Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Serabi Gold Plc

Publié le 08 octobre 2013

Serabi Gold plc : Drilling at Sao Chico returns further excellent high grade gold results of more th

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Precious Metals | Report | Zinc |
   

Published: 08:00 CEST 08-10-2013 /Thomson Reuters /Source: Serabi Gold plc /XLON: SRB /ISIN: GB00B4T0YL77

Serabi Gold plc : Drilling at Sao Chico returns further excellent high grade gold results of more than 100g/t

For immediate release

8 October 2013

Serabi Gold plc

("Serabi" or the "Company")

Drilling at Sao Chico returns further excellent high grade gold results of more than 100g/t

 

Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian focused gold exploration and development company, today announces the remaining results from its infill and step-out definition drilling programme at its Sao Chico gold deposit in the Tapajos Province, Para State, Brazil.  

[A PDF version of this release including pictures can be accessed using the following link - http://hugin.info/137617/R/1734141/580777.pdf

 

Highlights

 

  • High-grade gold intersections (including 114.74 g/t and 175.19 g/t) confirm a consistent high grade zone within the Main Vein.   

  • Strike length of Main Vein has now more than doubled. 

  • Structural continuity now confirmed over 350 metres. 

  • Potential for further significant strike and depth extension remains, particularly to the west. 

 

 

Mike Hodgson CEO said "These results continue to show the excellent potential of Sao Chico.  The overall programme has to date more than doubled the original 150 metre strike length, and following the first holes drilled (c.f press release 3 September 2013), the possibility of this strike length becoming substantially larger is a real possibility.  This latest set of results includes three very high grade intersections all exceeding 100g/t gold, and their location really opens up the possibility of the high grade ore zones extending at depth.  As well as potentially significantly enhancing the resource at Sao Chico we are increasing our understanding of the deposit and we are now preparing all the necessary submissions to the authorities for the conversion of the trial mining license to a full mining licence.

 

Meanwhile Palito, our main asset continues to move steadily towards production.  Mining is well underway, both ore being produced from stopes and through continuing mine development and a healthy high grade stockpile is being established.  The primary crushing plant is already operational, and rehabilitation of the milling, gravity and flotation sections is proceeding according to plan.  We remain confident the plant will be commissioned before year end. Once completed, we can begin to process stockpiled Palito ore and focus on our plans to grow future production".

 

A twenty-one (21) hole infill and step-out definition drill programme that commenced in June 2013, targeting the high grade Main Vein at the Sao Chico Project has now been completed.  The results from the first 11 of these 21 holes were released on 9 September 2013 and the remaining 10 holes have continued to return a series of high grade gold intersections.  The drilling intercepted a continuous zone of alteration and quartz sulphide veins beneath and along strike from the previous 3,200 metre resource drilling conducted by Kenai Resources Limited in 2011.  

The Main Vein reports strong lead and zinc analyses which assist in the interpretation of the mineralised zone. Where lower gold grades are returned from the main vein zone, the supporting base metal analyses confirm and support the continuity of the structure and the interpretation.

 

Drilling continues further exploration on the nearby Highway Vein prospect and also investigating target areas generated from the ongoing IP survey over the exploration tenement.

 

Long section looking north of the Main Vein at Sao Chico showing drill intercepts

Please click on the following link to access the diagram - http://hugin.info/137617/R/1734141/580778.png

 

 

 

Intercepts are tabled below;

 

Hole

East (UTM)

North (UTM)

RL (m)

Depth (mdh)

Dip/Azm

From (m)

To

(m)

Interval (m)

Au

(ppm)

Pb

(ppm)

Zn

(ppm)

13-SC-041

613855

9290285

281

245.7

-60/15

163.70

165.70

2.00

114.74

ADL

ADL

 

 

 

 

 

including

163.70

164.70

1.00

200.44

ADL

ADL

 

 

 

 

 

 

198.70

199.70

1.00

0.96

34

70

 

 

 

 

 

 

201.70

203.70

2.00

3.69

4,848

3,063

 

 

 

 

 

including

202.70

203.70

1.00

6.585

2,649

3,661

13-SC-043

614022

9290275

274

155.2

-60/20

96.00

97.00

1.00

5.15

1,328

785

13-SC-044

614100

9290240

276

201.7

-60/20

56.80

57.80

1.00

0.55

150

174

13-SC-045

614010

9290212

286

252

-60/20

200.55

201.55

1.00

0.59

528

31

 

 

 

 

 

 

209.55

210.55

1.00

0.53

30

49

13-SC-046

613990

9290300

270

114.85

-60/20

86.10

86.90

0.80

0.52

1,591

466

 

 

 

 

 

 

92.50

93.30

0.80

2.89

993

144

13-SC-047

613960

9290210

292

283.35

-60/15

167.50

168.15

0.65

4.93

1,235

649

 

 

 

 

 

 

235.75

237.55

1.80

175.19

37,497

35,303

 

 

 

 

 

including

236.35

236.95

0.60

452.11

ADL

ADL

13-SC-048

613900

9290270

285

249.05

-65/15

183.70

184.20

0.50

1.81

4145

ADL

 

 

 

 

 

 

192.00

194.00

2.00

1.79

5,769

9,393

13-SC-049

613920

9290220

294

294

-58/15

112.30

226.90

113.00

227.90

0.70

1.00

103.63

0.33

ADL

3,594

2,588

3,503

Note:                 All assays were prepared and analysed by SGS Geosol laboratory in Belo Horizonte using a 30gm Fire Assay with an AAS analysis. Assay intercepts are calculated based on a minimum weighted average grade of 0.5g/t Au using a 0.5g/t Au weighted average lower cut.  High Grade intercepts are calculated based on a minimum weighted average grade of 3.0/t Au using a 3.0g/t Au weighted average lower cut.  ADL refers to "Above Detection Limit".

Results from drill holes 13-SC-42 and 13-SC-50 are not included in the above table as reported results are below the 0.5g/t cut-off

 

 

 

About Sao Chico

 

The Sao Chico gold project was acquired by Serabi in July 2013.  It comprises a single exploration permit, AP12836 with an area of 1,416 hectares, located approximately 23 kilometres to the south west of the Palito mine and accessed by road from Palito along the Transgarimpeiro Highway via the town of Jardim do Ouro.

On October 15, 2012, a Technical Report was filed entitled "Mineral Resource Estimate on the Sao Chico Gold Project, Brazil" dated October 15, 2012 and authored by Mr A.J. Tunningley, MGEOL (Hons), MAusIMM (CP), MSEG, and Mr B. Ackroyd, BSc (Geo), MAIG in accordance with Canadian National Instrument 43-101 relating to the Sao Chico gold project ("the Sao Chico Technical Report").  The Sao Chico Technical Report has been reviewed on behalf of Serabi by Michael J Hodgson, a Qualified Person for the purposes of Canadian National Instrument 43-101.  To the best of Serabi's knowledge and belief, there is no new material scientific or technical information that would adversely affect the disclosure of the mineral resources in the Sao Chico Technical Report.

The Sao Chico Technical Report established an independent mineral resource based on the results of 22 diamond drill holes totalling 3,268 metres undertaken by Kenai Resources Limited in late 2011.  The NI 43-101 mineral resources are as follows:

 

 

Tonnes

Grade Au g/t

Ounces

 

 

 

 

Measured Resources

5,064

32.46

5,269

Indicated Resources

21,423

29.14

20,006

Total Measured and Indicated Resources

26,487

29.77

25,275

 

 

 

 

Inferred Resources

85,577

26.03

71,385

 

Metallurgical test-work has demonstrated the mineralisation at Sao Chico to be amenable to a variety of process routes including cyanidation leaching, gravity separation and flotation, with gold recoveries being reported of up to 99%.  All of these potential process routes can be accommodated at the Palito processing operation.

The main area of focus for the Sao Chico project is an area of some 200 artisanal workings, close to the Sao Chico village, in the form of shallow pits and shafts.  The current resources are identified in three vein structures namely the Main Vein, the Parallel Vein and the Highway Vein covering a strike length of some 600 metres.  Artisanal activity at the Main Vein includes a shaft extending some 18 metres below surface giving access to a 58 metre long exploration drive.

The Sao Chico Technical Report provides the following information:

  • The Main Vein comprises a gold-rich quartz/sulphide lens striking over 100 metres and with true widths between 0.9 metres and 2.9 metres wide.   

  • The lens is open along strike to the east and down dip to the west.   

  • The Parallel Vein is located 60 metres south of the Main Vein and has been defined over a strike length of 80 metres and to a depth of 75 metres, dipping steeply to the south.   

  • Surface workings in the form of small open pits exist 350 metres along strike from the known mineralisation at the Main Vein.  

  • Previous trenching has yielded high grades in this area which has not been thoroughly drill tested. 

 

 

Enquiries:

 

Serabi Gold plc

 

Michael Hodgson

Tel: +44 (0)20 7246 6830

Chief Executive

Mobile: +44 (0)7799 473621

 

 

Clive Line

Tel: +44 (0)20 7246 6830

Finance Director

Mobile: +44 (0)7710 151692

 

 

Email: contact@serabigold.com

 

Website:  www.serabigold.com

 

 

 

Beaumont Cornish Limited

Nominated Adviser

 

Roland Cornish

Tel: +44 (0)20 7628 3396

Michael Cornish

Tel: +44 (0)20 7628 3396

 

 

Peel Hunt LLP

UK Broker

 

Matthew Armitt

Tel: +44 (0)20 7418 9000

Andy Crossley

Tel: +44 (0)20 7418 9000

 

 

Blythe Weigh Communications Ltd

Public Relations

 

Tim Blythe

Tel: +44 (0)20 7138 3204

Mobile: +44 7816 924626

Halimah Hussain

Tel: +44 (0)20 7138 3203

Mobile: +44 7725 978141

Copies of this release are available from the Company's website at www.serabigold.com.

Forward-looking statements

Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identfied by their use of terms and phrases such as ''believe'', ''could'', "should" ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

 

Qualified Persons Statement

The scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 25 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognizing him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

 

Quality Assurance and Quality Control Procedures Disclosure

The Company has implemented and maintains a Serabi quality assurance/quality control (QA/QC) protocol at its JDO Project as defined in its "NI 43-101 Preliminary Economic Assessment  for the Jardim Do Ouro Project, Para State, Brazil" dated 28 June 2012. This ensures best industry practice in sampling and analysis of exploration and resource definition samples. The insertion of field duplicates, certified standards and blank samples into the sample stream form part of the Serabi procedure (these act as an independent check on contamination, precision and accuracy in the analytical laboratory).

 

Assay results are reported once rigorous QAQC procedures have been approved

 

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this news release.

 

 

GLOSSARY OF TERMS

The following is a glossary of technical terms:

 "Au" means gold.

 "assay" in economic geology, means to analyze the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.

"grade" is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb).

"g/t" means grams per tonne.

 "indicated mineral resource" is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

"inferred mineral resource" is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity.  The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

 "measured mineral resource" is that part of a mineral resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit.  The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

"mineral resource" is a concentration or occurrence of diamonds, natural solid inorganic material or natural fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge.

 "NI 43-101" means Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

"Pb" means Lead.

 "Vein" is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.

"Zn" means Zinc.



PDF of Press Release
Long Section Looking North



This announcement is distributed by Thomson Reuters on behalf of Thomson Reuters clients. Source: Serabi Gold plc, 66 Lincoln's Inn Fields, London WC2A 3LH, UK
If you would like to unsubscribe and stop receiving these e-mails click .

.

Serabi Gold Plc

PRODUCTEUR
CODE : SRB.L
ISIN : GB00B4T0YL77
CUSIP : 00B074J639
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Serabi Gold est une société de production minière d'or basée au Royaume-Uni.

Serabi Gold détient divers projets d'exploration au Bresil.

Son principal projet en production est PALITO au Bresil et ses principaux projets en exploration sont TAPAJOS - MODELO, JARDIM DO OURO, TAPAJOS - PIZON et PIAUI STRKE LENGTH au Bresil.

Serabi Gold est cotée au Royaume-Uni, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 44,9 milliards GBX (52,1 milliards US$, 48,9 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 31 octobre 2008 à 0,25 GBX, et son plus haut niveau récent le 31 décembre 2020 à 99,55 GBX.

Serabi Gold possède 700 843 570 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Serabi Gold Plc
01/07/2009- Investor Presentations
24/04/2008Corporate presentation 2008
05/04/2006Corporate presentation
Rapports annuels de Serabi Gold Plc
Notice of AGM and publication of Annual Report and Accounts
Financements de Serabi Gold Plc
30/03/2011 Completion of TSX Listing,C$4.95 million funding and Board ...
28/03/2011- Filing of Final Prospectus, C$4.95 million financing and B...
11/02/2011Filing of Preliminary Prospectus in Canada
Attributions d'options de Serabi Gold Plc
31/05/2011Awards 1.130.000 Options to its directors at C$0.60
28/01/2011Award of 1,455,000 stock options to directors
21/12/2009Award of 13,000,000 new options and cancellation of 6,149,58...
03/12/2007Award of 400,000 stock options
Nominations de Serabi Gold Plc
29/07/2013Serabi Gold plc : Appointment of new Director
17/01/2013Serabi Gold plc : Issue of 270,000,000 Ordinary Shares at 6 ...
04/07/2011(UK) - Appointment of Broker
Rapports Financiers de Serabi Gold Plc
26/07/2017Strong second quarter production consolidating mid-year posi...
13/05/2016Unaudited Interim Financial Results for the three month peri...
14/11/2013Serabi Gold plc : Financial Results for the third quarter 20...
14/08/2013Serabi Gold plc : Interim Results for the 6 months to 30 Jun...
15/05/2012Serabi Gold plc : Financial Results for the First Quarter 20...
16/08/2011(UK) - INTERIM RESULTS FOR THE 6 MONTHS TO 30 JUNE 2011
17/05/2011- Release of Q1 Financial Results and Managment Discussion a...
21/01/2011 Unaudited financial results for the 9 months ended 30 Septe...
Projets de Serabi Gold Plc
20/04/2016First quarter update on gold operations at Palito and Sao Ch...
05/02/2014Serabi Gold plc - Exploration Results Continue to Reveal Pro...
24/01/2012Serabi Gold plc : Drilling Update - Upgraded Intercepts Enha...
12/09/2011(Piaui Strke Length)(UK) - Exploration Update - Piaui Strike Length could now ex...
11/08/2011(Jardim Do Ouro)(UK) - Exploration Update - New IP geophysical survey underw...
15/07/2011(Palito)(UK) - Drilling result confirms potential structural and min...
11/07/2011(UK) - Drilling update - Positive drill intersections contin...
14/06/2011(Jardim Do Ouro) - Drilling Update - High Grade Gold Intersected at Currutel...
07/04/2011- FIRST DRILL TEST OF GEOPHYSICAL TARGETS AT PIAUI INTERSECT...
18/02/2011(Palito)- IBAMA cancels US$2.2 million fine
22/02/2011(Palito)- Correction - Geochemical results from Piaui drill target a...
22/02/2011(Palito)- GEOCHEMICAL RESULTS FROM THE PIAUI DRILL TARGET AT PALITO
09/04/2010(Palito)Statement re Update on Palito Gold Project
28/01/2010(Palito)Progress Update
09/07/2008(Palito)Ore Reserve and Mineral Resource Update
04/10/2006(Palito)Commercial production at Palito
Communiqués de Presse de Serabi Gold Plc
17/05/2016Award of Share Options
30/03/2016Audited Results for the year ended 31 December 2015
06/01/2016Initial partial draw down of US$5 million convertible loan f...
31/12/2015US$5 million convertible loan facility
31/12/2015Serabi Gold Plc ("Serabi" or the "Company") US$5 million con...
29/10/2015Third quarter 2015 Operational Update
29/10/2015Serabi Gold plc ("Serabi" or the "Company") Third quarter up...
14/08/2015Financial Results for Second Quarter 2015 and Management’s D...
14/08/2015Serabi Gold plc ("Serabi" or the "Company") Unaudited Interi...
11/08/2015Serabi Gold Plc ("Serabi" or the "Company") Voting results f...
30/07/2015Cancellation of Share Premium Account and Deferred Shares
30/07/2015Serabi Gold plc ("Serabi" or the "Company") Cancellation of ...
28/07/2015Serabi Gold plc ("Serabi" or the "Company") Second quarter u...
31/03/2015Audited Results for the year ended 31 December 2014
31/03/2015Serabi Gold plc ("Serabi" or the "Company") Audited Results ...
28/01/2015Assay result of 42 g/t over 3.6 metres from Main Vein develo...
28/01/2015Serabi Gold plc ("Serabi" or the "Company") Assay result of ...
23/01/2015Award of Share Options
23/01/2015Serabi Gold plc ("Serabi" or the "Company") Award of Share O...
20/01/2015Serabi Gold plc ("Serabi" or the "Company") Operational upda...
25/11/2014Approval of Final Exploration Report for Sao Chico
12/02/2014Serabi Gold Plc - First Month of Gold Production at Palito G...
23/12/2013Serabi Gold plc : Directorate change
09/12/2013Serabi on schedule to commence commissioning of Palito plant...
08/10/2013Serabi Gold plc : Drilling at Sao Chico returns further exce...
05/09/2013Serabi Gold plc - Palito Operational Update
03/09/2013Serabi Gold plc : New High Grade Zones Discovered at Sao Chi...
08/07/2013Kenai Shareholders Approve Plan of Arrangement with Serabi G...
19/06/2013Serabi Gold plc : AGM Statement
28/03/2013Serabi Gold plc : Audited Results for the year ended 31 Dece...
28/01/2013Serabi Gold plc : Award of Share Options
22/01/2013Serabi Gold plc : Total voting rights
17/01/2013Serabi Gold plc - Operational Update
16/01/2013Serabi Gold plc : Result of General Meeting
18/06/2012Serabi Gold plc : Result of AGM
18/06/2012Serabi Gold plc : AGM Statement
13/06/2012Positive Preliminary Economic Assessment for Serabi's Palito...
21/05/2012Serabi Gold plc : Award of Share Options
29/03/2012Serabi Gold plc : Audited results for the year ended 31 Dece...
24/01/2012=?UTF-8?Q?Serabi_Gold_plc_:_Issue_of_Equity_-_Placing_of_27,...
24/01/2012Serabi Gold plc : Drilling Update - High Grade Intersections...
24/01/2012Serabi Gold plc : Issue of Equity - Proposed Placing
19/12/2011Serabi Gold plc : Directorate change
27/06/2011(UK) - Result of AGM
23/05/2011- 2011 AIRBORNE GEOPHYSICAL SURVEY RESULTS
16/05/2011- Notice of Annual General Meeting and Special Meeting
16/06/2010- Share Issue
16/06/2010- Share Subscription Agreement with Eldorado Gold Corporatio...
31/12/2009Total Voting Rights
21/12/2009Variation in Directors Terms of Employment
10/12/2009- Holding in Company
03/12/2009- Additional Placing
03/12/2009- Result of the Open Offer
01/12/2009- Total voting rights
20/11/2009- Holding(s) in Company
17/11/2009- Announcement of Open Offer
10/11/2009- Update on Placing and Issue of further Ordinary Shares
10/11/2009- Placing of Shares, Convertible Facility and Open Offer
15/10/2009- Holding(s) in Company
23/09/2009- Statement re Share Price Movement
15/09/2009- Holding(s) in Company
18/08/2009- Results of Annual General Meeting
18/08/2009- AGM Statement
30/07/2009- 2nd Quarter Investor Update
26/06/2009- Holding(s) in Company
09/03/2009- Holding in Company
27/02/2009- Change of Nomad and Broker
24/02/2009- Holding in Company
23/02/2009- Update on Corporate Events
28/01/2009- Result of General Meeting of Shareholders
02/01/2009- Circular re Proposed Capital Reorganisation
08/12/2008- Update on Strategic Review
04/11/2008- Rule 2.10 Announcement : CORRECTION
04/11/2008- Section 2.10 Announcement
03/11/2008- Announcement re: preliminary approaches
22/09/2008- Holding(s) in Company
30/07/2008- 2nd Quarter Investor Update
23/04/2008 1st Quarter Results - correction
14/01/2008Discovery of new mineralisation close to the Palito gold min...
23/11/2007Director/PDMR Shareholding
25/10/20073rd Quarter Results
14/09/2007Notification of Shareholding
11/09/2007 Exploration Release
26/07/20072nd Quarter Results
05/06/2007Exploration results indicate new mining potential at Palito
01/06/2007AGM Statement
17/05/2007Holding(s) in Company
11/04/2007Mining Final Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (SRB.L)BERLIN (B9O.BE)
64,00-1.54%0,5400
LSE
GBX 64,00
23/04 17:21 -1,00
-1,54%
Cours préc. Ouverture
65,00 64,00
Bas haut
63,10 64,80
Année b/h Var. YTD
38,00 -  69,50 36,75%
52 sem. b/h var. 52 sem.
21,50 -  69,50 123,78%
Volume var. 1 mois
75 822 2,40%
24hGold TrendPower© : -41
Produit Gold
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024146,63%
2023-12,77%38,0021,00
2022-47,35%62,5021,36
2021-41,15%98,0053,50
202054,84%99,5542,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :