Gold One International Ltd

Publié le 29 octobre 2015

Third quarter update on gold operations at Palito and Sao Chico

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |
   

Published: 08:00 CET 29-10-2015 /GlobeNewswire /Source: Serabi Gold plc / : SRB /ISIN: GB00B4T0YL77

Third quarter update on gold operations at Palito and Sao Chico

For immediate release

 29 October 2015

 

Serabi Gold plc

("Serabi" or the "Company")

 

Third quarter update on gold operations at Palito and Sao Chico

 

Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian focused gold mining and development company, provides an operational update for the third quarter of 2015 on its wholly owned Palito and Sao Chico gold operations in the Tapajos region of Para State, Northern Brazil. 

HIGHLIGHTS

  • Record gold production for the quarter totaled 9,078 ounces(1) a 10.1% increase compared with the second quarter; 7,878 ounces from the processing of Palito run of mine ore ("ROM") and surface stockpiles, and 1,200 ounces from Sao Chico ore.     
  • Combined quarterly mill throughput, for both Palito and Sao Chico ore, totalled 31,789 tonnes.
  • Quarterly mine production totalled 36,587 tonnes, 28,625 tonnes at 11.04 g/t for Palito and 7,962 tonnes at 9.27 g/t gold for Sao Chico.   
  • Quarterly mine development at Palito totalled 1,850 metres, exceeding internal plans by 35%.  At Sao Chico, the quarterly total was 841 metres.     
  • The main ramp at Sao Chico has now almost reached the next planned development level at 156mRL.  Ore development is on-going on the three higher levels at 216mRL, 199mRL and 186mRL.       
  • At the end of the third quarter, surface stockpiles at Palito and Sao Chico totalled 14,799 tonnes @ 3.66 g/t gold
  • A third Ball mill has been purchased and is planned to be installed and operational together with other improvements in throughput for the Flotation and Carbon in Pulp ("CIP") process circuits at the start of the second quarter 2016.
  • At the end of September 2015, 6,014 metres of the current Sao Chico surface diamond drilling programme had been completed.
  • Current forecast for gold production in 2015 remains at approximately 35,000 ounces with All-In Sustaining Costs ("AISC") of between US$900 and US$950 per ounce.

 

Mike Hodgson, CEO said:

"The third quarter of 2015, was our best quarter year to date, as we continued to average 3,000 ounces pf gold production per month. For the year to date, we have now produced approximately 25,000 ounces and we remain on track to achieve our forecast of 35,000 ounces which will represent a doubling of the   production for 2014. 

"The Palito Mine continued to perform very well with both mined tonnage and grade exceeding our planning targets.  Mined grades for the year to date remain over 10 g/t, which is an excellent result. The mine is very much in regime, but we remain keen to establish additional operational flexibility.  During this last quarter we therefore began driving long cross-cuts to the Chico da Santa and Senna sectors to the north and south of the Palito Main Zone, two areas which have previously been drilled and have excellent potential.   These two new sectors will open up more ore faces, and in time production areas, especially on the upper levels.  

"At Sao Chico, ore development is now on three development levels, with over 2,000 metres of development mining now completed.  This initial development, along with surface and underground drilling, is providing us with a significantly improved understanding of the mineralisation.  As is the case with most vein mines, drilling alone does not provide the full story and it is the underground 'on-lode' development that ultimately defines the ore blocks.  The grades at Sao Chico are, at times, truly spectacular and often in excess of 100 g/t of gold, though as I reported last week, unlike Palito, the high grade ore zones at Sao Chico are not as easily visible.  As a result, in the mining of Sao Chico we are more reliant on assay control, requiring close spaced sampling..  Nevertheless, each month sees an improved level of contribution from Sao Chico to the Company's gold production.   

"One thing that has become clear over the past few months is that the operation will require increased milling capacity.  Since the commencement of production, we have never been able to run down our ROM stockpiles, albeit that they are of relatively low grade.  The generation of low grade ore in narrow vein mining is 'part and parcel' of the business, as lode development is an unavoidable and very necessary part of the exploration and evaluation process.  As a result we have approximately 14,800 tonnes of ROM stock, which we cannot process without increased throughput capacity.  A third ball mill identical to the two mills already operating, has been purchased in Brazil and will be operational early in the second quarter of 2016.  This, along with some improvements in the flotation and cyanidation plant, will see our daily throughput increase from the current levels of approximately 400 tonnes per day.  We anticipate being able to average 500 tonnes per day once the improvements are complete but importantly will also create excess capacity to catch up any lost production caused by unplanned stoppages.

"The surface diamond drilling programme has now exceeded 6,000m and whilst we have had to 'tighten' up the drill spacing due to the complexity of Sao Chico, some of the results have been excellent; the grades are very good, holes 47 and 93 are the deepest holes and both show grades in excess of 40 g/t over mineable widths.  We have been complementing this programme with additional underground drilling from within the development galleries.

"For the third consecutive quarter this year we have been able to demonstrate steady growth in gold production, in what has been a tough nine months for gold producers.  With Palito in a steady state of production, over the next months I expect that we will see increasing levels of gold production from Sao Chico.

"I anticipate Sao Chico entering commercial production late this year, and our 2015 production forecast of approximately 35,000 ounces and All-In Sustaining Cost guidance of US$900-US$950 per ounce remains.  As usual I look forward to updating the market on further production increases being achieved over the coming months."  

The latest interview with Serabi's Chief Executive, Mike Hodgson, can be accessed using the following link

 

http://brrmedia.co.uk/event/140562?popup=true

 

 

Results

 

Total production for the third quarter was 9,078 ounces(1) of gold.  During the quarter, gold production was derived from the processing of ROM ore from the Palito Mine, combined with the Palito surface coarse ore stockpiles, the stockpiled flotation tailings established during Palito mine production in 2014 and processing of Sao Chico ROM ore.

 

With a total stockpile of over 42,000 tonnes of flotation tails recovered from 2014 plant production, the Company will continue processing this material when possible. However, with excellent levels of Palito and Sao Chico ROM feed available, combined with the surface coarse ore stockpiles, available plant capacity for processing of the flotation tailings is limited.    

 

At the Sao Chico Mine over 840 metres of horizontal development was achieved during the quarter, of which 250 metres involved deepening of the ramp.  Over 950 metres of lode development has now been completed on the levels 216mRL, 199mRL and 186mRL. Production is now underway, albeit limited as the focus remains on lode development and evaluation.  During the quarter, approximately 6,200 tonnes of development and stope ore were processed through the plant.  Whilst the majority of the ore is being derived from the development drives, the Sao Chico ore processed this quarter showed an improved average grade of 7.40 g/t of gold.    

 

The Company expects to produce 28,000 - 29,000 ounces of gold during 2015 from the processing of Palito ROM and the Palito stockpiles.  With the Sao Chico Mine now under development, the Company also anticipates production of 6,000 - 7,000 ounces of gold from ore mined at Sao Chico, and as a result remains confident of achieving its production forecast of 35,000 ounces of gold for the year.     

 

 SUMMARY PRODUCTION STATISTICS FOR THE THREE QUARTERS ENDING 30th SEPTEMBER 2015 (Palito & Sao Chico)

 

 

Quarter 1

Quarter 2

Quarter 3

Year to Date

Horizontal development

Metres

1,491

2,078

2,691

6,260

   

 

 

 

 

Mined ore

Tonnes

25,812

31,488

36,587

93,887

 

Gold grade (g/t)

10.90

9.18

10.65

10.23

   

 

 

 

 

Milled ore

Tonnes

31,412

33,279

31,789

96,480

 

Gold grade (g/t)

8.52

8.28

9.47

8.75

   

 

 

 

 

Gold production (1)

Ounces

7,389

8,237

9,078

24,704

(1)                   Gold production figures are subject to amendment pending final agreed assays of the gold content of the copper/gold concentrate and the gold bullion when smelting and refining processes are completed.

 

 

Enquiries:

 

Serabi Gold plc

 

Michael Hodgson

Tel: +44 (0)20 7246 6830

Chief Executive

Mobile: +44 (0)7799 473621

 

 

Clive Line

Tel: +44 (0)20 7246 6830

Finance Director

Mobile: +44 (0)7710 151692

 

 

Email: contact@serabigold.com

 

Website:  www.serabigold.com

 

 

 

Beaumont Cornish Limited

Nominated Adviser and Financial Adviser

 

Roland Cornish

Tel: +44 (0)20 7628 3396

Michael Cornish

Tel: +44 (0)20 7628 3396

 

 

Peel Hunt LLP

UK Broker

 

Matthew Armitt

Tel: +44 (0)20 7418 9000

Ross Allister

Tel: +44 (0)20 7418 9000

 

 

Blytheweigh

Public Relations

 

Tim Blythe

Tel: +44 (0)20 7138 3204

Camilla Horsfall

Tel: +44 (0)20 7138 3224

 

 

Copies of this announcement are available from the Company's website at www.serabigold.com.

 

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this announcement.

 

 

GLOSSARY OF TERMS

The following is a glossary of technical terms:

 "Au" means gold.

 "assay" in economic geology, means to analyze the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.

"development" - excavations used to  establish access to the mineralised rock and other workings

"DNPM" is the Departamento Nacional de Produ��o Mineral.

"grade" is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb).

"g/t" means grams per tonne.

"granodiorite" is an igneous intrusive rock similar to granite.

"igneous" is a rock that has solidified from molten material or magma.

"Intrusive" is a body of igneous rock that invades older rocks.

"on-lode development" - Development that is undertaken in and following the direction of the Vein

 "mRL" - depth in metres measured relative to a fixed point - in the case of Palito and Sao Chico this is sea-level.  The mine entrance at Palito is at 250mRL.

"saprolite" is a weathered or decomposed clay-rich rock.

"stoping blocks" - a discrete area of mineralised rock established for planning and scheduling purposes that will be mined using one of the various stoping methods. 

"Vein" is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.

 

Qualified Persons Statement

The scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 26 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognising him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

 

Forward Looking Statements

Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'', ''could'', "should" ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

 

ENDS





This announcement is distributed by NASDAQ OMX Corporate Solutions (One Liberty Plaza, 165 Broadway, New York, NY 10006. Tel: +1 212 401 8700. www.nasdaqomx.com) on behalf of NASDAQ OMX Corporate Solutions clients. Source: Serabi Gold plc, 66 Lincoln's Inn Fields, London WC2A 3LH, UK
If you would like to unsubscribe and stop receiving these e-mails click .

.

Gold One International Ltd

PRODUCTEUR
CODE : GDO.AX
ISIN : AU000000GDO5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Gold One est une société développant des projet miniers d'or basée en Afrique Du Sud.

Ses principaux projets en production sont SUB NIGEL & SPAARWATER et MODDER EAST en Afrique Du Sud et ses principaux projets en exploration sont NEW KLEINFONTEIN & TURNBRIDGE, HOLFONTEIN et VENTERSBURG en Afrique Du Sud et ETENDEKA en Namibie.

Gold One est cotée aux Etats-Unis D'Amerique, en Australie, en Afrique Du Sud et en Allemagne. Sa capitalisation boursière aujourd'hui est 242,1 millions AU$ (213,2 millions US$, 156,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 03 avril 2009 à 0,01 AU$, et son plus haut niveau récent le 15 mai 2009 à 12,00 AU$.

Gold One possède 807 080 905 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Gold One International Ltd
2007 Annual report
Nominations de Gold One International Ltd
03/11/2008 appoints Macquarie First South Advisors
Rapports Financiers de Gold One International Ltd
29/10/2015Third quarter update on gold operations at Palito and Sao Ch...
28/07/2015Serabi Gold plc : Second quarter update on gold operations a...
16/04/2015Serabi Gold plc : First quarter update on Serabi's Tapajos g...
Projets de Gold One International Ltd
27/02/2014Pilot Gold reports 6.85 g/t gold over 41.7 metres at Western...
18/02/2014Melkior intersects 6.20 g/t Gold over 10.5 metre=?utf-8?Q?s_...
13/01/2014Beaufield Intersect 3=2E92 g/t Gold Over 13=2E40 Metres Near...
09/01/2014Pilot Gold reports 2.00 g/t oxide gold over 35.0 metres at K...
18/11/2013Pilot Gold reports 8.53 g/t gold over 36.6 metres at Kinsley...
01/11/2013Pilot Gold reports 0.60 g/t oxide gold over 81.0 metres at K...
01/10/2013ROBEX/Exploration Permit Moussala: RC Drilling Up to 18=2E56...
23/07/201315.3 g/t gold over 45.2 metres at KCD target, TV Tower
19/03/2013Pilot Gold drills 25.7 g/t gold over 16.5 metres, further de...
22/01/2013Pilot Gold reports 227 g/t gold over 12=2E0 metres from meta...
15/01/2013Tembo Gold Report First Deep Diamond Drill Hole of 22.81 g/t...
09/01/2013Pilot Gold reports 14.9 g/t gold over 14.1 metres from 50-me...
14/11/2012Pilot Gold reports 11.63 g/t gold over 32.5 metres at TV Tow...
05/09/2012Pilot Gold reports 13.7 metres of 6.03 g/t gold on west side...
08/08/2012El Gallo Phase 1 Production Area DrillingEncounters More Gol...
05/10/201110 g/t Gold over 13 Metres Intersected on Upper Montrose Zon...
10/08/2011Pilot Gold intersects 1=2E87 g/t gold over 48=2E0 metres in ...
10/02/2009(Modder East)Modder East intersects first reef
28/01/2009(Sub Nigel & Spaarwater)hoists first ore at recommissioned Sub-Nigel
21/01/2009(Modder East)Shareholders give thumbs up to Aflease/BMA union
Communiqués de Presse de Gold One International Ltd
13/01/2014Melkior and Beaufield intersect 3.92 g/t gold over 13.40 met...
03/09/2013Western Pacific Reports Sampling of up to 20.9 g/t Gold Over...
21/03/2013Red Cloud Congratulates Tyhee Gold on Nomination of Richard...
30/01/2013Tembo Gold Reports Drill Hole TRC0003 at Ngula 1 With 4.73 g...
29/01/2013Pilot Gold reports 2.33 g/t gold over 93.5 metres in step-ou...
05/09/2012Tembo Gold Drills 10.17g/t of Gold Over 6m Including 19.1g/t...
04/09/2012Comstock samples 3.31 g/t Gold over 95 m at VG Zone on QV Pr...
04/09/2012Tucano Gold Ore Resource and Reserve Update
21/08/2012Taku Drills 0.95gpt Gold Over 23.4m at Rosebute in White Gol...
16/07/2012Pilot Gold reports 5.48 g/t gold over 20.4 metres from core ...
10/05/2012Bonterra Assays 73.82 G/T Gold Over 3.0 Metres At The New Ri...
12/04/2012Marathon - Marathon Gold Hits 12.4 g/t Gold Over 5.2 Meters ...
10/04/2012Drilling Intersects 78 Grams per Tonne Gold on Destiny Gold ...
13/03/2012Tembo Gold Reports 16.10 g/t Au Over 3.00 Meters and 3.13 g/...
27/02/2012Marathon - Marathon Gold Hits 2.20 g/t Gold Over 26.2 Meters...
10/02/2012Initial Pilot Gold drilling returns 5.91 g/t gold over 18.4 ...
09/02/2012Assays for Upper Montrose Zone in DDH-MON-11-28 have 7.91g/t...
31/01/2012BONTERRA CONTINUES DISCOVERING HIGH GRADE GOLD ON ITS EASTER...
10/01/2012Marathon - Marathon Gold Intersects 1.48 g/t Gold Over 42.5 ...
09/12/2011Taku Intersects 2.3 Grams per Tonne Gold Over 1.0m at Portla...
05/12/2011Marathon - Marathon Gold Intersects 4.59 g/t Gold Over 18.1 ...
26/10/2011Marathon - Marathon Gold Intersects 2.05 g/t Gold Over 30.8 ...
11/10/201143.7 Grams/Tonne Gold Over 7.4 Metres Intersected on Southwe...
07/09/2011BonTerra Drills 14.85 g/t Gold over 15.3 Metres at Eastern E...
07/09/2011Marathon - Marathon Intersects 5.15 g/t Gold Over 29.2 Meter...
10/08/2011Marathon - Marathon Gold Intersects 8.26 g/t Gold over 5.5m ...
09/08/2011Marathon - Marathon Expands It's "Heart of Gold" with 16.15g...
27/07/2011Marathon - Marathon Continues Successful Results at Leprecha...
24/03/2011Auriga Gold's Drilling at Maverick Gold Project, Manitoba, I...
06/02/2009High court sanctions scheme of arrangement
02/02/2009Strategic and operation update
29/01/2009COMPETITION COMMISSION AND FOREIGN INVESTMENT
13/01/2009secures additional funding for Modder East completion
19/12/2008Scheme of arrangement update
15/12/2008Dealing in securities by directors
12/12/2008Change to the board of directors
10/12/2008Withdrawal of cautionary announcement
02/12/2008acquires prospective Mozambique concession
26/11/2008TRADING STATEMENT, ACQUISITION ISSUE, FINANCIAL EFFECTS...
20/11/2008BMA Gold deal creates new international gold company
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (GDO.AX)JSE (GDO.JSE)
0,300+0.00%285,00+0.00%
AUSTRALIA
AU$ 0,300
29/01 13:54 -
0%
Cours préc. Ouverture
0,300 0,295
Bas haut
0,295 0,300
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,300 -%
Volume var. 1 mois
245 319 -%
24hGold TrendPower© : 34
Produit Gold
Développe
Recherche Copper - Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 12/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,58%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :