Quarterly Report for the 3 Months Ended 31 March 2016

9ad11ac9-6b5b-496a-be32-816cb266a1be.pdf

ASX Announcement

28 April 2016

Quarterly Activities Report

For the Three Months Ended 31 March 2016

Specialty metals producer, Wolf Minerals Limited (ASX: WLF, AIM: WLFE) ("Wolf" or "the Company") is pleased to provide the following update on its recently developed Drakelands open pit mine ("Drakelands") at the Company's world class Hemerdon tungsten and tin project in Devon, southwest England, for the three month period to 31 March 2016 ("the Quarter").

Highlights for the Quarter include:

  • Ramp-up of the processing plant at Drakelands continuing.

  • Continuation of seven day, 24 hour operations approved by Devon County Council through to September 2016.

  • Construction of replacement public road ("Lee Moor Road") to facilitate future development is on track.

  • Total cash expenditure of A$16.8 million for the quarter with revenue of A$3.8 million.

Subsequent to the end of the Quarter, the £25 million standby subscription facility with Resource Capital Funds ("RCF") was approved by shareholders at a General Meeting held on 22 April 2016, with funds to be used to strengthen the Company's balance sheet. Lenders provided certain waivers of and amendments to the senior secured loan conditions and granted relief up to 31 March 2017 from financial and other covenants as a result of the RCF facility being approved by shareholders.

Commenting on the Quarter performance, Wolf's Managing Director, Russell Clark said:

"The tungsten price has remained soft throughout the Quarter and as a result the Company has arranged a £25 million standby subscription facility through its major shareholder RCF, which was recently approved by shareholders. As a result of this, the Company's Lenders have agreed to provide a number of waivers and amendments to the senior loan conditions through to March 2017. These steps were critical to ensure the Company can continue to optimise the operational activity at Drakelands in a low tungsten price environment. We are seeing the tungsten price increase and remain confident that this will continue and Wolf, with its large production capacity and location in a first world country, will be well positioned when the market recovers."

Wolf Minerals Limited

Level 3, 22 Railway Road, Subiaco WA 6008

Ph: +61 (0) 8 6143 2070

ABN: 11 121 831 472

www.wolfminerals.com.au

Media and Investor Relations

Australia

James Moses, Mandate Corporate Ph: +61 (0) 420 991 574

E: [email protected]

Russell Clark Managing Director

Ph: +61 (0) 8 6143 2070

E: [email protected]

UK

Helena Bogle, Newgate Ph: +44 (0) 20 7653 9850

E: [email protected]

"The open pit is starting to take shape and blasting activities commenced during the Quarter as we've mined into harder, deeper material. The Mining Waste Facility ("MWF") construction is on schedule, using waste from the mine and DMS rejects from the processing plant. The building of the Lee Moor Road diversion, away from the base of the MWF has continued and is expected to accelerate as we move into the spring and summer months. The takeover by Hargreaves Services Plc ("Hargreaves") of the mining contractor, CA Blackwell Group Limited ("Blackwell"), has occurred seamlessly and is already providing tangible benefits at Drakelands."

"We have continued with the ramp-up of the processing plant, focusing on run times, recovery and throughput. GR Engineering Services ("GRES") remains on site providing support and minor modifications to the plant as necessary."

"The Company has approval to extend the seven days per week processing operation from March through to September 2016, and is working with the Devon County Council to extend the life of the Drakelands planning permission beyond 2021."

Drakelands Operations

Overview

Although the weather during the Quarter was challenging, good progress continued to be made in the mine and the MWF.

The seven days a week, 24 hour operations trial of the processing plant has been extended for six months by Devon Country Council and will now run through to September 2016. The Company remains engaged with Devon County Council and the local community on the success of the trial, with a view to maintaining the arrangement on a permanent basis. In addition, the application to extend the duration of the planning permission at Drakelands is currently being processed by Devon County Council.

There was one lost time injury during the Quarter when an employee missed a shift following an electrical incident. Prior to this, the site had achieved 100 days LTI free at the end of February 2016.

The total cash expenditure for the Quarter was A$16.8 million, including A$3.9 million on development, A$7.7 million on production and A$4.1 million on debt service and repayment, with revenue of A$3.8 million.

On 6 April 2016 the Company announced the appointment of Mr Alan Fearon as General Manager of Drakelands. Mr Fearon has taken over from Wolf's long serving Operations Manager, Mr Jeff Harrison, who is retiring from full time employment and who was instrumental in the development and establishment of Drakelands, the first metal mine in the UK for almost 50 years. Mr Fearon is an experienced mining operations manager with wide-ranging experience in managing large mining and processing operations in environmentally sensitive areas with nearby communities.

Mining Activities

A total of 529,001 bank cubic metres ("BCM") of material was moved during the Quarter with mining activities predominantly focused on the extraction of ore from benches on the northern end of the pit.

Regular blasting of the waste rock (killas) has successfully been introduced to the mining operation. Ground vibration and noise from the blasting are being measured with results well below prescribed levels.

The future development plan for the MWF requires Wolf to construct a replacement public road. Site works for this road continued during the Quarter and are on track for completion in 2016.

The Company will commence a small Diamond drilling program in the open pit during the next quarter to gather additional data on particle size and the distribution of mineralisation within the ore body.

On 11 January 2016, it was announced that Blackwell, the mining services contractor at Drakelands, was being acquired by Hargreaves. Hargreaves is an AIM listed coal mining company and supplier of solid fuels and bulk material logistics. The acquisition of Blackwell is complementary to Hargreaves' existing nine open pit mining operations across the UK. Hargreaves has been working collaboratively with Wolf on the mining operations at Drakelands.

Processing Plant

Wolf gained full operational control of the Drakelands processing plant from GRES in the September 2015 quarter. Wolf has continued to work with GRES on those items which were outstanding at hand over and this work was largely completed in the Quarter.

During the Quarter the Company concentrated on increasing overall run times in the plant and

Further manufacturing faults in a number of pieces of equipment were experienced in the Quarter impacting overall run times and resulting in over 20 days of unplanned down time since start up. The faults have been rectified under warranty and Wolf is working with the manufacturers and GRES to prevent future failures. However the down time has impacted production of tungsten concentrate during the period.

The processing plant treated 310,949 tonnes of ore during the Quarter and produced 17,607 metric tonne units ("mtus") of tungsten concentrate.

A number of design improvements for the tin circuit were identified during the Quarter. Implementation of the improvements, with a corresponding positive impact on production, is expected to be completed in the June 2016 quarter.

Given the continuing softness of the tungsten price, the Company has taken steps to reduce its costs through active engagement with suppliers and reviewing manning levels at Drakelands.

£75M Senior Debt Finance

The first repayment of the £75 million senior debt finance facilities was made in January 2016 for

£497,000 (A$934,000). The second repayment is due in April 2016.

The senior debt finance facilities, comprising a £70 million term loan facility and a £5 million bond facility, have been provided by a consortium of global mining financiers including UniCredit Bank AG, London Branch, ING Bank N.V. and Caterpillar Financial Services (UK) Limited.

£25M Standby Subscription Facility with RCF

The tungsten price has not been immune from the general fall in commodity prices, halving since the project commenced construction in March 2014, and remaining well below the levels used in the definitive feasibility study. As a result, and to facilitate the ramp up and optimisation of the plant, as well as to service scheduled debt repayments, it became necessary to strengthen the Company's balance sheet. With the support of its major shareholder RCF, the Company arranged a £25 million standby subscription facility which was approved by shareholders subsequent to Quarter end on 22 April 2016. The subscriptions are for fully paid ordinary shares in the Company and will be purchased at 9.19 pence per share (approximately A$0.17 per share), a significant premium to the share price at the end of the Quarter. An initial subscription request for £16 million has been made by the Company in April.

In addition, the Company's Lenders agreed to provide a number of waivers and amendments to the senior loan conditions through to March 2017. These steps were critical to ensure the Company can continue to optimise the operational activity at Drakelands in a low tungsten price environment. The Company remains confident that the tungsten price will continue to strengthen and Wolf, with its large and secure first world country production, will be well positioned for the recovery.

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Wolf Minerals Limited

DEVELOPMENT STAGE
CODE : WLF.AX
ISIN : AU000000WLF3
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Wolf Min. is a tin development stage company based in Australie.

Wolf Min. develops tin and tungsten in U.k..

Its main asset in development is HEMERDON MINE in U.k. and its main exploration properties are DULLAH, YANCO GLEN, BURRANDANA, RED HILL ( AUSTRALIA) and KIOWARRAH in Australia.

Wolf Min. is listed in Australia. Its market capitalisation is AU$ 9.5 billions as of today (US$ 6.8 billions, € 5.8 billions).

Its stock quote reached its lowest recent point on September 19, 2018 at AU$ 0.03, and its highest recent level on September 30, 2020 at AU$ 8.75.

Wolf Min. has 1 085 689 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Wolf Minerals Limited
5/27/2010Intersuisse Research Report
In the News and Medias of Wolf Minerals Limited
10/12/2018Australian tungsten producer Wolf Minerals says its British ...
11/6/2014Australia's Wolf Minerals ready for construction of UK tungs...
Annual reports of Wolf Minerals Limited
2008 Annual report
Nominations of Wolf Minerals Limited
10/29/2013Appointment of Russell Clark as Managing Director highlights...
10/17/2013Wolf Minerals appoints Russell Clark new Managing Director -...
9/20/2013Wolf Minerals appoints Ronnie Beevor to the board as a Non-e...
Project news of Wolf Minerals Limited
3/13/2015Wolf Minerals' tungsten mine to start production in Devon
3/9/2015Wolf Minerals to open first British metal mine for 45 years ...
3/17/2014Ground breaking marks start of Wolf tungsten mine project
1/31/2014Continued progress towards construction at Hemerdon Tungsten...
1/20/2014Wolf Minerals provides update on Hemerdon Tungsten Project -...
1/15/2014Plymouth Minerals strengthens Board to drive Morille Tungste...
12/16/2013Wolf Minerals issued Class A Mining Waste Facility Environme...
11/12/2013Wolf Minerals achieves key milestone in permitting process f...
8/19/2013Wolf Minerals makes Senior Project Management appointments a...
7/18/2013Wolf Minerals finalises A$213M funding package for Hemerdon ...
6/12/2013Wolf Minerals commences development at Hemerdon Tungsten Pro...
6/4/2013Wolf Minerals Company Presentation_Hemerdon Tungsten Project...
1/31/2013Wolf Minerals secures A$212M funding package for Hemerdon Tu...
10/31/2012Wolf Minerals advances development of Hemerdon Tungsten Proj...
9/17/2012Wolf Minerals granted key environmental approvals for Hemerd...
9/3/2012Wolf Minerals to expand Hemerdon Tungsten Project senior deb...
7/31/2012Wolf Minerals completes first major construction work at Hem...
7/27/2012Wolf Minerals continues to progress development of Hemerdon ...
5/29/2012Wolf Minerals raises $5M for ongoing development of Hemerdon...
1/31/2012Wolf Minerals continues to progress Hemerdon Tungsten Projec...
1/13/2012Wolf Minerals secures UK Minister of State for Trade and Inv...
12/19/2011Wolf Minerals to raise GBP=C2=A355M ($A80M) project finance ...
12/15/2011Wolf Minerals to commence infrastructure work at Hemerdon Tu...
8/31/2011Wolf Minerals_updated Research Report_BUY recommendation_Pri...
8/26/2011Wolf Minerals secures $6M Development Funding Facility for H...
5/23/2011Wolf Minerals_Hemerdon Tungsten and Tin Project Definitive F...
5/16/2011Wolf Minerals releases positive results from Definitive Feas...
4/8/2011Wolf Minerals provides Definitive Feasibility Study update f...
8/12/2010(Hemerdon Mine)raises $2M to fast track completion of Hemerdon Tungsten pro...
3/13/2008(Hemerdon Mine)Resource Upgrade at Hemerdon Ball Tungsten-Tin deposit
1/29/2008(New South Wales)Exploration results
12/5/2007(Hemerdon Mine)Acquires Major World Class Tungsten Deposit
Corporate news of Wolf Minerals Limited
7/1/2016Performance Right Plan Update
5/23/2016Expiry of Unlisted Option
4/27/2016Quarterly Report for the 3 Months Ended 31 March 2016
4/22/2016Standby Subscription Facility Approved
4/22/2016Results of General Meeting - 22 April 2016
4/5/2016Wolf Announces New General Manager for Drakelands Mine
3/21/2016Notice of General Meeting and Independent Expert's Report
3/21/2016Notice of General Meeting & Independent Expert's Report
1/28/2016Quarterly Report for the 3 Months Ended 31 Dec 2015
12/1/2014Wolf Completes Hemerdon Geotechnical Drilling Campaign
11/20/2014Wolf Presenting at Mines and Money Conf on 1 Dec London
11/2/2014Appointment of Joint Company Secretary
3/14/2014Suspension from Official Quotation
3/12/2014Request for Trading Halt
2/24/2014Wolf Minerals awarded Deal of the Year for Hemerdon Tungsten...
2/17/2014Wolf Minerals Managing Director Russell Clark interview with...
2/11/2014Wolf Minerals to commence construction at Hemerdon Tungsten ...
12/12/2013Latest news from Wolf Minerals_ Interview with Managing Dire...
11/19/2013Wolf Minerals_Updated Research Report from Breakaway Researc...
10/3/2013Wolf Minerals Investor Update newsletter_October 2013
4/29/2013Wolf Minerals awards =C2=A375 million EPC Contract for Hemer...
3/13/2013Wolf Minerals_Updated Research Report from Breakaway Researc...
2/8/2013Wolf Minerals Investor Update newsletter_February 2013
8/7/2012Wolf Minerals Investor Update newsletter_August 2012
5/31/2012Wolf Minerals Investor Update newsletter_May 2012
3/5/2012Wolf Minerals secures credit approval for GBP=C2=A355M ($A81...
2/17/2012Wolf Minerals Investor Update newsletter_February 2012
5/10/2011Wolf Minerals Investor Update newsletter_May2011
5/9/2011Wolf Minerals Tungsten market update_Prices and Demand to re...
1/24/2008Hemerdon Tungsten and Tin Project Update
11/21/2007UPDATE ON REISNSTATEMENT TO TRADING ON ASX
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (WLF.AX)
8.75+0.00%
AUSTRALIA
AU$ 8.75
09/30 11:00 -
0%
Prev close Open
8.75 8.75
Low High
8.75 8.75
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  8.75 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -27
Produces
Develops Tin - Tungsten
Explores for Tin - Tungsten
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20200.00%8.758.75
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :