Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Yukon Zinc Corp.

Publié le 04 octobre 2007

Yukon Zinc Receives Type A Water Licence for Wolverine Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Zinc |

Dear Mr. E, October 4, 2007


����������������������������������������������News Release

Yukon Zinc Receives Type A Water Licence for Wolverine Project

Vancouver, B.C., October 4, 2007 - Yukon Zinc Corporation (TSX.V-YZC) is pleased to announce that the Yukon Water Board has granted a Type A Water Licence for the Company's Wolverine Project.� The Water Licence was signed into effect by the Premier of the Yukon, the Honorable Mr. Dennis Fentie on October 3, 2007.�

Pamela Ladyman, VP Environment and Community Affairs of the Company states "the receipt of the Type A Water Licence completes the environmental permitting of the Wolverine Project and provides the framework for developing Wolverine as a low impact mine". The Licence sets out the conditions for the use of water during construction and operations at the Wolverine Project and the deposit of waste into water as required for the tailings facility. The Licence extends to the end of 2027, thereby incorporating all phases of development, operation and closure of the Wolverine Project.

The Company acknowledges the cooperative efforts of all parties (Yukon Government, Environment Canada, Ross River Dena Council and Liard First Nations, and the Yukon Conservation Society) during the environmental assessment review process and the Yukon Water Board public hearing.� The cooperation of all parties ensured that the Wolverine Project was thoroughly and efficiently assessed with respect to environmental and socioeconomic issues, and led to the issuance of approvals in a timely manner.� With both the Quartz Mining Licence and Type A Water Licence in place, development and operation of a mine at the Wolverine Project can now proceed.�

Dr. Harlan Meade, President and CEO states that "the receipt of the Type A Water Licence overcomes one of the last remaining hurdles for the Wolverine Project; only the raising of the remaining funds required in order to achieve financial close of the previously-announced Barclays Capital US$140 million underwritten senior debt facility (see August 27, 2007 News Release) remains" .

Yukon Zinc Corporation is focused on the development of the Wolverine deposit as the Yukon's next significant zinc-silver mine and the exploration of the Finlayson District in the Yukon as Canada's newest Volcanogenic Massive Sulphide District. The Wolverine Project is strategically located to provide a secure supply of metals to the markets of the Pacific Rim.

Except for the statements of historical fact contained in this News Release, the information presented constitutes "forward-looking statements" as such term is used in Canadian securities laws. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management.� Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans, "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and should be viewed as "forward-looking statements". Such forward looking statements, including but not limited to, those with respect to the Barclays Facility, the raising of the additional funding requirement and the ability of the Company to proceed with construction at the Wolverine Project and the other factors and events described in this News Release, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, the estimation or realization of Mineral Resources and Mineral Reserves (as such terms are defined by applicable Canadian securities regulators); variations in the underlying assumptions associated with conclusions of economic evaluations including, the timing and amount of estimated future production, costs of production, capital expenditures, the failure of plant, equipment or processes to operate as anticipated and possible variations in ore grade or recovery rates; availability of capital to fund programs and the resulting dilution caused by the raising of capital through the sale of shares; and risks associated with the mining industry, including without limitation those associated with the environment.� Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.� There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements.� Accordingly, readers should not place undue reliance on forward-looking statements contained in this News Release and in any document referred to in this News Release.

- 30 -

For more information contact:
Dr. Harlan Meade, President and CEO
Shae Dalphond,� Manager, Investor Communications
Telephone: (604) 682-5474� Toll-free: 1-877-682-5474
Facsimile: (604) 682-5404
info@yukonzinc.comwww.yukonzinc.com

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OF THIS NEWS RELEASE.

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

EN DÉVELOPPEMENT
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Yukon Zinc est une société développant des projet miniers de zinc basée au Canada.

Yukon Zinc est en développement de projets de zinc, d'argent, de cuivre, d'or et de plomb au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est WOLVERINE au Canada et ses principaux projets en exploration sont GOAL NET, FINLAYSON, SWIFT PROJECT, LOGAN et ICE (FINLAYSON) au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de
25/02/2008Zinc Markets, the perfect storm ?
Rapports annuels de
2006 Annual Report
Financements de
21/12/2007 Closes Second Tranche of Unit and Flow-Through Financing
20/12/2007Closes First Tranche of Unit and Flow-Through Financing
Projets de
26/02/2008(Wolverine) Provides Update On Financing For Wolverine
Communiqués de Presse de
13/06/2008ISS Canada Recommends that Yukon Zinc Shareholders Vote for ...
07/05/2008 Enters Into Acquisition Agreement with Jinduicheng/Northwes...
30/04/2008 Griffin Notifies Yukon Zinc of No Amendment to Griffin Prop...
29/04/2008Receives New Acquisition Proposal
23/04/2008Griffin Mining Limited to Acquire Yukon Zinc Corporation
26/03/2008 Announces Extension of Barclays US$140 Million Senior Debt ...
20/03/2008 Closes $8 Million Financing
11/03/2008Yukon Zinc Announces $8 Million Financing for Wolverine Proj...
07/12/2007Announces C$8 Million Financing
06/12/2007 Withdraws Current Prospectus Financing
23/11/2007Announces Final Prospectus Filing
07/11/2007 Announces Pricing and Amendments to Financing
05/10/2007Announces C$140 Million Offering of Securities
04/10/2007Yukon Zinc Receives Type A Water Licence for Wolverine Proje...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -
Volume var. 1 mois
-
Produit
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Copper - Gold - Lead - Silver - Zinc
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,46 AU$-1,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,55 US$+0,79%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,63 CA$-0,75%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,35 CA$-2,35%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,83 CA$+5,17%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,42 US$-1,48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :