DENVER & PERTH, Australia--(BUSINESS WIRE)--
Samson Oil & Gas Limited (ASX: SSN; NYSE MKT: SSN):
TOTAL COMPANY PRODUCTION
Samson net production for 2014 is as follows:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
JAN
|
|
FEB
|
|
MARCH
|
|
APRIL
|
|
MAY
|
|
JUNE
|
|
JULY
|
|
OIL, BO
|
|
5,767
|
|
12,180
|
|
11,154
|
|
15,775
|
|
16,654
|
|
17,943
|
|
17,310
|
|
GAS, MCF
|
|
16,323
|
|
17,016
|
|
13,067
|
|
11,345
|
|
10,720
|
|
17,911
|
|
17,820
|
|
BOE
|
|
8,487
|
|
15,016
|
|
13,332
|
|
17,666
|
|
18,440
|
|
20,928
|
|
20,280
|
|
BOEPD
|
|
273
|
|
536
|
|
430
|
|
589
|
|
595
|
|
698
|
|
654
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NORTH STOCKYARD PROJECT, WILLIAMS COUNTY, NORTH DAKOTA
The infill development plan for North Stockyard consists of 8 middle
Bakken wells that have been drilled and 22 Three Forks wells. The Three
Forks wells consist of 8 First Bench Three Forks wells, 6 Second Bench
Three Forks wells, and 8 Third Bench Three Forks wells. For ease of
reference, the current status of each well is set out below with
separate tables for each drill pad:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOFTE 1 PAD
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Billabong
2-13-14HBK
|
|
6,147 ft.
|
|
Bakken
|
|
Work Over Completed
|
|
NA
|
|
NA
|
|
NA
|
|
Sail and Anchor 4-13-14HBK
|
|
6,375 ft.
|
|
Bakken
|
|
Flowing
|
|
1,323
|
|
205
|
|
57,669
|
|
Blackdog
3-13-14 HBK
|
|
8,383 ft.
|
|
Bakken
|
|
Flowing
|
|
1,995
|
|
554
|
|
109,878
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOFTE 2 PAD
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Tooheys
4-15-14HBK
|
|
6,740 ft.
|
|
Bakken
|
|
Shut in for Bootleg 4&5 fracks
|
|
1,078
|
|
SI
|
|
58,452
|
|
Coopers
2-15-14HBK
|
|
6,360 ft.
|
|
Bakken
|
|
Shut in for Bootleg 4&5 fracks
|
|
556
|
|
SI
|
|
47,064
|
|
Little Creature
3-15-14HBK
|
|
7,578 ft.
|
|
Bakken
|
|
Shut in for Bootleg 4&5 fracks
|
|
501
|
|
SI
|
|
72,284
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MATILDA BAY PAD
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Matilda Bay
2-15-HBK
|
|
4,215 ft.
|
|
Bakken
|
|
Shut in for Bootleg 4 frack
|
|
1117
|
|
SI
|
|
21,868
|
|
Matilda Bay
1-15-HBK
|
|
4,215 ft.
|
|
Bakken
|
|
Shut in for Bootleg 4 frack
|
|
318
|
|
SI
|
|
1,100
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TF NORTH PAD
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Bootleg
4-14-15TFH
|
|
7,211 ft.
|
|
Three Forks 1
|
|
Frac underway
|
|
NA
|
|
NA
|
|
NA
|
|
Bootleg
5-14-15TFH
|
|
7,495 ft.
|
|
Three Forks 1
|
|
Frac completed
|
|
NA
|
|
NA
|
|
NA
|
|
Ironbank
4-14-13TFH
|
|
7,466 ft.
|
|
Three Forks 1
|
|
APD approved
|
|
NA
|
|
NA
|
|
NA
|
|
Ironbank
5-14-13TFH
|
|
7,495 ft.
|
|
Three Forks 1
|
|
APD approved
|
|
NA
|
|
NA
|
|
NA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TF SOUTH PAD
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Bootleg
6-14-15TFH
|
|
6,867 ft.
|
|
Three Forks 1
|
|
Drilling completed
|
|
NA
|
|
NA
|
|
NA
|
|
Bootleg
7-14-15TFH
|
|
6,973 ft.
|
|
Three Forks 1
|
|
Drilling completed
|
|
NA
|
|
NA
|
|
NA
|
|
Bootleg
8-14-15TFH
|
|
6,771 ft.
|
|
Three Forks 2
|
|
Drilling
|
|
NA
|
|
NA
|
|
NA
|
|
Ironbank
6-14-13TFH
|
|
7,434 ft.
|
|
Three Forks 1
|
|
APD approved
|
|
NA
|
|
NA
|
|
NA
|
|
Ironbank
7-14-13TFH
|
|
7,458 ft.
|
|
Three Forks 1
|
|
APD approved
|
|
NA
|
|
NA
|
|
NA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
#The Avg. Daily rate is an average of the last week’s production or
the average after the well was put back into production.
|
BO: Barrels of oil
|
BOE: Barrels of oil equivalent (gas converted at its heating value)
|
BOPD: Barrels of oil per day
|
MCF: Thousand cubic feet
|
BOEPD: Barrels of oil equivalent per day
|
NA: Not available
|
APD: Application for Permit to Drill
|
IP Rate: Gross first 24 hour oil rate
|
Current rate BOPD: Barrels of Oil per Day
|
Cum to Date: Cumulative gross BO
|
COMMENTARY
Frontier Rig 24 has set and cemented the 9-5/8 inch surface casing on
the Bootleg 8-14-15TF2H. Presently, the intermediate section of the
wellbore is being drilled at depth of 10,397 feet.
Bootleg 8 is the first well in the North Stockyard field to target the
Second Bench of the Three Forks. Spacing approval has been received for
a total of 22 wells in the Three Forks Formation and therefore will
maintain a development drilling program over the forthcoming 2 years
within the North Stockyard Field.
The Bootleg 5-14-15TFH frack has been completed. A total of 35 stages
were successfully completed with 8.15 million pounds of sand placed. The
Bootleg 4-14-15TFH frack is underway and the plan is to fracture
stimulate 28 stages with a total of 4.5 million pounds of sand.
A rig is on site repairing the liner on the Matilda Bay 1, but the
operation has been temporarily suspended to shut-in the well for the
Bootleg 4 and 5 fracks. Following the fracture stimulation the work–over
will reconvene.
The Matilda Bay 2 is currently shut-in for the Bootleg 4 and 5 fracks.
Samson’s working interest and its net revenue interest for the North
Stockyard Project is set out in the following table:
|
|
|
|
|
|
Well
|
|
Working interest
|
|
Net revenue Interest
|
|
Billabong 2-13-14HBK
|
|
28.77220%
|
|
22.01073%
|
|
Sail and Anchor 4-13-14HBK
|
|
25.028509%
|
|
19.146809%
|
|
Blackdog 3-13-14H
|
|
24.863526%
|
|
19.020597%
|
|
Tooheys 4-15-14HBK
|
|
28.232033%
|
|
21.597505%
|
|
Coopers 2-15-14HBK
|
|
28.232033%
|
|
21.597505%
|
|
Little Creature 3-15-14H
|
|
27.759719%
|
|
21.236185%
|
|
Matilda Bay 2-15-H
|
|
32.972255%
|
|
25.223775%
|
|
Matilda Bay 1-15-H
|
|
32.972255%
|
|
25.223775%
|
|
Bootleg 4-14-15TFH
|
|
28.386344%
|
|
21.715553%
|
|
Bootleg 5-14-15TFH
|
|
28.386344%
|
|
21.715553%
|
|
Ironbank 4-14-13TFH
|
|
26.746521%
|
|
20.461089%
|
|
Ironbank 7-14-13TFH
|
|
26.746521%
|
|
20.461089%
|
|
Bootleg 6-14-15TFH*
|
|
28.386344%
|
|
21.715553%
|
|
Bootleg 7-14-15TFH*
|
|
28.386344%
|
|
21.715553%
|
|
Ironbank 6-14-13TFH*
|
|
26.746521%
|
|
20.461089%
|
|
Ironbank 7-14-13TFH*
|
|
26.746521%
|
|
20.461089%
|
|
|
|
|
|
|
|
* Wells have yet to be elected by Samson and therefore are
subject to change.
HAWK SPRINGS PROJECT, GOSHEN COUNTY, WYOMING
Bluff 1-11 (SSN 25%)
Planning has been completed to test the Permian Hartville 9500’ sand.
The majority of the joint venture has agreed to the test. Samson has
secured a drilling rig for this operation and will contract the rig once
the joint venture documentation is completed. The test zone appears from
log interpretation to be saturated with gas in a reservoir quality
sandstone. Pressure data obtained whilst controlling a gas kick after
this zone was drilled suggests the zone may be productive. The
motivation to conduct a flow test is to obtain further gas samples and
to determine whether the data obtained thus far proves that a trap
exists and the extent (if any) of an oil column beneath the gas cap.
RAINBOW PROJECT, WILLIAMS COUNTY, NORTH DAKOTA
Gladys 1-20H (SSN 23%)
The Gladys 1-20 H well has been drilled by Continental Resources to a
total depth of 19,994 feet. The well is a 1,280 acre lateral
(approximately 10,000 feet) in the middle member of the Bakken Formation.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Lateral length
|
|
Objective
|
|
Status
|
|
IP rate BOPD
|
|
Avg. Rate BOPD#
|
|
Cum to Date BO
|
|
Gladys 1-20H
|
|
9,558 ft.
|
|
Middle Bakken
|
|
Frack underway
|
|
NA
|
|
NA
|
|
NA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Gladys 1-20 fracture stimulation is currently underway and estimated
planned 200,000 pounds of sand will be pumped per stage. Currently 16
stages of the planned 40 stages have been completed. This stimulation
design follows the industry trend of “more is better” in terms of the
proppant volume placed, and this frack job is expected to comprise a
total of 8 million pounds of proppant.
Samson’s Ordinary Shares are traded on the Australian Securities
Exchange under the symbol "SSN." Samson's American Depository Shares
(ADSs) are traded on the New York Stock Exchange MKT under the symbol
"SSN." Each ADS represents 20 fully paid Ordinary Shares of Samson.
Samson has a total of 2,837 million ordinary shares issued and
outstanding (including 230 million options exercisable at AUD 3.8
cents), which would be the equivalent of 141.85 million ADSs.
Accordingly, based on the NYSE MKT closing price of US$0.40 per ADS on
Aug 18th, 2014, the Company has a current market capitalization of
approximately US$59.31 million (the options have been valued at an
exchange rate of 0.9326). Correspondingly, based on the ASX closing
price of A$0.022 for ordinary shares and a closing price of A$0.012 for
the 2017 options, on Aug 18th, 2014, the Company has a current market
capitalization of approximately A$65.17 million.
SAMSON OIL & GAS LIMITED
|
|
TERRY BARR
|
Managing Director
|
Statements made in this press release that are not historical facts may
be forward-looking statements, including but not limited to statements
using words like “may”, “believe”, “expect”, “anticipate”, “should” or
“will.” Actual results may differ materially from those projected in any
forward-looking statement. There are a number of important factors that
could cause actual results to differ materially from those anticipated
or estimated by any forward-looking information, including uncertainties
inherent in estimating the methods, timing and results of exploration
activities. A description of the risks and uncertainties that are
generally attendant to Samson and its industry, as well as other factors
that could affect Samson’s financial results, are included in the
prospectus and prospectus supplement for its recent Rights Offering as
well as the Company's report to the U.S. Securities and Exchange
Commission on Form 10-K, which are available at www.sec.gov/edgar/searchedgar/webusers.htm.