Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

International Enexco Limited

Publié le 11 août 2009

S SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | K Street | Uranium |
  Dear Subscriber, August 10, 2009  

 

INTERNATIONAL ENEXCO LIMITED

2080 - 777 Hornby Street

Vancouver, B.C.  V6Z 1S4 

August 10, 2009                                                                    Ticker Symbol:  IEC (TSX-V)

INTERNATIONAL ENEXCO UPDATES SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS

Vancouver, BC - August 10, 2009, Arnold Armstrong, President and CEO of International Enexco Ltd. (TSXV - IEC) (the "Company" or "Enexco" ) reported  details today on International Enexco's recent, current and forthcoming drill programs  including partial assay results from Enexco's Mann Lake uranium property located in the Athabasca Basin, Saskatchewan, operated by Cameco Corp.

Mann Lake Uranium Property

International Enexco has received incomplete assay results from four of the six drill holes completed in the 2009 winter Mann Lake drill program which commenced in January of this year. A total of 4,155 metres were drilled in the six holes, ranging in depth from 648 to 732 m. The Mann Lake Property is located in the eastern Athabasca Basin, approximately 25km southwest of the McArthur Mine and 20km's northeast of the Millennium deposit. Cameco Corp is the operator of the Mann Lake property (30% International Enexco, 52.5% Cameco Corp., 17.5%  AREVA.

The assays received for the first four holes in the program MN-022, 023, 024 and 025 (with assays for  MN-026 and 027 still pending) all exhibit strong boron (B) enrichment of the sandstone section above the Athabasca unconformity surface. MN-023 had a weighted average of 552 ppm boron over the entire sandstone section. International Enexco is encouraged by the discovery of high concentrations of Boron as it is typical of alteration systems associated with unconformity style uranium mineralization in the southeastern portion of the Athabasca Basin. Compared to historical statistics, holes MN-022 and 024 show relative anomalous uranium-in-sandstone concentrations. Most significantly 3.42 ppm U over the lower 126.4 m of the sandstone in hole MN-024. Spot samples of sandstone and basement faulting returned local anomalies in MN-024, including 138 ppm U and 6610 B from a basal sandstone fault, and strong anomalous boron (15,400 ppm B) associated with a basement fault gouge. An 18 m wide fault zone immediately above the unconformity contains local anomalous radioactivity (up to 250 cps, SPP2) associated with minor disseminated pitchblende. International Enexco anticipates receiving assays from the remaining two drill holes by the end  of August, 2009.

Cameco is working on the Mann Lake geophysics GoCad model and continues with interpretation of the 2009 winter drill results.  In addition to assay results from holes MN-026 and MN-027 International Enexco will announce in a future press release Cameco's next phases of planned work and drill programs set for the Mann Lake Project as and when they are received.

Hot Pot Gold Property

Phase one drilling continues at the Hot Pot Gold Property in Humbolt County, Nevada, where 991 meters have been drilled to date in 3 holes.  The property is located 6 km east of Newmont's Lone Tree Mine (5 million ounces) and 13 km north of Goldcorp's Marigold Mine (4 million ounces).  The Hot Pot Gold Property is under a joint-venture agreement between Enexco and Nevada Exploration Inc., the details of which are outlined in the Company's June 8, 2009 news release.

Hannah Gold Property

Assays are now pending on Enexco's phase one drilling on the Hannah Gold Property in Churchill County, Nevada, the results of which will be published in a forthcoming Company news release.  The Hannah Gold Property is under a joint-venture agreement with Lincoln Gold Corporation (see Enexco April 6, 2009 news release). A total of 932 meters were drilled in 5 holes in the phase one program.  Visual inspection showed at least 3 of the 5 holes encountered target host rocks with intervals of favorable alteration. 

Loomis Mountain Gold Property

Upon completing phase one drilling at the Hot Pot Gold Property, the Company will begin drilling on the Loomis Mountain Gold Property in Elko County, Nevada, where surface work programs are currently underway to refine drill targets and geology field crews are confirming previous rock chip and soil geochemical anomalies, along with structural mapping of targets.  The Loomis Mountain Gold Property is under a joint-venture agreement with Fronteer Development Group (see Fronteer June 2, 2009 news release).

Interested parties can view more information on the company's gold projects at www.enexco.ca

Contact Copper Property

The pre-feasibility study at the Company's 100% owned Contact Copper Project in northeast Nevada is near completion. The study includes an updated mineral resource estimate and will be published in a forthcoming news release.

The geological information presented herein associated with the Mann Lake Project was provided to International Enexco by Cameco Corp. and was reviewed by Mr. Mel Klohn who is a Director of International Enexco and a Qualified Person (QP) as defined by Canadian National Instrument 43-101.

The geological information presented herein associated with the Company's Nevada properties was reviewed by Dr. William Willoughby, PE who is a Director of International Enexco and a Qualified Person (QP) as defined by Canadian National Instrument 43-101

ABOUT INTERNATIONAL ENEXCO

Enexco is a Canadian based advanced exploration company headquartered in Vancouver, B.C. In addition to its 100% owned Contact Copper Resource Property, the Company is exploring other prospective areas of Nevada, and has a joint venture with Cameco Corporation (52.5%), International Enexco (30%) and AREVA. (17.5%) to jointly develop the High-Grade Mann Lake Uranium Project located in the Athabasca Basin in Saskatchewan. Cameco is operator of the Mann Lake Uranium Project.

For further information on all of Enexco's projects, visit our website at: www.enexco.ca

Paul McKenzie, Director, International Enexco Limited

Tel: (604) 669-8368 Fax: (604) 642-2629

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 



   
  Enexco.ca | Info@Enexco.ca | | r, August 10, 2009  

 

INTERNATIONAL ENEXCO LIMITED

2080 - 777 Hornby Street

Vancouver, B.C.  V6Z 1S4 

August 10, 2009                                                                    Ticker Symbol:  IEC (TSX-V)

INTERNATIONAL ENEXCO UPDATES SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS

Vancouver, BC - August 10, 2009, Arnold Armstrong, President and CEO of International Enexco Ltd. (TSXV - IEC) (the "Company" or "Enexco" ) reported  details today on International Enexco's recent, current and forthcoming drill programs  including partial assay results from Enexco's Mann Lake uranium property located in the Athabasca Basin, Saskatchewan, operated by Cameco Corp.

Mann Lake Uranium Property

International Enexco has received incomplete assay results from four of the six drill holes completed in the 2009 winter Mann Lake drill program which commenced in January of this year. A total of 4,155 metres were drilled in the six holes, ranging in depth from 648 to 732 m. The Mann Lake Property is located in the eastern Athabasca Basin, approximately 25km southwest of the McArthur Mine and 20km's northeast of the Millennium deposit. Cameco Corp is the operator of the Mann Lake property (30% International Enexco, 52.5% Cameco Corp., 17.5%  AREVA.

The assays received for the first four holes in the program MN-022, 023, 024 and 025 (with assays for  MN-026 and 027 still pending) all exhibit strong boron (B) enrichment of the sandstone section above the Athabasca unconformity surface. MN-023 had a weighted average of 552 ppm boron over the entire sandstone section. International Enexco is encouraged by the discovery of high concentrations of Boron as it is typical of alteration systems associated with unconformity style uranium mineralization in the southeastern portion of the Athabasca Basin. Compared to historical statistics, holes MN-022 and 024 show relative anomalous uranium-in-sandstone concentrations. Most significantly 3.42 ppm U over the lower 126.4 m of the sandstone in hole MN-024. Spot samples of sandstone and basement faulting returned local anomalies in MN-024, including 138 ppm U and 6610 B from a basal sandstone fault, and strong anomalous boron (15,400 ppm B) associated with a basement fault gouge. An 18 m wide fault zone immediately above the unconformity contains local anomalous radioactivity (up to 250 cps, SPP2) associated with minor disseminated pitchblende. International Enexco anticipates receiving assays from the remaining two drill holes by the end  of August, 2009.

Cameco is working on the Mann Lake geophysics GoCad model and continues with interpretation of the 2009 winter drill results.  In addition to assay results from holes MN-026 and MN-027 International Enexco will announce in a future press release Cameco's next phases of planned work and drill programs set for the Mann Lake Project as and when they are received.

Hot Pot Gold Property

Phase one drilling continues at the Hot Pot Gold Property in Humbolt County, Nevada, where 991 meters have been drilled to date in 3 holes.  The property is located 6 km east of Newmont's Lone Tree Mine (5 million ounces) and 13 km north of Goldcorp's Marigold Mine (4 million ounces).  The Hot Pot Gold Property is under a joint-venture agreement between Enexco and Nevada Exploration Inc., the details of which are outlined in the Company's June 8, 2009 news release.

Hannah Gold Property

Assays are now pending on Enexco's phase one drilling on the Hannah Gold Property in Churchill County, Nevada, the results of which will be published in a forthcoming Company news release.  The Hannah Gold Property is under a joint-venture agreement with Lincoln Gold Corporation (see Enexco April 6, 2009 news release). A total of 932 meters were drilled in 5 holes in the phase one program.  Visual inspection showed at least 3 of the 5 holes encountered target host rocks with intervals of favorable alteration. 

Loomis Mountain Gold Property

Upon completing phase one drilling at the Hot Pot Gold Property, the Company will begin drilling on the Loomis Mountain Gold Property in Elko County, Nevada, where surface work programs are currently underway to refine drill targets and geology field crews are confirming previous rock chip and soil geochemical anomalies, along with structural mapping of targets.  The Loomis Mountain Gold Property is under a joint-venture agreement with Fronteer Development Group (see Fronteer June 2, 2009 news release).

Interested parties can view more information on the company's gold projects at www.enexco.ca

Contact Copper Property

The pre-feasibility study at the Company's 100% owned Contact Copper Project in northeast Nevada is near completion. The study includes an updated mineral resource estimate and will be published in a forthcoming news release.

The geological information presented herein associated with the Mann Lake Project was provided to International Enexco by Cameco Corp. and was reviewed by Mr. Mel Klohn who is a Director of International Enexco and a Qualified Person (QP) as defined by Canadian National Instrument 43-101.

The geological information presented herein associated with the Company's Nevada properties was reviewed by Dr. William Willoughby, PE who is a Director of International Enexco and a Qualified Person (QP) as defined by Canadian National Instrument 43-101

ABOUT INTERNATIONAL ENEXCO

Enexco is a Canadian based advanced exploration company headquartered in Vancouver, B.C. In addition to its 100% owned Contact Copper Resource Property, the Company is exploring other prospective areas of Nevada, and has a joint venture with Cameco Corporation (52.5%), International Enexco (30%) and AREVA. (17.5%) to jointly develop the High-Grade Mann Lake Uranium Project located in the Athabasca Basin in Saskatchewan. Cameco is operator of the Mann Lake Uranium Project.

For further information on all of Enexco's projects, visit our website at: www.enexco.ca

Paul McKenzie, Director, International Enexco Limited

Tel: (604) 669-8368 Fax: (604) 642-2629

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 



   
  Enexco.ca | Info@Enexco.ca | | | Forward to a Friend | Update Profile
. <

International Enexco Limited

EXPLORATEUR
CODE : IEC.V
ISIN : CA45945G1072
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

International Enexco est une société développant des projet miniers de cuivre et d'uranium basée au Canada.

International Enexco détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont LOOMIS, HOT POT PROJECT, MANN LAKE, CONTACT COPPER et MANN LAKE (JV) au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de International Enexco Limited
14/02/2014Announces Non-Brokered Private Placement
Nominations de International Enexco Limited
13/07/2011Appoints Spiros Cacos
24/06/2008Appoints Two New Directors
Projets de International Enexco Limited
27/01/2014Commences $2.9 Million Drill Program on the Man Lake Uranium...
10/12/2013International Enexco Gives a Base Metal (and Uranium) Balanc...
13/11/2013(Mann Lake)Announces $2.9 Million Drill Program, on the Mann Lake Urani...
10/10/2013(Contact Copper)Files Pre-Feasibility Study for Contact Copper Project, Neva...
01/10/2013(Contact Copper)Announces Positive Pre-Feasibility Study for Contact Copper ...
25/06/2013Announces Joint Venture with Denison Mines on Bachman Lake U...
27/03/2013(Mann Lake)Reports On the Mann Lake Uranium Project, Athabasca SK
19/02/2013(Mann Lake)JV Partner Cameco Adds Third Drill Rig On the Mann Lake Uran...
08/02/2013(Mann Lake)Minesite.com Article: International Enexco Sets The Drills T...
24/01/2013INTERNATIONAL ENEXCO (TSX-V: IEC) COMMENCES $6 MILLION, THRE...
21/01/2013International Enexco Commences $6 Million, Three Rig Drill P...
21/01/2013(Mann Lake)Commences $6 Million, Three Rig Drill Program, On the Mann L...
18/09/2012International Enexco Announces Positive Metallurgical Result...
18/09/2012(Contact Copper)Announces Positive Metallurgical Results from Contact Copper...
10/09/2012(Contact Copper)Completes Drill Program at Contact Copper Project and Report...
19/03/2012International Enexco Announces Additional Drill Results from...
24/02/2012International Enexco's Shares Power Ahead, As The Contact Co...
23/02/2012(Contact Copper)MINESITE.COM: International Enexco's Shares Power Ahead, As ...
16/01/2012(Contact Copper)Drill Program Update for Contact Copper Project, Nevada
28/11/2011(Contact Copper)Commences Drilling Contact Copper Project, Nevada
27/07/2011(Contact Copper)to Acquire Properties of Allied Nevada at Contact, Nevada
09/02/2011(Contact Copper)Rising Copper Prices Favor International Enexco
17/08/2009Positive Copper Pre-Feasibility Study Received
09/02/2009(Mann Lake)Drilling at Mann Lake Underway with Cameco as Operator
07/01/2009(Mann Lake)Cameco to Commence 3rd Enexco Drill Program at Mann Lake
29/09/2008(Contact Copper)Prepares to Drill Newly Optioned Boston Claim Group
21/08/2008(Contact Copper)Pre-Feas Study to Commence at Contact - New Resource Calcula...
Communiqués de Presse de International Enexco Limited
04/11/2013Announces Drill Results From the Bachman Lake Uranium Projec...
10/10/2013Mid=2DDay Breaking News From Zenyatta and International Enex...
09/09/2013Mid=2DDay Breaking News From International Enexco=2C Miracul...
26/08/2013Mid=2DDay Breaking News From Rango Energy and International ...
26/08/2013and Denison Mines Commence Drill Program on the Bachman Lake...
10/10/2012Mid-Day Breaking News From International Enexco, Gold Reach,...
10/10/2012(Contact Copper)Announces an Increase of 49% to 1.06 Billion Pounds of Coppe...
10/10/2012Announces an Increase of 49% to 1.06 Billion Pounds of Coppe...
27/08/2012Mid-Day Breaking News From Pelangio, International Enexco, S...
27/08/2012(Contact Copper)Confirms New Copper Target at Contact Copper Project (Nevada...
20/06/2012Todd Hilditch Joins International Enexco as Director
08/06/2012RESOURCE WORLD: INTERNATIONAL ENEXCO EXPANDING PROPERTY AND ...
23/05/2012Mid-Day Breaking News From International Enexco, CardioComm,...
23/05/2012(Contact Copper)Additional Drill Results from Contact Copper Project, Nevada
10/05/2012JOIN INTERNATIONAL ENEXCO LTD. AT THE 2012 NEW YORK HARD ASS...
26/04/2012Mid-Day Breaking News From International Enexco and Canada R...
19/03/2012(Contact Copper)Announces Additional Drill Results From Contact Copper Proje...
01/03/2012Mid-Day Breaking News From Mirasol, Novadx, Zimtu, Internati...
01/03/2012(Mann Lake)Announces Winter Geophysical Survey Planned at Mann Lake, Sa...
16/01/2012Mid-Day Breaking News From El Ni=F1o Ventures and Internatio...
28/11/2011Mid-Day Breaking News From El Nino, Millrock, Golden Touch, ...
11/07/2011Former Nevada Governor Jim Gibbons Joins International Enex...
01/12/2010President's Letter International Enexco
02/06/2010REPORTS 161% INCREASE IN MINEABLE COPPER AND 20.2% IRR, IN U...
11/08/2009S SHAREHOLDERS ON MULTIPLE DRILL PROGRAMS
09/06/2009signs JV with Nevada Exploration Inc.
02/06/2009has entered into an option agreement with Fronteer Developme...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (IEC.V)Other OTC (IEXCF)
0,410+0.00%0,3700
TSX-V
CA$ 0,410
10/06 15:54 -
0%
Cours préc. Ouverture
0,410 0,440
Bas haut
0,410 0,440
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,410 -%
Volume var. 1 mois
33 100 -%
24hGold TrendPower© : 2
Produit
Développe
Recherche Copper - Gold - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,36%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+5,26%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :