Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Rambler Metals & Mining Plc

Publié le 29 juin 2016

UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD QUARTER ENDED 30 APRIL 2016

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cash | Copper | Europe | Mines | Precious Metals |

UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD QUARTER ENDED 30 APRIL 2016

b7eab197-cc94-45ce-b71f-6fbced4e7275.pdf

29 June 2016

UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD QUARTER ENDED 30 APRIL 2016‌‌‌

London, United Kingdom & Newfoundland and Labrador, Canada - Rambler Metals and Mining PLC (TSXV: RAB, AIM: RMM) ('Rambler') today announces its unaudited financial results and operational highlights for the third quarter ended 30 April 2016.

KEY FINANCIAL HIGHLIGHTS (CAD$, 000'S):

Q3 2016

Q2 2016

YTD 2016

Q3 2015

YTD 2015

Revenue

10,504

8,327

30,034

9,186

32,011

Profit/ (loss) after tax

1,633

(1,544)

(49)

1,916

(3,579)

Earnings/ (loss) per share ($)

0.008

(0.011)

0.000

0.009

(0.019)

FINANCIAL HIGHLIGHTS (all amounts in Canadian dollars except as otherwise specified)

  • A total of 4,595 dry metric tonnes ('dmt') (Q2/16 - 3,770 dmt, Q3/15 - 4,080 dmt) of concentrate was provisionally invoiced during the period at an average price of $2.67 (Q2/16 - $2.89, Q3/15 -

    $3.36) per pound copper;

  • Revenue for the third quarter was $10.5 million (Q2/16 $8.3 million, Q3/15 - $9.2 million). Revenue increased during the quarter despite a fall in copper prices due to increased production;

  • Net cash direct costs per pound of saleable copper net of by-product credits ('C1') for the quarter were $1.90 (USD 1.42) (Q2/16: $2.48 (USD 1.80), Q3/15: $2.50 (USD 2.00)). Saleable copper produced in the quarter was 2.6 million pounds (Q2/16: 2.1 million, Q3/15 2.2 million) which accounts for the decrease in C1 costs compared to Q2/16 and Q3/16;

  • Earnings before interest, taxes, depreciation, amortisation ('EBITDA') were $4.4 million for Q3/16 compared to $0.75 million in Q2/16 and $3.7 million in Q3/15;

  • Cash flows generated from operating activities for Q3/16 were $3.4 million compared with cash generated of $1.8 million in Q2/16 and $1.9 million in Q3/15. The generation of cash from operations for the three months is from a cash operating profit offset by changes in working capital;

    Operating profit of $141,000 (Q2/16: loss of $1,659,000, Q3/15: profit of $3,000).

    OPERATIONAL HIGHLIGHTS

  • Production of 4,530 tonnes of copper concentrate, representing a 25 per cent increase over Q2/16 is due to a higher copper head grade. This is a 14 per cent increase over Q3/15 as a result of a significantly higher throughput at the mill offset by a lower copper head grade.

  • Head grades of copper 2.22 per cent, gold 1.62 grammes per tonne ('g/t') and silver 10.34 g/t with recoveries to concentrate for copper 96.3 per cent, gold 68.0 per cent and silver 70.7 per cent.

  • Phase II optimisation strategy continued with Lower Footwall Zone ore blended with ongoing production from the high grade massive sulphide zones.

  • Rambler is on target to meet its production targets for the fiscal year.

    SUBSEQUENT EVENTS

  • Approximately $19.05 million was raised by way of an issue of 261,363,636 new Ordinary Shares at a subscription price of 4 pence per Subscription Share by CE Mining II Rambler Limited ('CEII'), a specialised mining and mineral investment fund, advised by Plinian;

  • This placement will allow the operation to expand, as per the pre-feasibility study ('PFS') released July 2015, with production anticipated to increase to 1,250 metric tonnes per towards the end of Fiscal 2017. During the initial expansion phase, further engineering and assessment work will be completed on ore pre-concentration as well as re-establishing the shaft for hoisting.

  • This raise was approved by shareholders at the General Meeting on the 27 May 2016.

  • Following the subscription there have been several changes to the Board of Directors. Bradford Alan Mills, Mark Vandyke Sander, Belinda Elaine Labatte and Terrell Ackerman have all joined the Board while George Ogilvie, John Thomson, Tat Sze Chan and Leslie Goodman have all stepped down.

Norman Williams, President and CEO, Rambler Metals & Mining commented:

"I am delighted that as we move towards the end of the fiscal year the operation is on target to meet forecasted guidance.

"Revenue and operating profit is up compared to the previous quarter. With a continued focus on cost control and production success we look to finish the year with a strong financial and operational performance, despite continued weakness in the price of copper.

"Following the investment by CEII, Rambler is now fully funded and ready to move into its next stages of growth. I am confident that the operation will continue to deliver on its expansion plans and I look forward to updating the market on our progress."

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's immediate plans are to increase mine and mill production to 1,250 mtpd by the end of Fiscal 2017. This initial expansion has been fully funded through CEII's investment. Rambler will also continue advancing engineering studies on ore-pre-concentration (DMS) and shaft rehabilitation with a view to further increase production to 2,000 mtpd at the Ming Mine. In addition, Rambler has initiated a detailed investigation at the mill with a goal to increase gold recovery and production rate in the copper concentrator.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investments in the former producing Hammerdown gold mine and the advanced Valentine Lake Gold Project.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

Norman Williams, CPA,CA President and CEO

Rambler Metals & Mining Plc Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Stewart Dickson / / David Porter Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Tim Blythe/ Megan Ray Blytheweigh

Tel No: +44 (0) 20 7138 3204

Website: www.ramblermines.com

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

GLOSSARY

dmt

Dry metric tonnes

g/t

Grammes per tonne

mtpd

Metric tonnes per day

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of Rambler, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for Rambler. Where Rambler expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward- looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward- looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and Rambler does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

APPENDIX 1 - SUPPLEMENTAL FINANCIAL INFORMATION

(See Rambler's website www.ramblermines.com or SEDAR for full Q3 2016 Results and Management's Discussion and Analysis)

RAMBLER METALS AND MINING PLC

UNAUDITED CONSOLIDATED INCOME STATEMENT

For the Quarter Ended April 30, 2016 (EXPRESSED IN CANADIAN DOLLARS)‌

Quarter ended April 30 2016

Quarter ended April 30 2015

Nine months ended April 30

2016

Nine months ended April 30

2015

$,000

$,000

$,000

$,000

10,504

9,186

30,034

32,011

(7,212)

(6,323)

(21,488)

(22,039)

(2,260)

(1,931)

(6,365)

(6,073)

1,032

932

2,181

3,899

(921)

(929)

(2,846)

(3,205)

35

-

35

-

(5)

1

(16)

(15)

141

3

(646)

679

8

19

38

78

152

1,017

1,821

(1,595)

(464)

1,796

184

692

(1,523)

418

(482)

(2,259)

1,492

1,912

754

(4,258)

1,633

1,916

108

(3,579)

(502)

(595)

(157)

833

1,131

1,321

(49)

(2,746)

Revenue Production costs

Depreciation and amortisation Gross profit

Administrative expenses Royalties receivable Exploration expenses Operating profit/(loss)

Bank interest receivable

Gain/(loss) on derivative financial instruments Finance costs

Foreign exchange differences Net financing expense

Profit (loss) before tax

Income tax (expense) credit

Profit (loss) for the period and attributable to owners of the parent

Earnings per share

Quarter ended April 30 2016

Quarter ended April 30 2015

Nine months ended April 30

2016

Nine months ended April 30

2015

$

$

$

$

0.008

0.009

(0.000)

(0.028)

Basic and diluted earnings per share

Lire la suite de l'article sur www.publicnow.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Rambler Metals & Mining Plc

EXPLORATEUR
CODE : RMM.L
ISIN : GB00B06Y3F14
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Rambler Metals & Mining est une société d’exploration minière de zinc et d'or basée au Royaume-Uni.

Rambler Metals & Mining détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont BIG BEAR et MING MINE au Canada.

Rambler Metals & Mining est cotée au Canada et au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 1,1 milliards GBX (1,3 milliards US$, 1,2 milliards €).

La valeur de son action a atteint son plus haut niveau récent le 17 février 2017 à 9,99 GBX, et son plus bas niveau récent le 30 décembre 2022 à 0,05 GBX.

Rambler Metals & Mining possède 549 739 702 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Rambler Metals & Mining Plc
23/04/2007Announces Private Placement
Nominations de Rambler Metals & Mining Plc
24/09/2012-Board Appointment
11/08/2008 Appoints General Manager
Rapports Financiers de Rambler Metals & Mining Plc
09/12/2013Rambler Reports Financial Results for Quarter Ended 31 Octob...
20/11/2013Rambler Provides a Summary of its First Quarter 2014 Operati...
29/10/2013Rambler Reports Financial Results for the Year Ended July 31...
22/10/2012and Mining plc Financial Results Year Ended 31 July 2012
21/03/2011Financial Results Quarter Ended January 31, 2011
08/12/2009First Quarter Results 2010 & Operational Highlights
Projets de Rambler Metals & Mining Plc
02/09/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
02/09/2015Rambler Enters Into Purchase Agreement with its Off-take Par...
14/01/2014Rambler Ships More High Grade Copper Concentrate to Internat...
13/11/2013Rambler Provides Diamond Drilling Update at its Ming Mine
01/10/2013Rambler Ships More High Grade Copper Concentrate; 26,000 Wet...
29/05/2013Rambler Ships More High Grade Copper Concentrate, Over 18,00...
28/05/2013Strategic Partner Releases Its First NI43-101
01/05/2013Rambler Makes Further Repayment to Sprott Resource Lending P...
16/04/2013Rambler Completes Property Arrangement to Explore for New Go...
09/10/2012(Ming Mine)Buys Out 1% Net Smelter Royalty on the Ming Mine Property
04/09/2012Rambler Continues to Optimize Copper and Gold Production Whi...
15/02/2012and Mining Aligns Itself With Maritime Resources Through 17%...
01/06/2011Rambler Signs Exploration and Development Alliance with Mari...
10/05/2011Rambler Develops Through High Grade Gold Zone Returning 227....
10/05/2011Develops Through High Grade Gold Zone Returning 227.15 g/t G...
26/04/2011Production Approval Received for Nugget Pond Crown Pillar Al...
02/03/2011(Ming Mine) Updated Footwall Zone Resource Estimate
02/03/2011Realizes a 21% Increase in Contained Metal by Updating its F...
16/02/2011(Ming Mine)Progresses in Bringing Its Copper and Gold Projects Into Pro...
01/06/2010(Ming Mine)Environmental Approval Received
12/04/2010(Ming Mine)Environmental Project Registration and Project Update for th...
26/02/2009(Ming Mine)NI43-101 Resource Estimate for the Ming Mine
10/02/2009(Ming Mine)and Mining Reports Positive Results From Its Lock Cycle Metu...
09/07/2008(Ming Mine)Ming Mine Dewatered and Project Update
16/06/2008Files NI43-101 Technical Report
02/06/2008Completes Scoping Study and Moves Ahead to Pre-Feasibility
15/05/2008(Ming Mine) Drills 5.10 metres of 3.68 g/T Gold and 15.77% Copper
30/04/2008Publishes Its NI43-101 Resource Estimate for the Ming Mine
26/03/2008Underground Footwall Program Drills 11.7 Metres of 2.25% Cop...
19/02/2008Directional Drilling Returns 5.37% copper over 3.0 metres
12/12/2007(Ming Mine)Drills 60.7 Feet of 4.26% Copper, 4.3 g/T Gold and 1.25% Zin...
Communiqués de Presse de Rambler Metals & Mining Plc
28/07/2016Director / PDMR Shareholding
28/07/2016Director / PDMR Shareholding
29/06/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
29/06/2016UNAUDITED CONSOLIDATED FINANCIAL INFORMATION FOR THE THIRD Q...
13/06/2016Notification of Major Interests in Shares - Correction
13/06/2016Notification of Major Interests in Shares - Correction
09/06/2016Notification of Major Interest in Shares
09/06/2016Notification of Major Interest in Shares
07/06/2016Notification of Major Interest in Shares
06/06/2016Transaction Close
06/06/2016Transaction Close
06/06/2016Holdings in Company
06/06/2016Holdings in Company
27/05/2016Result of General Meeting
27/05/2016Result of General Meeting
20/05/2016Notification of Major Interests in Shares
02/02/2016Rambler Metals & Mining PLC: Issuance of Share
02/02/2016Rambler Metals & Mining PLC: Issuance of Share
02/02/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
02/02/2016Rambler Metals & Mining PLC: 12th Shipment of High Grade Cop...
13/01/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
13/01/2016Rambler Metals and Mining Plc Completes Acquisition of Thund...
13/01/2016Acquisition of Thundermin Resources Inc.
13/01/2016Acquisition of Thundermin Resources Inc.
22/12/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
22/12/2015Rambler Metals & Mining PLC: Thundermin Resources Shareholde...
22/12/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
22/12/2015Thundermin Resources Inc. Shareholders Approve Merger with R...
14/12/2015Unaudited Consolidated Financial Information for the Quarter...
14/12/2015Unaudited Consolidated Financial Information for the Quarter...
14/12/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
14/12/2015Rambler Metals & Mining PLC Announces Unaudited Consolidated...
26/10/2015Rambler Metals and Mining PLC: Financial Results for year en...
26/10/2015Rambler Metals and Mining PLC: Financial Results for year en...
26/10/2015Financial Results Year End July 31, 2015
09/09/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
09/09/2015Rambler Files Lower Footwall Zone Prefeasibility Technical R...
08/09/2015Fiscal 2015 Q4 and Yearend Production Results
08/09/2015Fiscal 2015 Q4 and Yearend Production Results
03/09/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
03/09/2015Rambler and Thundermin Enter Into a Letter of intent Outlini...
02/09/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
02/09/2015Rambler Completes its 11th Shipment of High Grade Copper Con...
02/09/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
02/09/2015Rambler Metals & Mining PLC: Purchase Agreement With Off-Tak...
19/08/2015Rambler Metals & Mining PLC: 11th Shipment of High Grade Cop...
31/07/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
31/07/2015Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
31/07/2015TR-1: Notification of Major Interest in Shares
31/07/2015TR-1: Notification of Major Interest in Shares
20/07/2015Prefeasibility Study
20/07/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
20/07/2015Rambler Metals & Mining PLC Announces Prefeasibility Study O...
22/06/2015Financial Results for the Third Quarter 2015
22/06/2015Rambler Metals & Mining PLC: Financial Results for the Third...
22/06/2015Rambler Metals & Mining PLC: Financial Results for the Third...
19/03/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
19/03/2015Rambler Metals and Mining PLC: Second Quarter & Interim Fina...
19/03/2015Rambler Management Discussion and Analysis for the Quarter e...
19/03/2015Rambler Management Discussion and Analysis for the Quarter e...
19/03/2015Financial Results for the Second Quarter & Interim Six Month...
23/02/2015Second Quarter 2015 Production Results
23/02/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
23/02/2015Rambler Metals and Mining plc: Second Quarter 2015 Productio...
23/02/2015and Mining plc: Second Quarter 2015 Production Results
09/02/2015Progress Update on the Lower Footwall Zone
09/02/2015Rambler Metals & Mining PLC Announces Progress Update on the...
09/02/2015Rambler Metals & Mining PLC Announces Progress Update on the...
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
30/01/2015Rambler Implements Revised Plan at the Ming Copper-Gold Mine
29/12/2014Holdings in Company
29/12/2014Holdings in Company
29/12/2014Rambler Metals & Mining PLC: Holdings in Company
29/12/2014Rambler Metals & Mining PLC: Holdings in Company
23/12/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
23/12/2014Fifth High Grade Copper Concentrate Shipment Delivered in th...
09/12/2014First Quarter 2015 Unaudited Financial Results
09/12/2014First Quarter 2015 Unaudited Financial Results
09/12/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
09/12/2014Rambler Metals & Mining PLC Unaudited Consolidated Financial...
04/12/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
04/12/2014Rambler Metals & Mining PLC: Result of Annual General Meetin...
02/12/2014Resource and Technical Update and Update on DMS Project
02/12/2014Resource and Technical Update and Update on DMS Project
02/12/2014Rambler Provides Resource and Technical Update, Reporting a ...
02/12/2014Rambler Provides Resource and Technical Update, Reporting a ...
27/11/2014First Quarter 2015 Production Results
27/11/2014First Quarter 2015 Production Results
27/11/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
27/11/2014Rambler Metals & Mining PLC: First Quarter 2015 Production R...
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Provides Reminder of Upcoming Events
26/11/2014Rambler Metals & Mining PLC: Holding(s) in Company
17/11/2014Hammerdown Gold Mine Update
17/11/2014Rambler and Maritime Agree to Evaluate the Viability of Rest...
29/10/2014Proposed Change to its Board of Directors
29/10/2014Rambler Metals & Mining PLC Announces Proposed Change to Boa...
27/10/2014Financial Results Year Ended July 31, 2014
27/10/2014Rambler Metals & Mining PLC Announces Financial Results Year...
23/09/2014Fourth High Grade Copper Concentrate Shipment Delivered in t...
09/09/2014CORRECTION - Rambler Metals and Mining plc: Rambler Provides...
21/08/2014Rambler Metals & Mining PLC Announces Fourth Quarter and Yea...
05/08/2014Rambler Continues Its Investment in Marathon Gold
03/07/2014Rambler Continues to Ship High Grade Copper Concentrate
19/06/2014Rambler Metals & Mining PLC: TR-1: Notification of Major Int...
19/06/2014Financial Results for Quarter Ended 30 April 2014 Debt Free ...
19/06/2014Rambler Metals & Mining PLC: Financial Results for Quarter E...
27/01/2014Rambler Updates the Reserve and Resource Estimates at its Mi...
15/01/2014Rambler Senior Management Changes
04/12/2013Marathon Gold Enters into an Agreement With Rambler Metals a...
03/12/2013Rambler Reduces Debt Facility with Sprott Lending Partnershi...
29/10/2013and Mining PLC: Report of the Directors and Audited Financia...
15/10/2013Completes Purchase of 50% Interest in the Little Deer Projec...
01/10/2013Ships More High Grade Copper Concentrate
17/09/2013Enters Conditional Agreement to Purchase Cornerstone's 50% I...
09/09/2013TR-1: Notification of Major Interest in Shares
03/09/2013Rambler Makes a $500,000 Debt Re-Payment to Sprott Lending P...
03/09/2013Makes a $500,000 Debt Re-Payment to Sprott Lending Partnersh...
23/08/2013Announces Options Exercising
18/07/2013Exercises Warrants in Support of Maritime's Work Program on ...
11/07/2013Strategic Partner Maritime Files Technical Report
27/06/2013and Mining Releases Its Q3 2013 Results
24/06/2013Rambler Provides Diamond Drilling Update - Intersected 13.18...
24/06/2013Provides Diamond Drilling Update
24/06/2013Provides Diamond Drilling Update
03/06/2013Rambler Pays a Further $600,000 in Debt Re-Payment to Sprott...
03/06/2013Pays a Further $600,000 in Debt Re-Payment To Sprott Lending...
01/05/2013Makes Further Repayment to Sprott Resource Lending Partnersh...
16/04/2013Completes Property Arrangement to Explore for New Gold & Cop...
15/04/2013and Mining - Novation of Nominated Advisor and Brokerage Agr...
27/03/2013Extends Loan Arrangement With Sprott Resource Lending Partne...
21/02/2013Non-Executive Board Member Resigns
28/01/2013TR-1: Notification of Major Interest in Shares
13/11/2012Appoints New General Manager at the Ming Copper-Gold Mine; F...
29/10/2012(Ming Mine)and Mining Plc, Rambler's Ming Mine Moves into Commercial Pr...
30/05/2012Rambler Begins Trucking Copper Concentrate Following Start-u...
02/05/2012Rambler Completes Record Gold Pour of 1935 Ounces
11/04/2012Rambler Produces Over 9,700 Ounces of Gold While Exploration...
22/02/2012and Mining Produces Over 5,000 Ounces of Gold and Intersects...
09/01/2012Rambler Signs Commercial Off-take Agreement with Transamine ...
28/06/2011Significant Progress Being Made at Rambler's Copper Gold Pro...
17/06/2011Notification of Major Interest in Shares
01/06/2011Signs Exploration and Development Alliance With Maritime and...
05/05/2011Holding In Company
03/05/2011Results of EGM, Closing of Announced Placing and Admission o...
20/04/2011and Mining Presenting and the Proactive Investors One2One Fo...
07/04/2011Notice of General Meeting
14/03/2011Receives Final Permitting For the Ming Copper-Gold Mine
02/03/2011and Mining plc: Updated Footwall Zone Resource Estimate
01/12/2010VP Corporate Development Assumes Corporate Secretary Role
10/08/2010Construction Permits Received for Nugget Pond and Ming Mine ...
26/04/2010Financial Controller Promoted to Chief Financial Officer
26/03/2010Proposed Placing of £2.7 Million to Support Bringing Min
15/02/2010Apointment of Joint Broker
08/02/2010Hires Key Mine Engineering Staff
08/12/2009Features on CEO Clips airing on BNN
23/11/2009Notice of AGM
27/10/2009Completes Purchase of the Nugget Pond Processing Facility
22/10/2009Confirms Closing of Previously Announced Placing
29/09/2009Proposed Placing
25/09/2009NOTICE OF EGM CIRCULAR
21/09/2009Explores for New Gold
09/09/2009COMPLETES NEGOIATIONS FOR THE SALE AND PURCHASE OF THE NUGGE...
13/08/2009BEGINS NEGOTIATING THE DETAILS OF A SALE AND PURCHASE AGREEM...
27/05/2009Q3 2009 Results
21/01/2009REPORTS POSITIVE RESULTS FROM ITS TITAN 24 GEOPHYSICAL SURVE...
08/01/2009Implements Cost Reduction Programme
10/11/2008and Mining Drills 9.50 metres of 20.31 g/t Gold, 4.21 % Copp...
23/09/2008Drills 4.00 metres of 0.25 g/T Gold and 4.48 % Copper
09/09/2008Drills 2.9 metres of 3.05 g/T Gold and 5.19% Copper
27/08/2008Drills 7.4 metres of 2.22 % Copper in the Lower Footwall Zon...
18/06/2008ootwall Zone
07/05/2008Drills 6.00 metres of 2.86% Copper
15/04/2008Underground Gold Exploration Continues to Develop: Drills 5....
28/02/20081807 Zone Returns 4.0 Metres of 6.3% Copper New 200 Metre St...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
LSE (RMM.L)TSX-V (RAB.V)
2,00+3603.70%0,030+20.00%
LSE
GBX 2,00
27/04 12:21 1,95
3603,7%
Cours préc. Ouverture
0,054 2,00
Bas haut
2,00 2,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
2,00 -  2,00 3 603,70%
Volume var. 1 mois
256 931 -%
24hGold TrendPower© : -8
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 14/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,10 US$-1,47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,41 CA$-3,21%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,21 CA$-1,30%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,68 CA$-2,61%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,11 US$-1,08%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :