Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Capstone Mining to Purchase Pinto Valley Copper Mine
Published : April 28, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Capstone | Copper | G Mexico | Report | Zinc |

Capstone Mining to Purchase Pinto Valley Copper Mine

VANCOUVER, April 28, 2013 /CNW/ - Capstone Mining Corp. ("Capstone") (TSX: CS) today announced that it has entered into a definitive agreement with BHP Copper Inc., a subsidiary of BHP Billiton Ltd. ("BHP Billiton"), to purchase BHP Billiton's wholly-owned Pinto Valley copper mining operation and the associated San Manuel Arizona Railroad Company ("SMARRCO") in Arizona, USA for US$650 million.

The Pinto Valley Mine is located in the Globe-Miami mining district in Arizona, approximately 125 kilometres east of Phoenix. It is projected to produce 130 - 150 million pounds of copper in concentrate and approximately 10 million pounds of copper cathode annually, along with by-product molybdenum and silver, at an estimated cash cost of approximately $1.80 per pound, net of by-product credits, for the first five years of production.

"Pinto Valley represents a unique opportunity to acquire a mid-sized producing copper mine in a well-established and low-risk mining jurisdiction with a significant mineral resource," said Darren Pylot, President and CEO of Capstone. "This acquisition gives Capstone our third producing mine with a long mine life and is consistent with Capstone's strategy of building an intermediate copper producer focused in the Americas."

"The purchase price and financing structure allows us to maintain our financial flexibility, retaining approximately $135 million in cash," continued Mr. Pylot. "The retained cash, combined with the immediate cash flow and low on-going capital requirements expected from Pinto Valley and our current operations, provides us with the necessary financial resources to continue to fund our development projects."

"During our extensive due diligence process we were very impressed with the world-class operations and the solid workforce and management team that are in place at Pinto Valley.  We are looking forward to the Pinto Valley employees joining Capstone as we jointly prepare to realize the full value of the Pinto Valley asset well into the future," concluded Mr. Pylot.

Investment Highlights

  • Immediately transforms Capstone into an intermediate copper producer.
  • Annual production from Pinto Valley of 130 - 150 million pounds of copper provides immediate >160% increase in Capstone's copper production.
  • First five year estimated cash cost of $1.80 per pound (net of by-product credits).
  • Further asset diversification into Arizona, USA, one of the world's most favorable mining jurisdictions and aligned with Capstone's existing assets.
  • Work underway aimed at upgrading the 1 billion tonne Measured and Indicated ("M&I") Mineral Resource to extend operations beyond the current reserve life reported by BHP Billiton.
  • Maintained and managed to BHP Billiton's world-class standards.
  • All necessary established infrastructure, permits and skilled workforce in place.

Transaction Overview

The purchase price is being paid in cash and is subject to customary adjustments. The purchase price will be satisfied from Capstone's existing $200 million Senior Secured Revolving Credit Facility ($176 million available) and from a new 2.5-year, $200 million Senior Secured Reducing Revolving Credit Facility, that are respectively committed and underwritten by The Bank of Nova Scotia, and cash on hand. The new facility will include customary covenants and closing conditions, including closing of the Pinto Valley acquisition, and will bear interest at market rates. The acquisition agreement is not conditional upon financing.

Under the terms of the agreement, Capstone is committed to maintaining Pinto Valley's existing environmental standards and will provide financial assurances reasonably necessary to obtain regulatory approvals for the transfer of the applicable permits. BHP Billiton employees working at Pinto Valley and SMARRCO will become employees of Capstone as part of the transaction.

The purchase agreement includes typical closing conditions, including regulatory approvals. Closing of the transaction is expected to occur in the third quarter of 2013. There can be no assurances the acquisition or the financing will close.

Operational Highlights

The Pinto Valley Mine successfully restarted operations on schedule in December 2012 at a capital cost of $194 million (including approximately $60 million for a new mining fleet), which will be fully funded by BHP Billiton. The restart is progressing well, and is on schedule to achieve a run-rate of over 50,000 tonnes per day by the end of 2013.

The mine is projected to employ approximately 650 employees and has all necessary established infrastructure. Key contracts will be in place at closing of the transaction for water, power and access to markets, and a Transitional Services Agreement will be executed with BHP Billiton to provide various administrative services through a defined transition period.

Local regulatory and community support has been demonstrated for the mine during both prior operations and the recent re-start. Arizona is among the world's most favorable mining jurisdictions with respect to tax, regulation and labour.

Mineral Resources

The Pinto Valley property includes a significant amount of mineralization not included in BHP Billiton's publicly-reported Mineral Reserve estimate. Capstone has completed the following NI 43-101 compliant Mineral Resource estimate for the global identified resource, with a technical report to be filed within 45 days.

Mineral Resource Estimate, February 28, 2013, at a 0.25% COG*

  Metric
Tonnes
(M)
Copper
(%)
Molybdenum
(%)
Contained
Copper
(k tonnes)
Contained
Molybdenum
(M lbs)
Measured (M) 402 0.38 0.010 1,544 40
Indicated (I) 566 0.33 0.008 1,870 45
Total M&I 968 0.35 0.009 3,414 85
Inferred   45 0.33 0.009    146 4

* Totals may not sum exactly due to rounding. This estimate had not been adjusted for the three months of mining from start up to February 28, 2013.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied.

The current Pinto Valley plan of operation, based on BHP Billiton's publicly reported reserves, projects a 5-year operation, which is fully permitted with mining presently underway. Capstone believes that considerable potential exists to upgrade the M&I Mineral Resources into reserves, potentially extending the operation meaningfully beyond the current reserve life as reported by BHP Billiton.  A Preliminary Feasibility Study ("PFS") is underway that will target the M&I Mineral Resources for potential conversion to reserves, with expected completion in 2013. The PFS will consider the potential to extend operations within the currently permitted boundaries. In addition, Capstone intends to immediately commission the necessary engineering and economic studies to consider all remaining current mineral resources in preparation for filing the permit applications.

Mineral Resource Estimate Methodology

The mineral resource estimate reported herein was prepared by Kirkham Geosystems Ltd. of Burnaby, BC, Canada. The estimate was completed using commercial mine planning software MineSight® v7.50 using a three dimensional block model (100 ft by 100 ft by 45 ft (vertical) block size). The mineralization was interpreted into distinct domains, modelled as wireframes and used as hard boundaries to constrain estimation. Geostatistical analysis was completed on the 45 ft composite assay data for each of the metals, and variograms were defined for each domain of mineralization. The grades for copper and molybdenum were interpolated into the block model using the ordinary kriging method. Interpolated results are reported in measured, indicated and inferred categories and are based on continuity of the mineralization and sample density. The model was estimated in imperial units and converted to metric units where appropriate for disclosure purposes.

The mineral resources are confined within an optimized Lerchs-Grossman (LG) pit shell to ensure reasonable prospects of economic extraction. The pit shell was generated using a copper price of $3.30/lb, applied to copper equivalent grade, with mining costs (ore and waste) of $1.50/ton, processing costs of $5.00/ton and an overall pit slope of 45°. Copper equivalence (CuEq), used to constrain the pit, was calculated using a ratio of Cu:Mo of 1:3.3, and recoveries of 88% and 50%, respectively. Mr. Kirkham is author of a Technical Report on the Mineral Resource Estimate for the Pinto Valley resource estimate, to be filed within 45 days of this news release. Mr. Kirkham is independent of Capstone and is an "Independent Qualified Person" as defined by NI 43-101. Mr. Kirkham has reviewed and validated the resource information contained in this release.

Advisors

Scotia Capital Inc. is acting as financial advisor to Capstone and its Board of Directors. Capstone's legal counsel is Blake, Cassels & Graydon LLP and Davis, Graham & Stubbs LLP.

Pinto Valley Conference Call and Webcast

Capstone will hold a conference call and webcast on Monday April 29, 2013 at 11:00 am Eastern time (8:00 am Pacific time) for investors and analysts, and at 1:00 pm Eastern time (10:00 am Pacific time) for media.

Investors and Analysts

Date:   Monday, April 29, 2013
Time:    11:00 am Eastern Time -- 8:00 am Pacific Time
Dial in:    North America: 1-888-390-0546, International: 1-416-764-8688
Slides:   http://capstonemining.com/s/Presentation.asp (the webcast includes the presentation slides)
Webcast:    http://event.on24.com/r.htm?e=615451&s=1&k=0CA36935ACBB5C42EFD7343A12A3A4B6
Replay:    North America: 1-888-390-0541, International: 1-416-764-8677
Replay Code:   500122

Media

Date:   Monday, April 29, 2013
Time:   1:00 pm Eastern Time -- 10:00 am Pacific Time
Dial in:   North America: 1-888-390-0605, International: 1-416-764-8609
Slides:  http://capstonemining.com/s/Presentation.asp (the webcast includes the presentation slides)
Webcast:    http://event.on24.com/r.htm?e=615488&s=1&k=393BB64A7DEE379C2D11F3629A87D85E
Replay:   North America: 1-888-390-0541, International: 1-416-764-8677
Replay Code:  291320

The conference call replays will be available until May 13, 2013. The investor conference call audio and transcript will be available on Capstone's website within approximately 24 hours of the call at http://capstonemining.com/s/Conference_Calls.asp.

Change to Capstone's Q1 Financial Results Timing and Conference Call

Capstone will move the release of its first quarter financial results to Tuesday, May 7, 2013 after market close, from May 8 as originally scheduled. The conference call will also move by one day to Wednesday, May 8.  The Q1 conference call for investors and analysts will be held at 11:30 am Eastern time (8:30 am Pacific time) on Wednesday, May 8, 2013. Please note the revised date below.

Date:   Wednesday, May 8, 2013
Time:    11:30 am Eastern Time -- 8:30 am Pacific Time
Dial in:    North America: 1-888-390-0605, International: 1-416-764-8609
Webcast:    http://www.newswire.ca/en/webcast/detail/1134543/1237395
Replay:    North America: 1-888-390-0541, International: 1-416-764-8677
Replay Code:   378784

The conference call replay will be available until May 23, 2013. The conference call audio and transcript will be available on Capstone's website within approximately 24 hours of the call at http://capstonemining.com/s/Conference_Calls.asp.

About Capstone Mining Corp.

Capstone Mining Corp. is a Canadian base metals mining company, committed to the responsible development of our assets and the environments in which we operate. We are preferentially focused on copper, with two producing copper mines, the Cozamin copper-silver-zinc-lead mine located in Zacatecas State, Mexico and the Minto copper-gold-silver mine in Yukon, Canada. In addition, Capstone has two development projects, the large scale 70% owned Santo Domingo copper-iron-gold project in Chile in partnership with Korea Resources Corporation and the 100% owned Kutcho copper-zinc-gold-silver project in British Columbia, as well as exploration at properties in Canada, Chile, Mexico and Australia. Using our cash flow and strong balance sheet as a springboard, Capstone aims to grow with continued mineral resource and reserve expansions, exploration, and through acquisitions in politically stable, mining-friendly regions. Our headquarters are in Vancouver, Canada and we are listed on the TSX. Further information is available at www.capstonemining.com.

Cautionary Note Regarding Forward-Looking Information

This document may contain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking statements"). These forward-looking statements are made as of the date of this document and Capstone Mining Corp. (the "Company") does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation.

Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and mineral resources, the conversion of mineral resources to mineral reserves, the anticipated date of closing of the acquisition of Pinto Valley and the associated financing, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "outlook", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. In this document certain forward-looking statements are identified by words including "scheduled", "guidance", "plan", "planned", "estimated", "projections", "projected" and "expected". By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in ore reserves, grade or recovery rates; accidents; dependence on key personnel; labour pool constraints; labour disputes; availability of infrastructure required for the development of mining projects; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; and other risks of the mining industry as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.  Accordingly, readers should not place undue reliance on forward looking statements.

Quality Assurance and NI 43-101 Compliance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101") and reviewed by John Wright, P. Eng., Capstone's Business Development Manager, a "Qualified Person" under NI 43-101. The mineral resource estimate reported herein for the Pinto Valley property was prepared by Garth Kirkham, P. Geo, Kirkham Geosystems Ltd., an independent Qualified Person, from information provided by BHP Billiton. BHP Billiton's mineral reserve estimate has been publicly reported in the BHP Billiton 2012 Annual Report.

In addition, Gregg Bush, Senior Vice President and Chief Operating Officer for Capstone Mining Corp. reviewed and approved this news release.

Technical Report

A NI 43-101 compliant Technical Report related to the mineral resources reported herein, will be filed under Capstone's profile on SEDAR at www.sedar.com within 45 days.

Alternative Performance Measure

"Cash Cost per Pound of Copper" is an Alternative Performance Measure. This performance measure is included because this statistic is a key performance measure that management uses to monitor performance. Management uses this statistic to assess how the Company is performing to plan and to assess the overall effectiveness and efficiency of mining operations. This performance measure does not have a meaning within IFRS and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. This performance measure should not be considered in isolation as a substitute for measures of performance in accordance with IFRS.

Cautionary Note to United States Investors

This news release contains disclosure that has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of U.S. securities laws. Without limiting the foregoing, this news release uses the terms "indicated" and "inferred" resources. U.S. investors are cautioned that, while such terms are recognized and required by Canadian securities laws, the SEC does not recognize them. Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that all or any part of indicated resources will ever be converted into reserves. U.S. investors should also understand that "inferred resources" have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of "inferred resources" will ever be upgraded to a higher category. Therefore, U.S. investors are also cautioned not to assume that all or any part of inferred resources exist, or that they can be mined legally or economically. Accordingly, information concerning descriptions of mineralization and resources contained in this news release may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC.

Note:  All amounts in US$.

SOURCE: Capstone Mining Corp.

For further information:

Cindy Burnett, VP, Investor Relations and Communications
604-637-8157
cburnett@capstonemining.com

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Capstone Mining Corp.

PRODUCTEUR
CODE : CS.TO
ISIN : CA14068G1046
CUSIP : 14067U104
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Capstone Mining est une société de production minière de cuivre basée au Canada.

Capstone Mining est productrice de cuivre, d'argent, d'or, de plomb et de zinc au Canada et au Mexique, en développement de projets d'argent, de cuivre, d'or et de zinc au Canada.

Ses principaux projets en production sont MINTO MINE au Canada et COZAMIN BACIS au Mexique et son principal projet en développement est KUTCHO au Canada.

Capstone Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,6 milliards CA$ (2,6 milliards US$, 2,5 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 06 décembre 2002 à 0,11 CA$, et son plus haut niveau récent le 22 avril 2024 à 9,21 CA$.

Capstone Mining possède 390 500 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Capstone Mining Corp.
31/12/2007Corporate Presentation
Dans les médias de Capstone Mining Corp.
26/11/2018Capstone Mining mulls selling stake in Chile-based copper-ir...
Rapports annuels de Capstone Mining Corp.
2007 Annual Report
Nominations de Capstone Mining Corp.
14/05/2013Capstone Appoints D. James Slattery as Chief Financial Offic...
04/06/2012Capstone Mining Appoints Director
14/09/2011Capstone Appoints Santo Domingo General Manager and Awards E...
14/04/2011Reports Change to its Board
Rapports Financiers de Capstone Mining Corp.
28/07/2015Second Quarter 2015 Financial Results
21/02/2014Capstone Mining Reports Financial Results
21/02/2014Reports Financial Results for Pivotal Year
13/01/2014Capstone Mining 2013 Fourth Quarter and Full
30/10/2013Capstone Mining 2013 Third Quarter Continues
10/10/2013Capstone Mining 2013 Third Quarter
11/07/2013Capstone Mining 2013 Second Quarter
08/05/2013Capstone Mining 2013 First Quarter Financial
11/04/2013Capstone Mining 2013 First Quarter
08/11/2012Capstone Reports 2012 Third Quarter Financial Results; Cash ...
15/08/2012Capstone Reports 2012 Second Quarter
10/05/2012Capstone Reports Solid 2012 First Quarter
15/08/2011Capstone Reports Second Quarter 2011
25/05/2011Capstone Reports First Quarter 2011 Financial Results
07/11/2008Reports Financial Results For The Third Quarter
23/07/2008To Release Second Quarter Results
09/07/2008Announces Production and Sales for the Second Quarter of 200...
30/04/2008 Reports Record Operating Profit Of $15.9 Million For The Fi...
23/04/2008To Release First Quarter Results On Tuesday April 29, 2008
16/04/2008 Announces Production And Sales For The First Quarter Of 200...
15/11/2007Year-End and Fourth Quarter Results
Projets de Capstone Mining Corp.
22/09/2014(Minto Mine)Receives Quartz Mining License Amendment for Minto Mine
03/12/2013Capstone Mining Provides Pinto Valley Production Update
11/10/2013Capstone Mining Completes Acquisition of
08/08/2013Capstone Mining Acquires Option on 350,000 Hectare Explorati...
11/06/2013Capstone Mining Provides Update on Pinto Valley Acquisition
25/10/2012Capstone adds 101 Million Pounds of Copper in Indicated Mine...
18/06/2012Capstone Completes Minto Mine Phase VI
08/02/2012Capstone Updates Mineral Resource Estimate for Footwall Zone...
02/02/2012Capstone Completes Another Successful Drill Season at Minto ...
20/06/2011Capstone Announces Initial Mineral Resource
17/06/2011Capstone Completes Acquisition of Far West Mining and Transa...
14/06/2011Capstone Mining and Far West Mining Approve Acquisition and ...
30/05/2011Capstone Adds 219 Million Pounds of Copper in M&I Mineral Re...
02/05/2011Capstone Reports Additional High Grade
14/04/2011Capstone Reports High Grade Intercepts at
14/03/2011Capstone Completes Prefeasibility Study on Phase V Expansion...
24/02/2011(Kutcho)Reports 2011 Prefeasibility Study for Kutcho Copper-Zinc Pro...
24/02/2011Capstone Reports 2011 Prefeasibility Study
17/02/2009(Minto)Reports 5th New High Grade Copper-Gold Discovery at Minto Mi...
09/02/2009Announces Robust Mineral Resource Update for High Grade Kutc...
04/02/2009(Cozamin Bacis)Reports Record Copper Production for 2008 and Increases Fore...
10/01/2008(Cozamin Bacis)Highlights Production and Sales for the Four Months Ended De...
16/10/2007(Cozamin Bacis)Capstone Increases Resources to 8.6 Million Tonnes at the Co...
11/10/2007(Cozamin Bacis) Declares Expanded Commercial Production at Cozamin and High...
Communiqués de Presse de Capstone Mining Corp.
26/07/2016Capstone reports 2Q loss
26/04/2016Capstone reports 1Q loss
19/01/2016Capstone Mining to Attend Upcoming Investor Conferences
18/01/2016Capstone Mining 2016 Operating and Capital Guidance
18/01/2016Capstone Extends Pinto Valley Mine Life to 2039
06/01/2016Edited Transcript of CS.TO earnings conference call or prese...
25/11/2015Capstone Mining to Attend Upcoming Investor Conferences
27/10/2015Capstone reports 3Q loss
13/10/2015Capstone Mining 2015 Third Quarter Production Results
09/09/2015Capstone Mining Announces Spending Cuts in Response to Marke...
08/09/2015Capstone Mining to Attend Upcoming Investor Conference
27/08/2015Edited Transcript of CS.TO earnings conference call or prese...
05/08/2015Capstone Mining Receives Water Use Licence for Minto Mine
03/08/2015Zacks Investment Ideas feature highlights: Avino Silver and ...
28/07/2015Capstone Mining Second Quarter 2015 Financial Results
13/07/2015Capstone Mining 2015 Second Quarter Production Results
08/07/2015Capstone Mining Receives Approval of Environmental Impact As...
13/04/2015Capstone Mining 2014 First Quarter Production Results
01/04/2015Capstone Mining Publishes Inaugural Sustainability Report
01/04/2015Publishes Inaugural Sustainability Report
19/02/2015to Attend Upcoming Investor Conferences
01/12/2014to Attend Upcoming Investor Conferences
29/10/2014Capstone Mining Reports Another Quarter of Record Cash Flow
14/10/2014Capstone Mining to Attend Upcoming Investor Conference
12/09/2014Discontinues Planned Offering of $300 million Senior Notes
05/09/2014Announces Launch of $300 million Senior Notes Offering
07/05/2014Reports Operating Cash Flow Increases 134% to $47.1 Million
10/04/2014Record 2014 First Quarter Production Results
26/03/2014Extends Pinto Valley Mine Life to 2026
20/01/2014Capstone Mining to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
13/01/20142013 Fourth Quarter and Full Year Production Results
11/12/2013Capstone Mining Files Updated Technical Report for Pinto Val...
11/12/2013Files Updated Technical Report for Pinto Valley
14/11/2013Capstone Mining to Attend Upcoming Investor Conferences
14/11/2013to Attend Upcoming Investor Conferences
07/10/2013Capstone Mining Provides Update on Pinto
07/10/2013Provides Update on Pinto Valley Acquisition
31/07/2013Capstone Mining Delivers Consistent 2013
11/07/20132013 Second Quarter Production Results
13/06/2013Capstone Mining Files Pinto Valley 43-101 Mineral Resource E...
11/06/2013Provides Update on Pinto Valley Acquisition
30/05/2013Capstone Mining to Attend Upcoming Investor Conferences
10/05/2013Capstone Mining Reports Annual General Meeting Voting Result...
29/04/2013Capstone Mining to Purchase Pinto Valley
28/04/2013to Purchase Pinto Valley Copper Mine
13/03/2013Capstone Mining Reports 2012 Year End
18/02/2013to Present at Upcoming Investor Conferences
10/01/2013Capstone 2012 Fourth Quarter and Full Year Production Result...
10/01/20132012 Fourth Quarter and Full Year Production Results Meet Gu...
31/10/2012Capstone Reports Senior Management Change
31/10/2012Reports Senior Management Change
23/10/2012Capstone Reports Board Change
23/10/2012Reports Board Change
11/10/2012Capstone 2012 Third Quarter Production Results on Track
12/07/2012Capstone 2012 Second Quarter Production Results On Target
14/05/2012Capstone Reports Board Change
13/04/2012Capstone Mining Announces New $200 Million
12/04/2012Capstone 2012 First Quarter Production
14/03/2012Capstone Reports Strong 2011 Results
10/02/2012Capstone Mining Reports Board Change
26/01/2012Capstone 2012 Operating and Capital Guidance
17/01/2012Capstone Fourth Quarter and Full Year 2011 Production Result...
16/01/2012Capstone Awards Contract for Santo Domingo
06/10/2011Capstone Third Quarter Production Results
15/08/2011Capstone Reports Pre-Feasibility Study
10/08/2011to Hold Second Quarter and Santo Domingo PFS Conference Call...
06/07/2011Capstone Second Quarter Production Results
20/06/2011Capstone Mining Board of Director Changes
14/06/2011and Far West Mining Approve Acquisition and KORES Agreement
02/06/2011Independent Proxy Firms Recommend Capstone Shareholders Vote...
23/05/2011Mails Information Circular with Respect to Acquisition of Fa...
20/05/2011Capstone Mining Mails Information Circular
10/05/2011to Hold First Quarter Conference Call May 25, 2011
26/04/2011Capstone Reports First Quarter Production
17/04/2011Capstone Mining to Acquire Far West Mining
14/04/2011Capstone Reports Change to its Board
15/03/2011Capstone Reports Record Revenue and Strong
26/01/2009Commences US$ 3 Million Resource Expansion Drill Program at ...
22/01/2009Reports Debt Repayments, Funding of Debenture Repurchase and...
10/12/2008Reports Final Drill Intercepts of Near Surface Copper-Gold a...
25/11/2008Reports Minto Mine Connected to Yukon Electrical Grid
24/11/2008Sherwood and Capstone Announce Closing of Business Combinati...
14/11/2008Shareholders Overwhelmingly Approve Business Combination wit...
08/09/2008Announce Combination to Create Intermediate Copper Producer
29/07/2008Reports Record Revenues of $35.3 Million and Record Operatin...
15/07/2008Announces Normal Course Issuer Bid
28/02/2008December 31, 2007 Four Month Stub Period Results
21/02/2008to Release 4 Months Ended December 31, 2007 Results on Thurs...
17/01/2008Provides 2008 Expansion And Exploration Plans And Increases ...
08/11/2007 To Release 2007 Year End Results On Wednesday November 14,...
19/07/2007Provides Cozamin Mine Expansion Update
28/06/2007Reports Q3 Results: Operating Profit of $7.8 Million, $0.09 ...
05/04/2007Closes Previously Announced Agreement to Sell Cozamin Silver...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CS.TO)FRANKFURT (OUW.F)
9,21-3.05%5,45-2.68%
TORONTO
CA$ 9,21
22/04 17:00 -0,290
-3,05%
Cours préc. Ouverture
9,50 9,12
Bas haut
9,03 9,32
Année b/h Var. YTD
6,02 -  9,65 43,23%
52 sem. b/h var. 52 sem.
4,49 -  9,65 38,08%
Volume var. 1 mois
2 004 517 16,88%
24hGold TrendPower© : 40
Produit Copper - Gold - Silver
Développe Copper - Gold - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202451,48%
202323,08%7,254,90
2022-8,52%7,792,25
2021126,89%6,642,41
2020226,03%2,490,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,36%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-4,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,79 CA$-0,32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$+0,54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,13 US$+0,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :