Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

AndeanGold

Publié le 01 février 2010

Signs Memorandum of Understanding to Acquire a 60% JV Interest in the Urumalqui Au - Ag Project, Per

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street | Precious Metals |

To view this email as a web page, go here.

AndeanGold Signs Memorandum of Understanding to Acquire a 60% JV Interest in the Urumalqui Au - Ag Project, Peru

Vancouver, B.C. - February 1, 2010 - AndeanGold Ltd. ("the Company" or "AndeanGold") (TSX Venture Exchange: AAU) is pleased to announce that it has signed a Memorandum of Understanding (the "MOU") with Gitennes Exploration Inc. ("Gitennes" (TSX Venture Exchange: GIT) to acquire a 60% Joint Venture ("JV") interest in Gitennes' Urumalqui Au-Ag Project (the "Project"). The Project is located in the Department of Libertad, Peru, approximately 70 km east of the city of Trujillo. The Project consists of four (4) contiguous concessions totaling 2,700 hectares, and is located at elevations ranging from 3,400 - 3,700 metres.            
 
Mineralization at the Urumalqui Project is hosted in volcanics and is comprised of several gold-silver quartz veins. Vein mineralogy and textures and associated alteration are characteristic of low-sulphidation, vein-style, epithermal, mineralization.  
 
Gitennes acquired an interest in the Project in 2002 by way of a joint venture with Meridian Gold Inc. The joint venture was terminated in mid-2005, upon which Gitennes assumed 100% ownership of the Project. Work on the property since January 1, 2003 includes grid-controlled soil sampling, two episodes of IP and magnetic geophysics surveying, three phases of core drilling (approximately 7,336 metres in 47 holes) and preliminary metallurgical testing.  
 
A NI 43-101 Report (the "Report") was prepared on the Project, dated March 30, 2009 (See Gitennes technical report filing at www.sedar.com). Based on the Report:  
 
  • The principal target on the property, among several mineralized vein structures, is referred to as the Urumalqui Vein (the "Vein"), which is a near-vertical feature, up to 20 metres wide, containing a core of one or two banded quartz veins ranging from 0.5 to 11 metres aggregate thickness, and intervening oxidized vein breccias and altered volcanic rocks.  The Vein is exposed at surface over a strike length of 1,500 metres and consists of eight vein segments, ranging in length from 40 metres to 400 metres.  For the most part, vein outcrop is continuous along each segment.  

  • Much of the silver and gold mineralization is hosted within the vein quartz and is surrounded by a broad, lower grade envelope of disseminated Au-Ag material. Most of the silver occurs as argentite with the remainder being alloyed with gold as electrum.    

  • The majority of the drilling to date has been focused on the 1,000 metre long central and southeastern segment of the Urumalqui Vein and from the surface down to about 200 metres vertical depth. Some of the noteworthy reported drill intersections were: 

      TRUE      
DRILL FROM TO WIDTH AU AG AUE *
HOLE # (Metres) (Metres) (Metres) G/T G/T G/T
             
URU03-01 32.75 40.30 7.09 1.55 112.00 3.42
URU03-03 94.35 98.30 3.11 2.91 179.20 5.90
URU03-05 65.85 69.05 2.45 2.29 189.80 5.45
URU03-07 156.05 162.65 4.06 2.29 196.10 5.56
URU03-09 133.80 147.00 8.48 2.01 211.60 5.54
URU04-32 128.50 132.40 2.30 2.84 194.70 6.09
URU04-33 197.95 204.80 3.42 1.31 293.30 6.20
URU08-36 60.15 62.15 1.53 3.05 493.00 11.27
URU08-42 156.05 162.50 4.40 2.48 157.18 5.10
URU08-45 211.90 222.80 8.59 1.91 191.72 5.11
             
* AUE = Gold equivalent based on a 60:1 Ag - Au ratio and assuming 100% recoveries.

For the 35 holes (5,835m) drilled in the Urumalqui Vein to date, the average vein intersection width and weighted average Au and Ag grades were 3.31 metres of 1.33 g/t Au and 154 g/t Ag - 3.90 g/t AUE.  
 
  • The drilling was done on relatively widely-spaced centres, from 45 to over 100 metres. In the few holes that were deeper than 200 metres, the Vein structure remained strong and mineralized. All holes appear to have been in the "boiling zone", based upon vein textures, and the potential for good mineralization at deeper levels than those tested thus far is considered to be good. 
  
  • Mineralization is open along strike and recent drill results suggest that further drilling on the 400 to 500 metre-long Northwestern Segment of the same Vein structure is warranted. 
 
  • Based on preliminary metallurgical test results to date on core and rock samples, which entailed a combination of gravity, flotation and cyanide test work, it may be possible to achieve favorable recoveries by a combination of crushing and milling, followed by gravimetric separation and cyanide leaching. However, additional metallurgical tests will be required to determine the ultimate method of recovering gold and silver at the Project.  
 
Pursuant to the MOU, AndeanGold�s Peruvian subsidiary, PeruGold Resources S.A.C. ("PGR"), will sign an Option and Mining Assignment Agreement with Gitennes' Peruvian Subsidiary, Minera Corimalqui S.A. ("MC"), the concessions titleholder.  In addition, Gitennes and AndeanGold will sign a Parent Company Agreement, and the Peruvian subsidiaries will sign a Partners' Agreement, which will principally cover the formation of a new Peruvian company ("Newco") that will be responsible for the Project's JV activities once PGR has fulfilled its earn-in requirements under the Option and Mining Assignment Agreement. PGR will be entitled to exercise its option and earn a sixty (60) percent shareholder's interest in Newco by: 
 
  1. Expending $3 million of qualifying expenditures on the Project over a four (4) year term (the "Term"),  
  2. Completing 3,000 metres of drilling by the end of the second year of the Term and 7,000 metres of cumulative drilling by the end of the third year of the Term, and  
  3. AndeanGold issuing Gitennes 200,000 publicly traded shares of the Company, each, within five (5) days of signing the agreements and on the first, second and third year anniversaries of signing the agreements.   
 
Except for the first payment, Gitennes may elect to receive cash in lieu of shares, with the cash amount not to exceed $25,000, $50,000 and $100,000 with respect to the first, second and third year anniversary date payments, respectively. If the market value of the shares on the respective payment dates exceed the maximum cash payment amount on such date, the difference will be satisfied by the issuance of equivalent shares.  
 
Upon PGR exercising its option, MC will transfer the mining titles to the Project's concessions to Newco. 
 
The MOU shall remain in full force and effect provided that in the event the JV-related agreements are not executed and delivered by April 30, 2010 other than as a result of unreasonable delay by Gitennes, the MOU may be terminated by either Party upon giving five (5) days notice to the other Party. 
 
This transaction is subject to acceptance by the TSX Venture Exchange. 
 
Mr. Anthony F. Ciali, President and CEO, stated, "We are extremely pleased at the opportunity to add a high-quality, advanced-staged Au-Ag exploration project, such as Urumalqui, to the Company's portfolio in Peru. The Urumalqui Vein mineralization is open along strike and at depth, and the style of mineralization can reach depths of 400 to 600 metres. Future drilling programs will include both infill and deeper drilling to obtain accurate data for future resources / reserves calculations and to determine the depth potential of the Urumalqui Vein mineralization."  
 
Dr. William F. Lindqvist, a director of AndeanGold, is the Qualified Person in compliance with National Instrument 43-101 with respect to this release.

About AndeanGold Ltd:
AndeanGold Ltd. is engaged in the acquisition, exploration and potential development of primarily precious metals properties, principally in Peru and Ecuador. The focus of the Company's exploration activities is presently in advancing its Rio Seco Project, as well as pursuing mineral property acquisitions, in Peru. In Ecuador, the Company's activities have been limited to administrative and legal matters due to the Mining Mandate issued by the Ecuador Constituent Assembly on April 18, 2008. On November 4, 2009, President Correa signed the Mining Regulations into law pursuant to the requirements of the new Mines Law, which was passed in January 2009.  This was the final legal precursor to the re-initiation ofexploration and mining development in Ecuador.  The Company has filed the requisite documents with the Ministry of Non-Renewable Natural Resources in support of the Company�s request to renew exploration programs on its key progovernment officials to this end. 

Please refer to AndeanGold's website at www.andeangoldltd.com for Rio Seco detailed assay tables for exploration work completed to date and for further


On Behalf of the Board of Directors of
ANDEANGOLD  LTD.

Anthony F. Ciali
President, CEO and Director


FOR FURTHER INFORMATION PLEASE CONTACT:

Corporate Office:
Tony Ciali, AndeanGold Ltd. 
Phone: 609.844.7746
Email: tciali@andeangoldltd.com 
Investor Relations:
Jim Glass, Ascenta Capital Partners Inc.
Phone: 604.684.4743 ext. 225
Toll free: 1.866.684.4743
Email: jim@ascentacapital.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 



Ascenta Capital Partners Inc. � Suite 1610, 1066 West Hastings Street � Vancouver � BC V6E 3X1 � Canada


AndeanGold Ltd.

AndeanGold Signs Memorandum of Understanding to Acquire a 60% JV Interest in the Urumalqui Au - Ag Project, Peru

Vancouver, B.C. - February 1, 2010 - AndeanGold Ltd. ("the Company" or "AndeanGold") (TSX Venture Exchange: AAU) is pleased to announce that it has signed a Memorandum of Understanding (the "MOU") with Gitennes Exploration Inc. ("Gitennes" (TSX Venture Exchange: GIT) to acquire a 60% Joint Venture ("JV") interest in Gitennes' Urumalqui Au-Ag Project (the "Project"). The Project is located in the Department of Libertad, Peru, approximately 70 km east of the city of Trujillo. The Project consists of four (4) contiguous concessions totaling 2,700 hectares, and is located at elevations ranging from 3,400 - 3,700 metres.            
 
Mineralization at the Urumalqui Project is hosted in volcanics and is comprised of several gold-silver quartz veins. Vein mineralogy and textures and associated alteration are characteristic of low-sulphidation, vein-style, epithermal, mineralization.  
 
Gitennes acquired an interest in the Project in 2002 by way of a joint venture with Meridian Gold Inc. The joint venture was terminated in mid-2005, upon which Gitennes assumed 100% ownership of the Project. Work on the property since January 1, 2003 includes grid-controlled soil sampling, two episodes of IP and magnetic geophysics surveying, three phases of core drilling (approximately 7,336 metres in 47 holes) and preliminary metallurgical testing.  
 
A NI 43-101 Report (the "Report") was prepared on the Project, dated March 30, 2009 (See Gitennes technical report filing at www.sedar.com). Based on the Report:  
 
  • The principal target on the property, among several mineralized vein structures, is referred to as the Urumalqui Vein (the "Vein"), which is a near-vertical feature, up to 20 metres wide, containing a core of one or two banded quartz veins ranging from 0.5 to 11 metres aggregate thickness, and intervening oxidized vein breccias and altered volcanic rocks.  The Vein is exposed at surface over a strike length of 1,500 metres and consists of eight vein segments, ranging in length from 40 metres to 400 metres.  For the most part, vein outcrop is continuous along each segment.  

  • Much of the silver and gold mineralization is hosted within the vein quartz and is surrounded by a broad, lower grade envelope of disseminated Au-Ag material. Most of the silver occurs as argentite with the remainder being alloyed with gold as electrum.    

  • The majority of the drilling to date has been focused on the 1,000 metre long central and southeastern segment of the Urumalqui Vein and from the surface down to about 200 metres vertical depth. Some of the noteworthy reported drill intersections were: 

      TRUE      
DRILL FROM TO WIDTH AU AG AUE *
HOLE # (Metres) (Metres) (Metres) G/T G/T G/T
             
URU03-01 32.75 40.30 7.09 1.55 112.00 3.42
URU03-03 94.35 98.30 3.11 2.91 179.20 5.90
URU03-05 65.85 69.05 2.45 2.29 189.80 5.45
URU03-07 156.05 162.65 4.06 2.29 196.10 5.56
URU03-09 133.80 147.00 8.48 2.01 211.60 5.54
URU04-32 128.50 132.40 2.30 2.84 194.70 6.09
URU04-33 197.95 204.80 3.42 1.31 293.30 6.20
URU08-36 60.15 62.15 1.53 3.05 493.00 11.27
URU08-42 156.05 162.50 4.40 2.48 157.18 5.10
URU08-45 211.90 222.80 8.59 1.91 191.72 5.11
             
* AUE = Gold equivalent based on a 60:1 Ag - Au ratio and assuming 100% recoveries.

For the 35 holes (5,835m) drilled in the Urumalqui Vein to date, the average vein intersection width and weighted average Au and Ag grades were 3.31 metres of 1.33 g/t Au and 154 g/t Ag - 3.90 g/t AUE.  
 
  • The drilling was done on relatively widely-spaced centres, from 45 to over 100 metres. In the few holes that were deeper than 200 metres, the Vein structure remained strong and mineralized. All holes appear to have been in the "boiling zone", based upon vein textures, and the potential for good mineralization at deeper levels than those tested thus far is considered to be good. 
  
  • Mineralization is open along strike and recent drill results suggest that further drilling on the 400 to 500 metre-long Northwestern Segment of the same Vein structure is warranted. 
 
  • Based on preliminary metallurgical test results to date on core and rock samples, which entailed a combination of gravity, flotation and cyanide test work, it may be possible to achieve favorable recoveries by a combination of crushing and milling, followed by gravimetric separation and cyanide leaching. However, additional metallurgical tests will be required to determine the ultimate method of recovering gold and silver at the Project.  
 
Pursuant to the MOU, AndeanGold�s Peruvian subsidiary, PeruGold Resources S.A.C. ("PGR"), will sign an Option and Mining Assignment Agreement with Gitennes' Peruvian Subsidiary, Minera Corimalqui S.A. ("MC"), the concessions titleholder.  In addition, Gitennes and AndeanGold will sign a Parent Company Agreement, and the Peruvian subsidiaries will sign a Partners' Agreement, which will principally cover the formation of a new Peruvian company ("Newco") that will be responsible for the Project's JV activities once PGR has fulfilled its earn-in requirements under the Option and Mining Assignment Agreement. PGR will be entitled to exercise its option and earn a sixty (60) percent shareholder's interest in Newco by: 
 
  1. Expending $3 million of qualifying expenditures on the Project over a four (4) year term (the "Term"),  
  2. Completing 3,000 metres of drilling by the end of the second year of the Term and 7,000 metres of cumulative drilling by the end of the third year of the Term, and  
  3. AndeanGold issuing Gitennes 200,000 publicly traded shares of the Company, each, within five (5) days of signing the agreements and on the first, second and third year anniversaries of signing the agreements.   
 
Except for the first payment, Gitennes may elect to receive cash in lieu of shares, with the cash amount not to exceed $25,000, $50,000 and $100,000 with respect to the first, second and third year anniversary date payments, respectively. If the market value of the shares on the respective payment dates exceed the maximum cash payment amount on such date, the difference will be satisfied by the issuance of equivalent shares.  
 
Upon PGR exercising its option, MC will transfer the mining titles to the Project's concessions to Newco. 
 
The MOU shall remain in full force and effect provided that in the event the JV-related agreements are not executed and delivered by April 30, 2010 other than as a result of unreasonable delay by Gitennes, the MOU may be terminated by either Party upon giving five (5) days notice to the other Party. 
 
This transaction is subject to acceptance by the TSX Venture Exchange. 
 
Mr. Anthony F. Ciali, President and CEO, stated, "We are extremely pleased at the opportunity to add a high-quality, advanced-staged Au-Ag exploration project, such as Urumalqui, to the Company's portfolio in Peru. The Urumalqui Vein mineralization is open along strike and at depth, and the style of mineralization can reach depths of 400 to 600 metres. Future drilling programs will include both infill and deeper drilling to obtain accurate data for future resources / reserves calculations and to determine the depth potential of the Urumalqui Vein mineralization."  
 
Dr. William F. Lindqvist, a director of AndeanGold, is the Qualified Person in compliance with National Instrument 43-101 with respect to this release.

About AndeanGold Ltd:
AndeanGold Ltd. is engaged in the acquisition, exploration and potential development of primarily precious metals properties, principally in Peru and Ecuador. The focus of the Company's exploration activities is presently in advancing its Rio Seco Project, as well as pursuing mineral property acquisitions, in Peru. In Ecuador, the Company's activities have been limited to administrative and legal matters due to the Mining Mandate issued by the Ecuador Constituent Assembly on April 18, 2008. On November 4, 2009, President Correa signed the Mining Regulations into law pursuant to the requirements of the new Mines Law, which was passed in January 2009.  This was the final legal precursor to the re-initiation ofexploration and mining development in Ecuador.  The Company has filed the requisite documents with the Ministry of Non-Renewable Natural Resources in support of the Company�s request to renew exploration programs on its key progovernment officials to this end. 

Please refer to AndeanGold's website at www.andeangoldltd.com for Rio Seco detailed assay tables for exploration work completed to date and for further


On Behalf of the Board of Directors of
ANDEANGOLD  LTD.

Anthony F. Ciali
President, CEO and Director


FOR FURTHER INFORMATION PLEASE CONTACT:

Corporate Office:
Tony Ciali, AndeanGold Ltd. 
Phone: 609.844.7746
Email: tciali@andeangoldltd.com 
Investor Relations:
Jim Glass, Ascenta Capital Partners Inc.
Phone: 604.684.4743 ext. 225
Toll free: 1.866.684.4743
Email: jim@ascentacapital.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 



Ascenta Capital Partners Inc. � Suite 1610, 1066 West Hastings Street � Vancouver � BC V6E 3X1 � Canada

You may opt out of this email list in our Profile Centre


.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

AndeanGold

EXPLORATEUR
CODE : AAU.V
ISIN : CA03349A2002
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

AndeanGold est une société d’exploration minière d'or basée au Canada.

AndeanGold détient divers projets d'exploration au Perou.

Ses principaux projets en exploration sont MOLLETURO, SAN BARTOLOMÉ et CURIPLAYA en Equateur et RIO SECO et URULMAQUI au Perou.

AndeanGold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 4,2 millions CA$ (3,3 millions US$, 3,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 12 janvier 2007 à 0,58 CA$, et son plus bas niveau récent le 09 juin 2023 à 0,01 CA$.

AndeanGold possède 103 930 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de AndeanGold
24/02/2014AndeanGold Ltd. Announces $600=2C000 Non=2DBrokered Private ...
19/12/2013AndeanGold Ltd. Announces Closing of Private Placement
25/11/2013AndeanGold Announces Closing of Fourth Tranche of $500=2C00...
04/11/2013AndeanGold Announces Closing of Third Tranche of $500=2C000...
03/10/2013AndeanGold Announces Closing of Second Tranche of $500=2C00...
16/05/2013Announces Closing of Second Tranche of $1,000,000 Private Pl...
03/05/2013Announces Closing of First Tranche of $1,000,000 Private Pla...
29/04/2013Announces $1,000,000 Private Placement
02/11/2012Announces $1,200,000 Private Placement
03/09/2012Announces Closing of $645,000 Private Placement
10/02/2011Announces $3.0 Million Non-Brokered Private Placement
08/07/2009Announces Increase in Non-Brokered Private Placement up to $...
02/07/2009Announces Closing of First Tranche of $1.0 Million Non-Broke...
10/06/2009Announces $1.0 Million Non-Brokered Private Placement
Nominations de AndeanGold
25/03/2013Announces Appointment Vice President Exploration
Projets de AndeanGold
03/01/2014AndeanGold Ltd. Urumalqui Project Update
21/05/2013Signs Amendment to Agreement to Acquire Gitennes' 40% Intere...
15/05/2013Signs Phase II Drilling Agreement for Urumalqui Ag-Au Projec...
22/04/2013Announces Approval of Environmental Impact Assessment Drilli...
20/02/2013Announces Additional Surface Channel Sampling Assay Results ...
24/09/2012(Curiplaya)Authorized to Recommence Exploration onCuriplaya Project, Ec...
29/05/2012Announces Encouraging Surface Channel Sampling Assay Results...
23/05/2012Signs Agreement to Acquire Gitennes' 40% Interest in Urumalq...
12/04/2012Announces Initiation of Metallurgical Test Program Urumalqui...
23/01/2012Signs Memorandum of Understanding with Gitennes Providing an...
13/09/2011Commissions NI 43-101 Minera
07/07/2011Reports Additional Encouraging AGE Assay Results, Urumalqui ...
07/06/2011Reports Additional Noteworthy AGE Assay Results, Urumalqui ...
13/05/2011Intersects 9.01 oz/t AGE ove
30/03/2011(Urulmaqui)Commences Drilling at Urumal
22/03/2011(Urulmaqui)Signs Drilling Agreement for
16/02/2011Announces Approval of Drilling Permit for Urumalqui Au-Ag Pr...
17/11/2009(Rio Seco)Reports Phase 1 Drill Results
28/09/2009(Rio Seco)Commences Phase 1 Drilling Program at the Rio Seco Project, ...
16/09/2009(Rio Seco)on Rio Seco Project, Peru
09/02/2009(Rio Seco)Announces Work Program on Rio Seco Project, Peru
Communiqués de Presse de AndeanGold
30/10/2012Common Shares Commence Tradingon the Lima Stock Exchange
10/10/2012To Exhibit at Silver Summit 2012
15/08/2012Announces Positive Preliminary Metallurgical Test Results
16/07/2012Announces Closing of First Tranche of $500,000 Private Place...
06/07/2012Announces $500,000 Non-Brokered Private Placement
20/03/2012Announces Extension of Warrants Expiring on March 30, 2012
16/02/2012Provides Positive Update on
09/02/2012Exhibiting at the 2012 California Resource Investment Confer...
17/01/2012Exhibiting at the 2012 Vancouver Resource Investment Confere...
10/08/2011Reports Final Positive Assay Results, Urumalqui Au - Ag Proj...
24/05/2011Reports Additional Positive
06/05/2011s Phase I Infill Drill
30/06/2010Receives Shareholders’ App
20/05/2010s its Activities in Ecuador
01/02/2010Signs Memorandum of Understanding to Acquire a 60% JV Intere...
07/10/2009Completes Phase 1 Drill Program on Rio Seco Project, Peru
23/07/2009Announces Closing of $1.14 Million Private Placement
17/12/2008Acquires 17 Gold - Silver Concessions in Peru
25/09/2008signs Letter of Intent to enter into a Joint Venture in Colo...
12/09/2008Announces Results of Annual and Special General Shareholders...
28/07/2008 Updates its Activities in Colombia, Peru and Ecuador
07/08/2008Announces Opening of Office and Staff Additions in Colombia
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (AAU.V)
0,040-11.11%
TSX-V
CA$ 0,040
12/10 11:58 -0,010
-11,11%
Cours préc. Ouverture
0,045 0,045
Bas haut
0,040 0,045
Année b/h Var. YTD
0,100 -  0,230 -60,00%
52 sem. b/h var. 52 sem.
0,010 -  0,230 100,00%
Volume var. 1 mois
6 500 -75,00%
24hGold TrendPower© : -37
Produit
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 04/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-38,46%
2023160,00%0,100,01
2022-85,29%0,190,03
2021-63,83%0,530,13
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nos flux RSS24hGold Mobile
Gold Data CenterConvertisseur Or Argent
Pièces d'or sur eBayPièces d'argent sur eBay
Minières :
outils techniques
Minières : outils
d'analyse fondamentale
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,54 AU$-2,14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,46 US$-6,22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,72 CA$-4,61%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,74 CA$-8,42%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,18 US$-3,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profil de AndeanGold | Articles sur AndeanGold | Indicateurs de marché de AndeanGold | Projets et ressources de AndeanGold | Valorisation de AndeanGold | Voir les mines de AndeanGold | Présentation de l'entreprise AndeanGold | Rapport annuel de AndeanGold | Management de AndeanGold | Graphique interactif de AndeanGold | Graphiques gratuits de AndeanGold | AndeanGold TSX-V