Publié le 15 juin 2015

Urucum Underground Update

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   K Street | Nature |

Urucum Underground Update

ASX ANNOUNCEMENT 16 June 2015

ASX Code: BDR

URUCUM UNDERGROUND UPDATE

FD1410

FD1409

Lode 1

Lode 2

Lode 1

Lode 2

23 m @ 4.92 g/t including 5 m @ 20.32 g/t

5 m @ 2.76 g/t

2 m @ 17.31 g/t gold

20 m @ 2.00 g/t gold

FD1406

Lode 1

Lode 2

25 m @ 2.29 g/t gold including 17 m @ 3.13 g/t gold

22 m @ 2.75 g/t gold including 18 m @ 3.25 g/t gold

FD1405

Lode 1

Lode 11

8.75 m @ 4.38 g/t gold including 5 m @ 6.7 g/t gold

12 m @ 4.81 g/t gold including 7 m @ 6.70 g/t gold

Beadell Resources Limited ("Beadell" or "the Company") is pleased to announce significant new drill results from Urucum Underground at its 100% owned Tucano gold mine in Brazil (Figures 2 & 3, Table
1).
Surface diamond drilling targeting Urucum Underground continues to intersect high grade results beneath the open pit reserve showing excellent continuity of the recently identified lode plunges. The drilling is targeting an initial underground reserve in the 200-400 m vertical area beneath the Urucum North open pit with a Pre-Feasibility to be completed by end of 2015. New results have been received from Lode 1 and Lode 2 which form two subparallel shear zones separated by approximately 10-20 m.
Another parallel footwall lode was intersected in FD1405, Lode 11.

Beadell Resources Limited

Second Floor, 16 Ord Street, West Perth 6005, Western Australia ABN 50 125 222 291 PO Box 542, West Perth 6872, Western Australia www.beadellresources.com.au Telephone: +61 8 9429 0800 | Facsimile: +61 8 9481 3176


Figure 1. Mining Concession Plan

Lode 1

Lode 1 is the western parallel lode at Urucum North and a separate long section is presented in Figure
2. A significant new result in FD1410 of 23 m @ 4.92 g/t gold including 5 m @ 20.32 g/t gold has extended the up dip strike length of Central Lode 1. An excellent conceptual target is currently being drilled at the interpreted intersection between Central Lode 1 and South Lode 1. A summary of the
new Lode 1 results are summarised below and presented in Table 1.

FD1402

5 m @ 1.80 g/t gold

FD1405

8.75 m @ 4.38 g/t gold including 5 m @ 6.7 g/t gold

FD1406

25 m @ 2.29 g/t gold including 17 m @ 3.13 g/t gold

FD1407

11 m @ 1.72 g/t gold

FD1409

2 m @ 17.31 g/t gold

FD1410

23 m @ 4.92 g/t gold including 5 m @ 20.32 g/t gold

2


Figure 2. Urucum Lode 1 Long Section

Lode 2

Lode 2 forms the eastern parallel lode at Urucum North and a long section with new results is presented in Figure 3. Lode 2 is generally lower grade and wider than Lode 1 and forms an important compliment to Lode 1 due to its close spatial association and conceptually being able to be developed from single decline and development drives.
New drilling results from Lode 2 are presented below and in Table 1.

FD1402

7 m @ 1.42 g/t gold

FD1405

4 m @ 1.22 g/t gold

FD1406

22 m @ 2.75 g/t gold including 18 m @ 3.25 g/t gold

FD1407

9 m @ 1.58 g/t gold

FD1409

20 m @ 2.0 g/t gold

FD1410

5 m @ 2.76 g/t gold

3

Lode 11

Figure 3. Urucum Lode 2 Long Section
Significant gold mineralisation was intersected in an additional lode position named Lode 11 which is located in the footwall to Lode 1. A drilling result from Lode 11 included;

FD1405 12 m @ 4.81 g/t gold including 7 m @ 6.7 g/t gold

This mineralisation is likely to represent the northern plunge continuation of the main Urucum South mineralisation at depth. The Lode 11 position in Urucum North remains sparsely tested and requires additional drilling to define the extents and significance of the lode.

For further information please contact:

Peter Bowler | Managing Director Rob Watkins | Executive Director Geology T: +61 8 9429 0800 T: +61 8 9429 0800 [email protected][email protected]

Competent Persons Statement

The information in this report relating to Exploration Results and Mineral Resources and Ore Reserves is based on information compiled by Mr Robert Watkins who is a member of the Australasian Institute of Mining and Metallurgy and has sufficient exploration experience which is relevant to the various styles of mineralisation under consideration to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Watkins is a full time employee of Beadell Resources Limited. Mr Watkins consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

4

Table 1

Urucum Underground Diamond Drill Results

Target

Hole

North

East

RL

Dip

Az

From

(m)

To

(m)

Width

(m)

Gold

(g/t)

Urucum

FD1402

99,867

402,096

196

-65

239

199

218

251

265

276

203

225

256

268

281

4

7

5

3

5

0.69

1.42

0.81

0.64

1.80

Urucum

FD1405

99,589

402,099

185

-79

262

283

296

334

392

399

413

Inc 413

508.53

Inc 518

287

298

338

395

409

421.75

418

527

525

4

2

4

3

10

8.75

5

18.47

7

0.77

0.55

1.22

2.38

1.19

4.38

6.70

3.47

6.70

Urucum

FD1406

99,491

402,051

176

-84

310

284

299

Inc 303

324

Inc 328

287

321

321

349

345

3

22

18

25

17

1.26

2.75

3.35

2.29

3.13

Urucum

FD1407

100,021

402,091

228

-61

251

218

244

262

270

333

221

246

271

274

344

3

2

9

4

11

1.98

1.58

0.53

1.72

0.65

Urucum

FD1409

100,188

402,108

236

-67

243

0

284

321

11.5

304

323

11.5

20

2

1.96

2.0

17.31

Urucum

FD1410

99,868

402,097

196

-68

227

244

257

303

Inc 321

249

264

326

326

5

7

23

5

2.76

0.55

4.92

20.32

All intercepts are reported using a 0.5 g/t gold lower cut off and no greater than 2 m internal dilution.

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

JORC Code explanation

Commentary

Sampling

techniques

Nature and quality of sampling (e.g.

cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling.

For RC drilling the entire 1m RC samples were obtained and

split by an adjustable cone splitter attached to the base of the cyclone (1.5kg - 6.0kg) and were utilised for both lithology logging and assaying.

For diamond core, half core is measured, logged and then cut, crushed and pulverised at the Tucano site sample preparation laboratory.

Sampling

techniques

Include reference to measures

taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

Samples are split into single meter intervals.

Certified standards were inserted every 25th sample and to assess the accuracy and methodology of the external laboratories. Field duplicates were inserted every 20th sample to assess the repeatability and variability of the gold mineralisation. Laboratory duplicates were also completed approximately every 20th sample to assess the precision of the laboratory as well as the repeatability and variability of

5

the gold mineralisation. A blank standard was inserted at the

start of every batch. Results of the QAQC sampling were assessed on a batch by batch basis and were considered acceptable.

Aspects of the determination of

mineralisation that are Material to the Public Report. In cases where

'industry standard' work has been done this would be relatively simple (e.g. 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

1m RC samples were obtained by an adjustable cone splitter

attached to the base of the cyclone (1.5kg - 6.0kg) and were utilised for both lithology logging and assaying.

At the mine exploration sample preparation facility, core samples are dried at 105C, crushed to -8mm then to -2mm and split to 0.9-1kg before being pulverised to 1mm. This sample is quartered cut to between 200-400g before being pulverised to 95% passing 105μm. The final pulp is quartered again to achieve a sample of 100 - 200g and is sent to SGS laboratories in Belo Horizonte for fire assay.

At the mine exploration sample preparation facility, the RC

1m samples are dried at 140C, crushed to -2mm (if aggregated) and riffle split to 1kg. The 1 kg sample is then pulverised to 1mm and quarter cut to between 200 and 400g. This sample is then pulverised to 95% passing 105μm and quarter cut to a 100-200g sample to send to SGS. Any duplicates samples of the same interval are also sent to ACME laboratories for analysis. Samples from the Lookout Lode were assayed at the onsite chemical Laboratory.

Drilling

techniques

Drill type (e.g. core, reverse

circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sampling bit or other type, whether core is oriented and if so, by what method, etc.).

A 5.5'' diameter face sampling hammer was used for RC

drilling. For diamond drilling NQ size core is produced.

Drill sample

recovery

Method of recording and assessing

core and chip sample recoveries and results assessed.

RC recovery was visually assessed, with recovery being

excellent except in some wet intervals at the water table. The majority of mineralised intersection results received occurred above the water table. All core is orientated and measured

for recovery

Drill sample

recovery

Measures taken to maximise

sample recovery and ensure representative nature of the samples.

RC samples were visually checked for recovery, moisture

and contamination. The drilling contractor utilised a cyclone and cone splitter to provide uniform sample size. The cone splitter was cleaned at the end of every 3m rod and the cyclone cleaned at the completion of every hole.

Drill sample

recovery

Whether a relationship exists between sample recovery and

grade and whether sample bias may have occurred due to

preferential

Sample recoveries for RC holes were high within the mineralised zones. No significant bias is expected.

Logging

Whether core and chip samples

have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

Lithology, alteration, veining, mineralisation and weathering

were logged from the RC chips and stored in Datashed. Chips from selected holes were also placed in chip trays and stored in a designated building at site for future reference.

Logging

Whether logging is qualitative or quantitative in nature. Core (or

costean, channel, etc.)

All logging is qualitative except for density and recovery. All core photography has been completed shortly after being

received at the core yard and always prior to cutting.

6

photography.

The total length and percentage of

the relevant intersections logged.

All drill holes are logged in full.

Sub-sampling

techniques and sample preparation

If core, whether cut or sawn and

whether quarter, half or all core taken.

Core holes and half core sampled from cut core.

Sub-sampling

techniques and sample preparation

If non-core, whether riffled, tube

sampled, rotary split, etc. and whether sampled wet or dry.

The RC drilling utilised a cyclone and cone splitter to

produce samples in the 1kg to 6kg range. Once collected the sample is dried, crushed to -2mm and split at the site sample preparation lab down to approximately 1kg prior to pulverisation.

Sub-sampling

techniques and sample preparation

For all sample types, the nature,

quality and appropriateness of the sample preparation technique.

The 1 kg sample is then pulverised to 1mm and quarter cut

to between 200 and 400g. This sample is then pulverised to

95% passing 105μm and quarter cut to a 100-200g sample to send to SGS or to the mine chemical lab for analysis.

Sub-sampling

techniques and sample preparation

Quality control procedures adopted

for all sub-sampling stages to maximise representivity of samples.

Certified standards and blanks were inserted every 25th

sample to assess the accuracy and methodology of the external laboratory (SGS), and field duplicates were inserted every 20th sample to assess the repeatability and variability of the gold mineralisation. At Tucano field duplicates were taken for diamond core but not for RC. Laboratory duplicates (sample preparation split) were completed every 20th

sample to assess the precision of the laboratory as well as the repeatability and variability of the gold mineralisation. Duplicate samples were also sent to a different lab (ACME Laboratories) for analysis.

Sub-sampling

techniques and sample preparation

Measures taken to ensure that the

sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

The results of the field duplicates show an acceptable level

of repeatability.

Reconciliation data from mining at Tucano indicates that the sampling and estimation is representative.

Sub-sampling

techniques and sample preparation

Whether sample sizes are

appropriate to the grain size of the material being sampled.

Sample sizes (1kg to 6kg) are considered to be a sufficient

size to accurately represent the gold mineralisation based on the mineralisation style, the width and continuity of the intersections, the sampling methodology.

Field duplicates of diamond core have routinely been collected to ensure monitoring of the sub-sampling quality. Acceptable precision and accuracy is noted in the field duplicates albeit the precision is marginally acceptable and consistent with a course gold deposit.

Quality of

assay data and laboratory tests

The nature, quality and

appropriateness of the assaying

and laboratory procedures used and whether the technique is considered partial or total.

All resource or exploration holes (prefix FD or F) gold

assaying completed by external certified laboratories (SGS in Belo Horizonte and ACME laboratories) and using a 30g charge for fire assay analysis with an AAS finish. This technique is industry standard for gold and considered appropriate. All grade control hole (prefix GCRC) gold assaying completed at the non-certified Tucano mine site chemical laboratory using similar fire assay analysis. Selected Screen fire analysis was performed on selected intervals where coarse gold was observed.

For geophysical tools,

spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations

factors applied and their derivation,

Geophysical tools not used.

7

etc.

Nature of quality control procedures

adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

Certified Reference Material (CRM or standards) were

inserted every 25th sample to assess the assaying accuracy of the external laboratories. Field duplicates were inserted every 20th sample to assess the repeatability from the field and variability of the gold mineralisation. Laboratory duplicates were also completed approximately every 20th sample to assess the precision of assaying. Evaluation of both the Beadell submitted standards, and the internal laboratory quality control data, indicates assaying to be accurate and without significant drift for significant time periods. Excluding obvious errors, the vast majority of the CRM assaying report shows an overall mean bias of less than 5% with no consistent positive or negative bias noted. Duplicate assaying show high levels of correlation (linear correlation >0.96) and no apparent bias between the duplicate pairs. Field duplicate sample show marginally acceptable levels of correlation (0.89 for the SGS data set,

0.96 for the Ultratrace and MinAnalytical data set but 0.61 for the KalAssay data set) and no relative bias.

Each analysis batch (approx. 150 samples) is checked to ensure that the standards fall within the accepted levels of

standard deviation. Where any standard exceeds 3 standard

deviations or where more than one standard falls between 2 and 3 standard deviations, the entire batch is resubmitted for analysis.

Verification of

sampling and assaying

The verification of significant

intersections by either independent or alternative company personnel.

The high grade intersections of core and RC have been

observed by various visiting geological consultants (e.g. Cube consulting).

Verification of

sampling and assaying

The use of twinned holes.

At Urucum underground diamond twin holes have been

drilled previously showing what is considered to be normal variations in Orogenic gold mineralisation.

Verification of

sampling and assaying

Documentation of primary data,

data entry procedures, data verification, data storage (physical and electronic) protocols.

All geological logging information is entered directly into

Logchief and synchronised with the Datashed database. Other field data (e.g. sampling sheets, downhole surveys etc.) are entered into excel spreadsheets formatted for Datashed importation. Lab assay reports are directly imported into Datashed along with all QAQC data and metadata. Data importation is done by Maxwell Geoservices staff under contract by Beadell Resources. All data loading procedures have been documented by Maxwell Geoservices.

Verification of

sampling and assaying

Discuss any adjustment to assay

data.

Data below the detection limit is defined with a negative

value, e.g.

Location of

data points

Accuracy and quality of surveys

used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used

in Mineral Resource estimation.

Beadell drill hole collar locations were picked up by site-

based authorized surveyors using Total Station Leica 407, calibrated to a base station (expected accuracy of 20mm).

Downhole surveying was measured by the drilling contractors using a Reflex Gyro Downhole Survey Instrument for RC holes. Shallow RC holes were picked up at the collar and 2 points on the rod string using Total Station. Grade control RC holes less than ~50m depth are not down hole surveyed.

Location of

data points

Specification of the grid system

used.

The grid system is SAD 69 Zone 22N.

Location of

data points

Quality and adequacy of

Beadell Brasil Ltda Survey Staff generated a digital terrain

8

topographic control.

model (DTM) from Total Station surface pickups of the

Tucano deposit.

Data spacing and

distribution

Data spacing for reporting of

Exploration Results.

The nominal drill hole spacing is 5m (E) by 10m (N) for the

Tucano RC holes and nominal 50m x 50m spacing for diamond drilling at Urucum Underground.

Data spacing and

distribution

Whether the data spacing and

distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

The data spacing and distribution is sufficient to demonstrate

spatial and grade continuity of the mineralised domains to support the definition of Inferred, Indicated and Measured Mineral resources under the 2012 JORC code.

Data spacing and

distribution

Whether sample compositing has

been applied.

No sample compositing has been applied in the field within

the mineralised zones.

Orientation of data in

relation to geological

structure

Whether the orientation of sampling achieves unbiased sampling of

possible structures and the extent to which this is known, considering the

deposit type.

The majority of drilling is orientated east-west at Tucano with a 60 degree dip, which is roughly perpendicular to both the

strike and dip of the mineralisation; therefore ensuring intercepts are close to true-width.

Orientation of data in

relation to geological

structure

If the relationship between the

drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

Sectional interpretation of 5m spaced holes on 10m spaced

lines shows a very uniform mineralised zone both along strike and down dip. The drill orientation is as close to

normal to this body as possible and therefore the drill hole to mineralisation is not considered to have introduced a sampling bias.

Sample

security

The measures taken to ensure

sample security.

Samples are securely sealed and stored onsite, until delivery to Macapa via the company contracted Taxi driver, who then

also delivers the samples directly to TAM airlines cargo dispatch facility for delivery to Belo Horizonte. Sample submission forms are sent with the samples as well as emailed to the laboratory, and are used to keep track of the

sample batches.

Audits or

reviews

The results of any audits or reviews

of sampling techniques and data.

A site visits was completed in 2012 (Cube Consulting) to

review sampling procedures and grade control practices. This visit concluded the sampling to be at an industry standard, and of sufficient quality to carry out a Mineral Resource Estimation.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral

tenement and land tenure status

Type, reference name/number,

location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical

sites, wilderness or national park and environmental settings.

The Tucano deposits reside in tenement 851.676/1992,

centrally located within the northern state of Amapa, Brazil. The current registered holder of the tenements is Beadell Brasil Ltda.

The Duckhead prospect resides in tenement 852.730/1993, centrally located within the northern state of Amapa, Brazil. The current registered holders of the tenements is Anglo Ferrous, however Beadell Brasil Ltda has mineral rights to extract gold resources under a Joint Operators Agreement with the Anglo Ferrous. Beadell Brasil Ltda is already operating a nearby gold and iron ore producing mine site ("Tucano Gold") on its neighbouring mining lease.

9

The security of the tenure held at

the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Existing mining concession owned 100% by Beadell

Resources Ltd. Existing mining lease, owned by Anglo Ferrous at Duckhead. Beadell owns 100% of the gold rights and Duckhead Mining Agreements governs the access.

Exploration

done by other parties

Acknowledgment and appraisal of

exploration by other parties.

Beadell Brasil Ltda acknowledges the previous operator

MPBA for the initial discovery of the deposit.

Geology

Deposit type, geological setting

and style of mineralisation.

The Tucano deposits are structurally controlled orogenic

lode type gold deposit hosted within a Banded Iron Formation unit in contact with a Clastic quartz biotite schist. The Lodes are characterised by shear parallel disseminated pyrite and pyrrhotite mineral assemblages and generally exhibit a strong oxidation profile in the regolith without any secondary dispersion other than colluvial deposits.

The Duckhead deposits are structurally controlled orogenic lode type gold deposit hosted within a Banded Iron Formation unit in contact with a Clastic quartz biotite schist.

The Wing Lode and Hangingwall Lodes are characterised by shear parallel disseminated pyrite and pyrrhotite mineral assemblages. The Main Lode is characterised by extremely deep weathering on the BIF and clastic contact.

Drill hole

Information

A summary of all information

material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill

hole collar

o dip and azimuth of the hole

o down hole length and

interception depth

o hole length.

See Table 1

Drill hole

Information

If the exclusion of this information

is justified on the basis that the information is not Material and this exclusion does not detract from

the understanding of the report, the Competent Person should clearly explain why this is the

case.

Data

aggregation methods

In reporting Exploration Results,

weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated.

In the reporting of exploration results, un-cut grades are

reported. The lower cut-off limit is considered to be 0.5g/t for the reporting of drill hole intercepts with no more than 2 m downhole internal dilution. Intercepts are determined using a weighted average over the length of the intercept.

10

Where aggregate intercepts

incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

In the instance where aggregate intercepts include shorter

lengths of higher grade material, the total interval is stated first followed by the word "including", then a listing of the contained shorter high grade intercepts.

The assumptions used for any

reporting of metal equivalent values should be clearly stated.

No metal equivalents are used at Tucano.

Relationship

between mineralisation widths and intercept lengths

These relationships are particularly

important in the reporting of

Exploration Results.

The drilling was designed to intersect the mineralisation at

an angle that is roughly perpendicular to the overall trend for both strike and dip. The mineralised intervals are generally much wider than the minimum sample interval of 1m.

Relationship

between mineralisation widths and intercept lengths

If the geometry of the

mineralisation with respect to the drill hole angle is known, its nature should be reported.

The drilling was designed to intersect the mineralisation at

an angle that is roughly perpendicular to the overall trend for both strike and dip. The mineralised intervals are generally much wider than the minimum sample interval of 1m.

Relationship

between mineralisation widths and intercept lengths

If it is not known and only the

down hole lengths are reported, there should be a clear statement to this effect (e.g. 'down hole length, true width not known').

All drill intersections are stated as down hole lengths. At

Duckhead drill intercepts approximate true widths.

At Urucum true widths are approximately half the down hole width

Diagrams

Appropriate maps and sections

(with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

See diagrams in main body of the announcement.

Balanced

reporting

Where comprehensive reporting of

all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

All the significant results greater than 0.5 g/t gold over at

least 2m downhole have been reported in Table 1 and Table

2.

Other

substantive exploration data

Other exploration data, if

meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

The Tucano results are from an active mining area where

open pit mining is in progress. Reconciliation has been verified by mill metallurgical balance based on models using the same drilling method for results.

11

Further work The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

The Tucano lodes remain open at depth and along strike in most cases and contain numerous outlying intersections that will require follow up drilling. Several diagrams have been included to highlight this aspect.

12

Lire la suite de l'article sur www.noodls.com

Beadell Resources

EN DÉVELOPPEMENT
CODE : BDR.AX
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Beadell res est une société développant des projet miniers d'or basée en Australie.

Beadell res détient divers projets d'exploration en Australie.

Ses principaux projets en développement sont AMAPARI et TUCANO au Bresil et ses principaux projets en exploration sont WEST MUSTRAVE PROJECT (HANDPUMP) et TROPICANA EAST en Australie.

Beadell res est cotée en Australie. Sa capitalisation boursière aujourd'hui est 80,2 millions AU$ (56,2 millions US$, 49,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 07 décembre 2012 à 1,09 AU$, et son plus bas niveau récent le 28 décembre 2018 à 0,04 AU$.

Beadell res possède 1 233 430 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Beadell Resources
31/03/2010Updated Investor Presentation
Rapports annuels de Beadell Resources
Annual Report 2009
Financements de Beadell Resources
01/04/2010Institutional and Private Placement to Raise $57.0 million
Attributions d'options de Beadell Resources
01/02/2012ASX Announcement: Dividend Policy
Nominations de Beadell Resources
05/09/2016Change of Director's Interest Notice
Projets de Beadell Resources
24/04/2012(Tropicana East)ASX Announcement: Tropicana East - Hercules Drill Results
03/04/2012(Tucano)ASX Announcement: High Grade Drill Results - Tucano
31/01/2012ASX Announcement: Urucum Deeps High Grade Intersection
30/08/2011ASX Announcement: Maiden Iron Ore Resource on Beadell's Mini...
05/05/2011(Tucano)ASX Announcement: Government Approvals Received - Tucano
05/04/2011(Tucano)ASX Announcement: Tucano Gold Ore Reserve
31/03/2011Company Review - Beadell Resources Limited
01/12/2010(Tropicana East)ASX Announcement: New Discovery in Tropicana Belt 30m @ 8.3 ...
26/07/2010(Tucano)Outstanding Drill Results at Tucano
01/06/2010Tucano Definitive Feasibility Study Commences
13/04/2010(Amapari)Acquisition of Amapari Gold Mine and Iron Ore Royalty Comple...
02/03/2010(West Mustrave Project (handpump))West Musgrave Gold Discovery Update
28/01/2010(Amapari)Acquisition of Amapari Gold Mine
07/01/2010(West Mustrave Project (handpump))West Musgrave Gold Discovery Confirmed 60 m @ 0.9 gpt gold
05/01/2010High Grade Gold Discovery Confirmed 192 6 gpt gold
23/09/2009(Tropicana East)Hercules Drilling Results - Tropicana East Project
01/07/2009(West Mustrave Project (handpump))Anglo American Option and Joint Venture Agreement
Communiqués de Presse de Beadell Resources
18/05/2016Chairman's Address to Shareholders
16/05/2016Cancellation of Employee Options
24/11/2015Investor Presentation - November 2015
27/10/2015Urucum Preliminary Conceptual Underground Mine Design
05/10/2015Quarterly Production Update
17/09/2015Maiden Urucum Underground Mineral Resource
02/09/2015Operational Update
28/08/20152015 Interim Financial Report
28/08/20152015 Half Year Results
02/08/2015Investor Presentation - Diggers and Dealers 2015
13/07/2015Duckhead Operational Update
15/06/2015Urucum Underground Update
24/04/2015March 2015 Quarterly Report
17/04/2015Annual Report to shareholders
16/04/2015Tucano Exploration Update
07/04/2015Annual Mineral Resource and Ore Reserve Update
07/04/2015Quarterly Production Update
27/03/2015Dividend Follow-Up Letter (to AUS Residents only)
13/03/2015Letter to Shareholders
10/03/2015Currency Update
26/02/2015Maiden Dividend and 2014 Financial Year Results
26/02/20152014 4E and Full Year Statutory Accounts
12/11/2014Tucano Drill Results
09/11/2014MACA Partnership Commences
06/11/2014Change of Director's Interest Notice
23/10/2014Mining Partnership Agreement with MACA Limited
25/03/20142013 Financial Year Results
24/03/20142014 Guidance Upgrade and Production Update
08/02/2013BMO Conference Participation
26/04/2012ASX Announcement: Quarterly Report March 2012
06/03/2012ASX Announcement: Capital Raising Completed
29/02/2012ASX Announcement: Ross Kestel Joins Board
25/01/2012ASX Announcement: Quarterly Report 31 December 2011
08/12/2011ASX Announcement: Iron Ore Strategic Review
27/10/2011ASX Announcement: Quarterly Report 30 September 2011
07/09/2011Investor Presentation: Deutsche Bank Gold Conference 7 Sept ...
16/05/2011(Tropicana East)ASX Announcement: Tropicana East Results 5m @ 4 gpt Gold
12/05/2011(Tucano)ASX Annoucement: Tucano Resource Drilling Target
10/05/2011(Tucano)ASX Announcement: Definitive Feasibility Study Completed - T...
28/04/2011ASX Announcement: Quarterly Report 31 March 2011
12/04/2011ASX Announcement: Investor Presentation - April 2011
23/03/2011(Tucano)ASX Announcement: Tucano Gold Results 14 m @ 19.9 gold
21/03/2011ASX Announcement: Potential Iron Ore Production from Gold Pl...
01/03/2011(Tucano)ASX Announcement: New Tucano Gold and Iron Ore Results
01/12/2010ASX Announcement: New Gold Inc's Shares Sold
06/08/2010Legal Settlement - William Creek
28/07/2010Quarter Report 30 June 2010
18/05/2010Share Purchase Plan & Shortfall Placement
06/05/2010Resource Drilling to Commence - Brazil
04/05/2010Share Purchase Plan Update
29/04/2010Quarterly Activities Report 31 March 2010
15/04/2010New Non Executive Chairman and Non Executive Director Appoin...
18/03/2010Anglo American Airborne Spectrem Anomalies Detected
29/01/2010Quarterly Activities Report 31 December 2009
18/12/2009BDR Media Coverage: Kalgoorlie Miner Thursday, 17 December 2...
17/12/2009Additional Mineralised Zones Intersected at West Musgrave
01/12/2009New Gold Soil Anomaly Tartaruga Brazil
25/11/2009Beadell AGM 25 November 2009
27/10/2009Quarterly Activities Report 30 September 2009
30/09/2009Anglo American Airborne Spectrum Survey Commences
31/08/2009Company Announcement
27/07/200930 June 2009 Quarterly Activities Report
23/07/2009Company Announcement. New Results - Tropicana East
30/06/2009Company Announcement
27/01/2009ASX Announcement - December 2008 Quarter Report
22/01/2009Company Announcement
20/01/2009SIGNIFICANT GOLD ANOMALY AT TROPICANA EAST
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (BDR.AX)
0,065+0.00%
AUSTRALIA
AU$ 0,065
29/06 02:35 -
0%
Cours préc. Ouverture
0,065 0,062
Bas haut
0,062 0,067
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,065 -%
Volume var. 1 mois
17 662 973 -%
24hGold TrendPower© : -26
Produit
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :