Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Wesdome Gold Mines Ltd.

Publié le 06 novembre 2014

Wesdome Gold Mines announces third quarter financial results; generates CAD$3.4 million in free cash flow

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |

Wesdome Gold Mines announces third quarter financial results; generates CAD$3.4 million in free cash flow

WDO:TSX

TORONTO , Nov. 6, 2014 /CNW/ - Wesdome Gold Mines Ltd. (WDO.TO) today announces its financial and operational results for the third quarter and first nine months of 2014. All figures are in Canadian dollars unless stated otherwise.

Mr. Rolly Uloth , President and CEO commented, "I am pleased to report that the third quarter is the fourth consecutive quarter the Company has generated positive free cash flow, building our cash position to $10.7 million from $8.3 million in the previous quarter. Some profits were used to be active on our Normal Course Issuer Bid, where during the quarter 203,500 shares were bought back and retired. Over the last year, the Company has been expanding its milling capacity and reliability, and the benefits of these programs are beginning to take effect. During the third quarter, throughput increased by 54% and production based cash costs on a per tonne basis decreased by 33%. A profit growth approach to production while managing unit costs remains a priority as we continue to demonstrate financial strength. Guidance for 2014 was revised upwards to 52,000 ounces last quarter, which we are on track to meet or exceed. Initial guidance for 2015 is 55,000 ounces, with the increase coming primarily from the low-cost Mishi open pit. Current mill capacity supports this increased production rate."

HIGHLIGHTS:

  • During the third quarter, the Company generated CAD$3.4 million in free cash flow, or $0.03 per share during the third quarter in 2014. Free cash flow for the first nine months of the year totalled CAD$7.6 million or $0.07 per share.
  • Revenue generated for the quarter totalled CAD$22.3 million , cash flow from operations totalled CAD$7.9 million , and net income totalled CAD$2.2 million or $0.02 per share. For the first nine months of the year revenue, cash flow from operations and net income were CAD$61.5 million , CAD$19.7 million , and CAD$9.3 million or $0.09 per share, respectively.
  • During the third quarter 12,456 ounces of gold were produced at a recovered grade of 10.1 grams per tonne at Eagle River and 2.4 grams per tonne at Mishi.  Overall, the Eagle River Complex produced 45% more gold in the current quarter over the same period in 2013.  Total year to date production is 39,776 ounces at a recovered grade of 12.0 grams per tonne at the Eagle River mine.  The Company is on track to meet or exceed its upward revised guidance of 52,000 ounces.
  • Sales for the quarter were 15,878 ounces at an average price of CAD$1,407 (USD$1,292) .
  • Total production cash costs per ounce for the third quarter decreased 19% to average CAD$975 (USD$895) per ounce, compared to CAD$1,208 (USD$1,164) during the same period in 2013. Production cash costs per ounce were slighter higher in the third quarter than the second quarter ( CAD$859 , USD$788 ) due to grade sequencing, and one-time, non-recurring expenditures related to improving mill performance. 
  • Total all-in sustaining costs (which includes total cash costs, exploration, development and sustaining capital, project capital, corporate G & A and corporate taxes) on ounces produced were CAD$1,389 per ounce (USD$1,275) , compared to CAD$1,242 per ounce (USD$1,139) in the previous quarter due to lower grades. This is a significant 15% improvement over all-in sustaining cost in the same period last year of CAD$1,631 per ounce (USD$1,576) . All-in sustaining costs for the third quarter on ounces sold were CAD$1,292 per ounce (USD$1,185) .
  • Total all-in sustaining costs on a per tonne basis were reduced to CAD$323 (USD$297) per tonne in the third quarter from $CAD486 (USD$446) per tonne in the second quarter due to higher throughput.
  • Average daily throughput rates increased 53% in the third quarter to 583 tonnes per day, compared to 382 tonnes per day in the second quarter.  The Company exited the third quarter at a rate of 700 tonnes per day and expects to exit the fourth quarter at a rate of 1,000 tonnes per day.
  • The Company was active with its Normal Course Issuer Bid during the third quarter, buying back 203,500 shares at an average price of $0.78 and retiring them.  Current shares outstanding stand at 110,881,591.
  • Exploration programs at the Eagle River Complex continued throughout the quarter. The Company is aggressively drilling to delineate and define new parallel zones initially recognized in 2013 at the Eagle River Mine.  This drilling demonstrates the No 7 Zone is opening up at depth (see press release dated September 15, 2014 ). To date, this zone has demonstrated strong continuity, grades and widths over a 200 metre by 100 metre longitudinal area and remains open to the west and at depth.
  • The No 7 Zone is located 200 metres north and parallel to the main 8 Zone structure.  Encouraging results also continue from the 300 Zone (located 400 metres north and parallel to the main structure).  Results have prompted a decision to access and develop this zone from a crosscut currently being driven on the 750 metre level. We are currently 170 metres away from the 300 zone.
  • Additionally, a crosscut is being driven to the south of the main structure to examine the continuity and grade of the No Name Lake Zone.  The development of these three parallel structures has implications to potentially increase significantly our tonnage per vertical metre, mining flexibility and possibly production rates in the future.

ABOUT WESDOME

Wesdome Gold Mines Ltd. is in its 28th year of continuous gold mining operations in Canada that employs a profit growth approach to operations.  The Company is currently producing from its Eagle River and Mishi gold mines in Wawa, Ontario , which have earned consistent free cash flow during times of low gold prices. Wesdome's corporate goal is to build a profitable, long-life, sustainable gold mining Company with modest initial capital costs. This strategy has enabled the Company to acquire strategic property and infrastructure assets in two politically stable and historically proven mining camps. Wesdome has significant upside through ownership of its two other properties, the Kiena Mine Complex in Val d'Or , Québec and the Moss Lake gold deposit located 100 kilometres west of Thunder Bay, Ontario .  These assets are being explored and evaluated to be developed in the appropriate gold price environment. The Company has approximately 110.8 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol "WDO."

This news release contains "forward-looking information" which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management's estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. The Company has included in this news release certain non-IFRS performance measures, including, but not limited to, mine operating profit, mining and processing costs and cash costs. Cash costs per ounce reflect actual mine operating costs incurred during the fiscal period divided by the number of ounces produced.  These measures are not defined under IFRS and therefore should not be considered in isolation or as an alternative to or more meaningful than, net income (loss) or cash flow from operating activities as determined in accordance with IFRS as an indicator of our financial performance or liquidity. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow.

SOURCE Wesdome Gold Mines Ltd.

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Wesdome Gold Mines Ltd.

PRODUCTEUR
CODE : WDO.TO
ISIN : CA95083R1001
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Wesdome est une société développant des projet miniers d'or basée au Canada.

Wesdome détient divers projets d'exploration au Canada.

Ses principaux projets en production sont EAGLE RIVER et KIENA au Canada, son principal projet en développement est MISHI au Canada et ses principaux projets en exploration sont DUBUISSON DISCOVERY, WESDOME PROJECT, MAGNACON, SHAWKEY et EDWARDS MINE - WESTERN QUEBEC MINES au Canada.

Wesdome est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 1,4 milliards CA$ (1,1 milliards US$, 985,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 19 juillet 2013 à 0,32 CA$, et son plus haut niveau récent le 16 avril 2024 à 10,61 CA$.

Wesdome possède 132 550 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Wesdome Gold Mines Ltd.
18/01/2019Wesdome delivers 2019 guidance and grade increase at Eagle R...
14/12/2018Wesdome upgrades Kiena resources, extends Deep A zone along ...
07/12/2018Wesdome extends Eagle River zone 7 at depth
30/01/2009A little gold company that does it right
Rapports annuels de Wesdome Gold Mines Ltd.
2010 Annual Report
Annual Report 2007
Financements de Wesdome Gold Mines Ltd.
16/12/2008Announces Proposed Private Placement of Flow-Through Shares
06/12/2007Announces Proposed Private Placement of Flow-Through Shares ...
Nominations de Wesdome Gold Mines Ltd.
14/02/2014Appoints VP Corporate Development
30/05/2013Announces Director Resignation
22/03/2013Appoints JP Chauvin to its Board of Directors
04/01/2011 Wesdome appoints André Roy, P.Eng. as VP Operations
Rapports Financiers de Wesdome Gold Mines Ltd.
13/04/2015Announces First Quarter Operating Results
28/02/2014reports fourth quarter and annual operating and financial re...
07/11/2013Reports Third Quarter Operating and Financial Results
06/08/2013Reports 2nd Quarter and 1st Half Operating and Financial Res...
06/08/2013reports second quarter and first half operating and financia...
09/05/2013Reports First Quarter Operating and Financial Results
10/04/2013reports strong Q1 operating results
15/03/20132012 Annual and Fourth Quarter Results
16/05/2012Reports 2012 First Quarter Results
24/03/2011EARNS $0.04 PER SHARE IN 2010
24/01/2011(Eagle River)REPORTS STRONG Q4 OPERATING RESULTS
24/01/2011(Kiena)REPORTS STRONG Q4 OPERATING RESULTS
Projets de Wesdome Gold Mines Ltd.
01/12/2014Wesdome Gold Mines to pour its one millionth ounce of gold a...
19/11/2014Wesdome Gold Mines Ltd. -- Dubuisson North drilling cuts 45....
21/07/2014Reports Q2 Production / Sales
27/06/2014(Mishi)- Drilling expands Mishi potential
24/01/2014& Moss Lake Announce Agrmt for Proposed Acquisition by Wesdo...
16/12/2013(Eagle River)Drilling Expands Potential of New Zones at Wesdome's Eagle R...
16/12/2013(Eagle River)- Drilling expands potential of new zones at Eagle River
16/12/2013(Eagle River)- Drilling expands potential of new zones at Eagle River
09/09/2013Moss Lake 43-101 Preliminary Economic Analysis Report Filed
30/07/2013and Windarra Announce Definitive Agreement Regarding Acquisi...
17/06/2013(Mishi)Mill Upgrading Intensifies as Mishi Mine Stockpil Grows, Con...
07/05/2013(Eagle River)Eagle River Drilling Encouraging
20/02/2013Moss Lake - Material Increase in Mineral Resources
11/10/2012(Mishi)- Infill drilling east of Mishi Pit builds confidence
05/03/2012Encouraging Results from Northwest Zone Surface Drilling
17/08/2011(Eagle River)- Eagle River Mine - New zones at depth
16/02/2011(Kiena)- KIENA SAFETY MILESTONE
02/02/2011(Mishi)2010 YEAR END RESERVES AND RESOURCES ESTIMATES GROW
02/02/2011(Eagle River)2010 YEAR END RESERVES AND RESOURCES ESTIMATES GROW
02/02/2011(Kiena)2010 YEAR END RESERVES AND RESOURCES ESTIMATES GROW
05/02/2008(Moss Lake)Drilling Commences at Moss Lake
03/01/2008Drilling extends high grade 811 Zone to depth
Communiqués de Presse de Wesdome Gold Mines Ltd.
27/07/2016Wesdome Gold Mines Announces Appointment of Duncan Middlemis...
14/06/2016Wesdome Gold Mines Announces Results of Postponed Annual Gen...
09/06/2016Wesdome Announces Sale of Certain Mining Claims Adjoining Ag...
08/06/2016Support Builds for Wesdome’s Enhanced Board as Shareholders ...
31/05/2016Wesdome’s No. 7 Zone Expands, Continuity Confirmed with Init...
30/05/2016Wesdome Gold Mines Announces New Annual General Meeting Date...
27/05/2016Wesdome Gold Mines Ltd. and Canoe Mining Ventures Corp. Clos...
17/05/2016Wesdome Gold Mines Responds to a Press Release Issued by Res...
29/04/2016Wesdome Closes C$17 Million Bought Deal Financing
15/04/2016Wesdome Announces First Quarter 2016 Production Results
12/04/2016Wesdome Announces C$15 Million Bought Deal Financing
11/04/2016Wesdome Announces Appointment of Corporate Secretary
07/04/2016Wesdome Gold Mines Ltd. and Canoe Mining Ventures Corp. Ente...
06/04/2016Wesdome Gold Mines Announces Director Nominees in Connection...
29/03/2016Wesdome Announces 2015 Fourth Quarter and Full Year Financia...
21/03/2016Wesdome Announces Filing of NI 43-101 Technical Report for i...
18/01/2016Wesdome Announces Fourth Quarter and Full Year Production Re...
18/12/2015Wesdome Gold Mines Closes Private Placement of Flow-Through ...
20/10/2015Wesdome Gold Mines Announces Closing of Common Shares for Gr...
13/10/2015Wesdome Gold Mines Increases Third Quarter Gold Production b...
16/09/2015Wesdome Gold Mines Announces Executive Management Change
14/09/2015Wesdome Gold Mines Announces Four Year Mine Plan at the Eagl...
18/08/2015Wesdome Gold Mines Confirms Pit Extensions at Mishi
10/08/2015Wesdome Gold Mines Announces Second Quarter Financial Result...
21/07/2015Wesdome Gold Mines Announces Initial 300 West Lens Developme...
21/07/2015Wesdome Gold Mines Announces Initial 300 West Lens Developme...
15/07/2015Wesdome Gold Mines Announces Second Quarter Operating Result...
07/07/2015Wesdome Gold Mines Appoints Charles Page, P.Geo to the Board...
25/06/2015Confirms Continuity of the S50 East and Presqu'Ile Zones at ...
13/04/2015Wesdome Gold Mines Announces First Quarter Operating Results
08/04/2015New 300 Zone – Drifting Confirms Continuity – Drilling Expan...
08/04/2015- New 300 Zone - Drifting Confirms Continuity - Drilling Exp...
08/04/2015Wesdome Gold Mines Ltd. - New 300 Zone - Drifting Confirms C...
28/02/2015Wesdome Announces Fourth Quarter and Full Year Financial Res...
26/02/2015Wesdome announces fourth quarter and full year financial res...
29/01/2015Wesdome Increases Reserves 57% at Eagle River Mine
29/01/2015Wesdome Increases Reserves 57% at Eagle River Mine
14/01/2015Wesdome Gold Mines Exceeds Full Year Production Guidance
14/01/2015Wesdome Gold Mines Exceeds Full Year Production Guidance; Pr...
04/12/2014- Drilling Extends 300 And 7 Parallel Zones
04/12/2014Wesdome Gold Mines Ltd. - Drilling Extends 300 And 7 Paralle...
19/11/2014-- Dubuisson North drilling cuts 45.05 g/t Au over 5.0 metre...
06/11/2014announces third quarter financial results; generates CAD$3.4...
06/11/2014Wesdome Gold Mines announces third quarter financial results...
16/10/2014Wesdome Gold Mines announces third quarter operational resul...
15/09/2014- New 7 Zone opens up at depth drill hole EU-756 intersects ...
15/09/2014Wesdome Gold Mines Ltd. - New 7 Zone opens up at depth drill...
26/08/2014Wesdome appoints Vice President, Investor Relations
31/07/2014Wesdome reports earnings of $0.07 per share in first half 20...
21/07/2014Wesdome Reports Q2 Production / Sales
27/06/2014Wesdome Gold Mines Ltd. - Drilling expands Mishi potential
02/06/2014announces TSX approval of normal course issuer bid
10/02/20142013 Year End Reserves Increase
28/01/2014Posts Strong Fourth Quarter Production
24/01/2014and Moss Lake announce agreement for proposed acquisition by...
01/10/2013and Windarra Minerals Announce Closing of Amalgamation
27/09/2013Moss Lake Amends $2,000,000 Principal Amount Promissory Note
05/09/2013(Eagle River)Eagle River Update
26/08/2013and Resolute Performance Fund announce agreement
19/08/2013(Eagle River)Two New Gold Structures at Wesdome's Eagle River
19/08/2013(Eagle River)- Two new gold structures at Eagle River
12/08/2013receives meeting requisition from shareholder
29/07/2013Moss Lake Announces Preliminary Economic Analysis Results
18/07/2013Second Quarter Production Summary
17/07/2013and Windarra Announce Letter of Intent Regarding Acqusition ...
04/07/2013adopts corporate governance measures
03/05/2013Moss Lake Gold Mines Extends Maturity Date of $2,000,000 Pri...
01/05/2013(Eagle River)Reports Accident at Eagle River
12/11/2012Reports Further Improvement in Earnings and Cash in Q3 2012
12/09/2012at the Denver Gold Forum
01/09/2011- New Gold Prospect Identified Along The Cadillac Break
05/08/2011announces TSX approval of normal course issuer bid
21/04/2011at the European Gold Forum
01/04/2011PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011
05/07/2010Moss Lake Adds Two New Directors
05/11/2009Pukaskwa Drilling to Commence
24/06/2009Announces Intention to make a Normal Course Issuer Bid
24/01/2008 Website Updates
10/01/2008On BNN, Wednesday, January 9, 2008
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (WDO.TO)OTHER OTC (WDOFF)
10,61+1.43%7,67+1.05%
TORONTO
CA$ 10,61
16/04 17:00 0,150
1,43%
Cours préc. Ouverture
10,46 10,31
Bas haut
9,89 10,74
Année b/h Var. YTD
7,10 -  11,09 36,38%
52 sem. b/h var. 52 sem.
6,53 -  11,09 30,18%
Volume var. 1 mois
420 783 9,72%
24hGold TrendPower© : 34
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202427,83%
202310,96%9,466,03
2022-33,86%9,9810,26
20216,50%9,9810,01
20205,88%9,9610,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,76 AU$-1,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$-1,95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,44 CA$-2,01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,23 CA$-1,17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,23 CA$-4,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-7,14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,76 CA$+2,03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,18 US$-0,95%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :