Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Yukon-Nevada Gold Corp.

Publié le 09 janvier 2012

Yukon=2DNevada Gold Corp. Announces 11.59 m Averaging 20.19 g=2Ft Au at Jerritt Canyon=2C Nevada

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Johnson | Zinc |
Email not displaying correctly? View it in your browser.

You are receiving this email because you opted in at our website

 

Dear Subscriber,

January 9, 2012

 

Yukon-Nevada Gold Corp. Announces 11.59 m Averaging 20.19 g/t Au at Jerritt Canyon, Nevada

Vancouver, BC � January 9, 2011 � Yukon-Nevada Gold Corp. (TSX: YNG) (Frankfurt Xetra Exchange: NG6)is pleased to announce results from its 2011 Smith Mine underground diamond drilling program at its wholly-owned Jerritt Canyon gold operation in Nevada, USA.  Jerritt Canyon is located approximately 50 miles north of Elko, Nevada and is operated by Queenstake Resources USA Ltd., (�Queenstake�) a wholly owned subsidiary of Yukon-Nevada Gold Corp. (�YNG� or the �Company�).

Significant assay results from 23 diamond drill holes totaling 13,370 feet (4,078 meters) in 2011 have been received as of November 30, 2011.  Plan and cross-section maps as well as a table summarizing all of the assay results for all Zone 1, 2 (Phase II), and 9 drill holes can be found on the website here: 
http://www.yukon-nevadagold.com/i/pdf/NR_02_2012_Smith_Mine_2011_Drill_Assay_Summary.pdf and here: http://www.yukon-nevadagold.com/i/pdf/SmithMineMaps_2011.pdf
 
Zones 1, 2, and 9 at the Smith Mine were the targeted mining blocks for this drilling.  Twenty of the drill holes are categorized as resource conversion drilling while the remaining 3 drill holes are exploration or resource expansion drilling.
 
Zone 1

Zone 1 resource conversion drilling consisted of seven drill holes (SMI-LX-776 through SMI-LX-782) totaling 5,499 feet (1,679 meters).  Five of the seven drill holes intersected significant mineralization (four of which had multiple intersections).  Drill holes SMI-LX-777 and SMI-LX-778 highlighted the Zone 1 assay results as they returned 213.0 feet (64.96 meters) grading 0.208 opt (7.13 g/t) and 140 feet (42.70 meters) grading 0.145 opt (4.97 g/t) respectively.  Zone 1 mineralization lies sub-parallel to and in the foot wall of the northeast-trending Coulee fault zone.   All of the reported Zone 1 mineralization occurs within 750 linear feet (229 linear meters) of the existing underground infrastructure.  Significant drill hole assay results from Zone 1 are listed below in Table 1.
 
Table 1.  Significant 2011 Drill Hole Assay Results from Zone 1.

Hole ID From
Feet (ft)
Meters (m)
To
Feet (ft)
Meters (m)
Length
Feet (ft)
Meters (m)
 
Gold Grade
SMI-LX-776
439.0 ft
133.89 m
516.0 ft
157.38 m
77.0 ft
23.48 m
0.170 opt
5.83 g/t
SMI-LX-777 283.0 ft
86.31 m
498.0 ft
151.89 m
213.0 ft
64.96 m
0.208 opt
7.13 g/t
SMI-LX-778 482.0 ft
147.01 m
622.0 ft
189.71 m
140.0 ft
42.70 m
0.145 opt
4.97 g/t
SMI-LX-779 125.0 ft
38.12 m
192.0 ft
58.56 m
67.0 ft
20.43 m
0.177 opt
6.07 g/t
SMI-LX-780 711.0 ft
 216.85 m
727.0 ft
221.73 m
16.0 ft
 4.88 m
 0.098 opt
 3.36 g/t
SMI-LX-781 117.0 ft
35.68 m
228.0 ft
69.54 m
111.0 ft
33.85 m
0.129 opt
4.42 g/t
SMI-LX-782 557.0 ft
169.88 m
567.0 ft
172.93 m
 10.0 ft
3.05 m
0.138 opt
4.73 g/t
Notes: 
(1)  Gold grade reported in Troy ounces per ton (opt) and grams per tonne (g/t)
 
Zone 2

The Phase II resource conversion program was also completed for Zone 2 which is located to the northeast of the Zone 1 mineralization discussed above.  This program consisted of nine drill holes (SMI-LX-767 through SMI-LX-775) totaling 2,912 feet (889 meters).  This drilling was designed to in-fill and bracket the mineralization previously identified in four drill holes (SMI-LX-756 through SMI-LX-759) completed in January of 2011 and previously published in YNG news releases dated January 24, 2011; February 14, 2011; and February 25, 2011).  Four of the seven drill holes had multiple intersections containing significant mineralization. Drill holes SMI-LX-771 and SMI-LX-772 highlight the Zone 2 (Phase II) assay results as they returned 50.0 feet (15.3 meters) grading 0.211 opt (7.4 g/t) and 30.0 feet (9.2 meters) grading 0.165 opt (5.8 g/t) respectively.  As previously reported this Zone 2 mineralization lies parallel to, and in the hanging wall of, the northeast-trending Coulee fault zone.  All of the reported (previous and current) Zone 2 mineralization occurs within 600 linear feet (183 linear meters) of the existing underground infrastructure.  Significant drill hole assay results from Zone 2 are listed below in Table 2.
 
Table 2.  Significant 2011 Drill Hole Assay Results from Zone 2.

Hole ID From
Feet (ft)
Meters (m)
To
Feet (ft)
Meters (m)
Length
Feet (ft)
Meters (m)
 
Gold Grade
SMI-LX-768 148.0 ft
 45.14 m
160.0 ft
48.80 m
12.0 ft
3.66 m
 0.116 opt
3.98 g/t
SMI-LX-770 281.0 ft
85.70 m
291.0 ft
 88.75 m
10.0 ft
 3.05 m
0.130 opt
 4.46 g/t
SMI-LX-771 157.0 ft
 47.88 m
207.0 ft
63.13 m
50.0 ft
 15.25 m
0.211 opt
7.23 g/t
SMI-LX-772 187.0 ft
57.03 m
217.0 ft
66.18 m
 30.0 ft
9.15 m
0.165 opt
5.66 g/t
SMI-LX-774 161.0 ft
49.10 m
181.0 ft
55.20 m
 20.0 ft
6.10 m
0.111 opt
3.81 g/t
  226.0 ft
68.93 m
271.0 ft
82.65 m
 45.0 ft
13.72 m
0.131 opt
4.49 g/t
  321.0 ft
97.90 m
341.0 ft
 104.0 m
 20.0 ft
6.10 m
0.103 opt
3.53 g/t
Notes:
(1)  Gold grade reported in Troy ounces per ton (opt) and grams per tonne (g/t)
(2)  No Significant assays in drill holes SMI-LX-767, SMI-LX-769, SMI-LX-773, and   SMI-LX-775
 
Zone 9

Drilling in Zone 9 consisted of seven drill holes totaling 4,888 feet (1492 meters).  Zone 9 is accessed from a portal located on the southeast high-wall near the bottom of the Dash open pit and is separate from the main underground workings comprising the Smith Mine.  Four resource conversion drill holes (SMI-LX-760 through SMI-LX-763) totaling 976 feet (298 meters) were completed and constituted a vertical �fan� testing ground beneath the current level development.  The drill fan evaluated ground proximal to the south high wall for an approximate horizontal distance of 200 ft. (61 m) to an approximate vertical depth of 100 feet (31 meters) beneath the bottom of the Dash pit.  Drill hole SMI-LX-761 highlights the Zone 9 resource conversion assay results as it returned 38.0 feet (11.6 meters) grading 0.589 opt (20.68 g/t).  All of the reported mineralization occurs within 200 linear feet (61 linear meters) of the existing underground infrastructure. 
 
Three exploration drill holes (SMI-LX-764 through SMI-LX-766) totaling 3,912 feet (1,194 meters) were completed.  These drill holes constituted a (west to east) horizontal fan testing for mineralization beneath, and east of, the east high-wall of the Dash pit and covered a horizontal distance of approximately 600 ft. (183 m).  No significant mineralization was encountered in these drill holes. 
 
Todd Johnson, Vice President of Exploration for Yukon-Nevada Gold Corp. states, �These assay results are excellent and support the Company�s view that substantial conversion of Resources to Reserves will continue to be achieved at Jerritt Canyon as we expand our assay reporting and drilling activity in 2012.�
 
Significant drill hole assay results from Zone 9 are listed below in Table 3.
 
Table 3.  Significant 2011 Drill Hole Assay Results from Zone 9.

Hole ID From
Feet (ft)
Meters (m)
To
Feet (ft)
Meters (m)
Length
Feet (ft)
Meters (m)
 
Gold Grade
SMI-LX-760 92.0 ft
28.06 m
100.0 ft
30.50 m
8.0 ft
2.44 m
0.429 opt
14.71 g/t
SMI-LX-761 91.0 ft
 27.75 m
104.7 ft
 31.93 m
13.7 ft
4.18 m
0.468 opt
16.04 g/t
  146.0 ft
44.53 m
184.0 ft
 56.12 m
 38.0 ft
 11.59 m
0.589 opt
 20.19 g/t
SMI-LX-762 104.0 ft
31.72 m
148.0 ft
 45.14 m
44.0 ft
13.42 m
0.258 opt
8.84 g/t
SMI-LX-763 117.0 ft
35.68 m
135.0 ft
 41.17 m
18.0 ft
5.49 m
0.248 opt
8.50 g/t
Notes: 
(1)  Gold grade reported in Troy ounces per ton (opt) and grams per tonne (g/t)
(2)  No Significant assays in drill holes SMI-LX-764, SMI-LX-765, and SMI-LX-766
 

Geologic and grade modeling will be initiated in January, 2012 covering the mineralization identified in Zones 1, 2, and 9.  Subsequent engineering analysis will be conducted and it is anticipated that significant additions to the Smith Mine mineable reserve base will be realized and reported upon in an updated NI 43-101 report to be published in April 2012.  Diamond drilling is continuing at the Smith Mine in Zones 3 and 4.

Assaying of all samples from the 2011 underground drill program reported in this news release were conducted by ALS Laboratory Group in Reno, Nevada using standard fire assay techniques.  Assay intercepts are reported as drilled.  True widths have not yet been calculated; given the geometry of the mineralization at Jerritt Canyon, the concept of true width is not always meaningful before delineation drilling has been completed.  The company�s 2010 and 2011 Quality Assurance and Quality Control protocols are available at the Company�s website:
http://www.yukon-nevadagold.com/i/pdf/JC Assay Protocols.pdf
 
The information in this news release was compiled and reviewed by William Hofer B.Sc., Chief Geologist, Jerritt Canyon Mine.  The information contained in this news release has been reviewed and approved by the Company�s Vice President of Exploration, Todd Johnson, M.Sc., and is listed as the Qualified Person per the requirements of the NI 43-101 guidelines.
 
Yukon-Nevada Gold Corp. is a North American gold producer in the business of discovering, developing and operating gold deposits. The Company holds a diverse portfolio of gold, silver, zinc and copper properties in the Yukon Territory and British Columbia in Canada and in Nevada in the United States. The Company's focus has been on the acquisition and development of late stage development and operating properties with gold as the primary target. Continued growth will occur by increasing or initiating production from the Company's existing properties.
 
For more information please contact:

Yukon-Nevada Gold Corp.
Richard Moritz
Senior Director, Institutional Investor Relations
Tel: (604) 688-9427
Email: rmoritz@yngc.ca


Nicole Sanches
Investor Relations Manager
Tel: (604) 688-9427 ext 224
Email: nicole@yngc.ca
www.yukon-nevadagold.com

CHF Investor Relations
Jeanny So
Director of Operations
Tel: (416) 868-1079 ext. 225
Email: jeanny@chfir.com
www.chfir.com

AXINO AG
Wolfgang Seybold
Chairman
Tel: +49 711 25 35 92 40
Email: wolfgang.seybold@axino.de
www.axino.de

The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

WARNING: The Company relies upon litigation protection for "forward-looking" statements.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Yukon-Nevada Gold Corp.

PRODUCTEUR
CODE : YNG.TO
CUSIP : 98849Q 10 1
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Yukon-Nevada est une société développant des projet miniers d'or basée au Canada.

Yukon-Nevada détient divers projets d'exploration au Canada.

Ses principaux projets en production sont JERRITT CANYON MINE, JERRITT CANYON, JERRITT CANYON-MURRAY, JERRITT CANYON - MURRAY ZONE 9, JERRY CANYON - SSX, JERRY CANYON - EAST SMITH, JERRY CANYON - SAVAL, JERRY CANYON - STARVATION, JERRY CANYON - WRIGHT WINDOW, JERRITT CANYON STOCKPILES, JERRY CANYON - UG RESOURCES, JERRY CANYON - SMITH et JERITT CANYON - PIT RESOURCES en USA, son principal projet en développement est KETZA RIVER MANTO ZONE au Canada et ses principaux projets en exploration sont WOLF PROPERTY, MONEY CLAIMS, SILVER VALLEY PROPERTY, KETZA - SHAMROCK ZONE et KETZA RIVER au Canada.

Yukon-Nevada est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 274,5 millions CA$ (267,1 millions US$, 198,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 12 décembre 2008 à 0,02 CA$, et son plus haut niveau récent le 12 février 2013 à 2,95 CA$.

Yukon-Nevada possède 930 644 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Yukon-Nevada Gold Corp.
28/02/2012Website Update =2D new corporate presentation
12/01/2011Corporate presentation
Dans les médias de Yukon-Nevada Gold Corp.
16/08/2008considers operational and financial alternatives at Jerritt ...
Rapports annuels de Yukon-Nevada Gold Corp.
2008 Annual report
2007 Annual report
2006 Annual report
2005 Annual report
Financements de Yukon-Nevada Gold Corp.
20/07/2012Yukon=2DNevada Gold Corp. Announces Completion of an Additio...
18/06/2012Yukon=2DNevada Gold Corp. Announces Completion of Convertibl...
31/05/2011Closes Private Placement and Warrant Exercise for Total ...
25/05/2011Raises $59,328,000 by Exercise of Warrants and Private Plac...
24/05/2011Raises $59,328,000 by Exercise of Warrants and Private P...
02/03/2011Closes Flow-Through Private Placement
05/02/2011Announces Proposed Incentive for Early Exercise of Share Pu...
28/04/2010Announces $10,000,000 Flow-Through Private Placement
27/03/2010Closes Private Placement
11/01/2010TSX Conditionally Approves Issuance of Yukon-Nevada Gold Cor...
21/11/2009Announces That The September 2009 Private Placement Needs To...
15/10/2009Announces Issuance Of Inducement Warrants
10/08/2009Announces Private Placement
28/02/2009Closes Two Private Placements
04/02/2009Announces Private Placement
20/12/2008Closes Private Placement
05/12/2008Announces Increase To Private Placement
05/11/2008announces private placement
02/05/2008Closes Private Placement
11/04/2008Announces Flow-Though Private Placement
07/11/2007Lists Warrants On The TSX
11/10/2007 Announces Closing of Flow-Through Private Placement
27/09/2007ANNOUCES FLOW-THROUGH PRIVATE PLACEMENT
Attributions d'options de Yukon-Nevada Gold Corp.
20/07/2009Grants Stock Options
Nominations de Yukon-Nevada Gold Corp.
03/05/2012Yukon=2DNevada Gold Corp. Announces Resignation of Chairman...
29/03/2010Announces Appointment Of VP Exploration
26/10/2009Appoints Chief Geologist At Jerritt Canyon, Nevada
26/10/2009Appoints Environmental Manager At Jerritt Canyon, Nevada
16/01/2008 Appoints New Vice President Mining
Rapports Financiers de Yukon-Nevada Gold Corp.
11/08/2012Yukon=2DNevada Gold Corp. Announces Second Quarter Results f...
17/08/2011Announces Second Quarter Results for 2011
13/06/2011Form 40 F
25/05/2011Announces First Quarter Results for 2011
01/04/2011Announces Year End Results for 2010
17/08/2010Shows Continued Improvement In Second Quarter Results
18/05/20102010 first quarter results
13/11/2009Reports Third Quarter Results
15/08/2009Reports Second Quarter Results
15/11/2008Reports Third Quarter Results
21/08/2008Reports Second Quarter Results
02/04/2008 Reports A Record Profit Of $3.37 Million In Its Fourth Quar...
15/11/2007 Profitable In Third Quarter
16/08/2007Reports on Second Quarter Results and Progress at Jerritt Ca...
Projets de Yukon-Nevada Gold Corp.
25/07/2012(Ketza River)South Hill Target Delivers at Ketza River Project=2C Yukon T...
09/07/2012Yukon=2DNevada Gold Corp. Commences Portal Earthworks at Sta...
23/04/2012(Jerritt Canyon)Focus on Resource Conversion Proves Successful at Jerritt C...
06/02/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Re=2Dstarts Production at Jerritt ...
06/01/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Reports Revised Resources at Jerr...
02/12/2011(Jerritt Canyon)Yukon=2DNevada=E2??s Jerritt Canyon Mill on Safety Watch=2DL...
03/10/2011Starts Mining at SSX-Steer Mine Complex
21/09/2011(Jerritt Canyon)Preliminary Open Pit Gold Mine Plan Announced for Burns Basi...
14/09/2011(Jerritt Canyon)New Underground Gold Mine To Be Made Ready for Production at...
05/05/2011(Jerritt Canyon)Reports a Significant Resource Increase at Jerritt Canyon, ...
14/03/2011(Ketza River)Announces Restructuring of Ketza River Assets
22/02/2011(Ketza River)2.15 Meters Averaging 24.45 g/t Au in Drilling at Ketza Rive...
14/02/2011(Jerritt Canyon)96 feet Averaging 0.472 opt Au and a further 49 feet Averagi...
24/01/2011(Jerritt Canyon)39 feet Averaging 0.201 opt Au Encountered in Underground Ex...
18/08/2010Intersects Additional Strong Gold Mineralization At The Ketz...
23/07/2010(Jerritt Canyon)The Recommencement of Exploration Drilling Under the Directi...
19/03/2010Continues To Yield Exciting Exploration Drill Holes Assay Re...
04/03/2010Intersects 3.05 Meters Of 84.5 g/t Gold At Ketza River Proje...
20/10/2009(Jeritt Canyon - Pit Resources)Resumes Gold Production At Jerritt Canyon, Nevada
17/07/2009(Jerritt Canyon)Jerritt Canyon Targets
02/06/2009(Jerritt Canyon)Suspends Operation Of Its Roasters At Jerritt Canyon To Comp...
30/07/2008 INTERSECTS 14.5 METERS OF 8.95 G/T GOLD AT THE KETZA RIVER ...
10/07/2008(Jerry Canyon - Smith)Intersects 6.1 Meters Of 15 G/T Gold At Jerritt Canyon, Neva...
07/07/2008(Ketza River Manto Zone)Intersects 3.8 M Of 20.6 G/T Gold At The Ketza River Project
13/06/2008(Ketza River Manto Zone)Intersects 7.27 Meters Of 56 G/T Gold At The Ketza River Pro...
30/04/2008Intersects 21.3 Meters Of 19.47 GPT At The Smith Mine, Jerri...
28/04/2008(Jerry Canyon - Ssx)Reports Mineralization Extended At SSX Mine, Jerritt Canyon,...
24/04/2008(Jerry Canyon - Smith)Intersects 6.1 Meters Of 10.5 GPT Gold At Jerritt Canyon, Ne...
05/03/2008(Ketza River Manto Zone)Increase In The Grade Of The Resource At Ketza River Is A Mi...
08/01/2008(Jeritt Canyon - Pit Resources) Reports More Significant Results At Mahala Creek, Jerritt C...
07/01/2008(Ketza - Shamrock Zone)Reports Further Favorable Results From Ketza River
26/09/2007(Ketza River Manto Zone)GULLY VEIN CONTINUES TO GROW AT THE SHAMROCK ZONE, KETZA RI...
19/04/2007reports high grade results from its Silver Valley property
Communiqués de Presse de Yukon-Nevada Gold Corp.
05/10/2012Yukon=2DNevada Gold Corp. Announces New Name and Listing on ...
03/10/2012Yukon=2DNevada Gold Corp. Special Meeting Results
01/10/2012Live Webcast at John Tumazos Very Independent Research Metal...
10/09/2012Denver Gold Forum 2012 Webcast
24/07/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Drills 30.80 m Grading 10.53 g=2Ft...
28/06/2012Yukon=2DNevada Gold Corp. 2012 Annual General Meeting Result...
18/06/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Jerritt Canyon Operation Achieves ...
12/06/2012YNG Website Update =2D new photos and video
08/06/2012Yukon=2DNevada Gold Corp. Signs Agreement with Allied Nevada...
24/05/2012Yukon=2DNevada Gold Corp. Presents at the 2nd Annual Euro Pa...
30/04/2012Yukon=2DNevada Gold Corp. Signs Socio=2DEconomic Participati...
23/04/2012Yukon-Nevada Gold Corp. (TSX: YNG)
18/04/2012Yukon=2DNevada Gold Corp. Initiates Strategic Review to Maxi...
03/04/2012Webcast Alert =2D 2011 Year End
30/03/2012Yukon=2DNevada Gold Corp. Announces Year End Results for 201...
13/03/2012(Jerritt Canyon)Jerritt Canyon Earns Power Rebate
13/02/2012Our website is currently down
13/02/2012Website is Under Construction
13/02/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Drills 52.30 m Grading 6.17 g=2Ft ...
08/02/2012Yukon=2DNevada Gold Corp. Closes $20 Million Forward Gold Pu...
01/02/2012Join Us At GCFF Vancouver Conference
31/01/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Drills 28.97 m grading 18.86 g=2Ft...
27/01/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Begins Commissioning Refurbished M...
19/01/2012(Jerritt Canyon)Join Us At Yukon Night At Roundup & Jerritt Canyon Photo Gal...
13/01/2012Yukon=2DNevada Gold Corp. =2D Website Updates
11/01/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Announces 22.87 m grading 8.37 g=2...
09/01/2012(Jerritt Canyon)Yukon=2DNevada Gold Corp. Announces 11.59 m Averaging 20.19 ...
03/12/2011Yukon=2DNevada Gold Corp. Holds Employment Job Fairs
26/09/2011(Ketza River)Submits Assessment Application for Ketza River=2C Yukon
23/08/2011Website Update
15/08/2011Closes $120 Million Agreement with Deutsche Bank
10/08/2011Announces 2nd Quarter Summary and Outlook Webcast
03/08/2011Plans to Enter Into A Prepaid Forward Gold Purchase Agre...
13/07/2011Produces 25,713 Gold Ounces in Q2
30/06/20112011 Annual General Meeting Results
28/06/2011Reports on Reserves at Jerritt Canyon, Nevada
28/06/2011Announces New Corporate Appointments
27/06/2011(Ketza River)Resource Estimate at Ketza River to Support Imminent YESAB A...
26/05/2011Settles Class Action Suit
05/05/2011Comments on Unusual Trading Activity
14/03/2011Special General Meeting Results
16/02/2011Seeks Advice for US Listing
17/08/2010Closes US$25,000,000 Secured Note Financing
09/08/2010Reaches Steady State Production
21/07/2010Website Updates
13/07/2010Negotiates US$25 Million Note Financing
21/06/2010Successful Stack Test #4 For Yukon-Nevada Gold Corp.
17/05/2010Holds 2010 Annual General and Special Meeting
03/05/2010Continues To Improve Upon Its Already Successful Stack Test ...
20/04/2010Website Update
13/04/2010Rodeo Creek Gold Seeks To Unilaterally Cancel Agreement With...
01/04/2010Reports Year-End Results for 2009
30/03/2010Media Update
22/03/2010Website Updates
17/03/2010Successful Testing Of Mercury Recovery And Control Technolog...
02/03/2010Signs A Letter Of Engagement With BNP Paribas
12/01/2010Special General Meeting Results
08/01/2010Updates Golden Eagle Dispute
30/12/2009Announces Mail Out Of Special Meetings Materials
15/12/2009Signs Ore Treatment Agreement With Gold Hill Reclamation And...
03/12/2009Signs Mining Contract With Small Mine Developers
20/11/2009Riskmetrics Group And Glass, Lewis And Co. Recommend That Yu...
18/11/2009Receives Support For The Inducement Warrant Proposal
17/11/2009Corps Website Update
04/11/2009Meets TSX Continued Listing Requirements
15/10/2009Finalizes Consent Decree With The Nevada Division Of Environ...
01/09/2009Closes Final Tranche of Private Placement
22/07/2009Receives Class Action Lawsuit
11/06/2009Subsidiary, Queenstake Resources USA, Inc. Takes Over Suspen...
22/05/2009 2009 Annual General Meeting
22/05/2009announces new CEO and COO
12/09/2008s progress at Jerritt Canyon, Nevada
05/09/2008Presents at The Denver Gold Forum 2008
29/08/2008United States Subsidary Negotiates US$35 Million Senior Secu...
08/08/2008JERRITT CANYON TO FOCUS ON PROFITABILITY
08/08/2008Jerritt Canyon Engages Contract Miner
01/08/2008MOVES TO SECURE FINANCING FOR MINE EXPANSION
02/07/2008Settles With AIG
26/06/2008Moves Forward On Its Expansion Plan
27/05/2008Annual General Meeting Presentation
16/05/2008Records A Loss From Operations As It Starts To Prepare For G...
01/05/2008Announces Its Intention To Phase Out Custom Milling At Jerri...
24/04/2008 Announces Property Agreement In The Yukon
12/03/2008Reports The Receipt Of A Stop Order From NDEP
03/03/2008Reports A Significant Increase In Reserves At Jerritt Canyon
14/01/2008Reports More Important Results At SSX Mine, Jerritt Canyon
28/11/2007Awarded Prestigious Robert E. Leckie Award For Outstanding E...
27/11/2007More Exciting Results At Malhala Creek, Jerritt Canyon
11/10/2007- Strategy for Successful Exploration
09/10/2007Exciting New Joint Venture Announced
25/09/2007 REPORTS AN EXCITING NEW TARGET AT KETZA RIVER
24/09/2007REPORTS ON ENCOURAGING RESULTS AT MAHALA CREEK, JERRITT CANY...
08/08/2007reports favorable drill results from Jerritt Canyon
25/07/2007reports on progress at Silver Valley
19/07/2007REPORTS ON PROGRESS AT KETZA RIVER AND JERRITT CANYON
27/06/2007Announces New Listing on the Toronto Stock Exchange
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (YNG.TO)FRANKFURT (NG6.F)
0,295+0.00%0,249+3.75%
TORONTO
CA$ 0,295
12/02 14:12 -
0%
Cours préc. Ouverture
0,295 -
Bas haut
0,295 0,295
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,295 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -37
Produit Gold
Développe Gold
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,55 AU$-1,69%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,33 US$+6,89%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,72 GBX+0,84%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+10,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,59 CA$+1,17%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
17,50 CA$+4,48%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,53 CA$+13,45%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
49,62 US$+0,78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :