Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Tinka Resources Ltd

Publié le 28 octobre 2015

Tinka Drills 14.9 Metres at 1.1% Tin & 0.36% Copper at Ayawilca

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Indium | Zinc |

Tinka Drills 14.9 Metres at 1.1% Tin & 0.36% Copper at Ayawilca

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct 28, 2015) - Tinka Resources Limited ("Tinka" or the "Company") (TSX VENTURE:TK)(OTC PINK:TKRFF) is pleased to announce further high-grade tin and zinc mineralization in six step-out drill holes (A15-41 to A15-46) from the Ayawilca project, central Peru. Tinka continues to grow the footprint of the polymetallic mineral system at Ayawilca. Tin (cassiterite) mineralization is part of an extensive mineralized layer, located below and separate from the Zinc mineralization that hosts an Inferred Mineral Resource of 13.3 million tonnes grading 5.9% zinc, 0.2% lead, 68g/t indium, 14g/t silver (PR February 26, 2015). The Company is two-thirds the way through a 20-hole, up to 10,000 metre drill program, with results now reported for thirteen holes. The focus of the current drill program is to extend the initial zinc resource, and work towards an initial resource estimate for the tin-copper-silver mineralization.

Drill highlights:

Tin-Copper Intercepts:

- A15-44: 14.9 metres at 1.10% tin, 0.36% copper and 26g/t silver from 350.5 m depth;

- A15-43: 47.7 metres at 0.47% tin, 0.20% copper and 4g/t silver from 281.9 m depth, including:

-- 6.0 metres at 1.28% tin, 0.52% copper and 10g/t silver from 314.0 m depth;

- True thickness of the tin-copper intercepts estimated to be at least 90% of down-hole length;

- Drill holes A15-43 and A15-44 are located 400 and 600 metres, respectively, from hole A15-40 which intersected 50.5 metres at 1.23% tin and 0.16% copper reported in PR October 13, 2015.

Zinc Vein Intercepts:

- A15-46: 2.1 metres at 37.3% zinc, 347g/t indium, 255g/t silver and 2.3% lead from 99.2 m depth;

- A15-43: 3.3 metres at 14.9% zinc, 99g/t indium, 23g/t silver from 130.7 metres;

- A15-41: 1.9 metres at 28.0% zinc, 190g/t indium and 45g/t silver from 82.4 metres, and;

- True thickness of the zinc intercepts in veins are estimated to be between 35 and 65% of the down-hole length;

- Next steps: Drilling will continue until mid-November with two drill rigs working continuously, testing extensions of the tin mineralization discovered in A15-40, and step-out holes of the East and West Ayawilca Zinc Mineral Resource (Figures 1 and 2).

Dr. Graham Carman, Tinka's President and CEO, stated: "The Ayawilca tin-copper discovery continues to grow, exceeding our expectations. These new tin-copper intersections occur 400 to 600 metres from our best tin intercept recently announced in A15-40, within a wider zone covering 1.2 kilometres by 250 metres. The mineralization discovered to date occurs in a flat-dipping massive sulphide body or 'manto' - the feeder structure for this flat dipping mineralization is yet to be identified. Tinka is continuing to work towards an initial tin-copper resource estimate in 2016, as well as expanding the zinc resource.

"The high-grade zinc veins identified in this and earlier drill programs occur within near-surface sandstone formations, and although narrow (typically 1-2 metres true thickness, locally wider), they contain very high-grade zinc values with associated high grade indium and silver. Numerous vein structures surrounding the West Ayawilca Mineral Resource have the potential to add high grade material to our existing resource in that area. We look forward to reporting results of the last holes of the 2015 drill program within a few weeks."

2015 Ayawilca Drill Program

The 2015 program is focusing on drill testing extensions of the Inferred Mineral Resource at East, Central and West Ayawilca (Figures 1 and 2). Up to twenty step-out holes are planned using two diamond drill rigs. Drilling is likely to continue until mid-November 2015, when the Company will take a break from drilling to compile and interpret the new results and plan the 2016 work program.

The zinc and tin-copper mineralization is interpreted to be generally gently-dipping, replacing favourable sedimentary units. True widths of the zinc intercepts are interpreted to be at least 75% of the down-hole lengths, except where indicated (see Table 1). Table 2 summarises the drill hole collar information to date.

Geology of Ayawilca

Zinc mineralization at Ayawilca occurs as massive to semi-massive sulphide replacements of Mesozoic limestone up to 250 metres thick (Pucara Group). The zinc mineralization is interpreted to be hosted mostly by gently-dipping replacement bodies or "mantos," with feeders which are sub-vertical to steeply-south dipping. The zinc occurs as sulphide impregnations (sphalerite) accompanied by abundant pyrite, pyrrhotite, chlorite, iron carbonate, and/or magnetite. Minor sulphides include galena, chalcopyrite, and arsenopyrite. The Pucara limestone is overlain by Cretaceous sandstone (Goyllarisquizga Group) about 150 metre thick. The sandstone largely forms a barren cap to the mineralization, although narrow sphalerite-rich sub-vertical veins (<1 - 3 metres across) cut the sandstones and occasionally outcrop at the surface at West Ayawilca.

Massive to semi-massive pyrrhotite mantos, which occur at or near the base of the Pucara Group limestone, host the disseminated tin and copper mineralization. The pyrrhotite bodies are magnetic, and are the main source of the strong geophysical anomalies. The pyrrhotite-tin-copper mantos vary in thickness from a few metres to up to 50 metres thick. Sulphide stockwork veins occur beneath the mantos hosted within the underlying metamorphic rocks (Excelsior Group).

The Ayawilca project is located in the high Andes Mountains at elevations of between 4,000 and 4,300 metres. Ayawilca would likely be mined, if proven to be economic, using underground mining methods accessed by horizontal portals at lower elevations.

Tin and copper mineralogy

Based on a mineralogical study of eight tin-bearing samples from seven drill holes in 2014 (PR November 25, 2014), tin at Ayawilca occurs predominantly as cassiterite (tin oxide), the most common ore mineral of tin, with minor stannite (tin-copper sulphide). Almost half of the cassiterite was coarse-grained (> 0.3 mm), providing the opportunity for possible gravity separation of the coarser tin fractions in any future mining operation. Copper was predominantly as chalcopyrite (copper sulphide).

The qualified person, Dr. Graham Carman, Tinka's President and CEO, and a Fellow of the Australasian Institute of Mining and Metallurgy, has reviewed and verified the technical contents of this release.

About Tinka Resources Limited

Tinka is an exploration and development company with projects in Peru. Tinka's focus is on its 100%-owned Ayawilca and Colquipucro projects in the highly mineralized zinc-lead-silver belt of central Peru, 200 kilometres north of Lima. The Ayawilca project (Inferred Mineral Resource of 13.3 Mt @ 5.9% Zn, 0.2% Pb, 68g/t In, 14g/t Ag for 7.7% Zn Eq., Feb' 26, 2015) has the potential to be a major zinc sulphide discovery located 40 kilometres from Peru's largest historic zinc mine at Cerro de Pasco. The adjacent Colquipucro silver oxide project (Indicated Mineral Resource of 7.4 Mt @ 60g/t Ag for 14.3 Moz Ag and Inferred Mineral Resource of 8.5 Mt @ 48 g/t Ag for 13.2 Moz Ag, Feb' 26, 2015) is a near-surface, sandstone-hosted, silver oxide deposit.

On behalf of the Board,

Dr. Graham Carman, President & CEO

Forward-Looking Statements: Certain information in this news release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws (collectively "forward-looking statements"). All statements, other than statements of historical fact are forward-looking statements. Forward-looking statements are based on the beliefs and expectations of Tinka as well as assumptions made by and information currently available to Tinka's management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, the successful completion of the current and future drill programs, the interpretation and actual results from the drill programs, the Company's expectations regarding mineral resource calculations, capital and other costs varying significantly from estimates, production rates varying from estimates, changes in world metal markets, changes in equity markets, uncertainties relating to the availability and costs of financing needed in the future, equipment failure, unexpected geological conditions, imprecision in resource estimates or metal recoveries, success of future development initiatives, competition, operating performance, environmental and safety risks, delays in obtaining or failure to obtain necessary permits and approvals from local authorities, community relations, and other development and operating risks. Should any one or more of these risks or uncertainties materialize, or should any underlying assumptions prove incorrect, actual results may vary materially from those described herein. Although Tinka believes that assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. Except as may be required by applicable securities laws, Tinka disclaims any intent or obligation to update any forward-looking statement.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Notes on drill results in Table 1:

All drill holes are diamond HQ bore holes. The down-hole zinc intersections, using a 1% Zn cut-off grade (over 6 metre intervals), are summarized in Table 1. High-grade zinc intersections use a 3% Zn cut-off grade. Tin-copper intersections are calculated using a 0.2% tin or copper cut off.

Notes on core sampling:

All holes are diamond cores with recoveries generally at or close to 100%. The drill core is marked up, logged, and photographed on site. The cores are cut in half at the Company's core storage facility with half-cores stored as a future reference. The other half-core is bagged on average over 2 metre composite intervals and sent to SGS laboratory in Lima for assay in batches. Standards, blanks and duplicates are inserted by the Company for quality control purposes. At the laboratory, samples are dried, crushed to 100% passing 2mm, with 500 grams pulverized for multi-element analysis by ICP using multi-acid digestion. Samples assaying over 1% zinc, lead, or copper are reassayed using precise ore-grade AAS techniques.

Samples which assayed approximately 200 ppm tin or greater in the ICP analysis were re-assayed for tin by fusion with sodium peroxide and AAS finish (SGS Lima laboratory method SGS-MN-ME-112). The fusion results are presented in Table 1, where available. The high-grade tin interval in A15-40 (50.5 metres) was check assayed by XRF pressed powder technique (ALS Lima laboratory method ME-XRF15b) with the results being the same as fusion within analytical uncertainty. Gold was assayed by fire-assay with a 30g charge using an AAS finish, but has not been routinely assayed due to very low gold values found in most samples.

Table 1. Highlights of 2015 Drill Results at Ayawilca

Drillhole From
(m)
To
(m)
Int
(m)
Zn
(%)
Pb
(%)
Ag
(g/t)
Cu
(%)
Sn
(%)
In
(g/t)
A15-46 99.20 101.30 *2.10 37.25 2.29 255 0.15 pending 347
and 185.70 192.00 6.30 3.10 0.01 5 0.01 pending 9
and 230.70 231.20 0.50 6.23 9.92 308 0.26 pending 0
and 246.50 248.00 1.50 3.41 2.49 97 0.14 pending 0
A15-45 109.40 109.90 0.50 10.75 0.12 36 0.03 0 73
and 115.40 115.90 0.50 17.69 0.08 33 0.03 0 45
and 168.20 174.50 6.30 2.12 0.02 2 0.00 0 16
and 308.00 314.00 6.00 2.30 0.91 13 0.04 0 1
and 344.00 350.00 6.00 2.36 0.53 8 0.01 0.06 1
and 367.25 376.00 8.75 3.00 0.17 5 0.02 0.04 12
and 381.80 384.50 2.70 5.47 0.08 5 0.00 0.05 21
A15-44 172.80 178.70 5.90 2.67 0.05 19 0.02 0 23
and 305.90 310.90 5.00 2.80 0.02 6 0.04 0 23
and 350.55 365.40 14.85 0.46 0.00 26 0.36 1.1 15
A15-43 130.70 134.00 *3.30 14.87 0.07 23 0.05 0.04 99
and 151.30 156.10 4.80 2.24 1.08 16 0.02 0 0
and 177.20 206.50 29.30 2.16 0.31 7 0.01 0 27
and 221.00 252.30 31.30 2.63 0.01 5 0.08 0 52
and 281.90 329.60 47.70 0.08 0.00 4 0.20 0.47 4
including 314.00 320.00 6.00 0.01 0.00 10 0.52 1.28 6
A15-42 78.00 82.00 4.00 2.80 0.02 12 0.02 0 1
and 115.40 116.50 1.10 13.02 0.04 17 0.04 0.01 1
and 170.00 174.30 4.30 2.15 1.31 114 0.03 0 0
A15-41 82.40 84.30 *1.90 28.08 0.04 45 0.18 0.02 190
and 233.70 242.70 9.00 4.31 1.25 29 0.06 0.01 1
including 233.70 236.10 2.40 10.47 2.32 54 0.17 0.01 4
and 268.10 273.40 5.30 4.35 0.45 9 0.03 0.01 3
and 283.00 294.50 11.50 1.27 0.39 9 0.01 0.03 3
and 294.00 340.00 46.00 0.58 0.01 4 0.10 0.2 16
including 307.75 308.40 0.65 21.96 0.00 6 0.07 1.34 500
A15-40 55.00 62.00 7.00 3.89 0.00 3 0.00 -0.01 1
and 201.60 253.20 51.60 2.09 0.21 7 0.04 0.01 27
including 233.80 241.75 7.95 5.31 0.04 9 0.07 0.02 91
and 300.20 301.20 1.00 7.67 0.14 36 0.06 0.02 140
and 328.00 378.50 50.50 0.32 0.03 15 0.16 1.23 9
including 328.00 341.00 13.00 0.05 -0.01 12 0.25 2.94 8
including 330.00 332.50 2.50 0.02 -0.01 10 0.18 8.81 4
A15-39 182.60 183.60 1.00 9.64 0.01 10 0.03 -0.01 23
and 294.80 303.20 8.40 3.29 0.13 9 0.01 0.06 56
and 320.00 350.00 30.00 3.53 0.10 7 0.01 0.08 50
including 329.25 331.00 1.75 18.87 0.01 27 0.01 0.07 226
and 370.00 452.00 82.00 0.01 -0.01 5 0.22 0.33 3
including 370.00 420.00 50.00 0.01 -0.01 6 0.25 0.52 3
including 380.00 388.00 8.00 -0.01 -0.01 3 0.19 1.43 1
A15-38 236.60 280.00 43.40 3.65 0.08 13 0.06 0.08 63
including 268.00 278.00 10.00 5.90 0.02 16 0.08 0.18 119
and 294.00 303.30 9.30 4.20 0.02 5 0.03 0.11 31
and 312.00 328.00 16.00 1.83 -0.01 1 0.03 0.06 46
and 354.00 360.70 6.70 2.25 -0.01 2 0.05 0.04 46
and 372.70 379.00 6.30 2.46 -0.01 1 0.02 0.1 22
and 379.00 388.00 9.00 0.04 -0.01 4 0.26 0.04 5
A15-37 84.00 89.60 5.60 3.12 0.33 26 0.02 -0.01 50
and 475.50 481.90 6.40 4.16 0.74 25 0.03 0.07 53
and 481.90 485.20 3.30 0.16 0.03 13 0.11 0.26 3
A15-36 79.70 87.00 *7.30 7.10 1.29 194 0.12 -0.01 53
and 344.50 354.00 9.50 4.00 0.01 2 0.05 0.07 74
and 360.00 399.35 39.35 0.27 0.06 19 0.11 0.21 26
A15-35 162.00 190.00 28.00 3.26 0.78 25 0.06 0.06 10
and 196.00 246.00 50.00 2.97 0.33 12 0.02 0.1 31
including 202.00 216.00 14.00 3.78 0.04 6 0.02 0.1 19
including 238.00 246.00 8.00 4.74 0.06 19 0.05 0.17 67
and 262.00 302.00 40.00 2.26 0.03 3 0.02 -0.01 9
including 288.00 296.00 8.00 3.53 0.04 8 0.06 -0.01 6
and 340.00 354.15 14.15 0.31 0.00 1 0.16 0.36 12
A15-34 98.00 99.30 1.30 5.64 0.18 92 0.14 -0.01 138
and 364.00 368.00 4.00 1.50 0.12 6 0.02 -0.01 -1
and 418.00 426.00 8.00 1.41 0.22 8 0.02 0.01 5

Notes to Table 1: In the case of tin, true widths are at least 90% of down-hole length due to the flat-lying mineralization. True widths of the zinc intercepts are believed to be at least 75% of the down-hole widths mineralization is interpreted to be generally gently dipping (except where marked with * in hole A15-36, A15-41, A15-43 and A15-46 where true thickness of vein intercepts are estimated to be between 35% and 65% of down-hole length). N/A Not assayed.

Table 2. Drill hole collar coordinates and hole details

Drill Hole PSAD56
East
PSAD56
North
Elevation Total
depth m
Azimuth Dip Comment
A15-34 333,713 8,846,592 4,209 435.6 000 -70 Reported Sep' 29 2015
A15-35 333,720 8,846,129 4,138 385.7 180 -75 Reported Sep' 29 2015
A15-36 333,904 8,846,291 4,113 425.8 180 -80 Reported Sep' 29 2015
A15-37 333,858 8,846,620 4,198 509.1 000 -60 Reported Sep' 29 2015
A15-38 333,884 8,846,090 4,118 441.1 000 -90 Reported Sep' 29 2015
A15-39 333,698 8,845,727 4,185 568.3 000 -75 Reported Sep' 29 2015
A15-40 333,893 8,845,891 4,113 423.1 000 -75 Reported Oct' 13 2015
A15-41 333,397 8,845,857 4,202 360.3 180 -75 New Results
A15-42 332,858 8,846,372 4,275 299.2 180 -85 New Results
A15-43 333,507 8,845,865 4,171 427.5 000 -85 New Results
A15-44 333,400 8,845,723 4,220 392.9 180 -80 New Results
A15-45 333,800 8,845,816 4,145 404.2 000 -65 New Results
A15-46 333,160 8,845,900 4,230 407.3 180 -60 New Results
A15-47 333,997 8,846,181 4,062 425.8 180 -60 Results Pending
A15-48 334,314 8,846,134 3,982 68.7 000 -85 Hole Lost
A15-49 333,717 8,846,122 4,137 424.4 020 -70 Results Pending
A15-50 334,194 8,846,345 4,062 In Progress 000 -80 In Progress
A15-51 333,732 8,846,440 4,176 In Progress 025 -70 In Progress

Notes on drill hole data:

Eastings and Northings are based on the PSAD56/18S UTM datum. Elevations were taken from a measured topographic model compiled from field surveys using theodolite from known surveyed points at a scale of 1:1000. Azimuth and dip measurements of drill holes were taken using compass and inclinometer at surface. All holes were down-hole surveyed; small variances in both azimuth and dip do occur down hole but are not shown here.

To view Figures 1 and 2, please visit the following link: http://media3.marketwire.com/docs/tk1028figures.pdf.

Lire la suite de l'article sur finance.yahoo.com

Tinka Resources Ltd

EXPLORATEUR
CODE : TK.V
ISIN : CA8875221001
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tinka Resources est une société d’exploration minière d'argent et de zinc basée au Canada.

Tinka Resources détient divers projets d'exploration au Perou.

Ses principaux projets en exploration sont COLQUIPUCRO et TIBILLOS au Perou.

Tinka Resources est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,9 millions CA$ (20,4 millions US$, 19,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 09 janvier 2009 à 0,03 CA$, et son plus haut niveau récent le 22 mars 2013 à 1,25 CA$.

Tinka Resources possède 206 720 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Tinka Resources Ltd
Annual Report 2008
Financements de Tinka Resources Ltd
08/11/2013Provides Update on Private Placement Financing
08/10/2013Announces First Tranche Non-Brokered Private Placement Closi...
23/09/2013Announces Non-Brokered Private Placement Financing
14/05/2013Closes Private Placement Financing
11/12/2012Tinka Announces Non-Brokered Private Placement Financing
11/12/2012Announces Non-Brokered Private Placement Financing
22/06/2011TINKA AMENDS TERMS OF PRIVATE PLACEMENT
02/06/2011TINKA ANNOUNCES $5 MILLION FINANCING
Nominations de Tinka Resources Ltd
07/02/2013Tinka Announces Appointment of Mr. Allen Morton to its Advis...
02/02/2013Tinka Announces Appointment of New Investor Relations Consul...
Projets de Tinka Resources Ltd
29/09/2015Tinka extends zinc, tin, copper mineralization at Ayawilca
23/02/2015Tinka confirms indium with zinc mineralization at Ayawilca, ...
10/02/2015Tinka expands zinc, tin, copper mineralization at Ayawilca, ...
15/01/2015(Colquipucro)announces results of 1,600 metre ten-hole drill program at C...
18/02/2014Drills 36 Metres of 5.93% Zinc and 22.8 Metres of 5.80% Zinc...
15/01/2014Drills 24 Metres of 2.8% Zinc and 6.3 Metres of 6.19% Zinc a...
25/09/2013Mobilizes Drill Rig to Ayawilca Project, Peru
10/09/2013Resumes Work at Ayawilca Project in Preparation for Drilling
11/06/2013Tinka Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% ...
11/06/2013Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% Zinc ...
22/05/2013Tinka Drills 60 Metres of 7.75% Zinc (Including 24 Metres of...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc (Including 8 Metres of ...
26/03/2013Tinka Drills 18.7 Metres of 165 g/t Ag
13/02/2013Tinka Resources Named to TSX Venture Top 50
29/01/2013Tinka Commences Third IP Survey At Ayawilca Project And Init...
10/01/2013Tinka Resumes Drilling at Colquipucro and Ayawilca Projects,...
10/01/2013(Colquipucro)Resumes Drilling at Colquipucro and Ayawilca Projects, Peru
15/10/2012Tinka Increases Inferred Silver Resource To 32.7 Million Oun...
02/10/2012Tinka Resumes Exploration At The Chaucha Zone, Colquipucro, ...
02/10/2012(Colquipucro)Resumes Exploration At The Chaucha Zone, Colquipucro, Peru
17/09/2012Tinka Identifies Further Surface Mineralization At Zone 1, C...
10/09/2012Tinka Resumes Drilling At The Ayawilca Zone,
10/09/2012(Colquipucro)Resumes Drilling At The Ayawilca Zone, Colquipucro, Peru
01/05/2012Tinka Drills 20 m of 85.9 g/t Silver At
13/03/2012Tinka Drills 92.7 m of 92 g/t Silver,
21/02/2012Tinka drills 42 m of 165 g/t silver
27/05/2011(Colquipucro)DRILLING COMMENCES AT TINKA'S COLQUIPUCRO SILVER PROJECT, PE...
24/05/2011DRILLING COMMENCES AT TINKA'S COLQUIPUCRO
07/03/2011(Colquipucro)SIGNS DIAMOND DRILL CONTRACT FOR COLQUIPUCRO SILVER PROJECT,...
24/01/2011(Tibillos)IDENTIFIES DRILL TARGETS AT TIBILLOS COPPER PORPHYRY PROJECT...
28/08/2007(Colquipucro)Announces Positive Silver Results, Colquipucro Silver-Zinc P...
15/08/2007(Colquipucro)Update on Drill Program at Colquipucro Silver-Zinc Project, ...
15/05/2007(Colquipucro)Starts Drilling Colquipucro Silver Project, Peru
Communiqués de Presse de Tinka Resources Ltd
25/07/2016Tinka Appoints Investor Relations Consultant
29/06/2016Tinka Announces Filing Of NI 43-101 Technical Report On The ...
27/06/2016Tinka Commences Property-Wide Airborne Geophysics At Ayawilc...
21/04/2016Tinka Announces AGM Results
04/04/2016Tinka Announces Grant Of Stock Options
23/03/2016Tinka Resources Appoints Mary L. Little To Board Of Director...
21/03/2016Tinka Announces Passing Of Director William Lee
20/01/2016Tinka Continues to Expand Zinc and Tin Footprint at Ayawilca
28/10/2015Tinka Drills 14.9 Metres at 1.1% Tin & 0.36% Copper at Ayawi...
13/10/2015Tinka Drills 50.5 Metres at 1.23% Tin & 0.16% Copper at Ayaw...
28/07/2015commences 10,000 metre drill program at Ayawilca zinc projec...
27/07/2015Hot Maden – Continues to Deliver Significant Results
20/04/2015Tinka announces appointment of new Vice President Exploratio...
20/04/2015announces appointment of new Vice President Exploration
20/04/2015announces appointment of new Vice President Exploration
13/04/2015Tinka Announces C$7.0 Million Private Placement Financing wi...
27/03/2015Tinka Announces Filing of NI 43-101 Technical Report on the ...
27/02/2015Tinka Announces AGM Results
27/02/2015IIROC Trading Resumption - TK
26/02/2015Tinka Announces Initial Inferred Zinc Resource of 13.3 Milli...
26/02/2015IIROC Trading Halt - TK
15/01/2015Tinka announces results of 1,600 metre ten-hole drill progra...
18/12/2014Tinka provides update on drill programs at Ayawilca-Colquipu...
18/12/2014(Colquipucro)provides update on drill programs at Ayawilca-Colquipucro, P...
11/12/2014Tinka announces release from escrow following Tier 1 graduat...
25/11/2014Tinka Discovers Tin - Copper Mineralization Beneath High-Gra...
25/11/2014Discovers Tin - Copper Mineralization Beneath High-Grade Zin...
13/11/2014Tinka announces graduation to Tier 1 on the TSX Venture Exch...
12/11/2014Tinka Intersects Thick High-grade Zinc Mineralization in Fou...
12/11/2014Intersects Thick High-grade Zinc Mineralization in Four Dril...
22/09/2014Tinka Starts Drilling With Third Rig at Colquipucro-Ayawilca...
11/09/2014Tinka Announces Start of Drilling at Colquipucro, Peru
08/09/2014Tinka Starts Drilling at Ayawilca; Farms Out Rurimarac Gold ...
26/08/2014Tinka Mobilizes First of Three Drill Rigs to Ayawilca-Colqui...
06/08/2014Tinka Provides Exploration Update; Grants Stock Options; Ret...
21/05/2014Tinka to Commence Geophysical Surveying to Cover 26 km2 at A...
18/12/2013Drills 12 Metres of 4.22% Zinc and Intercepts Mineralization...
16/12/2013Adopts Advance Notice Policy for Director Nominations
30/11/2013Announces Appointment of Corporate Development - Investor Re...
24/10/2013Resumes Drilling at Ayawilca Project, Peru
03/09/2013(Colquipucro)Receives Return to Work Permit for Ayawilca Project and Dril...
23/07/2013Tinka Announces the Approval of Its Environmental Impact Ass...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/05/2013Tinka Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/...
23/05/2013(Colquipucro)Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/t Ag a...
22/05/2013Drills 60 Metres of 7.75% Zinc (Including 24 Metres of 13.85...
10/05/2013Announces Oversubscription in Private Placement Financing
23/04/2013Tinka Identifies 1.7 Km Anomalous Geophysical Strike Length ...
23/04/2013Identifies 1.7 Km Anomalous Geophysical Strike Length At Aya...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc
02/04/2013Drills 16 Metres of 4.62% Zinc (Including 8 Metres of 6.62% ...
26/03/2013Drills 18.7 Metres of 165 g/t Ag (Including 8 Metres of 298 ...
21/03/2013Tinka Announces Results of AGM
12/03/2013Tinka Drills 12 Metres of 5.84% Zinc
13/02/2013Named to TSX Venture Top 50
08/01/2013Tinka Drills 70 metres of 4.8% Zinc (Including 19 metres of ...
08/11/2012Tinka Drills 20 m of 7.1% Zinc Including 14 m of 9.6% Zinc a...
18/10/2012Tinka Releases Independent NI 43-101 Report for the Colquipu...
15/10/2012(Colquipucro)Increases Inferred Silver Resource To 32.7 Million Ounces At...
02/08/2012Tinka Secures Surface Agreement With
05/03/2012Tinka Extends IP Anomaly at Ayawilca Zone to
23/02/2012Tinka Drills 10.4 metres of 7% Zn at
07/02/2012Tinka commences second IP survey at Ayawilca
04/08/2011Tinka Resources drilling update
01/06/2011ANNOUNCES $5 MILLION FINANCING
19/05/2011DRILL RIG MOBILIZED TO TINKA'S COLQUIPUCRO
19/05/2011GUYANA PRECIOUS METALS ANNOUNCES TAKARA RESOURCES PROVIDES ...
07/03/2011TINKA SIGNS DIAMOND DRILL CONTRACT FOR
03/10/2007Drills 66m Grading 83 g/t Silver from Surface at Colquipucro...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TK.V)Other OTC (TKRFF)
0,135+3.85%0,100+3.09%
TSX-V
CA$ 0,135
24/04 16:11 0,010
3,85%
Cours préc. Ouverture
0,130 0,135
Bas haut
0,135 0,135
Année b/h Var. YTD
0,100 -  0,140 12,50%
52 sem. b/h var. 52 sem.
0,100 -  0,180 3,85%
Volume var. 1 mois
11 000 12,50%
24hGold TrendPower© : 44
Produit
Développe
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20248,00%
2023-7,41%0,170,11
2022-15,63%0,220,12
2021-28,89%0,300,16
202015,38%0,250,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :