.9
16HDY015 322.8 323.3 150 0.82 7.57 66.1 0.78 14.8 79.2
Table 1: Highlights from the Hollow Lake target winter 2016 sandstone and basement assays. All results are reported in ppm. All elements except Boron (B) reported as partial digestion; boron reported as near total digestion.

Epitaph: all three holes contained significant faulting, illitic clay, quartz dissolution, minor red hematite alteration, and rotated bedding in the sandstone, coupled with pervasive clay with weak hematite, limonite, and black chlorite alteration in the basement. A 1.0m interval at 286.8m in hole 16HDY002 returned 214ppm UTD in graphitic pelitic gneiss. Follow-up hole 16HDY004 intersected 131ppm UTD at 256.9m in pelitic gneiss. Structural disruption and alteration of this type is favourable for uranium mineralization, and follow-up drilling is recommended.

Hole ID From (m) To (m) U B As Cu Mo Ni Pb
16HDY002 149.25 149.5 2.82 24 1.02 0.29 0.08 2.92 1.2
16HDY002 286.8 287.8 214 78.6 47.4 158 2.83 55.2 37.1
16HDY004 256.9 257.4 131 10.9 20 11.9 1.77 26.5 34.5
Table 2: Highlights from the Epitaph target winter 2016 sandstone and basement assays. All results are reported in ppm. All elements except Boron (B) reported as partial digestion; boron reported as near total digestion. Sandstone results are above the space in the table, basement results are below.

Elephant: four out of the six holes drilled contained structurally disrupted sandstone with illitic clay, local minor red hematite alteration, and quartz dissolution. Basement alteration consisted of pervasive, red hematized clay near the unconformity along with black chlorite alteration in shear zones below. Further drilling to follow up areas with uranium-associated alteration and structural disruption is also recommended.

Hole ID From (m) To (m) U B As Cu Mo Ni Pb
16HDY001 160.15 160.65 2.54 161 5.41 0.6 0.12 2.9 2.59
16HDY003 101.6 102.6 1.2 25 11.6 9.14 1.14 0.28 1.91
16HDY003 102.6 103.1 4.55 16 11.9 13.3 1.3 5.25 1.36
16HDY005 148.5 149.0 3.48 11 1.86 0.98 0.11 1.4 1.18
16HDY005 149.0 149.5 3.64 10 1.98 0.88 0.12 1.37 1.65
16HDY005 150.4 150.88 1.99 15 2.07 1.07 0.4 1.04 1.81
16HDY006 154.0 154.73 1.37 382 1.75 0.56 0.22 1.57 2.62
16HDY012 149.0 149.5 1 469 1.53 1.42 0.04 1.18 3.54
16HDY006 249.18 250.31 6.13 514 1170 11 3.98 664 9.86
Table 3: Highlights from the Elephant target winter 2016 sandstone and basement assays. All results are reported in ppm. All elements except Boron (B) reported as partial digestion; boron reported as near total digestion. Sandstone results are above the space in the table, basement results are below.

A final report from RTX including a geochemical, radiometric, and geological interpretation of the drill results and recommendations for follow-up exploration is expected in Q2 2016. Samples include both chip samples (3.8-6.0m intervals) and split core (0.3--1.0m intervals) that are taken systematically and submitted to SRC Geoanalytical Laboratories (an SSC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon, Saskatchewan for analysis. All samples are analyzed using ICP-MS for trace elements reported as partial and/or total digestion, ICP-OES for major and minor elements reported as total digestion, and fusion solution of boron by ICP-OES reported as total digestion.

[Attachment]
Figure 1: The Henday Project: Rio Tinto Exploration (Operator - 60%) / Forum Uranium Corp. (40%).

[Attachment]
Figure 2: Interpreted cross-section of drill fence at Hollow Lake on the Henday property. Yellow is sandstone, pink is felsic rock, dark green is pelitic gneiss, grey is graphitic pelitic gneiss, pale green is felsic gneiss, blue is clay alteration, dashed lines are interpreted fault intersections. Red bar plot is UTD ppm.

Ken Wheatley, P.Geo. and Forum's VP, Exploration and Qualified Person under National Instrument 43-101, has reviewed and approved the contents of this news release.

About the Henday Property

The Henday Project consists of three claims covering 7,204ha at the north-eastern side of the Athabasca Basin, Saskatchewan. The property is strategically located north-east of Rio Tinto's Roughrider uranium deposit, the Denison/AREVA Midwest Lake project and nearby McClean Lake mill, and north of Cameco/AREVA's Dawn Lake project (Figure 1).

RTX has earned a 60% interest in Henday and Forum holds a 40% interest. RTX has the right to acquire an additional 10% interest in the Henday project by funding $20 million in exploration or delivering a Feasibility Study, whichever occurs first. Funds expended on this drill program will be credited towards RTX earning their additional 10% interest in the project.

About Forum Uranium

Forum Uranium Corp. is a Canadian-based energy company with a focus on the acquisition, exploration and development of Canadian uranium projects. Forum has assembled a highly experienced team of exploration professionals with a track record of mine discoveries for unconformity-style uranium deposits in Canada. The Company has a strategy to discover near surface uranium deposits in the Athabasca Basin, Saskatchewan by exploring on its 100% owned properties and through strategic partnerships and joint ventures with Cameco, AREVA, RTX, NexGen and Uracan.

ON BEHALF OF THE BOARD OF DIRECTORS

Richard J. Mazur, P.Geo.
President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

Rick Mazur, President & CEO
Tel: 604-630-1585

Matt Terriss, Director, Corporate Affairs
Tel: 604-689-2599

Lire la suite de l'article sur www.publicnow.com

Forum Uranium Corp.

EXPLORATEUR
CODE : FDC.V
ISIN : CA3498523016
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Forum Uranium est une société d’exploration minière d'uranium basée au Canada.

Forum Uranium détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont KEY LAKE ROAD, MAURICE POINT, NORTH THELON, HENDAY, COSTIGAN LAKE et KIPAWA WEST au Canada.

Forum Uranium est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 4,1 millions CA$ (3,3 millions US$, 2,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 24 décembre 2008 à 0,03 CA$, et son plus haut niveau récent le 11 février 2011 à 7,80 CA$.

Forum Uranium possède 75 350 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Forum Uranium Corp.
09/05/2008E-vite to the NY Hard Assets Conference
Financements de Forum Uranium Corp.
21/03/2013CLOSES FINAL TRANCHE OF $2.6 MILLION PRIVATE PLACEMENT
15/02/2013INCREASES PRIVATE PLACEMENT
06/02/2013CLOSES FIRST TRANCHE OF PRIVATE PLACEMENT
07/04/2011Announces Up To $5 Million Private Placement
28/10/2009Closing of Private Placement
18/08/2009Closing of Final Tranche of Private Placement
11/08/2009Closing of The First Tranche of Its Private Placement
23/07/2009Announces $250,000 Private Placement
07/01/2009Increases Financing To $560,000 And Announces Closing Of Fir...
18/12/2008Announces $500,000 Non-Brokered Private Placement and Provid...
06/08/2008Announces Repricing Of Flow Through Share Financing
29/11/2007Announces Closing Of Final Tranche Of Private Placement
26/11/2007Announces Closing Of First Tranche Of Private Placement
01/11/2007 Announces $800,000 Private Placement
30/05/2007Closes Brokered Private Placement
Attributions d'options de Forum Uranium Corp.
04/03/2008GRANTS STOCK OPTIONS
Nominations de Forum Uranium Corp.
02/02/2011Ian Stalker Joins Forum Board of Directors
30/10/2009Appoints New Director
15/08/2007Appoints Steeves to Board of Directors
10/04/2007Former Areva Geologist, Ken Wheatley Appointed Vice Presiden...
Projets de Forum Uranium Corp.
09/05/2013Drill Results at the Northwest Athabasca JV
11/04/2013drill results
08/02/2013=E2??S COMPILATION SHOWS POTENTIAL ON ITS CLAIMS ALONG TREND...
17/01/2013STAKES CLAIMS ON TREND OF THE ALPHA=2FFISSION DISCOVERY IN T...
09/01/2013UP TO 1% U308 ENCOUNTERED IN DRILLING ON THE NORTHWEST ATHAB...
15/08/2012(Kipawa West)COMMENCES SUMMER EXPLORATION PROGRAM AT ITS KIPAWA WEST HEAV...
17/07/2012Confirms First Reported Occurrence of Eudialyte Outside of M...
09/05/2012DRILLING DISCOVERS BASEMENT=2DHOSTED URANIUM ON THE NW ATHAB...
12/04/2012ON FORUM URANIUM EXPLORATION PROGRAMS
22/02/2012RECEIVES ENCOURAGING DRILL RESULTS ON ITS AGNICO=2DEAGLE OPT...
14/02/2012RECEIVES ENCOURAGING DRILL RESULTS ON INUIT OWNED LANDS NEAR...
01/02/2012(Kipawa West)HEAVY RARE EARTH POTENTIAL ON THE KIPAWA WEST PROJECT
23/01/2012DRILL PROGRAM COMMENCES ON NORTHWEST ATHABASCA PROJECT
05/10/2011(Kipawa West)Announces Kipawa West Heavy Rare Earth Exploration Program
04/10/2011Roxgold Receives Additional High Grade Gold Intercepts from ...
10/08/2011(North Thelon)COMMENCES DRILLING ON NORTH THELON URANIUM PROJECT
14/07/2011OPTIONS RARE EARTH PROPERTY FROM AURIZON MINES
23/06/2011TO EXPLORE NUTAAQ RARE EARTH PROPERTY IN NUNAVUT
08/04/2011(Maurice Point)Commences Exploration at Maurice Bay, NW Athabasca
31/03/2011(Henday)and Hathor Complete Drill Program on the Henday Project
08/03/2011and Mega Option the Maurice Bay Uranium Deposit from Cameco
19/08/2009(Key Lake Road)Commences Summer Exploration On Key Lake Road Project
27/02/2009(Henday)Hathor Options Forum's Henday Property Northeast of the Roug...
27/01/2009(Key Lake Road)Commences Geophysics On The Key Lake Road Project
23/04/2008(Maurice Point)DRILLS INTO A MAJOR BASEMENT-HOSTED HYDROTHERMAL ALTERATION ...
21/02/2008(Maurice Point)AND MEGA COMMENCE DRILLING AT MAURICE POINT URANIUM PROJECT
24/10/2007(Key Lake Road) Commences Drilling On Key Lake Road Project,Saskatchewan
13/06/2007Follow-Up Drilling At Forum's DD Zone Intersects Widespread ...
02/04/2007(Key Lake Road)Releases Assay Results From Ongoing Key Lake Drill Program
Communiqués de Presse de Forum Uranium Corp.
05/07/2016Forum Plans Geophysics And Drilling At Clearwater Project, P...
01/06/2016Positive Geochemical Results Returned From Initial Drilling ...
25/05/2016Forum Acquires 100% Interest In The Wham Property North Of T...
18/05/2016Rio Tinto Exploration Canada Identifies New Zone Of Anomalou...
07/04/2016Drilling Confirms Potential of Strong 10KM EM Conductor on F...
25/01/2016Forum Closes Second Tranche Of $850,000 Private Placement
21/01/2016Forum Uranium: Corporate Update and 2016 Exploration Plans f...
14/01/2016Forum Increases Private Placement To $850,000
31/12/2015Forum Increases Private Placement To $750,000
29/12/2015Forum Announces First Tranche Closing of Private Placement
21/12/2015Forum Announces $500,000 Non-Brokered Private Placement
03/11/2015Forum and Rio Tinto Canada Uranium Corporation Amend Henday ...
24/08/2015Forum Announces Extension Of Warrant Term
17/07/2015Uranium Juniors That Could Be The Next Takeover Targets
20/04/2015Forum Discovers Potential New Uranium Trend on its 100% Owne...
26/02/2015Forum Commences Drilling on its 100% Owned Fir Island Projec...
26/02/2015Forum Commences Drilling on Its 100% Owned Fir Island Projec...
22/01/2015Uracan And Forum Announce Drill Results From Clearwater Prop...
22/01/2015Uracan and Forum Announce Drill Results From Clearwater Prop...
13/01/2015Reviews 2014 Highlights and 2015 Drill Plans at Patterson La...
13/01/2015Forum Reviews 2014 Highlights and 2015 Drill Plans at Patter...
10/12/2014Uracan And Forum Commence Drilling On Clearwater Property In...
10/12/2014Uracan and Forum Commence Drilling on Clearwater Property in...
28/10/2014Forum Provides North Thelon Project Update as Areva Files En...
27/08/2014Uracan and Forum Sign Definitive Option Agreement on Clearwa...
19/08/2014Forum Acquires 100% of the Karpinka Property South of the Ke...
13/08/2014Positive Drill Results from Northwest Athabasca Joint Ventur...
08/07/2014Forum Options Patterson Lake South Area Property to Uracan R...
08/07/2014Uracan options Patterson Lake South area property from Forum...
01/05/2014Forum Uranium Corp.: Drilling Confirms High Grade Intersecti...
22/10/2013Anomalous Radon Results Returned From Forum Uranium Claims a...
22/10/2013Anomalous Radon Results Returned From Forum Uranium Claims a...
17/09/2013Follow-Up Prospecting and Expanded Radon Surveys on Forum Ur...
12/09/2013James A. Hutton Appointed to Forum's Advisory Board
27/08/2013Increases Financing to $2.5 Million
20/08/2013Ground Prospecting, Radon and Geochemical Surveys Commence o...
30/07/2013Airborne Radiometric Survey Commences on Forum Uranium Claim...
17/07/2013Expands Presence in Key Lake Area of Athabasca Basin
03/07/2013News Release
13/06/2013Mentioned in the Sun News Video Interview with Mark Lackey
06/06/2013David Talbot of Dundee recommends Forum Uranium
05/06/2013REPORTS WIDE ZONE OF CONTINUOUS=2C SHALLOW URANIUM MINERALIZ...
05/06/2013Reports Wide Zone of Continuous, Shallow Uranium Mineralizat...
28/05/2013Commences Airborne Geophysical Survey on Its Claims Along Tr...
13/05/2013Dundee Capital Market Report
23/04/2013CLOSES $500=2C000 PRIVATE PLACEMENT=3B AIRBORNE SURVEY PATTE...
11/04/2013Hits =E2?=9COff Scale=E2?=9D at Zone A and 40 Metres of Radi...
10/04/2013Hits "Off Scale" at Zone A and 40 Metres of Radioactivity at...
14/01/2013Announces $2 Million Non-Brokered Private Placement
08/11/2012Shallow, High Grade Uranium Mineralization Confirmed on NW A...
29/10/2012RETAINS CHF INVESTOR RELATIONS
25/10/2012AND MEGA COMMENCE DRILL PROGRAM ON THE NORTHWEST ATHABASCA P...
19/06/2012Rio Tinto Exercises Option
22/12/2011Strategically Positioned In The Emerging Kiggavik Mining Cam...
02/12/2011Dundee Analyst Recommends Forum in Wake of Rio Tinto Takeove...
22/09/2011EXTENDS DRILL PROGRAM; STAKES MORE GROUND IN THE KIGGAVIK AR...
16/06/2011NUMEROUS DRILL TARGETS IDENTIFIED ON NW ATHABASCA PROJECT
31/05/2011Addition to Management Team
04/05/2011Closes $5.7 Million Brokered Private Placement
01/12/2010(TSX.V: FDC) featured on BNN
11/05/2010In The News - minesite.com
03/03/2010In The News - The Midas Letter
10/11/2009In The News - Forum Uranium
29/10/2009In The News - Forum Uranium
09/07/2009Commences Exploration On North Thelon Project
18/03/2009In The News - Hard Rock Analyst Recommends Accumulation of F...
04/03/2009Agreements with Nunavut Tunngavik Incorporated
02/12/2008SIGNS MOU WITH NUNAVUT TUNNGAVIK INCORPORATED FOR EXPLORATIO...
26/11/2008IDENTIFIES URANIUM POTENTIAL ON TREND FROM AREVA'S KIGGAVIK ...
09/09/2008IDENTIFIES ALTERATION ZONE WITH ANOMALOUS URANIUM GEOCHEMIST...
24/07/2008ACQUIRES 100% INTEREST IN HIGHROCK LAKE CLAIM, ATHABASCA BAS...
08/07/2008ACQUIRES 100% INTEREST IN THE NORTH THELON JV PROPERTY
18/06/2008MOBILIZES GRAVITY CREWS TO NORTH THELON JV PROPERTY
28/05/2008COMPLETES AIRBORNE SURVEY OVER TANQUERAY
27/05/2008ENGAGES DEACON & COMPANY AS CORPORATE ADVISORS
03/03/2008COMPLETES $3 MILLION FINANCING WITH AGNICO-EAGLE
06/02/2008DEFINES SEVEN PRIORITY URANIUM EXPLORATION TARGETS, NORTH TH...
15/01/2008 Mobilizes Three Drills For 13,000 Metres Drilling On Three ...
03/12/2007 Commences Drilling On Orchid Lake Project, Saskatchewan
20/11/2007Discovers Up To 1% Uranium On Tanqueray Option, Nunavut
26/09/2007Options Maurice Point Project To Mega Uranium
14/09/2007Hires European Investor Relations
10/07/2007And Superior Diamonds Commence Exploration Nearby Areva's Ki...
17/05/2007Finalizes Agreement For The Purchase Of Henday Project Near ...
07/05/2007Chief Geologist, Dr. Boen Tan Receives Outstanding Achieveme...
12/03/2007Uranium And Global Uranium Intersect 0.19% U3O8 At Orchid La...
07/03/2007Announces Stock Option Grant
20/02/2007Completes Orchid Lake Drilling; Moves To Hobo
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FDC.V)OTHER OTC (FDCFF)
0,055-8.33%0,082+2.50%
TSX-V
CA$ 0,055
26/02 15:21 -0,010
-8,33%
Cours préc. Ouverture
0,060 0,055
Bas haut
0,055 0,055
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,055 -%
Volume var. 1 mois
50 000 -%
24hGold TrendPower© : 22
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+10,53%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :