Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Pele Mountain Resources Inc

Publié le 27 juillet 2009

Signs Agreement With the City of Elliot Lake for Surface Rights at Eco Ridge Mine Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Uranium |

Pele Mountain Signs Agreement with the City of Elliot Lake
For Surface Rights at Eco Ridge Mine Project

Symbol: GEM
Listing:  TSX Venture Exchange
Common Shares Outstanding: 95,486,944

FOR IMMEDIATE RELEASE


July 27, 2009 - Toronto - Pele Mountain Resources Inc. (TSX Venture: GEM) ("Pele" or the "Company") today announced the signing of a 21-year lease agreement (the "Lease") between Pele's wholly-owned subsidiary, First Canadian Uranium Inc. ("First Canadian"), and the City of Elliot Lake (the "City") in respect of surface rights to key mining claims owned by First Canadian at its Eco Ridge Mine Uranium Project in Northern Ontario.  The Lease includes the City's surface rights to a total of 48 surface patents comprising approximately 796 hectares and includes an option for First Canadian to purchase the surface rights under certain circumstances.

 

Pele President and CEO Al Shefsky stated, "The Lease is another important milestone achieved on the path to sustainable development of Pele's Eco Ridge Mine project.  The surface rights covered by the Lease include areas planned for mine portals and other surface plant, equipment, and related infrastructure.  Negotiations with the City have been active for more than a year and the end product demonstrates the achievability of a win-win solution through collaborative efforts, balancing economic growth opportunities with broader 'quality of life' concerns.  We are grateful for the unanimous support of Elliot Lake's City Council in approving the Lease with First Canadian and for the opportunity to advance Eco Ridge for the long-term benefit of the local communities and our shareholders."

 

In September 2008, Pele commenced the permitting process at Eco Ridge by filing a Project Description with the Canadian Nuclear Safety Commission and the Federal Government's Major Project Management Office.  The document, which can be viewed at http://www.pelemountain.com/pdf/pele_project_description.pdf, details Pele's approach to sustainable development.  The mining, processing, and waste management plans make innovative use of proven technologies to build a modern, state-of-the-science facility, significantly more advanced and environmentally-friendly than historic operations in the Elliot Lake camp.

 

With its excellent regional infrastructure, well-understood geology, and politically-stable and mining-friendly jurisdiction, Elliot Lake is an ideal location for the development of a long-term secure and reliable uranium supply.  Pele's 100-percent owned Eco Ridge Mine project contains a NI 43-101 compliant resource of 6.4 million pounds of "indicated" U3O(5.68 million tonnes grading 0.051-percent U3O8) and 36.1 million pounds of "inferred" U3O8 (37.26 tonnes grading 0.044-percent U3O8) with the potential for significant expansion.  More than 300 million pounds of U3O8 were mined from similar deposits near Elliot Lake by Rio Algom and Denison Mines from 1956 to 1996. 

 

The rental fee under the Lease is $3.00 per hectare per calendar year commencing July 23, 2009 and terminating on December 31, 2030.  The Lease includes several provisions permitting and protecting the continued use of all existing recreational trails for hiking, recreational vehicle and snowmobile use and for the continued use of Pecors Lake Road.  Furthermore, the City has maintained the right to construct additional roadways on portions of the property to enhance and advance its cottage lot business.  In addition, the City reserved a 400-foot wide buffer from the water's edge of Pecors Lake whereon no mining activity can be conducted without the consent of the City.

 

Provided certain conditions have been met, which include either obtaining a license to commence mine development or obtaining a NI 43-101 compliant feasibility study, First Canadian has the right under the Lease to purchase the surface rights from the City pursuant to an agreed upon purchase price formula based on market value of the surface rights.  The City in turn has the right under the Lease to require First Canadian to purchase the surface rights from the City upon 90 day's advance notice pursuant to an agreed upon purchase price formula also based on market value.  The City also has a right of first offer to purchase the surface rights from First Canadian in the event mining activities have permanently ceased thereon and First Canadian has decided to sell the surface rights to an arm's length third party.


About Pele

Pele is focused on the sustainable development of the Eco Ridge Mine in the historic Elliot Lake mining camp.  The company is developing a safe, secure, and reliable uranium project in order to deliver lasting benefits to local communities and its shareholders.  Pele also holds a diverse portfolio of gold, diamond, and base metal projects in Northern Ontario.  Pele stock is listed on the TSX Venture Exchange under the symbol "GEM".

For further information please contact Al Shefsky, President, at (800) 315-7353, or visit the Pele website at www.pelemountain.com.
 
The TSX-V has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe Pele's future plans, objectives or goals, including words to the effect that Pele or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements. The economic viability of the NI 43-101 mineral resource at Pele's Eco Ridge Mine Project has not yet been demonstrated by a pre feasibility study.


 
Sent By:
Pele Mountain Resources
2200 Yonge Street
Suite 905
Toronto Ontario M4S 2C6
To view as a web page.
<

Pele Mountain Resources Inc

EN DÉVELOPPEMENT
CODE : GEM.V
ISIN : CA7059071034
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Pele Mountain Res. est une société d’exploration minière et d'uranium basée au Canada.

Pele Mountain Res. est en développement de projets de rare earth au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est ECO RIDGE au Canada et ses principaux projets en exploration sont HIGHLAND (EAST / WEST), ARDEEN, ALLIANCE, SUDBURY et FESTIVAL au Canada.

Pele Mountain Res. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 6,3 millions CA$ (4,6 millions US$, 4,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,62 CA$, et son plus bas niveau récent le 02 juin 2017 à 0,01 CA$.

Pele Mountain Res. possède 210 000 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Pele Mountain Resources Inc
24/10/2007 Advances Baseline Environmental Studies at Elliot Lake Uran...
Financements de Pele Mountain Resources Inc
23/09/2016Pele Mountain Enters Into Funding Agreement
13/04/2015Announces Closing of Private Placement
03/10/2013Announces Closing of Private Placement Offering
26/07/2013Announces Closing of Private Placement Offering
04/07/2013Announces Closing of Second Tranche of a Private Placement O...
Nominations de Pele Mountain Resources Inc
11/02/2014Nominates Janis Peleshok to its Board of Directors
27/11/2013John Wilkinson Former Ontario Cabinet Minister Joins Pele Mo...
07/11/2007 Appoints Fergus Kerr Vice-President of Uranium Operations t...
09/05/2007Appoints James Andersen as Chief Financial Officer and Renew...
Projets de Pele Mountain Resources Inc
09/10/2013Interview with Roger Payne P. Eng. Executive Vice President ...
12/09/2013(Eco Ridge)Reviews Economics at Its Eco Ridge Mine Rare Earth and Urani...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
28/05/2013(Festival)Announces Reactivation of Festival Project Joint Venture Nea...
03/04/2013(Eco Ridge)to Update Eco Ridge Resource Estimate
29/01/2013Hits Higher Grade Uranium & Rare Earths at Elliot Lake
17/01/2013(Eco Ridge)Drilling Expands Eco Ridge Deposit
16/10/2012(Eco Ridge)Begins 6,500-Metre Drill Program at Its Eco Ridge Mine Rare ...
27/09/2012Samples High Grade Rare Earths at Mountain Pass
26/09/2012Closes Acquisition of Mining Claims 1800 Metres from Molycor...
15/05/2012(Eco Ridge)Closes Highland Project Sale Agreement; Will Focus on Eco Ri...
17/04/2012(Eco Ridge)Enters Agreement to Sell Highland Gold Projects; Will Focus ...
16/04/2012(Eco Ridge)Announces Robust Updated PEA for Eco Ridge Mine Rare Earths ...
06/03/2012Enters Agreement to Acquire Rare Earth Mining Claims Surroun...
13/10/2011(Eco Ridge)Announces Discovery of Continuous Rare Earths Mineralization...
07/09/2011(Eco Ridge)Files Preliminary Economic Assessment for Eco Ridge, Providi...
05/07/2011(Eco Ridge)Announces Preliminary Economic Assessment for Eco Ridge Mine...
26/05/2011(Eco Ridge)Launches 7,000 Metre Drill Program at Its Eco Ridge Mine Rar...
17/05/2011(Eco Ridge)Receives Mining Leases at Its Eco Ridge Mine Rare Earths and...
07/03/2011(Ardeen)Provides Gold Projects Update
24/02/2011(Eco Ridge)Announces Total Rare Earth Oxide Resources of 52-Million Pou...
24/01/2011(Eco Ridge)Announces Major Increase in Indicated Resources at its Eco R...
25/06/2010(Highland (east / West))Initiates Permitting Process to Mine Gold Bulk Sample
04/03/2010(Highland (east / West))Hits High Grade Gold at Highland’s A-Zone
18/01/2010(Highland (east / West))Begins Drilling at East Highland Gold Project
23/12/2009(Highland (east / West))Samples 14.76 g/t Gold Over 3.6 Metres at Its East Highland ...
11/12/2009(Highland (east / West))Samples 50 g/t Gold, 161 g/t Silver 4.3% Zinc, and 1.2% Lead...
10/11/2009(Highland (east / West))Discovers New Mineralized Zones, Expands Others, at East Hig...
17/09/2009Finds More High-Grade Gold at East Highland
01/09/2009(Ardeen)Coventry Resources Commences Diamond Drilling at Pele Mounta...
11/08/2009(Highland (east / West))High-Grade Gold Discovery at Its Highland Project
27/07/2009(Eco Ridge)Signs Agreement With the City of Elliot Lake for Surface Rig...
09/01/2009(Eco Ridge)Advances Eco Ridge Mine Project - Extensive Drill Program Re...
08/01/2009(Sudbury)Wallbridge Mining Company to Continue Exploration at Pele Mo...
09/09/2008(Eco Ridge)Initiates Permitting Process at Eco Ridge
26/08/2008(Eco Ridge)assembles team of uranium industry leaders to develop Eco Ri...
12/05/2008(Timmins - Whitney Township)Enters Into Option Agreement to Sell Its Timmins Nickel Proj...
02/05/2008(Eco Ridge)Launch Pre-Feasibility Study for Elliot Lake Uranium Mine Pr...
06/03/2008(Eco Ridge) Reports Additional Positive Drill Results from Its Elliot L...
13/02/2008(Eco Ridge)Identifies High Priority Geophysical Targets at its Elliot L...
25/01/2008(Eco Ridge)New Drill Results Expand Higher-Grade Zone at Pele Mountain'...
17/01/2008(Eco Ridge)Expands Exploration for Higher Grade Remobilized Uranium at ...
28/11/2007(Eco Ridge)Targets Remobilized Uranium at Elliot Lake
12/10/2007(Eco Ridge)Publishes Positive Scoping Study for Uranium Mine Project at...
04/10/2007Achieves Major Milestone with Positive Scoping Study for Ura...
02/10/2007Announces Scoping Study for Its Elliot Lake Uranium Project ...
19/09/2007(Eco Ridge)Achieves Positive Results from 5,600-Metre Drill Program at ...
09/07/2007(Eco Ridge)Advances Mine Planning and Scoping Studies on 33-Million Pou...
30/05/2007(Eco Ridge)Expands Drilling at Elliot Lake Uranium Project
07/05/2007(Eco Ridge)Intersects High-Grade Uranium In Basal Conglomerate Bed at E...
02/05/2007(Eco Ridge)Expands Elliot Lake Uranium Project
01/05/2007(Eco Ridge)Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele...
26/01/2006hits more high grade gold at Talisker
Communiqués de Presse de Pele Mountain Resources Inc
05/07/2016Pele Mountain to Sell Its Ardeen Gold Project
04/05/2016Pele Mountain Provides Update on Development Plans and Progr...
15/01/2016Pele Mountain Resources Appoints Wayne Richardson as Chairma...
07/10/2015Pele Mountain Announces Option Grants
01/10/2015Pele Mountain Provides an Update on its Eco Ridge Monazite P...
28/07/2015Pele Mountain Advances Cogent Solution to Rare Earth Industr...
13/04/2015Pele Mountain Announces Closing of Private Placement
30/03/2015Pele Mountain Executes MOU with Major Chinese Rare Earth Pla...
30/03/2015IIROC Trading Resumption - GEM
30/03/2015Executes MOU with Major Chinese Rare Earth Player to Pursue ...
30/03/2015IIROC Trading Halt - GEM
05/03/2015Pele Mountain Shareholders Approve All Matters Presented at ...
05/03/2015Shareholders Approve All Matters Presented at the Annual and...
17/02/2015Pele Mountain Advances Monazite Recycling Strategy to Kick-S...
12/02/2015Pele Mountain Announces Option Grants
24/12/2014Pele Mountain Announces Closing of Private Placement
02/12/2014The Council of the City of Elliot Lake Supports Pele Mountai...
07/11/2014Pele Mountain Announces Proposed Shares for Debt Settlement
07/10/2014Pele Mountain Expands its Business Model to Include Recyclin...
25/09/2014Pele Mountain Appoints Martin S. Cooper As Vice President of...
11/09/2014Pele Mountain Acquires Key Mining Lease in Elliot Lake
02/09/2014Pele Mountain Announces Collaboration with Canmet to Advance...
08/07/2014Pele Mountain Participates in Regional Roundtable Discussion...
25/06/2014Parliamentary Committee on Natural Resources Publishes "The ...
24/06/2014Pele Mountain Announces Closing of Private Placement
09/05/2014Pele Mountain Announces Closing of Private Placement Offerin...
02/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
01/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
05/06/2013Shareholders Approve All Matters Presented at the Annual and...
29/01/2013Intersects Higher-Grade Uranium & Rare Earths; Discovers Wid...
17/01/2013CEO Interviewed by Jeb Handwerger
24/10/2012(Eco Ridge)Achieves Processing Milestone: Mixed Rare Earth Concentrate ...
04/07/2012(Eco Ridge)Files Updated Preliminary Economic Assessment for Eco Ridge ...
31/01/2012Updated PEA on Schedule for Q1 2012
12/09/2011(Eco Ridge)Drilling Expands Eco Ridge Deposit Northward, Demonstrates S...
27/07/2011Roger Payne Named Executive Vice-President at Pele Mountain
21/07/2011(Eco Ridge)to Separate Gold Assets from Eco Ridge
03/05/2011Commences Trading in the United States on OTCQX Internationa...
05/08/2010Dr. William Bird Joins Rare Metals Advisory Board
17/05/2010Begins Drilling Ni-Cu-PGE Targets at Pigeon River
29/04/2010to Drill Ni-Cu-PGE Targets at Pigeon River
03/05/2010Coventry Resources Reports Winter Drill Results from Pele Mo...
05/03/2010Completes VTEM Survey at Pigeon River, Identifies Several Pr...
07/01/2010Acquires Property in Thunder Bay Area with High Potential fo...
07/10/2009Confirms Significant Rare Earth Mineralization at Its Eco Ri...
05/08/2009Initiates Long-Term Research Study to Minimize Environmental...
05/02/2009Letter to Shareholders
05/02/2008Completes Acquisition of the Westward Extension of the Histo...
29/10/2007 Resumes Drilling at Its Elliot Lake Uranium Mine Project
26/07/2007Retains O&M Partners for Investor Relations
03/05/2007Announces Plan to Optimize Corporate Structure
27/04/2007Featured in Northern Miner Article
17/04/2007Expands Elliot Lake Uranium Project
29/03/2007Advances Mine Planning Studies on 33-Million Pound Uranium O...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GEM.V)Other OTC (PMNHF)
0,030+20.00%0,040+0.00%
TSX-V
CA$ 0,030
26/04 12:16 0,010
20%
Cours préc. Ouverture
0,025 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
0,025 -  0,060 -50,00%
52 sem. b/h var. 52 sem.
0,025 -  0,080 -57,14%
Volume var. 1 mois
35 750 -%
24hGold TrendPower© : 22
Produit
Développe Rare earth
Recherche Diamonds - Gold - Platinum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-45,45%
202337,50%0,100,04
2022-70,37%0,180,04
202117,39%0,720,09
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :