Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Silvercorp Metals Inc.

Publié le 15 avril 2013

SilverCorp - Silvercorp Reports Underground Diamond Drilling and Tunneling Exploration Results for t

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |


Silvercorp Reports Underground Diamond Drilling and Tunneling Exploration Results for the Second Half of 2012 at the TLP Mine, Ying Mining District, China

VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 15, 2013) - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX:SVM)(NYSE:SVM) is pleased to report the results from its 2012 underground diamond drilling and tunneling exploration programs for the second half of 2012 at the TLP mine, Ying Mining District, Henan Province, China.

Highlights of selected intercepts in drill holes:

--  Hole ZKT0331 intercepted an interval of 1.91 metres ("m"), 1.28m true
    width of vein T33 grading 1,669 grams per tonne ("g/t") silver ("Ag"),
    0.82% lead ("Pb") and 0.29% zinc ("Zn") at the 877m elevation; and an
    interval of 1.11m, 0.74m true width of vein T33E grading 115 g/t Ag,
    0.46% Pb and 0.03% Zn at the 771m elevation;

--  Hole ZKT1731 intercepted an interval of 1.54m, 1.19m true width of vein
    T33E grading 1,016 g/t Ag, 5.48% Pb and 0.80% Zn at the 922m elevation;

--  Hole ZKG0404 intercepted an interval of 3.58m, 2.57m true width of vein
    T16E grading 233 g/t Ag, 1.95% Pb and 0.60% Zn at the 838m elevation,
    including an interval of 0.90m, 0.65m true width grading 702 g/t Ag,
    6.77% Pb and 1.94% Zn; and an interval of 1.67m, 1.22m true width of
    vein T11 grading 1,023 g/t Ag, 6.18% Pb and 0.96% Zn at the 553m
    elevation;

--  Hole ZKG0621 intercepted four veins: an interval of 1.07m, 1.04m true
    width of vein T16E grading 669 g/t Ag, 0.97% Pb and 0.12% Zn at the 838m
    elevation, an interval of 1.13m, 1.10m true width of vein T16E2 grading
    449 g/t Ag, 3.16% Pb and 0.30% Zn at the 806m elevation, an interval of
    0.81m, 0.79m true width of vein T15W1 grading 221 g/t Ag, 0.98% Pb and
    0.13% Zn at the 799m elevation, and an interval of 1.09m, 1.06m true
    width of vein T11 grading 320 g/t Ag, 0.93% Pb and 1.03% Zn at the 729m
    elevation; and

--  Hole ZKG0622 intercepted three veins: an interval of 1.27m, 1.12m true
    width of vein T16E grading 909 g/t Ag, 5.35% Pb and 0.49% Zn at the 837m
    elevation, an interval of 1.59m, 1.26m true width of vein T15W1 grading
    348 g/t Ag, 4.02% Pb and 0.19% Zn at the 770m elevation, and an interval
    of 1.52m, 1.35m true width of vein T15 grading 1,150 g/t Ag, 2.18% Pb
    and 0.10% Zn at the 717m elevation.

The purpose of the 11,916m underground tunneling program in 2012 was to further delineate and upgrade the previous drill-defined resource blocks within major vein structures T1, T1W, T1W1, T1W3, T2, T3, T16, T16W, T22, T33 and T34 between the 510m and the 990m elevations. Drift and crosscut tunnels have been developed at 30m to 50m intervals. A total of 5,619 chip samples were collected. Mineralized zones were exposed in drift tunnels on different levels along the major vein structures.

The 2012 underground diamond drilling program was designed to test the downdip and strike extension of the major mineralized vein structures and to explore for new vein structures. A total of 23,709m in 73 holes was completed and 3,336 core samples were collected. Assay results for 22 holes were received by the end of June 2012 and were reported by the Company on August 27, 2012 via news release.

In the second half of 2012, the Company revised its underground drilling strategy. Instead of focusing on step out drilling at depths below the current mining depth, the Company tested the lateral extensions by conducting in-fill and step-out drilling at shallow depth on the upper portions of the major production vein structures at or above the 700m elevation. As previously reported via news release on February 13, 2013, this strategy has been successful in defining additional high grade mineralization of production veins and discovered several new veins at shallow depth where mine development exits. As of March 10, 2013, assay results for 51 holes had been received. 44 of the 51 holes with new assay results intercepted single or multiple mineralized zones.

Seven new mineralized vein structures, T23, T33W3, T41, T16E1, T16E2, T15W and T15W1 were also discovered as a result of the 2012 underground tunneling and diamond drilling program. A summary of these new vein structures is as follows:

--  Vein structure T15W: T15W is located 10m to 30m parallel to the west of
    vein T15 and the discovery was made by underground drilling from access
    tunnel PD820 at the 820m elevation. The mineralized vein structure has
    been intercepted between the 649m and 796m elevations by 6 holes drilled
    between exploration lines 4 and 6.

--  Vein structure T15W1: T15W1 is located 40m to 70m parallel to the west
    of vein T15 and the discovery was made by underground drilling. The
    mineralized vein structure has been intercepted between the 696m and
    808m elevations by 6 holes drilled between exploration lines 4 and 6.

--  Vein structure T16E1: T16E1 is located 50m to 70m parallel to the east
    of vein T16. The mineralized vein structure has been intercepted between
    the 765m and 828m elevations by 6 holes drilled between exploration
    lines 4 and 6.

--  Vein structure T16E2: T16E2 is located 80m to 90m parallel to the east
    of vein T16. The mineralized vein structure has been intercepted between
    the 735m and 814m elevations by 6 holes drilled between exploration
    lines 4 and 6.

--  Vein structure T23: T23 is located 120m parallel to the east of vein
    T33. Mineralized zones have been intersected by drifting along the vein
    developed on the 930m, 890m and 840m levels between exploration lines 5
    and 11.

--  Vein structure T33W3: T33W3 is located 100m to 120m parallel to the west
    of T33, which was intersected by drifting along the vein at the 800m
    level. A zone of mineralization 105m in length has been defined.

--  Vein structure T41: T41 is located 30m to 40m to the west of vein T27
    and was intersected by a drift tunnel developed on the 930m level. A
    zone of mineralization 40m in length within the vein has been defined.

Tables 1 and 2 below list the assay results of some selected mineralized zones that were exposed in tunnels and via drilling.

In 2013 Silvercorp has planned an exploration and resource development program at the TLP mine consisting of 9,790m of underground tunneling and 14,500m of underground drilling. The goals of the program are: infill drilling of previously defined resource blocks at shallower depths; exploration along strike (lateral) and up dip (shallower) of the extensions of major producing veins; and exploration for parallel vein structures in the hanging wall and footwall of known mineralized veins. Where possible, the program will take advantage of existing underground mine development to access new discoveries and will drive new tunnels as required to provide drill stations in prospective areas beyond the reach of existing mine workings.

Table 1: Selected tunneling results from the TLP Mine

----------------------------------------------------------------------------
                                Length              Weighted Average
                                    of      --------------------------------
                           Mineralized      Horizontal  True
                  Elevation       Zone           Width Width    Ag   Pb   Zn
Tunnel ID               (m)        (m)  Vein       (m)   (m) (g/t)  (%)  (%)
----------------------------------------------------------------------------
PD840-840-T1W3-
 7SYM                   840         40  T1W3      0.52  0.48   451 1.36 0.03
----------------------------------------------------------------------------
PD820-798-T16W-
 12NYM&12SYM            798         55  T16W      0.60  0.56   216 0.71 0.39
----------------------------------------------------------------------------
PD730-730-T34-
 23NYM                  730         65   T34      0.59  0.54   147 4.42 0.27
----------------------------------------------------------------------------
PD840-874-T14-
 21TJ-NYM&SYM           874         55   T14      0.60  0.55   201 1.84 0.32
----------------------------------------------------------------------------
PD820-820-T16-
 10SYM                  820         60   T16      0.44  0.42   176 1.41 0.30
----------------------------------------------------------------------------
PD960-960-T22-0SYM      960         49   T22      0.86  0.84   211 4.95 0.12
----------------------------------------------------------------------------
PD930-930- W3-
 5SYM&NYM               930         80   T23      0.51  0.46   184 2.03 0.22
----------------------------------------------------------------------------
PD890-890-T23-
 11SYM                  890        145   T23      0.75  0.68   264 5.04 0.11
----------------------------------------------------------------------------
PD840-840-T23-7NYM      840         64   T23      0.69  0.62   214 4.80 0.22
----------------------------------------------------------------------------
PD930-930-T33-
 13SYM                  930        245   T33      0.79  0.73   338 1.80 0.28
----------------------------------------------------------------------------
PD930-930-
 T33Branch-
 11SYM&NYM              930        189   T33      0.91  0.84   567 0.67 0.15
----------------------------------------------------------------------------
PD800-800-T33W3-
 19SYM&NYM              800        105 T33W3      0.43  0.41   295 2.67 0.56
----------------------------------------------------------------------------
PD820-691-T16-6SYM      691         65   T16      0.64  0.61   253 3.40 0.13
----------------------------------------------------------------------------

Table 2: Selected drilling results from the TLP Mine

----------------------------------------------------------------------------
                                          True
            From     ToElevationInterval Width    Ag    Pb    Zn Mineralized
Hole ID      (m)    (m)      (m)     (m)   (m) (g/t)   (%)   (%) Vein
----------------------------------------------------------------------------
ZKG0805   226.42 227.07      759    0.65  0.62   178  0.64  0.14 T16E
          277.68  278.1      741    0.42  0.40   192  1.00  0.13 T15-Branch
          289.78 290.21      737    0.43  0.41 1,544  1.48  0.66 T15
----------------------------------------------------------------------------
ZKT0232    79.63  84.29      841    4.66  3.92   187  3.03  0.28 T1W1
----------------------------------------------------------------------------
ZKT0054   329.44 330.58      691    1.14  0.95   149  0.32  0.18 T17W
          437.47 438.69      602    1.22  0.56   440  3.61  0.20 T17
----------------------------------------------------------------------------
ZKG1004   180.01 181.17      698    1.16  0.78   679  3.16  0.70 T16W
          223.44 224.01      665    0.57  0.47 4,534  4.07  0.26 T16
          433.51 433.75      508    0.24  0.22   258  0.14  0.04 T11E
----------------------------------------------------------------------------
ZKT0003   366.78 367.61      473    0.83  0.58 1,052  1.05  0.02 T3
----------------------------------------------------------------------------
ZKG0401     1.13   1.58      838    0.45  0.39   967  4.61  0.26 T16E
           29.01  29.52      828    0.51  0.44   235  5.90  0.13 T16E1
                                                                 T15W1-
           72.61  73.86      812    1.25  1.07   233  4.80  0.12 Branch
           85.58  85.95      808    0.37  0.32    42 13.87  0.46 T15W1
          117.41 118.37      796    0.96  0.82   211  3.80  0.46 T15W
----------------------------------------------------------------------------
ZKT0331    19.93  21.84      877    1.91  1.28 1,669  0.82  0.29 T33
          174.05 175.16      771    1.11  0.74   115  0.46  0.03 T33E
----------------------------------------------------------------------------
ZKG1005   175.15 177.72      678    2.57  0.73   120  1.25  0.20 T17
          230.18 232.14      630    1.96  1.31   176  1.20  0.20 T16W
          469.02 469.78      418    0.76  0.58   158 11.25  4.85 T11E
----------------------------------------------------------------------------
ZKG1801   140.97 141.91      747    0.94  0.81   284  0.45  0.36
----------------------------------------------------------------------------
ZKG0402     0.68   1.71      838    1.03  0.90   411  0.66  0.08 T16E
           92.24  92.91      779    0.67  0.59   101  3.57  0.42 T15W1
          156.78 157.32      738    0.54  0.46   264  4.79  0.06 T15
----------------------------------------------------------------------------
ZKT0332   381.92 382.72      794    0.80  0.51   398  1.19  0.12 T1W1
----------------------------------------------------------------------------
ZKT1001  134.054134.744      722    0.69  0.65   584  1.51  2.18 T1W1
----------------------------------------------------------------------------
ZKG0403      2.6   3.79      836    1.19  0.96   180  2.76  0.20 T16E
           52.75  54.01      794    1.26  1.02    17  3.25  0.32 T16E1
           76.28  78.54      774    2.26  1.83   195  3.96  0.25 T16E2
           107.1 107.86      748    0.76  0.61   150  1.84  0.34 T15W1
                                                                 T15W1-
          131.04 131.64      727    0.60  0.49   132  1.16  0.02 Branch
           159.9 162.04      703    2.14  1.73   121  1.12  0.08 T15W
          218.47 219.45      654    0.98  0.75    15  3.16  0.07 T15E
          283.16 284.53      599    1.37  1.05   126  1.15  0.36 T11
----------------------------------------------------------------------------
ZKG1803   304.27 304.84      539    0.57  0.34   231  0.31  0.18 T11
----------------------------------------------------------------------------
ZKG1601   246.52 247.26      741    0.74  0.53   230  2.29  0.81 T11E
----------------------------------------------------------------------------
ZKT1731   109.29 109.79      939    0.50  0.38   285  0.51  0.07 T1W
          169.86  171.4      922    1.54  1.19 1,016  5.48  0.80 T33E
----------------------------------------------------------------------------
ZKG0404      0.9   4.48      838    3.58  2.57   233  1.95  0.60 T16E
Including    0.9    1.8      838    0.90  0.65   702  6.77  1.94
          220.53 221.07      632    0.54  0.39   119  1.33  0.06 T15
          304.94 306.61      553    1.67  1.22 1,023  6.18  0.96 T11
Including 304.94  305.9      553    0.96  0.70 1,761  9.45  4.30
----------------------------------------------------------------------------
ZKT3904   247.98 249.97      518    1.99  1.97   100  4.07  0.27 T3
----------------------------------------------------------------------------
ZKT1523    88.78  89.47      989    0.69  0.61   217  0.87  0.07 T1W
----------------------------------------------------------------------------
ZKG1602   175.63 176.96      711    1.33  0.93   352  0.57  0.13 T11
          258.32  260.5      653    2.18  1.53   274  1.04  0.40 T11E
----------------------------------------------------------------------------
ZKG0621     1.38   2.45      838    1.07  1.04   669  0.97  0.12 T16E
Including   1.38   1.75      838    0.37  0.36 1,302  2.61  0.33
           61.79  62.92      806    1.13  1.10   449  3.16  0.30 T16E2
           75.08  75.89      799    0.81  0.79   221  0.98  0.13 T15W1
                                                                 T15W1-
           88.82  89.53      791    0.71  0.69   108  0.42  1.12 Branch
          207.61  208.7      729    1.09  1.06   320  0.93  1.03 T11
----------------------------------------------------------------------------
ZKG2021   148.78 150.11      768    1.33  1.30   127  1.40  0.21 T11
----------------------------------------------------------------------------
ZKT1732   202.53 203.67      951    1.14  0.99   323  0.30  0.35 T33-Branch
          255.25 256.06      947    0.81  0.70   112  0.23  0.13 T33W
----------------------------------------------------------------------------
ZKG0622     2.29   3.56      837    1.27  1.12   909  5.35  0.49 T16E
Including   2.29   3.04      837    0.75  0.65 1,543  9.10  0.83
           84.27  85.86      770    1.59  1.26   348  4.02  0.19 T15W1
          149.92 151.44      717    1.52  1.35 1,150  2.18  0.10 T15
----------------------------------------------------------------------------
ZKT0521   211.94 213.04      851    1.10  0.94   158  3.05  0.21 T14
          335.52 336.56      807    1.04  0.89   117  0.43  0.11 T17
----------------------------------------------------------------------------
ZKG0623   129.31 131.26      718    1.95  0.74    56  4.66  0.14 T15W1
          214.39 216.75      639    2.36  1.20   115  0.57  0.07 T15
----------------------------------------------------------------------------
ZKG0221    66.94  68.25      810    1.31  0.99    31  0.95  0.08 T16E1
          149.21 154.85             5.64  4.27   146  0.98  0.22 T15W
----------------------------------------------------------------------------
ZKT4307   150.09 152.04      488    1.95  1.58   145  0.41  0.11 T1W
----------------------------------------------------------------------------
ZKG1603   318.34 319.95      546    1.61  0.98   113  0.13  0.14 T11E
----------------------------------------------------------------------------
ZKG0806    71.92  73.56      798    1.64  1.23   285  1.29  0.23 T17
          178.73 179.69      743    0.96  0.78    37  0.56  0.08 T16
          363.55 367.36      650    3.81  3.31   194  4.09  0.78 T11
----------------------------------------------------------------------------

Quality Control

Drill cores are NQ size. Drill core samples, limited by apparent mineralization contact or shear/alteration contact, were split into halves by saw cutting. The half cores are stored in the Company's core shacks for future reference and checking, and the other half of the core samples are shipped in security sealed bags to the Chengde Huakan 514 Geology and Minerals Testing and Research Institute, an ISO9000 certified analytical lab in Chengde, China, 226 km northeast of Beijing. For analysis the sample is dried and crushed to minus 1mm and then split to a 200-300g subsample which is further pulverized to minus 200 mesh. Two subsamples are prepared from the pulverized sample. One is digested with aqua regia for gold analysis with AAS, and the other is digested with two-acids for analysis of silver, lead, zinc and copper.

Chip samples are collected along sample lines perpendicular to the mineralized vein structure in exploration tunnels. Spacing between sampling lines is typically 5m along strike. Both the mineralized vein and the altered wall rocks are cut with continuous chisel chipping. Sample length ranges from 0.2m to more than 1m, depending on the width of the mineralized vein and the mineralization type.

A routine quality assurance/quality control procedure is adopted at each lab to monitor the analytical quality at the lab. Certified reference materials (CRM), pulp duplicates and blanks are inserted into each lab batch of samples. QA/QC data at the lab are attached to the assay certificates for each batch of samples.

The Company maintains its own comprehensive quality assurance and quality control program to ensure best practice in sample preparation and analysis of the drill core samples. Project geologists regularly insert CRM, field duplicates and blanks to each batch of core samples to monitor the sample preparation and analysis procedures at the labs. The analytical quality of the labs is further evaluated with external checks by sending about 3% of the pulp samples to higher level labs to check for lab bias.

Data from both the Company's and the labs' QA/QC programs are reviewed on a timely basis by project geologists.

Rujin Jiang, P. Geo., is the Qualified Person on the project as defined under National Instrument 43-101. He has verified the information and has reviewed and approved the contents of this news release.

About Silvercorp

Silvercorp is a low-cost silver-producing Canadian mining company with multiple mines in China which has paid a cash dividend since 2007. The Company is currently developing the GC project in southern China which it expects will become its next operating mine in 2013. The Company's vision is to deliver shareholder value by focusing on the acquisition of under developed small-scale projects with resource potential and self-fund the growth of those assets. For more information, please visit our website at www.silvercorp.ca.

CAUTIONARY DISCLAIMER -- FORWARD LOOKING STATEMENTS

Certain of the statements and information in this press release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of the Company's revenues and capital expenditures; estimated production from the Company's mines in the Ying Mining Camp; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties.

Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licenses; title to properties; First Nations title claims and rights; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China and Canada; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act; and bringing actions and enforcing judgments under U.S. securities laws.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information. Forward-looking statements or information are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements or information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form for the year ended March 31, 2012 under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company's forward-looking statements and information are based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements and information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking statements and information.


FOR FURTHER INFORMATION PLEASE CONTACT:
Silvercorp Metals Inc.
Jonathan Hackshaw
Director, Investor Relations
(604) 669-9397 or Toll Free: 1(888) 224-1881
(604) 669-9387 (FAX)
investor@silvercorp.ca
www.silvercorp.ca




Source: Silvercorp Metals Inc.


If you no longer wish to receive future mailings from Silvercorp Metals Inc., please click




Date Sent: 4/15/2013 5:10:11 PM Powered by Q4 Web Systems
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Silvercorp Metals Inc.

PRODUCTEUR
CODE : SVM.TO
ISIN : CA82835P1036
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Silvercorp Metals est une société de production minière d'argent basée au Canada.

Silvercorp Metals est productrice d'argent, d'or, de plomb et de zinc en Chine, en développement de projets d'argent, d'or, de plomb et de zinc en Chine, et détient divers projets d'exploration au Canada.

Ses principaux projets en production sont YING MINE, BYP, HPG MINE, TLP MINE et XBG en Chine, ses principaux projets en développement sont LM MINE, GAOCHENG (GC) et SHIMENTOU (SMT) en Chine et ses principaux projets en exploration sont NA BAO et GC en Chine et SILVERTIP au Canada.

Silvercorp Metals est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 792,3 millions CA$ (578,2 millions US$, 540,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 21 décembre 2001 à 0,02 CA$, et son plus haut niveau récent le 02 octobre 2020 à 9,97 CA$.

Silvercorp Metals possède 167 850 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Silvercorp Metals Inc.
2007 Annual Report
Financements de Silvercorp Metals Inc.
25/06/2011Announces TSX Approval Of Share Repurchase Program
06/07/2009Responds to Klondex’s Directors’ Circular and Completed Priv...
06/04/2006(Hpg Mine)arranges bought deal financing to raise $41,542,500
Attributions d'options de Silvercorp Metals Inc.
06/09/2012AGM Rescheduled To Friday September 28, 2012; Board Proposes...
11/01/2012Received RMB 269 Million Cash Dividend From Its Chinese Subs...
Nominations de Silvercorp Metals Inc.
16/09/2013Silvercorp - Silvercorp Announces Appointment of Senior Vice...
08/11/2012Announces Management Appointments
28/11/2011Announces New Director Appointment
Rapports Financiers de Silvercorp Metals Inc.
22/09/2015Silvercorp Reports 2015 AGM Results
19/08/2015Silvercorp to Return to Single Listing Status
13/08/2015Silvercorp Reports Q1 Fiscal 2016 Financial And Operating Re...
13/08/2015Silvercorp posts 1Q profit
13/02/2014Silvercorp - Silvercorp Reports Financial and Operating Resu...
14/11/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
09/08/2013Silvercorp - Silvercorp Reports Financial and Operating Resu...
22/05/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
22/05/2013Reports Financial and Operating Results for the Fourth Quart...
13/02/2013SilverCorp - Silvercorp Reports Financial and Operating Resu...
14/11/2012SilverCorp - Silvercorp Reports Financial and Operating Resu...
13/11/2012Reports Financial and Operating Results for the Second Quart...
03/08/2012Reports Financial And Operating Results For The First Quarte...
08/02/2012Reports Revenue of $61.9 Million and Operating Cash Flow of ...
25/10/2011Receives Clear Forensic Accountants Report
03/08/2011Reports Net Income Up 82% to $25.6 Million or $0.15 Per Shar...
03/06/2011Form 40-F Available on Website
12/05/2011Reports Record Silver Production Of 5.3 Million Ounces, Rec...
13/05/2010Net Income Of $9.8 Million And Cash Flow Of $23.8 Million In...
09/11/2009Reports Net Income Of $8.9 Million And Cash Flow Of $15.9 Mi...
13/08/2009Reports Net Income of $7.5 Million ($0.05 EPS) on Record Sil...
14/05/2009Financial And Operating Results For The 4th Quarter And Fisc...
13/02/2009Announces Its Financial And Operating Results For The 3rd Qu...
17/11/2008Second Quarter Dividend - CAD$0.02
14/11/2008Announces Its Financial And Operating Results For The 2nd Qu...
16/05/2007to Report 2007 Fourth Quarter and Year End Results on June 1...
Projets de Silvercorp Metals Inc.
23/11/2015(Tlp Mine)Silvercorp Reports Newly Exposed Mineralization At The TLP M...
11/06/2013SilverCorp - Silvercorp Reports Exploration Results at the H...
11/06/2013(Hpg Mine)Reports Exploration Results at the HPG Mine, Ying Mining Dis...
06/06/2013SilverCorp - Silvercorp Reports Underground Exploration Resu...
04/06/2013SilverCorp - Silvercorp Reports Results From Its 2012 Explor...
15/04/2013SilverCorp - Silvercorp Reports Underground Diamond Drilling...
20/02/2013SilverCorp - Silvercorp Intercepts 33.29 Metres True Width G...
17/09/2012(Gc)GC Project Construction Progress Photo Album - Sep 17, 2012
27/08/2012(Tlp Mine)Intercepts High-Grade Silver-Lead-Zinc Mineralization At The...
16/08/2012(Byp)Reports Resource Update for Its BYP Mine in Hunan Province, ...
01/08/2012(Ying Mine)Reports Intercept of 10.87 Meters Grading 715 Grams per Tonn...
06/06/2012Reports Significant Gain In Measured And Indicated Mineral R...
18/05/2012Reports Record Silver Production Of 5.6 Million Ounces, Reco...
13/02/2012(Lm Mine)Reports 4.34 metre interception (true width) of 642 gram per...
31/01/2012(Gc)Announces Positive Pre-Feasibility Study for the GC Silver-L...
26/01/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams per tonne...
26/01/2012(Lm Mine)Reports Intercept of 7.39 Meters Grading 678 Grams Per Tonne...
17/01/2012(Gc)Surface Diamond Drilling Intercepted 3.13 Meters of 432 Gram...
06/01/2012(Gc)Provides Progress Update on its GC Project in Guangdong Prov...
22/08/2011(Xbg)Acquires High Grade XBG Silver-Gold-Lead-Zinc Property in Lu...
07/07/2011(Ying Mine)Reports Resource and Reserves Update at Ying Silver-Lead-Zin...
06/07/2011(Silvertip)Reports Resources Estimate On The Silvertip Silver-Lead-Zinc...
05/07/2011(Byp)Reports Resources Estimate on the BYP Gold-Lead-Zinc Propert...
05/05/2011(Byp) Diamond Drilling Intercepts 69.5 Metres Grading 5 g/t Gold ...
17/02/2011(Silvertip)Announces Positive Preliminary Assessment For The Silvertip ...
03/02/2011(Byp)Closes Acquisition Of BYP Gold-Lead-Zinc Mine In Hunan Pro...
31/01/2011(Ying Mine)Underground Drilling Intercepts 2.0 Metres Grading 1,593 Gra...
21/01/2011(Ying Mine)Underground Drilling Intercepts 14.62 Metres Grading 363 Gra...
04/08/2010(Gaocheng (gc))Submits Mining Permit Application
26/07/2010(Ying Mine)Heavy Rain Fall Affects Operations At Ying Mining District
14/06/2010(Gaocheng (gc))Receives Environmental Permit
01/03/2010(Ying Mine)Reports Proven & Probable Reserves Estimate At Ying Mining D...
29/06/2009(Gaocheng (gc))Measured and Indicated Silver Resources Increase by 250% at ...
08/01/2009(Gaocheng (gc))Drilling Intersects High-Grade Silver Mineralization in V2 a...
19/12/2008(Lm Mine)Technical Report Completed On The TLP-LM Project, Henan Prov...
21/01/2008Discovers High Grade Polymetalic Mineralization at the Na-Ba...
14/02/2006(Ying Mine)environment assessment report for developing the Ying Silver...
Communiqués de Presse de Silvercorp Metals Inc.
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
26/05/2016Silvercorp reports 4Q loss
26/05/2016Silvercorp Reports Silver Production Of 5.0 Million Ounces, ...
23/12/2015Silvercorp Announces New Share Repurchase Program
20/08/2015Silvercorp to Return to Single Listing Status
19/02/2014Silvercorp - Silvercorp Intercepts 1.42 Metre Interval Gradi...
06/02/2014Silvercorp - Silvercorp to Release Third Quarter Fiscal 2014...
20/12/2013Silvercorp - Silvercorp Notes Regulators Allege Fraud in Act...
15/11/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
18/10/2013Silvercorp - Silvercorp Announces Senior Management and Dire...
18/10/2013Announces Senior Management and Director Changes
21/09/2013Silvercorp - Silvercorp Reports 2013 AGM Results
20/09/2013Reports 2013 AGM Results
12/09/2013Silvercorp - Silvercorp Provides Operation Update for Ying M...
12/09/2013Provides Operation Update for Ying Mining District
09/08/2013Silvercorp - Silvercorp Declares Quarterly Cash Dividend of ...
08/08/2013Declares Quarterly Cash Dividend of CAD$0.025
30/07/2013Silvercorp - Silvercorp to Release Financial and Operating R...
30/07/2013to Release Financial and Operating Results for the First Qua...
04/06/2013Reports Results From Its 2012 Exploration Program at the SGX...
23/05/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
06/05/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
06/05/2013to Release Audited Year-End Results for Fiscal 2013 on May 2...
15/04/2013Reports Underground Diamond Drilling and Tunneling Explorati...
03/04/2013SilverCorp - Silvercorp Responds to Recent Press Article Abo...
03/04/2013Responds to Recent Press Article About the Company
25/03/2013A Shareholder Class Action Was Filed But Does Not Include Ce...
13/03/2013SilverCorp - Silvercorp Provides Update Regarding Defamation...
13/03/2013Provides Update Regarding Defamation Case and Class Action
20/02/2013Intercepts 33.29 Metres True Width Grading 151 g/t Silver, 0...
15/02/2013SilverCorp - Silvercorp Issues Correction to Dividend Record...
14/02/2013SilverCorp - Silvercorp Declares Quarterly Cash Dividend of ...
13/02/2013SilverCorp - Silvercorp Provides Outlook for Fiscal 2014
13/02/2013Provides Outlook for Fiscal 2014
07/02/2013Discovers Five New High-Grade Silver Zones and Extends Known...
31/01/2013SilverCorp - Silvercorp Intercepts 18.8 Metres True Width Gr...
29/01/2013SilverCorp - Silvercorp Share Repurchase Program Approved by...
26/01/2013SilverCorp - Silvercorp: Open Letter from Chairman
24/01/2013SilverCorp - Silvercorp Responds to Class Action Lawsuits
24/01/2013Responds to Class Action Lawsuits
14/11/2012SilverCorp - Silvercorp Announces Dividend of CAD$0.025
29/10/2012to Release Results for Fiscal 2013 Second Quarter on Novembe...
18/10/2012(Gc)Reports Intercept of 2.12 Metres Grading 1,684 Grams Per Ton...
28/09/2012Reports 2012 AGM Results
06/09/2012(Gc)Reports Intercept of 3.88 Metres Grading 609 Grams Per Tonne...
20/08/2012(Lm Mine)Reports Intercept of 4.55 Metres Grading 2,196 Grams per Ton...
03/08/2012Announces First Quarter Dividend Of CAD$0.025
25/07/2012to Release First Quarter 2013 Results on August 2 and Host C...
05/07/2012(Silvertip)Reports Independent Mineral Resource Estimates on Silvertip ...
05/06/2012Reports Significant Gain in Measured and Indicated Mineral R...
28/05/2012(Ying Mine)Provides Update on Production at the Ying Mine in Henan Prov...
19/05/2012Announces Fourth Quarter Dividend Of CAD$0.025
17/05/2012Reports Record Silver Production of 5.6 Million Ounces, Reco...
30/04/2012to Announce Fourth Quarter and Year End Results & Hold Analy...
10/02/2012Announces Third Quarter Dividend Of CAD$0.025
09/02/2012Forecasts 20% Increase In Silver Production For Fiscal Year ...
09/01/2012Sues Jon R. Carnes, his EOS Holdings and Zane Heilig as “Alf...
30/12/2011to Commence Work on Resource and Reserve Updates
21/12/2011Chinese Law Enforcement Agents Open Criminal Case to Investi...
08/12/2011Fiscal 2012 Drilling Exploration Program Update
26/10/2011Statement From Chairman
28/09/2011’s 2011 China Investor Tour Pictures
23/09/2011Files Lawsuit In New York Against Stock Manipulation Scheme
22/09/2011Open Letter From Chairman - Key Points
15/09/2011Repurchases Over $31 Million Of Shares Under NCIB
14/09/2011Responds To Second Anonymous Allegation And Provides Governm...
12/09/2011On Progress To Identify The Anonymous Letter Writer And To R...
31/08/2011Repurchases In Excess Of 2 Million Shares Under Normal Cours...
26/08/2011On Normal Course Issuer Bid
11/08/2011Update on Normal Course Issuer Bid
04/08/2011Announces First Quarter Dividend Of CAD$0.02
25/07/2011to Announce First Quarter Results & Hold Analyst Conference ...
14/07/2011Reports: Record Silver Production Of 1.6 Million Ounces And ...
11/07/2011Reports 24% Year Over Year M&I Silver-Equivalent Resource Gr...
21/06/2011Announces Share Repurchase Program
09/06/2011Henan Subsidiary Ranked as the 7th Strongest Company in Luoy...
12/05/2011Announces Fourth Quarter Dividend Of Cad$0.02
28/04/2011to Announce Fourth Quarter Results & Hold Analyst Conference...
09/02/2011Announces Q3 Dividend Of CAD$0.02
13/08/2010Q1 Dividend Of CAD $0.02
13/08/2010Reports Record Silver Production for Q1 of Fiscal 2011: Sale...
31/07/2010Files Preliminary Base Shelf Prospectus
13/05/2010Declaration of Quarterly Dividend-CAD$0.02
22/02/2010to Acquire Advanced Stage Silver-Lead-Zinc Project in Britis...
10/02/2010Declaration Of Quarterly Dividend - CAD$0.02
25/11/2009to Present and Exhibit at Mines & Money London Show on Dec. ...
10/11/2009Announces Declaration Of Quarterly Dividend - CAD$0.02
03/11/2009Lists on New York Stock Exchange
01/10/2009Annual General Meeting Results
28/09/2009Reminder: Silvercorp Metals Annual General Meeting – Septemb...
14/08/2009Announces Declaration of Quarterly Dividend - CAD$0.02
22/07/2009Announces It Has Terminated Its Offer To Klondex Shareholder...
20/07/2009Announces That Its Offer To Klondex Shareholders Will Expire
15/06/2009Formally Commences Offer to Acquire All of the Outstanding S...
08/06/2009Announces its Intention to Make an Offer to Acquire Klondex ...
03/06/2009Responds to Stock Trading Activity
17/02/2009Commences Trading On NYSE Alternext US
13/02/2009 Announces Declaration Of Quarterly Dividend - Cad$0.02
13/03/2008$50 Million Exploration and Development Program Budgeted for...
15/02/2008 RECORDS $0.12 EPS FOR Q3 FISCAL 2008 ENDED DECEMBER 31, 200...
12/12/2007to Build A New 2,000 Tonne Per Day Mill For The Ying Silver ...
07/12/2007Announces Additions to its Senior Management Team
16/04/2007Signed Agreement to Participate in Constructing a New Lead S...
12/04/2007Commencement of Drill Program on the NPG Molybdenum Project ...
31/03/2006(Ying Mine)receives mining permit on Ying Silver Project, Henan, China
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SVM.TO)NYSE (SVM)
4,72-2.48%3,47-1.84%
TORONTO
CA$ 4,72
24/04 17:00 -0,120
-2,48%
Cours préc. Ouverture
4,84 4,79
Bas haut
4,70 4,87
Année b/h Var. YTD
3,04 -  5,27 38,42%
52 sem. b/h var. 52 sem.
2,92 -  5,27 -1,67%
Volume var. 1 mois
238 585 12,92%
24hGold TrendPower© : 28
Produit Gold - Lead - Silver - Zinc
Développe Gold - Lead - Silver - Zinc
Recherche Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 29/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202433,33%
2023-11,06%5,593,23
2022-19,92%5,412,74
2021-41,60%9,654,31
202015,47%9,9710,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :