Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Mustang Minerals Corp

Publié le 22 mars 2010

Updates Project Economics at Makwa Nickel Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cobalt | Copper | Dollar | Nickel | Palladium |

 
 
Mustang Minerals Corp.
TSX VENTURE: MUM
Other Recent News

March 22, 2010
Mustang Updates Project Economics at Makwa Nickel Project

Drill Results Announced

TORONTO, ONTARIO--(Marketwire - March 22, 2010) - The Board of Directors of Mustang Minerals Corp. (TSX VENTURE:MUM) is pleased to announce news of recent activities to develop the Makwa Nickel-Copper-PGM Project located in southeast Manitoba. The Company has reported updated project economics and exploration results from the property.

Improved Project Economics

The project cash flow model developed by Micon International Limited and used to validate the February 05, 2010 Mineral Reserve Estimate, has been updated with recent metal prices and shows enhanced potential economics for the Makwa project. Metal prices used in this exercise, in $US values, were Nickel (9.00/lb), Copper (3.00/lb), Cobalt (20.00/lb), Platinum (1500.00/oz), Palladium (375.00/oz). A dollar exchange rate of 0.90US equals 1.00CDN was used. The nickel price and exchange rate are within the sensitivity range examined in the Prefeasibility Study of May 2008 and filed on SEDAR.

Highlights of the cash flow calculation are as follows, based on the updated Probable Reserve (diluted ) estimate of 9.855Mt grading 0.54% Ni, 0.11% Cu, 0.02% Co and 0.434/t (Pt plus Pd):

----------------------------------------------------------------------------
Nickel net cash cost                            $US/lb                  3.81
----------------------------------------------------------------------------
Nickel cash cost including byproduct credits    $US/lb                  2.69
----------------------------------------------------------------------------
Project operating profit pre-tax                $CDN000              322,980
----------------------------------------------------------------------------
Project operating profit after tax              $CDN000              263,286
----------------------------------------------------------------------------
Pre-production capital                          $CDN000              129,449
----------------------------------------------------------------------------
Project IRR pre-tax                             %                       18.9
----------------------------------------------------------------------------
Project IRR after tax                           %                       14.6
----------------------------------------------------------------------------
Project NPV 7% pre-tax                          $CDN000               76,210
----------------------------------------------------------------------------
Project NPV 7% after tax                        $CDN000               43,883
----------------------------------------------------------------------------
 
Drill Program

Mustang recently completed several drill holes at the Makwa Project including two holes designed to test the depth potential of the eastern portion of the deposit beneath the previously known shallower sections. Results follow from these two holes which showed the existence of wide zones of both the hangingwall and main zone of the deposit. Metallurgical testwork completed during the previous year has indicated that the nickel recovery from low grade material within the pit outline is in the range of 50% and that this material exhibits good upgrading to a final concentrate.

----------------------------------------------------------------------------
    Drill hole   Collar   From   To  Interval(i)    Ni   Cu     Co   Au+Pt  
                Location                                               +Pd  
----------------------------------------------------------------------------
                 Easting  (m)    (m)   (m)           %   %      %      g/t  
----------------------------------------------------------------------------
----------------------------------------------------------------------------
 MM10-146        325750  119.5  158.5  39.0       0.24  0.07   0.01   0.29  
----------------------------------------------------------------------------
             and         259.0  283.0  24.0       0.40  0.07   0.02   0.45  
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
 MM10-148        325750  134.4  146.5  12.1       0.29  0.09   0.01   0.35  
----------------------------------------------------------------------------
             and         164.5  242.5  78.0       0.32  0.07   0.02   0.40  
----------------------------------------------------------------------------
       including         212.5  239.5  27.0       0.49  0.10   0.02   0.76  
----------------------------------------------------------------------------
                                                                            
(i)Drilled width.
 
Exploration drilling also included two holes to examine the potential for near surface mineralization in the area of the adjacent Dumbarton and Dumbarton F zone mines which were operated in the 1970's as underground mines only, producing nickel-copper-PGM ore. Results from these two holes are pending.

Mayville Exploration

The Company has recently received its exploration work permit for the Mayville Property which is located approximately 35 km north of Makwa. Mustang is evaluating the potential to co- process a near surface core of Mayville mineralization with the Makwa deposit. Exploration at Mayville is planned to commence shortly.

Drill core is logged and split on the Makwa site facility by Mustang staff, with half core sent to the laboratory. Mustang conducts an ongoing QA/QC program on the drill core including inserting blanks, duplicates and standards with the samples. Assays noted above were completed at Accurassay Laboratories in Thunder Bay Ontario. For nickel, copper and cobalt assays, aqua regia digestion followed by AA determination was used. For gold, platinum and palladium, fire assay of 30g aliquots followed by AA finish was employed.

Ian Ward P.Eng, Senior Vice President of the Company, is the Qualified Person for the Makwa project information and this press release.

To find out more about Mustang Minerals Corp. (TSX VENTURE:MUM) visit our website at www.mustangminerals.com.

We seek safe harbour.

This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements may include the Company's plans for its mineral projects in Manitoba, the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward-looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, currency fluctuations, fluctuations in the price of nickel and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at www.sedar.com.

Shares Outstanding: 94,498,233

CONTACT INFORMATION:

Mustang Minerals Corp.
David Black
Investor Relations
416-955-4773
info@mustangminerals.com

INDUSTRY: Manufacturing and Production - Mining and Metals


.

Mustang Minerals Corp

EN DÉVELOPPEMENT
CODE : MUM.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Mustang est une société d’exploration minière de nickel et de cuivre basée au Canada.

Mustang est en développement de projets de nickel, de cuivre, de cobalt, de palladium et de platine au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est MAKWA au Canada et ses principaux projets en exploration sont RIVER VALLEY PGM, EAST BULL LAKE, TILLICUM CLAIMS, RIVER VALLEY PGM et MAYVILLE au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Mustang Minerals Corp
24/01/2013Announces Completion of Additional Financing and 2013 Strate...
23/01/2012Completes Financing With Western Areas 7500m Drill Program U...
06/01/2012Completes Flow Through Financing
11/01/2010Completes Private Placement
08/12/2009Increases Private Placement Financing and Closes First Tranc...
06/11/2009Announces Non-Brokered Private Placement
Projets de Mustang Minerals Corp
20/02/2013(Mayville)Announces Increase to Mayville Resource
07/11/2012(Mayville)Provides Update on Mayville Drilling
12/09/2012(Mayville)Drilling at Mayville Property
14/06/2012(Mayville)Intersects Higher Grade Zone of Copper-Nickel-PGM Mineraliza...
17/05/2012(Mayville)Drilling Update-Mayville Project
02/06/2011(Mayville)Drill Program Resumes at Mayville Property
05/05/2011Drills 9=2E1 Meters of 3=2E9 g/t Platinum-Palladium Strike L...
06/04/2011(Mayville)Completes Additional Holes at New PGM Zone
23/03/2011MUSTANG MINERALS ANNOUNCES NEW PLATINUM AND PALLADIUM DISCOV...
22/03/2011Announces New Platinum and Palladium Discovery in Manitoba
01/12/2010(Mayville)s Exploration at Mayville/Tanco Properties
13/07/2010(Mayville)Exploration Deal With Tantalum Mining Corporation of Canada
22/03/2010(Makwa)Updates Project Economics at Makwa Nickel Project
17/02/2010(Makwa)Makwa Nickel Project Update
01/09/2009(Makwa)Advances its Maskwa Nickel Project
22/06/2009(East Bull Lake)Western Areas-Mustang JV Commences Drilling at East Bull Lak...
02/03/2009(Makwa)Completing Drilling at Manitoba Nickel Project
22/01/2009(Makwa)Provides Update on Maskwa Nickel Project Feasibility Study
01/12/2008(Makwa)Provides Update at Maskwa Nickel Project Feasibility Study
12/09/2008(East Bull Lake)and Western Areas Sign Agreement for Joint Venture at East B...
03/07/2008(East Bull Lake)New PGM+Ni+Cu Mineralization Drilled at East Bull Lake, Onta...
26/06/2008(Makwa)Mustang Tables Positive Prefeasibility for Maskwa Nickel Pro...
12/05/2008(East Bull Lake Pgm)Drilling at East Bull
09/05/2008(Makwa) Reports Positive Results From Prefeasibility Study at Maskw...
23/04/2008(Makwa)Tests Chromite Horizon at Maskwa Property
03/03/2008(Makwa)Drill Update at Maskwa North and Maskwa West
Communiqués de Presse de Mustang Minerals Corp
20/10/2015Board Resignation
10/12/2012(Mayville)Extends Mayville Cu-Ni Deposit Mineralization to the East
17/07/2012(Mayville)Drilling Extends Copper Nickel Mineralization to Depth at Ma...
05/03/2012Provides Exploration Update Continuesto Intersect PGM Minera...
01/12/2011(Mayville)Announces Mayville Exploration-Financing
09/09/2011: Corporate Update
03/03/2011(Mayville)Drills New Surface Zone of CopperNickel Mineralization at th...
15/04/2010Expands Resources in Project Area
19/11/2009and Sagkeeng First Nation Conclude Memorandum of Understandi...
18/09/2009AGM, September 22
01/10/2008Visit Our Booth This Weekend
05/08/2008Builds Project Development Team
17/07/2008 Closing of Oversubscribed, Increased Financing
16/07/2008Announces Increase to Brokered Financing
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MUM.V)Other OTC (MSMGF)
0,175-2.78%0,048-4.00%
TSX-V
CA$ 0,175
07/06 13:54 -0,010
-2,78%
Cours préc. Ouverture
0,180 0,180
Bas haut
0,175 0,195
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,175 -%
Volume var. 1 mois
24 600 -%
24hGold TrendPower© : -31
Produit
Développe Cobalt - Copper - Nickel - Palladium - Platinum
Recherche Cobalt - Copper - Gold - Nickel - Palladium - Platinum - Rhodium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :