Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sandfire Resources NL

Publié le 14 octobre 2015

TLM: Monty - Exploration Update

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

TLM: Monty - Exploration Update

324caaa3e6ba529a2131c8.pdf

F o c u s e d A u s t r a l i a n M i n e r a l E x p lo r a t i o n C o m p a n y


15th October 2015


COMPANY SNAPSHOT

Board of Directors Alan Senior

Non-Executive Chairman

Gary Lethridge

Managing Director

Brian Dawes

Non-Executive Director

Karen Gadsby

Non-Executive Director


Contact Details Telephone:

+61 8 9380 4230

Facsimile:

+ 61 8 9382 8200

Email:

[email protected]

Website:

www.talismanmining.com.au


Capital Structure

Monty Exploration Update

Thick zone of bornite-bearing massive sulphides intersected in Lower Zone

Highlights


  • Three horizons of massive sulphides intersected in step-out drill hole TLDD0026, 45 metres along strike from recently reported hole TLDD0021 (7.3 metres of massive sulphides from 286.2m downhole), including a significant intercept of:


    o 19.9 metres of massive sulphides from 340.2m down-hole (true width not known at this time, top of intercept is approximately 286m vertically below surface).


  • The primary mineralisation in TLDD0026 is similar to previous holes in the Lower Zone but also contains variable amounts of bornite, a copper mineral which has not previously been encountered by Sandfire in any significant quantities at Doolgunna. Bornite typically has a copper content of ~63% by mass compared with chalcopyrite's copper content of ~35% by mass.


    Shares on Issue:

    148,559,904 (TLM)


    Options on Issue:

    6,400,000 (Unlisted)


    ASX: TLM


    Photo: Cross section through TLDD0026 NQ2 drill core showing bornite disseminated in the matrix of the sulphides (359.3 metres down hole).


    • High-grade copper assay results returned from Reverse Circulation (RC) drill hole TLRC0009 located in the Upper Zone:


      o 12 metres grading 5.7% Cu and 1.8 g/t Au from 133m to 145m down- hole (true width not known at this time, but anticipated to be significantly less than down-hole widths).


      Sandfire is continuing drilling to define the extents of the mineralisation identified to date in both the Upper and Lower zones at Monty and is also targeting other prospective areas, both in the immediate vicinity of Monty and further afield within the Springfield Project.

      Talisman Mining Limited (ASX: TLM 'Talisman') is pleased to announce that Sandfire Resources NL (ASX: SFR; 'Sandfire') has provided an update on ongoing activities at the Monty copper-gold discovery within Talisman's Springfield Project located approximately 10km east of the DeGrussa Copper-Gold Mine (see Appendix 1).


      The collar locations of advised holes drilled to date by Sandfire are shown in the plan view diagram below (see Figure 1) and Table 1.

      Figure 1: Plan view of Monty showing drill-hole collar locations and simplified interpreted geology.


      Monty Lower Zone


      Thick Zone (~20 metres) of massive sulphides intersected in Lower Zone


      Diamond drill hole TLDD0026 was drilled approximately 45 metres along strike from recently reported hole TLDD0021 (7.3 metres of massive sulphides from 286.2m down hole) (see TLM ASX announcement - 2 October 2015) and approximately 46 metres up-dip of the halo mineralisation intersected in TLDD0014 (see Figures 1 and 2).


      Sandfire have advised that TLDD0026 intersected three horizons of massive sulphides within the host sequence of the Lower Zone:


  • 3.0 metres of massive sulphides from 325.6m to 328.6m down-hole

    (true width not known at this time, top of intercept is approximately 275m vertically below surface);


  • 2.4 metres of massive sulphides from 330.5m to 332.9m down-hole

    (true width not known at this time, top of intercept is approximately 279m vertically below surface); and


  • 19.9 metres of massive sulphides from 340.2 to 360.1m down-hole

    (true width not known at this time, top of intercept is approximately 286m vertically below surface)

    Geological Discussion of the Lower Zone and TLDD0026


    Ongoing work at Monty has provided sufficient detail to enable Sandfire to provide an updated interpretation of the geological setting of the known mineralisation at Monty. An updated vertical longitudinal projection (looking to the south-east) is shown in Figure 2.


    The Lower Zone at Monty incorporates the massive sulphide mineralisation intersected in TLDD0004A, TLDD0005, TLDD0009, TLDD0010 (previously reported), TLDD0021 (previously reported, assays pending) and TLDD0026 (reported above, assays pending).



    Figure 2: Vertical longitudinal projection of Monty showing drill-hole piercepoints at the top of the primary intercept shown in bold. All intercepts are down-hole widths.


    The 19.9 metre intersection of massive sulphides in TLDD0026 is interpreted by Sandfire to be a continuation of the 7.3m (down-hole width) primary mineralisation previously reported from TLDD0021 (see TLM ASX announcement - 2 October 2015) (see Figure 2 above and Appendix 3). The mineralisation in the upper two intersections in TLDD0026 appears to be consistent with that of the higher level, subordinate mineralisation zones intersected in TLDD0021 (see Appendix 3).


    Based on field observations by Sandfire, the mineralogy of the 19.9 metre intercept in TLDD0026 differs from that observed in the previously reported intersections of the primary mineralisation in TLDD0004A, TLDD0005, TLDD0009, TLDD0010, and TLDD0021.


    The massive sulphides intersected in these earlier holes comprises variable amounts of chalcopyrite (main copper-bearing sulphide mineral), pyrite and pyrrhotite, minor sphalerite and galena, along with silicate and talc gangue minerals (with gold and silver).

    The primary mineralisation in TLDD0026 has a similar composition to that of the earlier holes, but also contains variable amounts of bornite (a copper-bearing sulphide). Photos of the drill core from the mineralised intervals in TLDD0026 are provided in Appendix 2 to this release.


    Bornite is an important copper mineral and commonly occurs in VMS deposits globally, along with the more common copper mineral; chalcopyrite. Bornite, in isolation, typically has a copper content of approximately 63 per cent by mass compared with chalcopyrite's typical copper content of ~35% by mass.


    Both the bornite and other sulphide minerals are deformed and exhibit features consistent with re-crystallisation, which suggests that modification of the massive sulphide may have occurred during deformation.


    Photo: TLDD0026 NQ2 drill core showing bornite in foliation (right) and rimming pyrite and pyrrhotite (left) - intercept shown is from 351m down-hole.


    Talisman understands that Bornite has not previously been seen at the DeGrussa mine to any material extent.


    This potentially significant sighting of Bornite mineralisation at Monty will require additional work to put its presence in TLDD0026 into context and determine its significance in the exploration campaign at Monty and further afield at Springfield, but is considered by Talisman to be highly encouraging at this stage.


    Diamond core from TLDD0026 will be despatched by Sandfire for analysis.


    Additional Recent Lower Zone Drilling Results


    Sandfire have also advised Talisman of the results from two other diamond drill holes targeting the Lower Zone at Monty; TLDD0024 and TLDD0028.


    TLDD0024 was drilled approximately 66 metres down-dip of previously reported hole TLDD0010 (intercepts including 10.5m grading 18.9%Cu and 3.1 g/t Au from 359.7m down hole and 4.7m grading 12.8%Cu and 2.5 g/t Au from 373.6m down hole ) (see TLM ASX announcement - 8 September 2015) (see Figures 1 and 2).


    Sandfire have advised that TLDD0024 intersected a single horizon of 1.8 metres of massive sulphides within the host sequence of the Lower Zone from 445.6m to 447.3m down-hole (true width not known at this time, top of intercept is approximately 381m vertically below surface). Assays are awaited.


    TLDD0028 was drilled approximately 37 metres along strike to the south-west from previously reported hole TLDD0021 (7.3 metres of massive sulphides from 363.1m down-hole) (see TLM ASX announcement - 2 October 2015) and 46 metres from the mineralisation intersected in TLDD0020 (1.2 metres of massive sulphides from 272.6m down-hole), (see Figures 1 and 2).

    TLDD0028 intersected the prospective horizon with weak haematite, jasper and minor disseminated sulphides logged in the core. No massive sulphides were encountered and Sandfire have advised that further drilling will be undertaken down-dip to help define the extents of the mineralisation in this area.


    Recent Lower Zone Assay Results


    Sandfire have also advised that it has received assay results from the previously reported Diamond drill holes

    TLDD0014 and TLDD0011 (see Figure 1, Figure 2 and Table 1)


    TLDD0014 was located 45 metres along strike of TLDD0026 (see Figures 1 and 2) and intersected:


  • 0.5 metres grading 3.6% Cu and 0.1g/t Au from 334.2m to 334.7m down-hole

    (corresponding to the stratigraphic position of the main mineralised zone); and


  • 3.4 metres grading 3.5% Cu and 0.8g/t Au from 359.4m to 362.8m down-hole

    (true widths for both intersections not known at this time).


    TLDD0011 was drilled along strike of TLDD0010 (see Figures 1 and 2) and returned an intersection of:


  • 0.4 metres grading 1.2% Cu and 1.3g/t Au from 370.9m to 371.3m down-hole

    (true width not known at this time).


    Monty Upper Zone


    Upper Zone Drilling Results and Geological Discussion / Interpretation


    Sandfire have advised that reverse circulation drill holes TLRC0015, TLRC0016 and TLRC0017 were drilled up- dip of, and at the opposite orientation to, previously reported holes TLRC0004, TLRC0008 and TLRC0009 to test for potential mineralisation (see Figures 1 and 2).


    No visible mineralisation was observed by Sandfire and the mineralised zone is therefore interpreted by Sandfire to not extend to the surface (see Figure 2).


    Sandfire advise that the spatial position of the host horizon intersected in TLRC0016 and TLRC0017 indicates at this time that the host horizon in the near-surface portion of the Upper Zone may be locally overturned and dip at approximately 75° to the south-east.


    As the earlier drill-holes that intersected mineralisation in the Upper Zone (TLRC0004, TLRC0008 and TLRC0009) were drilled at a dip of 60 - 62° to the south-east, as previously reported the true widths of mineralisation in these holes is anticipated to be significantly lower than the down-hole widths.


    Additional diamond holes are planned by Sandfire to be drilled below TLRC0004, TLRC0008 and TLRC0009 in order to test for down-dip mineralisation as well as to provide information to accurately constrain the dip of the Upper Zone.

    Assay Results Upper Zone


    Sandfire have also advised that it has received assay results from the previously reported reverse circulation drill hole TLRC0009 (see Figures 1 and 2 and Tables 1 and 2).


    TLRC0009 intersected mineralisation approximately 40 metres along strike to the north-east of TLRC004 (see Figures 1 and 2) and returned an intersection of:


  • 12.0 metres grading 5.7% Cu and 1.8g/t Au from 133m to 145m down-hole

(true width not known at this time, but anticipated to be significantly less than down-hole widths).


Further Exploration Activity


Sandfire is continuing drilling at Monty, in both the Lower and Upper Zones, to define of the extents of the currently known mineralisation and to provide information on the overall orientation and extents of this mineralisation.


In addition to continuing definition drilling around the currently known mineralisation, Sandfire is also beginning to step further afield, with the objective of finding the next lenses or clusters of lenses of VMS mineralisation, both at Monty and also within the broader Springfield Project.


The Springfield Project is subject to an exploration farm-in joint venture between Sandfire and Talisman where Sandfire has the right to earn up to a 70% interest in Talisman's Doolgunna Projects by the expenditure of $15 million on exploration at the Projects.


ENDS


For further information, please contact: For media inquiries, please contact:

Gary Lethridge - Managing Director Nicholas Read - Read Corporate

on +61 8 9380 4230 on +61 419 929 046


Competent Person's Statement


Information in this ASX release that relates to Exploration Results is based on information compiled by Mr Graham Leaver, who is a member of the Australian Institute of Geoscientists. Mr Leaver is a full time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australian Code for Reporting of Mineral Resources and Ore Reserves'. Mr Leaver consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

Table 1 - Drill-hole Information Summary, Monty Prospect

Details and co-ordinates of all relevant drill hole collars are provided in the table below:


Hole ID

Depth

Dip

Azimuth

Grid_ID

East

North

RL

Lease ID

Hole Status

TLDD0002A

463

-61°

110°

MGA94_50

743544

7171211

602

E52/2282

Complete

TLDD0004A

817

-60°

148°

MGA94_50

743588

7171281

601

E52/2282

Complete

TLDD0005

478

-62°

139°

MGA94_50

743544

7171210

602

E52/2282

Complete

TLDD0006

554

-62°

140°

MGA94_50

743469

7171174

601

E52/2282

Complete

TLDD0007

589

-62°

138°

MGA94_50

743504

7171271

601

E52/2282

Complete

TLDD0008

688

-62°

138°

MGA94_50

743441

7171223

600

E52/2282

Complete

TLDD0009

472

-61°

140°

MGA94_50

743578

7171190

602

E52/2282

Complete

TLDD0010

433

-62°

142°

MGA94_50

743514

7171138

601

E52/2282

Complete

TLDD0011

472

-62°

141°

MGA94_50

743451

7171092

598

E52/2282

Complete

TLDD0012

598

-62°

140°

MGA94_50

743403

7171155

599

E52/2282

Complete

TLDD0014

399

-62°

143°

MGA94_50

743638

7171231

603

E52/2282

Complete

TLDD0015

376

-62°

146°

MGA94_50

743561

7171073

602

E52/2282

Complete

TLDD0016

274

-61°

147°

MGA94_50

743621

7171119

604

E52/2282

Complete

TLDD0017

236

-62°

146°

MGA94_50

743686

7171166

605

E52/2282

Complete

TLDD0018

340

-62°

146°

MGA94_50

743471

7171054

599

E52/2282

Complete

TLDD0019

552

-62°

141°

MGA94_50

743566

7171329

600

E52/2282

Complete

TLDD0020

340

-61°

141°

MGA94_50

743536

7171106

602

E52/2282

Complete

TLDD0021

331

-62°

144°

MGA94_50

743599

7171152

603

E52/2282

Complete

TLDD0022

304

-62°

141°

MGA94_50

743441

7171035

599

E52/2282

Complete

TLDD0024

571

-60°

141°

MGA94_50

743470

7171172

600

E52/2282

Complete

TLDD0026

409

-59°

141°

MGA94_50

743609

7171209

602

E52/2282

Complete

TLDD0028

441

-62°

143°

MGA94_50

743569

7171129

602

E52/2282

Complete

TLRC0003

544

-61°

144°

MGA94_50

743720

7171393

599

E52/2282

Complete

TLRC0004

306

-62°

142°

MGA94_50

743497

7171025

600

E52/2282

Complete

TLRC0006

318

-62°

143°

MGA94_50

743430

7170973

598

E52/2282

Complete

TLRC0008

294

-62°

143°

MGA94_50

743461

7171001

599

E52/2282

Complete

TLRC0009

265

-62°

141°

MGA94_50

743527

7171050

601

E52/2282

Complete

TLRC0012

210

-62°

143°

MGA94_50

743553

7171017

602

E52/2282

Complete

TLRC0015

138

-60°

320°

MGA94_50

743503

7170953

600

E52/2282

Complete

TLRC0016

120

-58°

317°

MGA94_50

743580

7170985

602

E52/2282

Complete

TLRC0017

120

-60°

318°

MGA94_50

743548

7170968

601

E52/2282

Complete

Table 2 - Significant Drill-hole Assay Intersections, Springfield Project

Details of all relevant intersections are provided below:



Hole ID


Int


From


To


Downhole Width

Intersection

Cu (%)

Au (g/t)

Zn (%)

TLDD0004A

409.5

426.0

16.5

18.9

2.1

1.5

TLDD0005

417.0

426.2

9.2

11.8

2.9

2.3

TLDD0009

1

343.0

344.0

1.0

8.6

0.3

0.1

2

363.1

371.0

7.9

8.3

2.4

2.1

3

385.8

390.6

4.8

4.9

1.1

1.4

TLDD0010

1

355.6

356.1

0.5

1.2

1.4

0.2

2

359.7

370.2

10.5

18.9

3.1

1.1

3

373.6

378.2

4.7

12.8

2.5

0.8

TLRC0004

1

107.0

125.0

18.0

5.7

2.4

3.2

2

158.0

162.0

4.0

4.2

0.7

0.1

TLRC0008

1

89.0

95.0

6.0

7.8

0.9

0.9

2

112.0

123.0

11.0

15.0

1.9

1.0

TLRC0009

133.0

145.0

12.0

5.7

1.8

2.2


Appendix 1: Talisman's Doolgunna Copper-Gold Projects subject to the $15M Exploration Farm-In Joint Venture with Sandfire Resources NL


Monty Update


[


Appendix 2: TLDD0026 Core Tray Pictures




Appendix 3 - Interpretive cross-section of the Monty mineralisation (Lower Zone)

Appendix 4 - JORC TABLE 1


Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)


Criteria

JORC Code explanation

Commentary

Sampling techniques

  • Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down-hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • In cases where 'industry standard' work has been done this would be relatively simple (e.g. 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

  • The sampling method employed by Sandfire i s h a l f -core sampling of NQ2 core from diamond drilling (DD)

  • Sandfire collect RC samples by cone splitter for single metre samples or a sampling spear for first pass composite samples using a face sampling hammer with a nominal hole diameter of 140mm

  • Sampling is guided by Sandfire protocols as per industry standard.

  • Diamond drill core sample size reduction is through a Jaques jaw crusher to -10mm and a second stage reduction via Boyd crusher to - 4mm.Representitive sub samples are split and pulverised via an LM5 mill.

  • RC samples are crushed to -4mm through a Boyd crusher and representative sub samples are split and pulverised with an LM5 mill.

  • Pulverising is to nominal 90% passing -75µm and is checked using wet sieving technique.

  • Samples are assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and MAD Hotbox 0.15g charge methods with ICPOES or ICPMS.

  • Fire Assay is completed by firing 40g portion of the sample with ICPMS finish.

Drilling techniques

  • Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

  • Sandfire diamond drilling is completed using NQ2 size coring equipment.

  • RC drilling is with a face sampling hammer of a nominal 140mm hole diameter.

  • All drill collars are surveyed using RTK GPS.

  • All core, where possible is oriented using a Reflex ACT II RD orientation tool.

  • Downhole surveying is undertaken using a gyroscopic survey instrument.



Drill sample recovery

  • Method of recording and assessing core and chip sample recoveries and results assessed.

  • Measures taken to maximise sample recovery and ensure representative nature of the samples.

  • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

  • Sandfire diamond core recovery is logged and captured into the database. Core recoveries are measured by drillers for every drill run. The core length recovered is physically measured for each run and recorded and used to calculate the core recovery as a percentage of core recovered.

  • Appropriate measures are taken to maximise sample recovery and ensure the representative nature of the samples. This includes diamond core being reconstructed into continuous intervals on angle iron racks for orientation, metre marking and reconciled against core block markers.

  • RC sample recovery is good with almost no wet sampling in the project area

  • Samples are routinely weighed and the information captured into the central secured database.

  • No sample recovery issues have impacted on potential sample bias

Logging

  • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

  • The total length and percentage of the relevant intersections logged.

  • Sandfire Geological logging is completed for all holes and is representative across the orebody. The lithology, alteration and structural characteristics of core are logged directly to a digital format following procedures, and using Sandfire NL geologic codes. Data is imported into Sandfire NL's central database after validation in LogChief™.

  • Logging is both qualitative and quantitative depending on field being logged.

  • All cores are photographed.

  • All drill holes are fully logged.

Sub- sampling techniques and sample preparation

  • If core, whether cut or sawn and whether quarter, half or all core taken.

  • If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

  • For all sample types, the nature, quality and appropriateness of the sample preparation technique.

  • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

  • Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the grain size of the material being sampled.

  • Sandfire complete diamond core orientation where possible and all core is marked prior to sampling. Half core samples are produced using an Almonte Core Saw. Samples are weighed and recorded.

  • RC samples are split using a cone or riffle splitter. The majority of samples collected are dry. On occasion that wet samples are encountered they are dried prior to splitting with a riffle splitter.

  • All samples are sorted, dried at 80° for up to 24 hours and weighed. Samples are then crushed through a Jaques crusher to nominal -10mm. A second stage crushing is through a Boyd crusher to nominal -4mm.

  • Sample splits are weighed at a frequency of 1:20 and entered into the job results file. Pulverising is completed using LM5 mill to 90% passing 75%µm using wet sieving technique.

  • 1:20 grind quality checks are completed for 90% passing 75%µm criteria to ensure representativeness of sub-samples.

Lire la suite de l'article sur www.noodls.com

Sandfire Resources NL

EN DÉVELOPPEMENT
CODE : SFR.AX
ISIN : AU000000SFR8
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sandfire est une société d’exploration minière de cuivre et d'or basée en Australie.

Sandfire est en développement de projets de cuivre, d'or et d'argent en Australie, et détient divers projets d'exploration en Australie.

Son principal projet en développement est DEGRUSSA en Australie et ses principaux projets en exploration sont URANDY, YANNARIE, BORROLOOLA et DOOLGUNNA en Australie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Sandfire Resources NL
22/01/2019Australia's MOD rejects Sandfire bid as undervalued, willing...
Nominations de Sandfire Resources NL
30/07/2010Appointment of Independent Non-Executive Director
Projets de Sandfire Resources NL
08/11/2015PMY: Drilling Halted at Coppermine Creek & DHEM to Commence
06/08/2015PMY: Coppermine Creek Results
27/04/2011(Degrussa)DeGrussa underground development commences
01/04/2011(Degrussa)DeGrussa Project: Maiden Open Pit Ore Reserve
23/03/2011(Degrussa)Orders Key Long-Lead Items for DeGrussa Copper-Gold Project
21/01/2010(Doolgunna)Offers Significant Upside
22/12/2009(Doolgunna)Further Outstanding Results
27/11/2009(Doolgunna)Drilling Strengthens Third Vms Copper-Gold Discovery
09/11/2009(Doolgunna)New Results Confirm Third High-Grade Copper-Gold Discovery
22/10/2009(Doolgunna)Fresh Results Point to Exciting New Discovery
15/10/2009(Doolgunna)Spectacular New Drilling Results
09/11/2009(Doolgunna)New results confirm third high-grade copper-gold discovery a...
01/10/2009(Doolgunna)Bell Potter Research Update on Sandfire Resources
23/09/2009(Doolgunna)Doolgunna Drilling Continues to Deliver
17/09/2009(Doolgunna)Looking like a terrific discovery at Doolgunna
02/09/2009(Doolgunna)DOOLGUNNA: 93.6 METRE MINERALISED INTERSECTION
19/08/2009(Doolgunna)Doolgunna: Further Drilling Success
10/08/2009(Doolgunna)Drilling at Doolgunna Returns More Promising Results
23/07/2009(Doolgunna)Further Outstanding Copper Intersections From Doolgunna
21/07/2009(Doolgunna)21.35m of Sulphides Intersected in Third Diamond Hole
20/07/2009(Doolgunna)27 % Copper intersected over 8 metres at Doolgunna
15/07/2009(Doolgunna)Drilling Extends Known Limits of Conductor 1 Mineralisation
08/07/2009(Doolgunna)More Evidence of a Substantial Discovery at Doolgunna
06/07/2009(Doolgunna)High Grade Intersections Point to Significant Discovery at D...
17/06/2009(Doolgunna)New massive sulphide discovery north of Degrussa opens up Do...
21/05/2009(Doolgunna)Degrussa Drilling Returns +100 Metres of Copper Sulphide Min...
18/05/2009(Doolgunna)New high-grade Gold and Copper discovery at Degrussa
18/05/2009New High-Grade Gold and Copper Discovery at Degrussa Prospec...
Communiqués de Presse de Sandfire Resources NL
01/08/20162016 Diggers and Dealers Presentation
28/07/2016Quarterly Activities and Cashflow Report
27/07/2016Sandfire June 2016 Quarterly Report Presentation
27/07/2016Sandfire June 2016 Quarterly Report
26/07/2016Ceasing to be a substantial holder
25/07/2016Quarterly Activities Report
13/07/2016Monty Mining Lease Application
13/07/2016TLM: Monty Mining Lease Application
13/07/2016Ceasing to be a substantial holder from CBA
07/07/2016Sandfire Achieves Record Annual Copper Production
30/06/2016Appendix 3B
30/06/2016PMY: Zinc and Copper Exploration to Commence Immediately
08/06/2016TLM: Springfield Project Update
08/06/2016PEA: Completion of Largest Hybrid Power Station in Australia
08/06/2016DeGrussa Solar Project
03/06/2016Change of Director's Interest Notice
31/05/2016Change in substantial holding
29/01/2016Quarterly Report and Appendix 5B
29/01/2016Quarterly Activities and Cashflow Report
29/01/2016Becoming a substantial holder from CBA
28/01/2016Quarterly Activities Report
27/01/2016Sandfire December 2015 Quarterly Report
27/01/2016Sandfire December 2015 Quarterly Report Presentation
27/01/2016Quarterly Report Period Ended 31 December 2015
19/01/2016Doolgunna Project - Monty Update
19/01/2016TLM: Monty Exploration Update
15/01/2016Appendix 3B
15/01/2016AIS: COMPLETION OF SALE OF EXPLORATION PROJECTS
07/01/2016COMPLETION OF SALE OF EXPLORATION PROJECTS
18/12/2015Initial Director's Interest Notice
18/12/2015Non-Executive Director Appointment
16/12/2015TLM: Monty Exploration Update
16/12/2015Doolgunna Project - Monty Update
30/11/2015DeGrussa Solar Project Update
24/11/2015Change of Director's Interest Notice
24/11/2015Appendix 3B
18/11/20152015 AGM Presentation
04/11/2015TLM: Monty - Assay Results and Exploration Update
04/11/2015Doolgunna Project - Monty Exploration Update
02/11/2015Ceasing to be a substantial holder from IFL
29/10/2015Quarterly Activities Report
27/10/2015Change in substantial holding from IFL
23/10/2015OZ Minerals boosts forecast copper output, weak Aussie dolla...
22/10/2015Sandfire September 2015 Quarterly Report
22/10/2015Sandfire September 2015 Quarterly Report Presentation
21/10/2015Annual Report - including Shareholder Information
20/10/20152015 Annual Report
20/10/2015Notice of Annual General Meeting/Proxy Form
20/10/20152015 Appendix 4G
16/10/2015Ceasing to be a substantial holder from CBA
14/10/2015TLM: Monty - Exploration Update
14/10/2015Doolgunna Project - Monty Exploration Update
14/10/2015Change in substantial holding from IFL
07/10/20152015 Sustainability Report
06/10/2015VRX: Diamond Drilling at Thaduna Green Dragon
05/10/2015SRQ: SALE OF TEMORA AND CURRUMBURRAMA EXPLORATION PROJECTS
02/10/2015VRX: Sandfire RC Drilling at Thaduna Copper Project
01/10/2015Doolgunna Project - Monty Exploration Update
01/10/2015TLM: Monty - Exploration Update
30/09/2015Annual Report to shareholders
30/09/2015Change in substantial holding from IFL
30/09/2015Ceasing to be a substantial holder
28/09/2015Becoming a substantial holder from CBA
24/09/2015Resources Rising Stars Investor Presentation
24/09/2015PMY: Earns 51% in Borroloola and Drilling to Commence
21/09/2015TLM: Monty Update
21/09/2015Doolgunna Project - Drilling Update
17/09/2015Doolgunna Project - Drilling Update
17/09/2015TLM: Monty - Drilling Update
13/09/2015Doolgunna Project - Drilling Update
13/09/2015TLM: Monty - Drilling Update
09/09/2015MEP: SFR continues earn-in at Altia project, Cloncurry
08/09/2015Change in substantial holding
08/09/2015PMY: Work continues Ahead of Diamond Drilling
07/09/2015TLM: Monty - Assay Results
07/09/2015Doolgunna Project - Assay Results
03/09/2015Ceasing to be a substantial holder
01/09/2015Investor Presentation
31/08/2015Change in substantial holding
23/08/2015TLM: Monty -Drilling Update
23/08/2015Doolgunna Project - Drilling Update
17/08/2015Becoming a substantial holder from IFL
12/08/2015Doolgunna Project - Assay Results
12/08/2015TLM: Monty - Assay Results
02/08/2015DeGrussa Copper Mine Site Visit Presentation
02/08/20152015 Diggers and Dealers Presentation
02/08/2015TLM: Monty -Drilling Update
02/08/2015Doolgunna Project - Drilling Update
30/07/2015Ceasing to be a substantial holder
28/07/2015Sandfire June 2015 Quarterly Report Presentation
28/07/2015Sandfire June 2015 Quarterly Report
28/07/2015Change in substantial holding
26/07/2015TLM: Monty Prospect Drilling Update
26/07/2015Doolgunna Project - Drilling Update
22/07/2015Becoming a substantial holder
20/07/2015Doolgunna Project - Assay Results
20/07/2015TLM: Monty Prospect - Assay Results
20/07/2015Change in substantial holding from NAB
19/07/2015TLM: Monty Drilling Update
19/07/2015Doolgunna Project - Drilling Update
17/07/2015Becoming a substantial holder
17/07/2015Ceasing to be a substantial holder from IFL
15/07/2015DeGrussa Solar Power Project Construction
03/07/2015Becoming a substantial holder - NAB
16/06/2015Doolgunna Project - Exploration Update
16/06/2015TLM: Springfield Exploration Update
16/06/2015Ceasing to be a substantial holder - NAB
16/06/2015Change of Director's Interest Notice
16/06/2015Lapse of Unlisted Options
15/06/2015Appendix 3B
10/06/2015Becoming a substantial holder from NAB
23/04/2015Appendix 3B
22/04/2015Sandfire March 2015 Quarterly Report
22/04/2015Sandfire March 2015 Quarterly Report Presentation
22/04/2015Sandfire Completes Restructure of DeGrussa Finance Facility
21/04/2015Executive Long Term Incentive Plan
19/04/2015OZL: OZ Minerals New Strategy Announced
13/04/2015Becoming a substantial holder from IFL
31/03/2015Finance Facility Repayment Profile
27/03/2015Ceasing to be a substantial holder from CBA
25/03/2015OZL: Sale of equity investment complete
25/03/2015Trading Halt
25/03/2015Becoming a substantial holder from CBA
25/03/2015Sale of shares by OZ Minerals
25/03/2015Sandfire Announce 2014 Half Year Results
25/03/20152014 Half Year Results Presentation and Operations Update
25/03/20152014 Half Year Report and Appendix 4D
25/03/2015Ceasing to be a substantial holder from OZL
25/03/2015Ceasing to be a substantial holder from MQG
25/03/2015Becoming a substantial holder from MQG
28/12/2014SRI: Sipa Reaches Agreement to Divest Thaduna
23/12/2014Change of Director's Interest Notice
20/11/2014Chairman's Address to Shareholders
20/11/2014AGM Presentation
13/11/2014Change of Director's Interest Notice
12/11/2014Appendix 3B
05/11/2014Cancellation of Unlisted Options
28/10/2014Change of Director's Interest Notice
15/10/2014Sandfire September 2014 Quarterly Report
02/09/2014Australian company to buy $16M in Tintina shares
30/08/2014Sandfire Resources NL - Early Warning Report
19/12/2013Talisman Secures $15M Farm-in deal with Sandfire
09/12/2013Horseshoe awarded WA Govt Grant for Kumarina Project
12/11/2013New Potentially Mineralised Structure at Kumarina Project
03/06/2011(Degrussa)Awards underground mining and process plant contracts for De...
03/06/2011(Degrussa)Delivers DeGrussa Feasibility Study
13/04/2011Quarterly Report for the Period Ending 31 March 2011
04/03/2011(Degrussa)DeGrussa Project: Approved for development
30/07/2010Quarterly Report for the Period Ending 30 June 2010
30/07/2010Chairman's Letter to Shareholders
23/07/2010Raises $93.9M to Fund Unprecedented Exploration Campaign and...
07/07/2010New Discovery at Degrussa Copper-Gold Project
04/05/2010Degrussa Chalcocite Grades to 52% Copper
29/03/2010Embarks on $8M Exploration Drive
19/03/2010Mining lease application for Degrussa
05/03/2010GLOBAL INVESTOR ROADSHOW PRESENTATION
02/03/2010RESULTS OF MEETING
08/02/2010DeGrussa Project and Company Update
08/02/2010Alchemy set for aggressive exploration program on Sandfire b...
22/12/2009Board Announcement
22/02/2010Phase I Degrussa Resource: 372,000 Tonnes Of Copper And 439,...
22/01/2010BROKER RESEARCH
18/01/2010DECEMBER 2009 QUARTERLY ACTIVITIES REPORT
18/01/2010Quarterly Report For The Period Ended 31 December 2009
22/12/2009ASX RELEASE 22/12/2009
21/10/2009SEPTEMBER 2009 QUARTERLY ACTIVITIES REPORT
16/10/200915-10-2009
30/09/2009Enters into Manganese Agreement with Mineral Resources
19/08/2009ASX RELEASE 19 AUGUST 2009
03/08/2009ASX ANOUNCEMENT
29/07/2009June 2009 Quarterly Report
24/07/2009ASX ANNOUNCEMENT 22 JULY 2009
24/07/2009ASX RELEASE
22/07/2009Non-Renounceable Entitlement Offer
21/07/2009Amendment to Previous Announcement
06/07/20096-7-2009
22/06/2009Additional Massive Sulphide Intersection Recorded In Newly D...
22/06/2009ASX RELEASE 22/6/09
09/06/2009Degrussa Prospect - Update
11/12/2008MANGANESE – DRILLING PROGRESS REPORT BORROLOOLA PROJECT, NOR...
24/10/2008http://www.asx.com.au/asxpdf/20081020/pdf/31cztt41g7yzb6.pdf
17/09/2008COMMENCES DRILLING ON THE BORROLOOLA PROJECT
20/06/2008Results of 19 June 2008 General Meeting
22/05/2008Notice of General Meeting
05/05/2008 Secures Strategic Alliance with Korea's Posco
31/01/2008Quaterly activities report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (SFR.AX)
9,28+1.20%
AUSTRALIA
AU$ 9,28
26/04 15:48 0,110
1,2%
Cours préc. Ouverture
9,17 9,32
Bas haut
9,18 9,32
Année b/h Var. YTD
6,54 -  9,28 25,92%
52 sem. b/h var. 52 sem.
5,49 -  9,28 40,18%
Volume var. 1 mois
895 959 4,39%
24hGold TrendPower© : 40
Produit
Développe Copper - Gold
Recherche Copper - Gold - Lead - Silica - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202444,77%
202317,83%7,225,29
2022-17,33%7,500,00
202122,99%7,834,64
2020-12,30%6,272,75
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :