Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Silvercorp Metals Inc.

Publié le 20 février 2013

SilverCorp - Silvercorp Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0.68 Percent Lead

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Zinc |


Silvercorp Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0.68 Percent Lead, 1.51 Percent Zinc, and 0.30 Percent Tin at Its GC Project

VANCOUVER, BRITISH COLUMBIA -- (MARKET WIRE) -- 02/20/13 -- Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM)(NYSE:SVM) is pleased to report results from the ongoing infill and step-out drilling exploration program at the GC silver-lead-zinc project located in Guangdong Province, China including the discovery of several new mineralized veins.

Highlights of selected intercepts and discoveries:

--  Hole CK2102 intercepted 49.65 metres ("m"), 33.29m true width at the -9m
    elevation of vein V2 grading 151 grams per tonne ("g/t") silver ("Ag"),
    0.68% lead ("Pb"), 1.51% zinc ("Zn") and 0.30% tin ("Sn"), including an
    interval of 4.81m, 3.42m true width at the -23m elevation grading 525
    g/t Ag, 2.06% Pb, 1.99% Zn and 0.87% Sn;

--  Hole CK1831 intercepted 3.85m, 3.50m true width at the 39m elevation of
    vein V2 grading 460 g/t Ag, 1.20% Pb, 2.95% Zn and 0.86% Sn, including
    an interval of 1.30m, 1.18m true width at the 39m elevation grading 923
    g/t Ag, 0.21% Pb, 1.35% Zn and 1.84% Sn;

--  Hole CK2410 intercepted 3.88m, 3.76m true width at the 107m elevation of
    vein V15-1 grading 609 g/t Ag, 0.41% Pb, 0.56% Zn and 0.03% Sn,
    including an interval of 1.16m, 1.13m true width at the 107m elevation
    grading 698 g/t Ag, 0.63% Pb, 0.79% Zn and 0.03% Sn;

--  Hole CK10450 intercepted 7.84m, 5.76m true width of vein V28 at the 97m
    elevation grading 359 g/t Ag, 1.55% Pb, 1.09% Zn and 0.03% Sn; and

--  Hole CK2001 intercepted 3.15m, 2.76m true width at the 47m elevation of
    vein V9W-2 grading 441 g/t Ag, 3.29% Pb, 5.71% Zn and 0.16% Sn,
    including an interval of 1.40m, 1.23m true width at the 46m elevation
    grading 661 g/t Ag, 4.80% Pb, 5.98% Zn and 0.27%Sn. 

--  Discovery of new veins V25, V26, V28 as well several other new veins
    (referred to as "New" in tables 1 and 2 below) which have not yet been
    named.

The purpose of the 2012 GC project surface and underground drilling program was to upgrade the classification of the known resource blocks and further define and extend known vein structures in preparation for mining in 2013.

Using two underground drill rigs to achieve a drill spacing of approximately 25m by 25m, drilling of V2 was focused on an area 300m in length from mine section lines 10 through 30 and 150m in vertical depth from the 100m elevation down to the -75m elevation. Access to V2 at the 20m elevation was gained via the main ramp and existing cross-cuts. In March 2013 Silvercorp expects to have an additional access point to V2 when the exploration ramp reaches the -50 m elevation. Present drill results (as evidenced by drill hole CK2102) indicate that V2 is a thick, continuous zone that would be amenable to bulk tonnage mining. In addition to its thickness, V2 also contains high-grade silver and tin mineralization. For example drill hole CK1831 intercepted 3.50m true width grading 460 g/t Ag, 1.20% Pb, 2.95% Zn and 0.86% Sn at the 39m elevation. As noted in the Company's news release of November 19, 2012, the presence of tin is expected to enhance the economics of the GC project.

Drilling of the V9 vein group (V9, V9-1, V9W1 and V9W-2 veins) was conducted in an area 400m in length from mine section lines 14 through 32 and 150m in vertical depth between the 0m elevation and the 150m elevation using three underground drill rigs. Access to the V9 vein group was achieved via the exploration ramp with existing drifts and cross-cuts at elevations of 150m, 100m, 50m and 0m.

In addition to the V2 and the V9 vein groups, drilling has also further defined vein groups V5, V6, V8, V13, V14 and V15. Veins V25, V26, and V28 are new discoveries. Assay results have been received for 97 drill holes totaling 7,037m of drilling. Additional assays results for twelve holes are pending. In 2013, Silvercorp plans to continue with its infill and step-out drilling program at the GC project and currently has five underground drill rigs and two surface drill rigs on site.

The following tables are highlights of selected intercepts from the V2 and the V9 vein groups including intersections from potential veins and new discoveries at the GC project. To view longitudinal sections, visit the following link: http://www.silvercorpmetals.com/projects/gc-project/longsections

Table 1: Selected Intercepts from the GC project                            

----------------------------------------------------------------------------
                         Sample    True                                     
Drill       From      To Length   Width Elev-    Ag    Pb    Zn    Sn       
Hole         (m)     (m)    (m)     (m) ation (g/t)   (%)   (%)   (%)   Vein
----------------------------------------------------------------------------
CK1831     89.90   93.75   3.85    3.50    39   460  1.20  2.95  0.86     V2
----------------------------------------------------------------------------
including  89.90   91.20   1.30    1.18    39   923  0.21  1.35  1.84       
----------------------------------------------------------------------------
including  91.20   92.50   1.30    1.18    38   247  2.16  6.18  0.43       
----------------------------------------------------------------------------
CK2102    141.49  191.14  49.65   33.29    -9   151  0.68  1.51  0.30     V2
----------------------------------------------------------------------------
including 160.32  165.13   4.81    3.42   -23   525  2.06  1.99  0.87       
----------------------------------------------------------------------------
including 172.37  175.38   3.01    2.00   -32   542  0.90  4.24  1.45       
----------------------------------------------------------------------------
ZK1210    220.51  229.87   9.36    4.68   -88    97  1.35  3.67  0.11     V6
----------------------------------------------------------------------------
including 225.11  226.34   1.23    0.61   -93   221  6.34  4.16  0.03       
----------------------------------------------------------------------------
CK2002    500.55  507.23   6.68    5.37  -261   246  2.41  4.33  0.57   V7-0
----------------------------------------------------------------------------
including 503.26  504.53   1.27    1.03  -263   555  0.38  2.66  1.81       
----------------------------------------------------------------------------
including 504.53  505.83   1.30    1.05  -264   331  4.11  9.73  0.51       
----------------------------------------------------------------------------
including 505.83  507.23   1.40    1.13  -265   302  7.16  8.19  0.23       
----------------------------------------------------------------------------
CK1000A    31.14   32.59   1.45    1.36   112   691  0.34  0.46  0.02     V9
----------------------------------------------------------------------------
including  32.14   32.59   0.45    0.42   112  2190  1.04  1.42  0.06       
----------------------------------------------------------------------------
CK1810    238.93  242.62   3.69    3.02     6   400  6.09  3.21  0.14     V9
----------------------------------------------------------------------------
including 241.59  242.62   1.03    0.84     4  1020 16.80  5.11  0.14       
----------------------------------------------------------------------------
CK1851    116.63  119.41   2.78    2.47   108   677  0.98  2.55  0.14     V9
----------------------------------------------------------------------------
CK1852    107.81  109.97   2.16    1.45    68   347  0.18  8.38  0.07  V9W-2
----------------------------------------------------------------------------
CK2001    172.64  175.79   3.15    2.76    47   441  3.29  5.71  0.16  V9W-2
----------------------------------------------------------------------------
including 174.39  175.79   1.40    1.23    46   661  4.80  5.98  0.27       
----------------------------------------------------------------------------
CK2410    139.21  143.09   3.88    3.76   107   609  0.41  0.56  0.03  V15-1
----------------------------------------------------------------------------
including 139.21  140.37   1.16    1.13   107   698  0.63  0.79  0.03       
----------------------------------------------------------------------------
including 140.37  141.42   1.05    1.02   106  1250  0.67  0.86  0.05       
----------------------------------------------------------------------------
CK2613    161.57  162.72   1.15    1.11   104   364  1.24  0.96  0.03  V15-1
----------------------------------------------------------------------------
ZK10303   133.10  140.70   7.60    3.96    27   189  5.79  3.41  0.18    V28
----------------------------------------------------------------------------
including 137.60  139.60   2.00    1.04    22   647 20.00  7.56  0.43       
----------------------------------------------------------------------------
CK10450     8.71   16.55   7.84    5.76    97   359  1.55  1.09  0.03    V28
----------------------------------------------------------------------------
including   8.71    9.77   1.06    0.78    97   538  7.51  3.45  0.08       
----------------------------------------------------------------------------
including  14.96   16.55   1.59    1.17    95  1140  2.13  1.11  0.03       
----------------------------------------------------------------------------
ZK10623   154.75  156.08   1.33    1.07    18   226  5.80  3.80  0.20    V28
----------------------------------------------------------------------------
CK10650     6.76    8.06   1.30    0.95    97   491  1.98  1.42  0.07    V28
----------------------------------------------------------------------------
ZK10622    37.85   42.00   4.15    2.94   131   157  0.14  0.47  0.03    New
----------------------------------------------------------------------------
ZK10703   151.95  153.50   1.55    1.14    22   301  6.27  5.09  0.23    New
----------------------------------------------------------------------------
CK10850    15.79   23.61   7.82    5.16    87    99  0.02  5.21  0.32    New
----------------------------------------------------------------------------
CK2550     91.34   93.85   2.51    2.26   104   614  1.19  0.45  0.08    New
----------------------------------------------------------------------------
including  91.34   92.54   1.20    1.08   104  1130  2.32  0.56  0.03       
----------------------------------------------------------------------------
CK2613    304.48  306.77   2.29    2.20    50   231  3.89  2.77  0.12    New
----------------------------------------------------------------------------
including 305.86  306.77   0.91    0.87    50   562  9.63  6.36  0.24       
----------------------------------------------------------------------------


Table 2: Assay Results in Addition to Table 1                               

----------------------------------------------------------------------------
                         Sample  True                                       
Drill       From      To Length Width   Elev-    Ag    Pb    Zn    Sn       
Hole         (m)     (m)    (m)   (m)   ation (g/t)   (%)   (%)   (%)   Vein
----------------------------------------------------------------------------
CK800B     53.50   56.11   2.61  1.31      63   103  0.25  0.47  0.02    V23
----------------------------------------------------------------------------
CK1000C     3.49    4.92   1.43  1.15     108    51  0.08  1.00  0.14    New
----------------------------------------------------------------------------
ZK1011    127.12  128.20   1.08  1.02     127    85  3.96  2.86  0.28     V6
----------------------------------------------------------------------------
ZK1011    143.93  145.09   1.16  1.10     144   147  1.70  1.89  0.12    New
----------------------------------------------------------------------------
CK1100     35.66   37.38   1.72  1.16      68   115  2.76  0.65  0.06    New
----------------------------------------------------------------------------
CK1100     42.88   50.97   8.09  5.44      62    50  0.22  1.10  0.11     V7
----------------------------------------------------------------------------
including  49.90   50.97   1.07  0.72      56   215  0.69  5.47  0.26       
----------------------------------------------------------------------------
ZK1110    119.25  122.15   2.90  2.35      43   253  0.46  0.22  0.01     V6
----------------------------------------------------------------------------
ZK1111    137.16  139.05   1.89  1.22     139   173  0.24 12.55  0.13    New
----------------------------------------------------------------------------
ZK1210    220.51  229.87   9.36  4.68     -88    97  1.35  3.67  0.11     V6
----------------------------------------------------------------------------
including 225.11  226.34   1.23  0.61     -93   221  6.34  4.16  0.03       
----------------------------------------------------------------------------
CK1215     27.24   28.83   1.59  1.40      84   210  0.89  0.63  0.09     V7
----------------------------------------------------------------------------
CK1450     81.76   83.46   1.70  1.36      73   176  1.44  0.50  0.02  V9W-1
----------------------------------------------------------------------------
CK1550    106.13  107.73   1.60  1.43      58   122  0.75  1.09  0.03  V9W-2
----------------------------------------------------------------------------
CK1702     59.01   62.51   3.50  2.96      59    86  0.68  1.13  0.06     V2
----------------------------------------------------------------------------
including  61.91   62.51   0.60  0.51      57   226  2.36  2.87  0.28       
----------------------------------------------------------------------------
CK1703     53.30   54.91   1.61  0.80      48   103  0.08  1.36  0.02   V2-1
----------------------------------------------------------------------------
CK1703    115.59  118.13   2.54  1.26     -12   148  0.16  0.50  0.44     V2
----------------------------------------------------------------------------
including 115.59  117.29   1.70  0.84     -12   209  0.26  0.65  0.62       
----------------------------------------------------------------------------
CK1750    139.24  140.74   1.50  1.28      44    91  0.46  2.25  0.12    New
----------------------------------------------------------------------------
CK1752    186.26  187.83   1.57  1.09      -2    70  0.17  7.18  0.11     V9
----------------------------------------------------------------------------
CK1810    146.63  148.22   1.59  1.30      63   102  0.19  0.87  0.06  V9W-2
----------------------------------------------------------------------------
CK1831     81.24   82.44   1.20  1.09      45   106  0.04  1.02  0.30     V2
----------------------------------------------------------------------------
CK1902    143.95  156.10  12.15  7.14     -32    80  1.93  2.78  0.15     V2
----------------------------------------------------------------------------
CK2001    161.47  164.87   3.40  2.01      54   104  0.12  1.41  0.01   V9-1
----------------------------------------------------------------------------
CK2001    214.38  215.83   1.45  1.27      21    74  0.07  1.32  0.11  V9W-1
----------------------------------------------------------------------------
CK2002    156.15  158.27   2.12  1.72      26   158  0.37  1.37  0.07    New
----------------------------------------------------------------------------
including 157.15  158.27   1.12  0.91      25   204  0.59  0.88  0.05       
----------------------------------------------------------------------------
CK2002    163.32  165.96   2.64  2.14      20   215  0.77  1.49  0.30    New
----------------------------------------------------------------------------
including 164.24  165.24   1.00  0.81      19   423  1.47  2.27  0.32       
----------------------------------------------------------------------------
CK2002    192.25  195.73   3.48  2.82      -3    61  0.02  3.68  0.05  V9W-2
----------------------------------------------------------------------------
CK2015     43.22   44.19   0.97  0.93     132 2,260  1.18  3.27  0.11  V15-0
----------------------------------------------------------------------------
CK2051    239.40  240.90   1.50  1.33       9    93  0.41  2.04  0.06    New
----------------------------------------------------------------------------
CK2051    287.20  288.90   1.70  1.50     -20    71  0.21  2.55  0.10    New
----------------------------------------------------------------------------
CK2201    154.25  155.80   1.55  1.02     105   147  0.50  0.47  0.06    New
----------------------------------------------------------------------------
CK2212     52.00   54.91   2.91  2.67     129   139  0.06  0.16  0.02  V15-1
----------------------------------------------------------------------------
CK2212    252.27  252.90   0.63  0.58      35   101  0.04  0.27  0.07     V9
----------------------------------------------------------------------------
CK2251    122.87  124.22   1.35  0.78     -18   100  0.52  1.80  0.37    New
----------------------------------------------------------------------------
CK2251    167.74  169.01   1.27  0.73     -60   140  0.30  1.45  0.34    New
----------------------------------------------------------------------------
CK2251    176.88  181.38   4.50  2.60     -69    99  1.11  2.61  0.31    New
----------------------------------------------------------------------------
CK2301     71.68   75.53   3.85  9.25      79    71  1.15  1.82  0.07     V2
----------------------------------------------------------------------------
CK2302     78.41   83.02   4.61  4.30      48    88  2.20  3.35  0.13     V2
----------------------------------------------------------------------------
CK2302    149.88  153.18   3.30  3.08       3    77  0.12  0.42  0.25    New
----------------------------------------------------------------------------
CK2350    174.66  176.89   2.23  2.16     100    80  0.54  0.63  0.09    V15
----------------------------------------------------------------------------
CK2350    239.71  241.02   1.31  1.27      75   208  0.09  1.48  0.09    V14
----------------------------------------------------------------------------
CK2351    260.93  264.63   3.70  3.44      55    89  0.26  0.82  0.13     V9
----------------------------------------------------------------------------
including 263.71  264.63   0.92  0.86      54   294  1.01  1.48  0.33       
----------------------------------------------------------------------------
CK2410    226.49  227.49   1.00  0.97      69   248  0.24  7.08  0.15    New
----------------------------------------------------------------------------
CK2410    292.30  293.34   1.04  1.01      40   113  0.11  0.86  0.08  V9W-1
----------------------------------------------------------------------------
CK2425     72.84   79.56   6.72  6.38      63    64  0.33  2.42  0.14    New
----------------------------------------------------------------------------
CK2428     58.15   59.73   1.58  1.34      60    80  0.81  2.76  0.11    New
----------------------------------------------------------------------------
CK2550     79.02   81.82   2.80  2.52     111    80  0.04  1.37  0.09    New
----------------------------------------------------------------------------
CK2551     36.86   37.96   1.10  0.73     122   309  0.08  7.37  0.08    New
----------------------------------------------------------------------------
CK2551    123.05  124.35   1.30  0.87      46    72  0.03  2.41  0.07  V9W-1
----------------------------------------------------------------------------
CK2613    274.56  275.22   0.66  0.64      60   153  1.33  4.90  0.13    New
----------------------------------------------------------------------------
CK2650     69.85   71.75   1.90  1.48     123   114  0.04  0.80  0.07  V9W-2
----------------------------------------------------------------------------
CK2650    121.13  126.03   4.90  3.81     101    57  0.01  3.82  0.21    New
----------------------------------------------------------------------------
CK2805    127.64  127.84   0.20  0.10      56   156  6.55  5.18  0.00    New
----------------------------------------------------------------------------
                                                                         V8-
CK2805    184.41  184.96   0.55  0.28       6    55  1.25  1.65  0.01 Branch
----------------------------------------------------------------------------
                                                                        V15-
CK2805    316.12  319.49   3.37  1.63    -110   131  3.83  3.73  0.39 Branch
----------------------------------------------------------------------------
including 316.12  317.14   1.02  0.49    -110   226  5.37  5.39  0.32       
----------------------------------------------------------------------------
ZK28001     7.44    8.64   1.20  1.04      98    25  0.02  5.20  0.29     V2
----------------------------------------------------------------------------
ZK28001    28.12   29.02   0.90  0.78      84    24  0.02  4.06  0.05   V2-1
----------------------------------------------------------------------------
ZK28A01    10.98   12.76   1.78  1.14      93    44  0.14  5.29  0.17    New
----------------------------------------------------------------------------
ZK28A01    35.96   37.53   1.57  1.01      70     8  0.02  1.23  0.45    New
----------------------------------------------------------------------------
ZK28A01   103.68  108.40   4.72  3.02       6    21  0.07  1.87  0.12    New
----------------------------------------------------------------------------
CK2950     63.65   70.99   7.34  5.09      75    43  0.52  1.42  0.06  V9W-2
----------------------------------------------------------------------------
CK2950     93.42   94.96   1.54  1.12      68    31  0.05  2.09  0.02    New
----------------------------------------------------------------------------
CK2950    112.46  123.22  10.76  7.86      63    56  0.10  2.73  0.12    New
----------------------------------------------------------------------------
including 112.46  113.86   1.40  1.02      63   269  0.37 10.20  0.53       
----------------------------------------------------------------------------
CK2951     71.57   72.98   1.41  1.16      56   101  0.03  2.49  0.23  V9W-2
----------------------------------------------------------------------------
                                                                         V5-
CK3005     27.02   29.20   2.18  2.07      81    83  1.82  2.04  0.06 Branch
----------------------------------------------------------------------------
CK3005     50.37   51.27   0.90  0.85      73    36  0.03  3.38  0.04     V5
----------------------------------------------------------------------------
CK3005     98.12   99.33   1.21  1.15      55   114  1.55  0.82  0.03   V5-1
----------------------------------------------------------------------------
CK3050     45.09   51.90   6.81  6.17      64    74  1.63  1.72  0.08    New
----------------------------------------------------------------------------
CK3051    154.25  156.05   1.80  1.39     -35   228  0.21  0.24  0.03  V9W-2
----------------------------------------------------------------------------
CK3202      9.53   10.30   0.77  0.70      85    53  0.01  9.80  0.23     V9
----------------------------------------------------------------------------
CK3202     30.05   31.02   0.97  0.88      71    67  0.24  7.34  0.20     V5
----------------------------------------------------------------------------
CK3202    191.75  196.49   4.74  4.36     -35    99  0.05  0.57  0.07     V2
----------------------------------------------------------------------------
including 192.95  193.61   0.66  0.60     -36   450  0.24  0.81  0.16       
----------------------------------------------------------------------------
CK3250     97.24   98.06   0.82  0.74      52    60  0.01  5.36  0.12   V5-1
----------------------------------------------------------------------------
CK3251     54.92   57.93   3.01  2.61      56    79  0.11  2.77  0.06  V9W-2
----------------------------------------------------------------------------
including  93.50   94.83   1.33  1.15      89   231  4.11  9.61  0.19    V28
----------------------------------------------------------------------------
ZK10202   113.20  117.45   4.25  2.46      50    54  0.41  3.92  0.15    V28
----------------------------------------------------------------------------
ZK10301    47.95   51.07   3.12  2.81     122    34  1.28  3.61  0.22    New
----------------------------------------------------------------------------
ZK10302    53.54   55.40   1.86  0.72     108    64  1.00  3.29  0.29    New
----------------------------------------------------------------------------
ZK10302   111.60  120.40   8.80  3.40      55   101  1.74  3.48  0.10    V28
----------------------------------------------------------------------------
including 116.00  117.00   1.00  0.39      51   489  6.80  6.20  0.26    V28
----------------------------------------------------------------------------
ZK10401   120.04  124.15   4.11  3.72      80    67  1.01  2.56  0.10    New
----------------------------------------------------------------------------
ZK10401   148.43  149.43   1.00  0.91      60    81  0.66  2.03  0.05    V28
----------------------------------------------------------------------------
ZK10410   112.55  113.20   0.65  0.46      69   119  0.01 14.85  0.23    New
----------------------------------------------------------------------------
ZK10411   174.20  178.35   4.15  2.99       2   107  1.80  2.49  0.29    V28
----------------------------------------------------------------------------
CK10450   172.47  174.07   1.60  1.17      44    94  1.58  2.54  0.11    New
----------------------------------------------------------------------------
CK10450   195.66  197.24   1.58  1.16      36   107  0.04  1.29  0.22    New
----------------------------------------------------------------------------
ZK10521    94.57   95.92   1.35  0.96      84    41  0.01  7.06  0.06    New
----------------------------------------------------------------------------
ZK10521   129.05  136.21   7.16  5.08      55   123  1.61  3.87  0.16    New
----------------------------------------------------------------------------
including 133.90  135.00   1.10  0.78      51   397  3.08 13.20  0.54    New
----------------------------------------------------------------------------
including 135.00  136.21   1.21  0.86      50   229  5.93  9.05  0.28    New
----------------------------------------------------------------------------
ZK10522    31.60   33.60   2.00  1.49     134   181  0.04  1.68  0.02    New
----------------------------------------------------------------------------
ZK10522   197.73  199.46   1.73  1.29     -23   101  6.82  2.24  0.01    V28
----------------------------------------------------------------------------
CK10550     8.33    9.27   0.94  0.69      97    89  1.25  1.44  0.07    New
----------------------------------------------------------------------------
CK10550    14.47   18.81   4.34  3.19      95   144  1.10  3.14  0.06    V28
----------------------------------------------------------------------------
including  14.47   15.20   0.73  0.54      95   256  0.59  1.04  0.09    V28
----------------------------------------------------------------------------
including  16.00   16.96   0.96  0.70      94   237  2.50  7.26  0.10    V28
----------------------------------------------------------------------------
CK10550   154.99  159.82   4.83  3.55      51    50  1.18  1.65  0.02    V26
----------------------------------------------------------------------------
CK10550   181.42  182.59   1.17  0.86      43   114  2.55  2.13  0.06    V25
----------------------------------------------------------------------------
ZK10621   125.70  129.60   3.90  1.79      65    99  1.05  3.96  0.07    V28
----------------------------------------------------------------------------
ZK10622    80.55   81.65   1.10  0.78      94    63  0.03  3.80  0.09    New
----------------------------------------------------------------------------
ZK10622   102.93  104.13   1.20  0.85      74    97  0.29  0.62  0.02    New
----------------------------------------------------------------------------
ZK10623   102.86  104.11   1.25  1.01      67    62  0.01  3.95  0.17    New
----------------------------------------------------------------------------
ZK10623   182.09  183.06   0.97  0.78      -8   105  1.20  4.10  0.07    New
----------------------------------------------------------------------------
CK10650    21.54   26.17   4.63  3.40      92    86  1.32  0.66  0.08    New
----------------------------------------------------------------------------
ZK10704    84.00   85.35   1.35  1.14     104   243  0.23  0.77  0.05    New
----------------------------------------------------------------------------
CK10820    21.33   27.36   6.03  5.35      80    62  0.03  3.85  0.14    New
----------------------------------------------------------------------------
CK10820    87.43   88.97   1.54  1.37      43    84  0.54  2.47  0.07    New
----------------------------------------------------------------------------

Quality Control

Drill cores are in NQ size. Drill core samples, from 1.00m to 1.50m in length, or limited by apparent mineralization contact or shear/alteration contact, were split into halves by saw cutting. One half of the cores are stored in the Company's core shacks for future reference and checking and the other remaining samples are shipped in security sealed bags to ALS Chemex in Guangzhou, China (Certification ISO 9001), located approximately 180km southeast of the GC project site for sample preparation and assay.

Sample preparation consists of drying, crushing and splitting of samples to 250 grams and then they are pulverized to 200 mesh. Silver, lead, and zinc in drill core samples were analyzed by aqua regia digestion and AAS finish. Tin was analyzed by fusing with peroxide then by leaching the melt and acidifying to precipitate the tin for AAS finish.

The Company maintains a comprehensive quality assurance and quality control program to ensure best practices in sample preparation and analysis of the drill core samples. Project geologists regularly insert certified reference materials (CRM), field duplicates and blanks to each batch of core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending about 3% of the pulp samples to higher-level labs to check for lab bias.

Data from both the Company's and the labs' QA/QC programs are reviewed and evaluated in a timely manner by project geologists.

Brian O'Connor P.Geo., is the Qualified Person on the project as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China which has paid a cash dividend since 2007. The Company is currently developing the GC project in southern China which it expects will become its next operating mine in 2013. The Company's vision is to deliver shareholder value by focusing on the acquisition of under developed projects with resource potential and the ability to grow organically. For more information, please visit our website at www.silvercorp.ca.

CAUTIONARY DISCLAIMER -- FORWARD-LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licenses; title to properties; First Nations title claims and rights; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2012 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.

Contacts:
Silvercorp Metals Inc.
Jonathan Hackshaw
Director, Investor Relations
(604) 669-9397 or Toll Free: 1(888) 224-1881
investor@silvercorp.ca
www.silvercorp.ca


Source: Silvercorp Metals Inc.


If you no longer wish to receive future mailings from Silvercorp Metals Inc., please click




Date Sent: 2/20/2013 5:36:52 PM Powered by Q4 Web Systems
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Silvercorp Metals Inc.

PRODUCTEUR
CODE : SVM.TO
ISIN : CA82835P1036
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Silvercorp Metals est une société de production minière d'argent basée au Canada.

Silvercorp Metals est productrice d'argent, d'or, de plomb et de zinc en Chine, en développement de projets d'argent, d'or, de plomb et de zinc en Chine, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont YING MINE, BYP, HPG MINE, TLP MINE et XBG en Chine, ses principaux projets en développement sont LM MINE, GAOCHENG (GC) et SHIMENTOU (SMT) en Chine et ses principaux projets en exploration sont NA BAO et GC en Chine et SILVERTIP au Canada.

Silvercorp Metals est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 827,5 millions CA$ (601,9 millions US$, 565,4 millions €).

La valeur de son action a atteint son plus bas niveau récent le 21 décembre 2001 à 0,02 CA$, et son plus haut niveau récent le 02 octobre 2020 à 9,97 CA$.

Silvercorp Metals possède 167 850 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Silvercorp Metals Inc.
2007 Annual Report
Financements de Silvercorp Metals Inc.
25/06/2011Announces TSX Approval Of Share Repurchase Program
06/07/2009Responds to Klondex’s Directors’ Circular and Completed Priv...
06/04/2006(Hpg Mine)arranges bought deal financing to raise $41,542,500
Attributions d'options de Silvercorp Metals Inc.
06/09/2012AGM Rescheduled To Friday September 28, 2012; Board Proposes...
11/01/2012Received RMB 269 Million Cash Dividend From Its Chinese Subs...
Nominations de Silvercorp Metals Inc.
16/09/2013Silvercorp - Silvercorp Announces Appointment of Senior Vice...
08/11/2012Announces Management Appointments
28/11/2011Announces New Director Appointment
Rapports Financiers de Silvercorp Metals Inc.
22/09/2015Silvercorp Reports 2015 AGM Results
19/08/2015Silvercorp to Return to Single Listing Status
13/08/2015Silvercorp Reports Q1 Fiscal 2016 Financial And Operating Re...
13/08/2015Silvercorp posts 1Q profit
13/02/2014Silvercorp - Silvercorp Reports Financial and Operating Resu...
14/11/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
09/08/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
22/05/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
22/05/2013Reports Financial and Operating Results for the Fourth Quart...
13/02/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
14/11/2012SilverCorp - Silvercorp Reports Financial and Operating Resu...
13/11/2012Reports Financial and Operating Results for the Second Quart...
03/08/2012Reports Financial And Operating Results For The First Quarte...
08/02/2012Reports Revenue of $61.9 Million and Operating Cash Flow of ...
25/10/2011Receives Clear Forensic Accountants Report
03/08/2011Reports Net Income Up 82% to $25.6 Million or $0.15 Per Shar...
03/06/2011Form 40-F Available on Website
12/05/2011Reports Record Silver Production Of 5.3 Million Ounces, Rec...
13/05/2010Net Income Of $9.8 Million And Cash Flow Of $23.8 Million In...
09/11/2009Reports Net Income Of $8.9 Million And Cash Flow Of $15.9 Mi...
13/08/2009Reports Net Income of $7.5 Million ($0.05 EPS) on Record Sil...
14/05/2009Financial And Operating Results For The 4th Quarter And Fisc...
13/02/2009Announces Its Financial And Operating Results For The 3rd Qu...
17/11/2008Second Quarter Dividend - CAD$0.02
14/11/2008Announces Its Financial And Operating Results For The 2nd Qu...
16/05/2007to Report 2007 Fourth Quarter and Year End Results on June 1...
Projets de Silvercorp Metals Inc.
23/11/2015(Tlp Mine)Silvercorp Reports Newly Exposed Mineralization At The TLP M...
11/06/2013SilverCorp - Silvercorp Reports Exploration Results at the H...
11/06/2013(Hpg Mine)Reports Exploration Results at the HPG Mine, Ying Mining Dis...
06/06/2013SilverCorp - Silvercorp Reports Underground Exploration Resu...
04/06/2013SilverCorp - Silvercorp Reports Results From Its 2012 Explor...
15/04/2013SilverCorp - Silvercorp Reports Underground Diamond Drilling...
20/02/2013SilverCorp - Silvercorp Intercepts 33.29 Metres True Width G...
17/09/2012(Gc)GC Project Construction Progress Photo Album - Sep 17, 2012
27/08/2012(Tlp Mine)Intercepts High-Grade Silver-Lead-Zinc Mineralization At The...
16/08/2012(Byp)Reports Resource Update for Its BYP Mine in Hunan Province, ...
01/08/2012(Ying Mine)Reports Intercept of 10.87 Meters Grading 715 Grams per Tonn...
06/06/2012Reports Significant Gain In Measured And Indicated Mineral R...
18/05/2012Reports Record Silver Production Of 5.6 Million Ounces, Reco...
13/02/2012(Lm Mine)Reports 4.34 metre interception (true width) of 642 gram per...
31/01/2012(Gc)Announces Positive Pre-Feasibility Study for the GC Silver-L...
26/01/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams per tonne...
26/01/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams Per Tonne...
17/01/2012(Gc)Surface Diamond Drilling Intercepted 3.13 Meters of 432 Gram...
06/01/2012(Gc)Provides Progress Update on its GC Project in Guangdong Prov...
22/08/2011(Xbg)Acquires High Grade XBG Silver-Gold-Lead-Zinc Property in Lu...
07/07/2011(Ying Mine)Reports Resource and Reserves Update at Ying Silver-Lead-Zin...
06/07/2011(Silvertip)Reports Resources Estimate On The Silvertip Silver-Lead-Zinc...
05/07/2011(Byp)Reports Resources Estimate on the BYP Gold-Lead-Zinc Propert...
05/05/2011(Byp) Diamond Drilling Intercepts 69.5 Metres Grading 5 g/t Gold ...
17/02/2011(Silvertip)Announces Positive Preliminary Assessment For The Silvertip ...
03/02/2011(Byp)Closes Acquisition Of BYP Gold-Lead-Zinc Mine In Hunan Pro...
31/01/2011(Ying Mine)Underground Drilling Intercepts 2.0 Metres Grading 1,593 Gra...
21/01/2011(Ying Mine)Underground Drilling Intercepts 14.62 Metres Grading 363 Gra...
04/08/2010(Gaocheng (gc))Submits Mining Permit Application
26/07/2010(Ying Mine)Heavy Rain Fall Affects Operations At Ying Mining District
14/06/2010(Gaocheng (gc))Receives Environmental Permit
01/03/2010(Ying Mine)Reports Proven & Probable Reserves Estimate At Ying Mining D...
29/06/2009(Gaocheng (gc))Measured and Indicated Silver Resources Increase by 250% at ...
08/01/2009(Gaocheng (gc))Drilling Intersects High-Grade Silver Mineralization in V2 a...
19/12/2008(Lm Mine)Technical Report Completed On The TLP-LM Project, Henan Prov...
21/01/2008Discovers High Grade Polymetalic Mineralization at the Na-Ba...
14/02/2006(Ying Mine)environment assessment report for developing the Ying Silver...
Communiqués de Presse de Silvercorp Metals Inc.
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
26/05/2016Silvercorp reports 4Q loss
26/05/2016Silvercorp Reports Silver Production Of 5.0 Million Ounces, ...
23/12/2015Silvercorp Announces New Share Repurchase Program
20/08/2015Silvercorp to Return to Single Listing Status
19/02/2014Silvercorp - Silvercorp Intercepts 1.42 Metre Interval Gradi...
06/02/2014Silvercorp - Silvercorp to Release Third Quarter Fiscal 2014...
20/12/2013Silvercorp - Silvercorp Notes Regulators Allege Fraud in Act...
15/11/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
18/10/2013Silvercorp - Silvercorp Announces Senior Management and Dire...
18/10/2013Announces Senior Management and Director Changes
21/09/2013Silvercorp - Silvercorp Reports 2013 AGM Results
20/09/2013Reports 2013 AGM Results
12/09/2013Silvercorp - Silvercorp Provides Operation Update for Ying M...
12/09/2013Provides Operation Update for Ying Mining District
09/08/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
08/08/2013Declares Quarterly Cash Dividend of CAD$0.025
30/07/2013Silvercorp - Silvercorp to Release Financial and Operating R...
30/07/2013to Release Financial and Operating Results for the First Qua...
04/06/2013Reports Results From Its 2012 Exploration Program at the SGX...
23/05/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
06/05/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
06/05/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
15/04/2013Reports Underground Diamond Drilling and Tunneling Explorati...
03/04/2013SilverCorp - Silvercorp Responds to Recent Press Article Abo...
03/04/2013Responds to Recent Press Article About the Company
25/03/2013A Shareholder Class Action Was Filed But Does Not Include Ce...
13/03/2013SilverCorp - Silvercorp Provides Update Regarding Defamation...
13/03/2013Provides Update Regarding Defamation Case and Class Action
20/02/2013Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0...
15/02/2013SilverCorp - Silvercorp Issues Correction to Dividend Record...
14/02/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
13/02/2013SilverCorp - Silvercorp Provides Outlook for Fiscal 2014
13/02/2013Provides Outlook for Fiscal 2014
07/02/2013Discovers Five New High-Grade Silver Zones and Extends Known...
31/01/2013SilverCorp - Silvercorp Intercepts 18.8 Metres True Width Gr...
29/01/2013SilverCorp - Silvercorp Share Repurchase Program Approved by...
26/01/2013SilverCorp - Silvercorp: Open Letter from Chairman
24/01/2013SilverCorp - Silvercorp Responds to Class Action Lawsuits
24/01/2013Responds to Class Action Lawsuits
14/11/2012SilverCorp - Silvercorp Announces Dividend of CAD$0.025
29/10/2012to Release Results for Fiscal 2013 Second Quarter on Novembe...
18/10/2012(Gc)Reports Intercept of 2.12 Metres Grading 1,684 Grams Per Ton...
28/09/2012Reports 2012 AGM Results
06/09/2012(Gc)Reports Intercept of 3.88 Metres Grading 609 Grams Per Tonne...
20/08/2012(Lm Mine)Reports Intercept of 4.55 Metres Grading 2,196 Grams per Ton...
03/08/2012Announces First Quarter Dividend Of CAD$0.025
25/07/2012to Release First Quarter 2013 Results on August 2 and Host C...
05/07/2012(Silvertip)Reports Independent Mineral Resource Estimates on Silvertip ...
05/06/2012Reports Significant Gain in Measured and Indicated Mineral R...
28/05/2012(Ying Mine)Provides Update on Production at the Ying Mine in Henan Prov...
19/05/2012Announces Fourth Quarter Dividend Of CAD$0.025
17/05/2012Reports Record Silver Production of 5.6 Million Ounces, Reco...
30/04/2012to Announce Fourth Quarter and Year End Results & Hold Analy...
10/02/2012Announces Third Quarter Dividend Of CAD$0.025
09/02/2012Forecasts 20% Increase In Silver Production For Fiscal Year ...
09/01/2012Sues Jon R. Carnes, his EOS Holdings and Zane Heilig as “Alf...
30/12/2011to Commence Work on Resource and Reserve Updates
21/12/2011Chinese Law Enforcement Agents Open Criminal Case to Investi...
08/12/2011Fiscal 2012 Drilling Exploration Program Update
26/10/2011Statement From Chairman
28/09/2011’s 2011 China Investor Tour Pictures
23/09/2011Files Lawsuit In New York Against Stock Manipulation Scheme
22/09/2011Open Letter From Chairman - Key Points
15/09/2011Repurchases Over $31 Million Of Shares Under NCIB
14/09/2011Responds To Second Anonymous Allegation And Provides Governm...
12/09/2011On Progress To Identify The Anonymous Letter Writer And To R...
31/08/2011Repurchases In Excess Of 2 Million Shares Under Normal Cours...
26/08/2011On Normal Course Issuer Bid
11/08/2011Update on Normal Course Issuer Bid
04/08/2011Announces First Quarter Dividend Of CAD$0.02
25/07/2011to Announce First Quarter Results & Hold Analyst Conference ...
14/07/2011Reports: Record Silver Production Of 1.6 Million Ounces And ...
11/07/2011Reports 24% Year Over Year M&I Silver-Equivalent Resource Gr...
21/06/2011Announces Share Repurchase Program
09/06/2011Henan Subsidiary Ranked as the 7th Strongest Company in Luoy...
12/05/2011Announces Fourth Quarter Dividend Of Cad$0.02
28/04/2011to Announce Fourth Quarter Results & Hold Analyst Conference...
09/02/2011Announces Q3 Dividend Of CAD$0.02
13/08/2010Q1 Dividend Of CAD $0.02
13/08/2010Reports Record Silver Production for Q1 of Fiscal 2011: Sale...
31/07/2010Files Preliminary Base Shelf Prospectus
13/05/2010Declaration of Quarterly Dividend-CAD$0.02
22/02/2010to Acquire Advanced Stage Silver-Lead-Zinc Project in Britis...
10/02/2010Declaration Of Quarterly Dividend - CAD$0.02
25/11/2009to Present and Exhibit at Mines & Money London Show on Dec. ...
10/11/2009Announces Declaration Of Quarterly Dividend - CAD$0.02
03/11/2009Lists on New York Stock Exchange
01/10/2009Annual General Meeting Results
28/09/2009Reminder: Silvercorp Metals Annual General Meeting – Septemb...
14/08/2009Announces Declaration of Quarterly Dividend - CAD$0.02
22/07/2009Announces It Has Terminated Its Offer To Klondex Shareholder...
20/07/2009Announces That Its Offer To Klondex Shareholders Will Expire
15/06/2009Formally Commences Offer to Acquire All of the Outstanding S...
08/06/2009Announces its Intention to Make an Offer to Acquire Klondex ...
03/06/2009Responds to Stock Trading Activity
17/02/2009Commences Trading On NYSE Alternext US
13/02/2009 Announces Declaration Of Quarterly Dividend - Cad$0.02
13/03/2008$50 Million Exploration and Development Program Budgeted for...
15/02/2008 RECORDS $0.12 EPS FOR Q3 FISCAL 2008 ENDED DECEMBER 31, 200...
12/12/2007to Build A New 2,000 Tonne Per Day Mill For The Ying Silver ...
07/12/2007Announces Additions to its Senior Management Team
16/04/2007Signed Agreement to Participate in Constructing a New Lead S...
12/04/2007Commencement of Drill Program on the NPG Molybdenum Project ...
31/03/2006(Ying Mine)receives mining permit on Ying Silver Project, Henan, China
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SVM.TO)NYSE (SVM)
4,93+0.82%3,57+0.00%
TORONTO
CA$ 4,93
19/04 17:00 0,040
0,82%
Cours préc. Ouverture
4,89 4,87
Bas haut
4,86 5,06
Année b/h Var. YTD
3,04 -  5,27 44,57%
52 sem. b/h var. 52 sem.
2,92 -  5,27 -0,605%
Volume var. 1 mois
296 383 18,80%
24hGold TrendPower© : 28
Produit Gold - Lead - Silver - Zinc
Développe Gold - Lead - Silver - Zinc
Recherche Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 29/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202439,27%
2023-11,06%5,593,23
2022-19,92%5,412,74
2021-41,60%9,654,31
202015,47%9,9710,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :