Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Timberline Resources Corporation

Publié le 14 janvier 2015

Timberline Resources Drilling Identifies New Zone of Gold Mineralization at Eureka

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cœur D'alene |

Timberline Resources Drilling Identifies New Zone of Gold Mineralization at Eureka

01/14/15

Coeur d'Alene, Idaho - January 14, 2015 - Timberline Resources Corporation (NYSE MKT: TLR; TSX-V: TBR) ("Timberline" or the "Company") today announced the recognition of a new higher grade zone of gold mineralization at the Company's Eureka project in Nevada.  Reverse circulation (RC) drill hole BHSE-171 intersected 25 feet of 0.144 ounces of gold per ton (opt) (7.62 meters (m) of 4.93 grams of gold per tonne (g/t)) within a longer 65 foot interval assaying 0.094 opt (19.82 m of 3.22 g/t) in the Lookout Mountain area.  This hole was offset 140 feet from BHSE-152 (drilled in 2012) which first encountered the new zone but was not completed due to drilling difficulties.  Additional drilling at Lookout Mountain and the previously announced drill program at the Windfall target is expected to recommence in the next two weeks. 

Kiran Patankar, Timberline's President and Chief Executive Officer, commented, "BHSE-171 is significant for several reasons.  First, the mineralization identified represents a new discovery at Eureka and validates the conceptual target identified by our technical team.  Given our demonstration of continuity over 140 feet, it is reasonable to believe that we have not yet seen the center of the mineralization.  With several thousand feet of untested strike extent, the Eureka project now has clear potential for a large underground bulk-mineable gold deposit."   Results from BHSE-171, as well as the previously-drilled BHSE-152, are presented in the table below:
Drill Hole From (feet) Length (feet)(1) Gold (opt) From (meters) Length (meters)(1) Gold (g/t)
BHSE-171 990 65 0.094 301.8 19.82 3.22
including 1020 25 0.144 311.0 7.62 4.93
BHSE-152 1,025 15.0 0.14 312.4 4.6 4.73

Notes: 
  1. True widths of the drill intercepts have not been determined   

The mineralization intersected in holes BHSE-171 and BHSE-152 is well correlated and represents a newly recognized zone of higher grade gold mineralization at depth associated with the existing resource at Lookout Mountain.  The Company's current NI 43-101 compliant gold resource is defined over, and open beyond, a strike length of 4,000 feet.  This new gold zone occurs within the favorable Dunderberg Shale near the brecciated contact with the Secret Canyon Formation and may represent a higher grade feeder system as recognized in many Carlin-type systems.   

Drilling at Lookout Mountain is planned to resume in January and will initially include two additional holes to offset BHSE-171.  Having now identified the mineralized zone through initial RC drilling, follow-up core drilling will sample the mineralized section to more accurately assess gold grade, stratigraphic and structural controls, and target geometry.   

The program is also expected to include RC drilling at Windfall in order to test the strike extension and follow up on historic gold mineralization and the exploration target previously disclosed (December 17, 2014 press release).  

Timberline's current gold resource estimate at Lookout Mountain, which was prepared by Mine Development Associates ("MDA") of Reno, Nevada, consists of:

Lookout Mountain Gold Resource(1)(2)(3)
Resource Category Short Tons Metric Tonnes Ounces of Gold per Ton (opt) Grams of Gold per Tonne (g/t) Gold Ounces
Measured 3,043,000 2,761,000 0.035 1.20 106,000
Indicated 25,897,000 23,493,000 0.016 0.55 402,000
Measured & Indicated 28,940,000 26,254,000 0.018 0.62 508,000
Inferred 11,709,000 10,622,000 0.012 0.41 141,000


Notes:

  1. 0.006 opt (0.21 g/t) cut-off applied to oxidized material to capture mineralization potentially available to open pit extraction and heap leach processing.  0.030 opt (1.03 g/t) cut-off applied to unoxidized material to capture mineralization potentially available to open pit extraction and lower heap leach recoveries or sulfide processing. 
  2. Rounding may cause apparent discrepancies. 
  3. The effective date of the Lookout Mountain updated gold resource is February 20, 2013.   

The full MDA Resource Estimate with various cut-off grades can be seen at http://timberline-resources.com/main.php?page=208.  

Timberline's district-scale Eureka project is strategically located within the greater Eureka Mining District, just four miles from Barrick Gold's multi-million ounce Archimedes / Ruby Hill mine.  The Eureka project features three distinct zones defined by structure and geochemistry and includes past-producing open pits, along with several untested zones and underexplored exploration targets.  In addition to the estimated resources shown above, there is an exploration target totaling 185,000 - 200,000 ounces of gold at the Windfall structural trend that grades approximately 0.024 opt - 0.027 opt using a 0.010 opt cutoff.  Detailed maps can be viewed at http://timberline-resources.com/main.php?page=194.  

Note:  A qualified person has not done sufficient work to classify the exploration target estimates as current mineral resources.  The Company is not treating the exploration target estimates as current mineral resources and the exploration target estimates should not be relied upon.  The management estimates of the exploration target at Windfall were determined based on drill results and geologic modeling using polygonal grade shells with a 0.01 ounce per ton cut-off and a non-statistical average grade calculation based on a weighted average grade within each polygon. The estimate is conceptual in nature, and there has been insufficient exploration drilling to define a mineral resource that may be categorized as an indicated, measured, or inferred resource.  It is uncertain if further exploration will result in the target being delineated as a mineral resource as defined in NI 43-101.

Steven Osterberg, Ph.D., P.G., Timberline's Vice-President of Exploration, is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical contents of this news release.  He has verified the drill results and other data disclosed in this news release, including sampling, analytical and test data.  Field work has been conducted under his supervision.  The Timberline sampling and analysis program included an industry standard QA/QC program.  After logging and cutting or dividing the sample intervals in half, the samples were picked up by Inspectorate America Corporation and taken to their ISO-9001 certified assay lab in Sparks, Nevada for analysis.  The samples were analyzed for gold using a standard 30g fire assay with an AA finish.  Samples returning a gold value in excess of 3 ppm were re-analyzed using a 30g fire assay with a gravimetric finish.  

The Lookout Mountain mineral resources were modeled and estimated by MDA by evaluating the drill data statistically, utilizing geologic interpretations provided by Timberline to interpret gold mineral domains on cross sections spaced at 50- to 100-foot intervals across the extents of the Lookout Mountain mineralization, rectifying the mineral-domain interpretations on level plans spaced at 10-foot intervals, analyzing the modeled mineralization geostatistically to aid in the establishment of estimation parameters, and interpolating grades into a three-dimensional block model.  Mike Gustin, CPG of MDA is a Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimate.  

About Timberline Resources    

Timberline Resources Corporation is focused on advancing and developing its 23 square mile Eureka project located within the Battle Mountain-Eureka gold trend in Nevada.  The Company continues to advance the NI 43-101 resource of 508,000 ounces (M&I) and 141,000 ounces (Inferred) of gold at Lookout Mountain in addition to advancing the exploration target of 185,000 - 200,000 ounces of gold at the Windfall area into NI 43-101 compliance.  Exploration potential across the project area occurs along three separate structural trends defined by distinct geochemical gold anomalies.  The majority of the project area has yet to be drill tested.  Historic production from heap leach mines took place at Lookout Mountain and Windfall mines, both located on the Company's Eureka project.  Timberline also owns the Seven Troughs project in northern Nevada, known to be one of the state's highest grade, former producers, as well as a carried-to-production interest in the Butte Highlands high-grade underground gold project in Montana.  

Timberline is listed on the NYSE MKT where it trades under the symbol "TLR" and on the TSX Venture Exchange where it trades under the symbol "TBR".    

Cautionary note to U.S. investors concerning estimates of measured and indicated resources: This press release uses the terms "measured resources", "indicated resources" and "measured & indicated resources." We advise U.S. investors that while these terms are defined in and required by Canadian regulations, these terms are not defined terms under United States Securities and Exchange Commission ("SEC") Industry Guide 7 and are normally not permitted to be used in reports and registration statements filed with the SEC. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures.  The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC.  U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into SEC Industry Guide 7 reserves.
Cautionary note to U.S. investors concerning estimates of inferred resources: This press uses the term "inferred resources". We advise U.S. investors that while this term is defined in and required by Canadian regulations, this term is not a defined term under SEC Industry Guide 7 and is normally not permitted to be used in reports and registration statements filed with the SEC. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7 compliant "reserves" as in-place tonnage and grade without reference to unit measures.  The term "contained gold ounces" used in this press release is not permitted under the rules of the SEC.  U.S. investors are cautioned not to assume that any part or all of an inferred resource exists or is economically or legally minable.  

Forward-looking Statements  

Statements contained herein that are not based upon current or historical fact are forward-looking in nature and constitute forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such forward-looking statements reflect the Company's expectations about its future operating results, performance and opportunities that involve substantial risks and uncertainties.  These statements include but are not limited to statements regarding the timing and results of the Company's continued exploration and drill program at South Eureka and Lookout Mountain, the timing of assay results from such drilling program being released, the Company's ability to expand and upgrade the South Eureka resource, the amount of drilling or the location of the drill holes, and the length of time it will take to drill.  When used herein, the words "anticipate," "believe," "estimate," "upcoming," "plan," "target", "intend" and "expect" and similar expressions, as they relate to Timberline Resources Corporation, its subsidiaries, or its management, are intended to identify such forward-looking statements. These forward-looking statements are based on information currently available to the Company and are subject to a number of risks, uncertainties, and other factors that could cause the Company's actual results, performance, prospects, and opportunities to differ materially from those expressed in, or implied by, these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, whether or not the Company completes the acquisition of Wolfpack US, risks related to obtaining shareholder and regulatory approvals, market risks, risks and uncertainties related to mineral estimates, risks related to the inherently dangerous activity of mining, and other such factors, including risk factors discussed in the Company's Annual Report on Form 10-K for the year ended September 30, 2013.  Except as required by Federal Securities law, the Company does not undertake any obligation to release publicly any revisions to any forward-looking statements.  

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

For Further Information Please Contact:  

Kiran Patankar
President and Chief Executive Officer
Tel: 208-664-4859
E-mail: [email protected]
Website: www.timberline-resources.com

Lire la suite de l'article sur www.noodls.com

Timberline Resources Corporation

EN DÉVELOPPEMENT
CODE : TLR
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Timberline Res. est une société d’exploration minière d'or basée aux Etats-Unis D'Amerique.

Timberline Res. détient divers projets d'exploration en USA.

Ses principaux projets en développement sont SOUTH EUREKA et LOOKOUT MOUNTAIN en USA et ses principaux projets en exploration sont SOUTH RATTO RIDGE, SECRET CANYON, ICBM, EAST BULL, LUCKY LUKE, MINTON PASS, STANDARD CREEK, SANTA ROSA CALIFORNIA, WINDFALL-HOOSAC et BUTTE HIGHLANDS en USA.

Timberline Res. est cotée aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 3,2 millions US$ (2,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 26 août 2011 à 9,96 US$, et son plus bas niveau récent le 21 décembre 2018 à 0,05 US$.

Timberline Res. possède 36 027 819 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Timberline Resources Corporation
Annual report 2007
Financements de Timberline Resources Corporation
03/03/2011(Lookout Mountain)Closes $5-Million Offering, Fast-Track Exploration to Contin...
28/02/2011Announces US$5 Million Offering of Common Stock
Nominations de Timberline Resources Corporation
03/10/2009Appoints Executive Chairman and Nears Completion of 2009 Sur...
Rapports Financiers de Timberline Resources Corporation
10/08/2010Announces Third Quarter 2010 Financial Results
15/08/2009Third Quarter Financial Results, Consolidated Profit, Contin...
14/05/2009Announces Second Quarter Financial Results, Provides Operati...
17/02/2009Announces First Quarter Financial Results and Provides Corpo...
Projets de Timberline Resources Corporation
26/01/20168:24 am Timberline Resources provides corporate update, will...
20/04/20158:35 am Timberline Resources announces positive drill result...
06/04/2011Drills 10.2 metres of 56.5 g/t Gold (33.6 Feet of 1.65 opt) ...
23/03/2011(Lookout Mountain)Completes Successful Drill Program at Lookout Mountain
06/05/2010(Butte Highlands)Submits Operating Permit Application for Butte Highlands Joi...
07/04/2010(Butte Highlands)Advances Toward Underground Drilling at Butte Highlands
18/11/2009(Butte Highlands)Announces Positive Metallurgical Test Results From Its Butte...
25/09/2009(Butte Highlands)Provides Economic Update on Butte Highlands Gold Project, An...
25/08/2009(Butte Highlands)Receives Permit to Begin Development at its Butte Highlands ...
14/08/2009(South Doughstick)Reports Independent NI 43-101 Uranium Resources on South Do...
12/01/2009(Butte Highlands)Receives Positive Hydrogeologic Test Results at Its Butte Hi...
Communiqués de Presse de Timberline Resources Corporation
11/07/2016Timberline Resources Adds Finance and Development Expertise ...
14/06/2016Timberline Resources Closes Second Tranche of Equity Financi...
31/05/2016Timberline Resources Closes First Tranche of Equity Financin...
27/05/2016Timberline Resources Announces Increase to Private Placement
16/05/2016Timberline Announces Second Quarter 2016 Financial Results
11/05/2016Timberline Resources Announces Private Placement Offering of...
02/05/2016Timberline Resources Announces Resignation of Director
01/02/2016New Jersey Mining Company Completes Purchase of 50-Percent I...
26/01/2016Timberline Resources Announces Asset Sale and Provides Corpo...
26/01/2016Timberline Resources Receives Audit Opinion with Going Conce...
26/01/2016New Jersey Mining Company Signs Binding Letter of Intent to ...
19/01/20163:17 am Timberline Resources confirms audit opinion with 'Go...
16/01/2016Timberline Resources Receives Audit Opinion With Going Conce...
13/01/20168:03 am Timberline Resources appoints Steven Osterberg as ne...
12/10/2015Timberline Announces Positive Final Decision by US Forest Se...
23/09/2015Timberline Resources Announces Closing of Non-Brokered Priva...
15/09/2015Timberline Announces Non-Binding Letter Agreement for Acquis...
10/08/201510-Q for Timberline Resources Corp.
07/08/2015Timberline Announces Third Quarter 2015 Financial Results
16/05/201510-Q for Timberline Resources Corp.
20/04/2015Timberline Completes Successful Eureka Drill Program
01/04/2015Timberline Closes Transaction to Acquire Talapoosa Project O...
18/03/2015Timberline Announces Positive Decision on Butte Highlands Mi...
17/03/2015Timberline Acquires Option For 100% of Talapoosa Project in ...
16/02/2015Timberline Announces First Quarter 2015 Financial Results
13/02/2015Timberline Announces First Quarter 2015 Financial Results
13/02/201510-Q for Timberline Resources Corp.
12/02/2015Timberline Resources Announces New Board Appointment
27/01/2015Timberline Announces Authorization for Construction and Oper...
14/01/2015Timberline Resources Drilling Identifies New Zone of Gold Mi...
29/12/2014Timberline Resources Announces 2014 Financial Results
23/12/2014Timberline Resources Announces 2014 Financial Results
22/12/2014Timberline Announces Release of Final EIS for Butte Highland...
19/12/2014Timberline Resources Enhances Management Team with New Chief...
18/12/2014Timberline Resources Commences Drilling at Eureka
25/11/2014Timberline Resources Receives NYSE MKT Compliance Letter
24/10/2014Timberline Announces Terms of Reverse Stock Split
20/10/2014Timberline Releases Schedule for Publication of Final Enviro...
20/04/2011(Butte Highlands)Reports Additional High-Grade Intercepts from Underground Dr...
04/08/2010Commences Drill Program at South Eureka Project in Nevada
26/07/2010Joins Russell Microcap Index
25/06/2010Announces Extension of Due Date on Convertible Loan
01/06/2010Shareholders Approve Acquisition of Staccato Gold Resources
24/05/2010Staccato Securityholders Approve Acquisition by Timberline R...
05/05/2010Updates Progress on its Acquisition of Staccato Gold Resourc...
23/03/2010Agrees to Acquire Staccato Gold with Potential Near-Term Nev...
08/03/2010Advances Underground Development at Butte Highlands
01/05/2008Approved for Listing On the American Stock Exchange
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AMEX (TLR)
0,090+12.50%
AMEX
US$ 0,090
08/02 15:59 0,010
12,5%
Cours préc. Ouverture
0,080 0,130
Bas haut
0,090 0,130
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,090 -%
Volume var. 1 mois
1 400 -%
24hGold TrendPower© : -6
Produit
Développe Gold
Recherche Copper - Gold - Lead - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :