Positive Progress Report for Bombore Feasibility Study and Resource Update
Published : March 27, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso | Report |

OTTAWA, ONTARIO--(Marketwire - March 27, 2013) - Orezone Gold Corporation (News - Market indicators) is pleased to provide an update on the progress of the ongoing Feasibility Study, resource update and the latest drilling results for its wholly owned Bomboré Gold Project in Burkina Faso, West Africa.

Highlights

  • Mining and processing costs for the oxide material have been reduced as compared to those costs used in the August 2012 resource estimation. The improvement in costs is based on the technical studies and current design criterion for an oxide-only carbon-in-leach (CIL) plant. This will have a positive impact on the next resource update and the potential economics of the project.

  • Geotechnical work confirms that the pit slopes used in the previous resource update were conservative and steeper slopes can be used and should result in a positive impact on the next resource update and feasibility study pit designs. No significant issues were discovered with respect to ground water, infrastructure design, mine water management or waste management.

  • Metallurgical studies indicate that previously estimated recoveries, work indices and rapid leaching kinetics were reasonable. Further optimization work including a gravity circuit, flotation and air sparging with the addition of lead nitrate will be performed on the sulphide material. Tests also indicate that approximately 67% of the softer near surface saprolite oxide material (approx. 43% of the Aug. 2012 oxide resource) is amenable to using a scrubber as part of the crushing/grinding circuit to send the already fine material directly to the leaching circuit and thereby possibly reducing capital and operating costs for an initial oxide-only CIL processing plant.

  • Drill results continue to indicate the potential to further expand the oxide and sulphide resources.

Pit Slope Study

Golder Associates from Montreal, Quebec, delivered their final pit slope recommendations in a Technical memorandum that was received on March 14, 2013 and can be found on the Company website. Except for instances where the saprolite slope height would exceed 60 m, the pit slopes recommended by Golder are steeper than those used in the August 2012 resource estimation, i.e. between 36 and 55 degrees in saprolite (vs. 35 in 2012), 40 and 45 degrees in saprock (vs. 40 in 2012) and 45 and 55 degrees in fresh (sulphide) rock (vs. 45 in 2012). The final report is expected in Q2 2013.

Geotechnical Studies

Golder Associates from Montreal, Quebec, has essentially completed the field investigations and the laboratory test work that is required for the geotechnical design of the main infrastructure, the mine waste and potential construction material geochemical characterization and the water management plan. Golder will now focus on the engineering design and a feasibility design report that is expected in the following months.

Metallurgical Study

Orezone submitted a suite of 76 samples representative of Bomboré oxide, sulphide and mixed gold-bearing material to McLelland Laboratories from Sparks, Nevada in October 2011 and their final report can be found on Orezone's website. The testing program was conducted under the technical direction of Mr. Jeffrey Woods, consulting metallurgist with the objective to determine ore variability and optimum conditions for cyanide leaching of the Bomboré gold-bearing material. Each of the samples was submitted for detailed head analysis to characterize the samples by grade, cyanide solubility, elemental make-up and carbon and sulphide content. The majority of the samples were then combined into four different composites that represented medium grade oxide, high grade oxide, medium grade sulphide and high grade sulphide material. Metallurgical testing of the composite samples included gravity concentration, bulk sulphide flotation, direct agitated (bottle-roll) cyanidation, combined gravity concentration/cyanidation, bulk mechanically agitated CIL and carbon-in-pulp (CIP) cyanidation tests. A petrographic study, comminution tests and solid-liquid separation (SLS) tests were also conducted at third party laboratories.

The main conclusions of the McLelland Metallurgical report are:

- Gold recovery rates were generally rapid;

- Almost all variability samples were amenable to whole ore milling cyanidation treatment at optimized conditions;

- Conventional SO2/air tailings slurry treatment was effective in decreasing slurry CNWAD concentration to acceptable level;

- The optimum feed size for whole ore cyanidation of oxide composites was in the range of 100% -212um to 100% -150um;

- The optimum cyanide concentration for cyanidation of oxide composites was a maximum of 0.5 gNaCN/L (the lowest concentration used for this optimization work and could leave room for improvement);

- The optimum feed size for whole ore cyanidation of sulphide composites was 80% -53um;

- The optimum cyanide concentration for cyanidation of sulphide composites was 0.5 to 1.0 gNaCN/L;

- Gravity concentration prior to cyanidation may improve gold recovery for sulphide composites; and

- The sulphide composites responded well to flotation treatment for recovery of gold.

The main recommendations of the McLelland Metallurgical report are:

- Further optimization of the cyanide concentration for the oxide composites as gold recovery was not decreased at the lowest cyanide concentration tested (0.5 gNaCN/L);

- Further optimization of flotation conditions for the sulphide composites since they showed high gold recoveries by flotation;

- Further optimization of gold recovery for sulphide composites during agitated cyanidation testing should include air sparging and lead nitrate addition; and

- Mineralogical analysis of the tailings from outlier variability results may determine the causes for the few below trend recoveries.

Since December 2012, Orezone initiated the following complementary metallurgical studies

- Hazen Research Inc. from Golden, Colorado, has completed semiautogenous grinding (SAG) Mill Comminution (SMC) testing on three saprolite and saprock granodiorite PQ core samples. Their report was received on February 26, 2013 and is posted on the Orezone website.

- Orezone submitted a suite of 26 sulphide samples to SGS Laboratories from Lakefield, Ontario for additional comminution work including JK tech Drop Weight, Crusher Work Index and Bond Ball Mill Work Index test work. Their report is expected in Q2 2013. Preliminary results confirm the findings of previous similar studies by AMMTEC from Perth, Australia and McLelland on Bomboré samples, indicating a Bond Ball Mill Work Index of 15 kWh/t for typical sulphide samples.

- Orezone submitted a suite of pyrrhotite-bearing sulphide samples to COREM from Quebec City, Quebec, for lead nitrate optimization tests, with the possible benefits of improving cyanidation recoveries and reducing cyanide consumption for this type of material. Their report is expected in Q2 2013.

- Orezone, with the supervision of G Mining from Montreal, Quebec, completed preliminary scrubbing tests on site which confirmed the potential use of scrubbers in a lower CAPEX\OPEX comminution circuit. Orezone then submitted a suite of eight oxide composite PQ drill samples to Met-Solve Laboratories Inc., from Langley, British Colombia, for scrubber test work and design parameters. The Met-Solve preliminary results are positive and indicate a scrubber is viable to process the upper and mid portions of the saprolite (softer portions). The final report of results and any suggested design parameters is expected in Q2 2013. Orezone plans to visit in April another gold operation in West Africa that uses a scrubber, with similar grades and resources to Bomboré.

- Orezone has contracted Roche Ltd. from Montreal, Quebec, as the process engineers to deliver the preliminary mill design.

Resource Update

The Company has recently commissioned with SRK from Toronto, Ontario and G Mining an interim resource update using 68,400 m (843 holes) of the current program that will bring the total database to over 405,000 m (5,106 holes), including 72 recent P16 holes totalling 4,867 m. The update is expected to be completed in April 2013 and will be the basis for the reserves and the mine plan of the full Feasibility Study ("FS") to be released in 2H 2013.

Table 1 2013 Resource Update Optimization parameters

Optimization Parameter Unit 2013 CIL 2012 CIL 2011 CIL
Gold Price $/oz 1,400.00 1,400.00 1,000.00
Govt. Royalty $/oz 70.00 70.00 40.00
Selling Costs $/oz 2.5 2.5 2.5
Dilution % 5 5 5
Mining Loss % 5 5 5
Overall Pit Slopes        
    Oxide Degrees 36(1) 35 35
    Transition Degrees 44(2) 40 40
    Fresh Degrees 51(3) 45 45
Process recovery        
    Oxide % 92.0(4) 94.0 93.0
    Transition % 89.0(5) 92.0 92.0
    Fresh % 81.7(6) 82.0 81.0
Mining Costs - Ore        
    Oxide $/tonne 1.74 1.90 1.40
    Transition $/tonne 2.32 2.35 1.74
    Fresh $/tonne 2.44 2.44 1.89
Mining Costs - Waste        
    Oxide $/tonne 1.63 1.90 1.40
    Transition $/tonne 2.18 2.35 1.74
    Fresh $/tonne 2.28 2.44 1.89
Incr. Bench Cost        
    per 10 m Bench $/tonne 0.03 0.04 0.03
Processing Costs (7)        
    Oxide $/tonne 6.60 7.21 6.67
    Transition $/tonne 7.83 9.76 8.52
    Fresh $/tonne 15.02 12.66 12.43
G&A Costs (8)        
    Oxide $/tonne 3.72 3.84 2.69
    Transition $/tonne 3.72 3.84 2.69
    Fresh $/tonne 3.72 3.84 2.69
 
Notes:
 
(1),(2),(3) Average slopes were used for the 2013 Whittle optimization but Golder's detailed recommendations will be used for the pit design; between 36 and 55 degrees for saprolite (where the height of the saprolite wall is less than 80 meters), between 40 and 45 degrees for transition, and between 45 and 55 degrees for sulphide/fresh.
 
(4),(5),(6) For the 2013 Whittle optimization, this table shows the metallurgical recovery expected around the average in-situ grade, and is including fine carbon and solution losses of 0.017 gpt.
 
(7) 2013 Whittle optimization costs include $0.10/t in re-handling costs.
 
(8) 2013 Whittle optimization costs include $0.60/t of rehabilitation and sustaining capital provisions. Ore haulage costs will be refined for each pit in the feasibility study.

Exploration and definition drilling

The recent drilling has further expanded the southern P16 and the P17N deposits and with open ended mineralization, more expansion drilling is warranted. Scout drilling on the new P13 target on 400 m line spacing has intersected narrow mineralized zones on all fences in the northern portion of the target area; follow up reverse circulation (RC) and core (DD) drilling is required to confirm the geometry and the continuity of the mineralized zones intercepted during the scout drilling program. Results for this release include 7,734 m of RC drilling (151 holes) and 145 m of DD drilling (1 hole) and are essentially from the southern area of the property. The drilling in this location was designed to upgrade and expand the P16, P17N and Siga South deposits, as well as test new targets with limited to no prior drilling. Grades from P16, P17N and P13 remain higher than the average Bomboré grade.

Drilling stopped at the end of February (drill rig moved to Orezone's Bondi project) and is expected to resume in April with one core rig and one RC rig until the end of June when the rainy season and two month break is planned.

An additional 92,000 m of results have now been released since the August 2012 resource estimation. The ongoing drill program continues to demonstrate the potential to upgrade and expand the resources, especially the softer near surface oxide resources. The current resource is constrained within optimized open pit shells that span 11 km and includes 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters. The oxide portion of the resource occurs in the top 50 m and includes 1.76 Moz M&I and 0.26 Moz Inferred resources.

Table 2 Cumulative Results Excluded from the August 2012 Resource Reported to Date

Total Drilling to Date Grade g/t
Zone # of Holes Total m Uncut Cut(9)
KT - RC 23 1,169 1.31 1.22
CFU - RC 17 1,455 0.82 0.82
CFU - DD 16 2,517 2.72 1.08
Maga - RC 268 17,885 1.09 0.96
Maga - DD 60 12,874 1.29 1.09
P8P9 - RC 30 1,665 0.91 0.90
P8P9 - DD 44 8,416 1.04 0.99
P11 - RC 22 1,100 1.29 1.11
P11- DD 4 641 1.66 1.14
Siga E - RC 57 3,036 1.14 0.94
Siga E - DD 16 2,047 1.38 1.03
Siga W - RC 35 1,750 0.89 0.89
Siga W - DD 17 2,127 0.93 0.88
Siga S - RC 240 12,017 0.96 0.88
Siga S - DD 36 5,423 0.94 0.90
P16 - RC 53 2,664 1.04 1.04
P16 - DD 10 2,032 1.41 1.28
P17 - RC 4 175 2.43 2.25
P17 - DD 1 175 3.60 2.48
P17 N - RC 51 2,598 1.09 1.04
P17 N - DD 1 175 0.72 0.72
P17 S - DD 15 1,694 2.94 2.46
P13 102 5,375 1.13 1.11
North - RC 338 22,174 1.08 0.96
North - DD 120 23,807 1.29 1.04
South - RC 354 17,903 0.99 0.90
South- DD 73 10,238 1.01 0.92
SE - RC 57 2,839 1.14 1.13
SE - DD 11 2,207 1.53 1.34
New targets - RC 153 7,973 1.11 1.07
New targets - DD 16 1,869 2.86 2.39
All - RC 902 50,889 1.05 0.96
All - DD 220 38,120 1.25 1.05
 
Notes:
 
(9) Weighted average grade of individual assays, cut to 5 g/t.

Table 3 Breakdown of Drilling Meterage for this Release

Zone Core Drilling RC Drilling
# of holes Total m # of holes Total m
P11 1 145 0 0
Siga South 0 0 63 3,140
P16 0 0 20 1,005
P17N 0 0 13 683
P13 0 0 51 2,705
Sterilization 0 0 4 201
TOTAL 1 145 151 7,734

Table 4 Highlights of Reverse Circulation Drilling Results for this Release

      From To Length Uncut
Grade
Cut
Grade
Total
Zone Section Hole (m) (m) (m) (g/t)(10) (g/t)(11) Assay(12)
P13 3400 TYC0038 25.00 32.00 7.00 1.57 1.57  
P13 2200 TYC0013 18.00 33.00 15.00 1.42 1.38  
P16 44225 BBC4008 29.00 43.00 14.00 1.05 1.05  
P16 43925 BBC4004 30.00 37.00 7.00 1.64 1.64  
P17 N 45975 BBC3989 36.00 57.00 21.00 0.83 0.83  
P17 N 45950 BBC3950 25.00 38.00 13.00 0.86 0.86  
P17 N 45950 BBC3951 12.00 19.00 7.00 1.60 1.60  
P17 N 45875 BBC3992 6.00 15.00 9.00 1.58 1.58  
Siga S 10650 BBC4072 30.00 42.00 12.00 4.08 2.40 Pending
Siga S 9950 BBC4043 19.00 40.00 21.00 0.81 0.81 Pending
Siga S 9900 BBC4036 10.00 32.00 22.00 0.69 0.69 Pending
Siga S 9900 BBC4037 25.00 36.00 11.00 1.01 1.01 Pending
Siga S 9750 BBC4025 39.00 50.00 11.00 1.25 1.25  
Siga S 9750 BBC4026 15.00 26.00 11.00 1.54 1.54  
 
Notes:
 
(10) Weighted average grade of uncut individual assays
 
(11) Weighted average grade of individual assays cut to 5 g/t
 
(12) Composite width and grade are preliminary where leach residue fire assay results are pending

The mineralized intervals are based on a lower cut-off grade of 0.5 g/t, a minimal width of 3 m and up to a maximum of two consecutive meters of dilution being included. The true width of the mineralization is approximately 85% of the drill length intervals in KT, CFU, Maga, P16, P17 and P8P9 areas, and 95% of the drill length intervals in the Siga area. The true width is not known yet on P17N, P17S and P13.The half-core samples were collected by Orezone employees using a diamond saw. The core samples were prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst.

The RC drilling samples were divided by Orezone employees using RSDs. A 2 kg split was prepared by SGS Burkina Faso s.a.r.l. at the Bomboré site facility and then split by Orezone to 1 kg using RSDs. A 1 kg aliquot was analyzed for leachable gold at BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll cyanidation using a LeachWell™ catalyst. The leach residues from all samples with a leach grade in excess of 0.2 g/t were prepared by BIGS Global Burkina s.a.r.l. and then split by Orezone to 50 g using RSDs. A 50 g aliquot was analyzed by fire assay at SGS Burkina Faso s.a.r.l.. Orezone employs a rigorous Quality Control Program (QCP) including a minimum of 10% standards, blanks and duplicates.

Qualified Persons

The drilling program was executed under the supervision of Pascal Marquis, SVP Exploration for Orezone; the report titled "Report on Metallurgical Testing - Bomboré Drill Core Samples, MLI Job No. 3625" was prepared by J. Davis, Metallurgist and Project Manager at McLelland Laboratories; the technical memorandum titled "Pit Slope Design for Bomboré Project" was prepared by P. Fréchette, Project Manager at Golder Associates and; the Whittle optimization parameters have been established by R. Gourde, Study Manager at G Mining Services Inc. All are Qualified Persons under National Instrument 43-101 and approved their respective technical information in this release. 

About Orezone Gold Corporation

Orezone is a Canadian company with a gold discovery track record of +12 Moz and recent mine development experience in Burkina Faso, West Africa. The company owns a 100% interest in Bomboré which is situated 85 km east of the capital city, adjacent to an international highway. Mineral resources are constrained within optimized open pit shells that span 11 km, and include 4.13 Moz of measured and indicated (125 Mt @ 1.03 g/t) and 1.03 Moz of inferred resources (35 Mt @ 1.00 g/t) with an average depth of drilling to only 120 meters. The Company is working to further expand the resources at Bomboré while it completes a FS for a phase one oxide-only CIL plant in 2H 2013 and becomes a mid-tier gold producer by 2015.

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION: This news release contains certain "forward-looking statements" within the meaning of applicable Canadian securities laws. Forward-looking statements and forward-looking information are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "potential", "possible" and other similar words, or statements that certain events or conditions "may", "will", "could", or "should" occur. Forward-looking statements in this release include statements regarding, among others; ground water; infrastructure design; mine water management or waste management; scrubber and grinding circuit design; improvements in the project economics; optimization and trade-off studies; capital and operating cost estimates; gold production for the project; completion of technical reports in Q2 2013; completion of a resource update in April 2013; completion of a FS in 2H 2013; commencement of production at the Bomboré Project in 2015.

FORWARD-LOOKING STATEMENTS are based on certain assumptions, the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological and geotechnical data, fluctuating metal prices, the possibility of project cost overruns or unanticipated costs and expenses, the ability of contracted parties (including laboratories and drill companies to provide services as contracted); uncertainties relating to the availability and costs of financing needed in the future and other factors. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements. Comparisons between any resource model or estimates with the subsequent drill results are preliminary in nature and should not be relied upon as potential qualified changes to any future resource updates or estimates.

Readers are advised that National Instrument 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Readers should refer to the annual information form of Orezone for the year ended December 31, 2011 and other continuous disclosure documents filed by Orezone since January 1, 2012 available at www.sedar.com, for this detailed information, which is subject to the qualifications and notes set forth therein.



Orezone
Ron Little
CEO
(613) 241-3699 or Toll Free: (888) 673-0663
rlittle@orezone.com
or
Orezone
Pascal Marquis
SVP Exploration
(613) 241-3699 or Toll Free: (888) 673-0663
pmarquis@orezone.com
Données et statistiques pour les pays mentionnés : Burkina Faso | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Tous

Orezone Gold Corp.

EXPLORATEUR
CODE : ORE.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Orezone Gold est une société d’exploration minière d'or basée au Canada.

Ses principaux projets en exploration sont ZELINE 1 & ZELINE 4 et KOSSA au Niger et BOMBORE, SEGA et BONDI au Burkina Faso.

Orezone Gold est cotée au Canada. Sa capitalisation boursière aujourd'hui est 93,9 millions CA$ (68,4 millions US$, 63,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 avril 2011 à 5,26 CA$, et son plus bas niveau récent le 27 novembre 2015 à 0,22 CA$.

Orezone Gold possède 117 350 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Orezone Gold Corp.
2009 Annual Report
2008 Annual Report
Annual report 2006
Financements de Orezone Gold Corp.
13/11/2013Closes C$5M Non-Brokered Private Placement
30/10/2013Arranges C$5M Non-Brokered Private Placement
23/06/2010Arranges C$5M Private Placement for Brighton Energy
02/01/2009 Closes Private Placement, Updates Timing of Transaction wit...
Rapports Financiers de Orezone Gold Corp.
15/11/2008 Third Quarter Update
Projets de Orezone Gold Corp.
27/03/2013(Bombore)Positive Progress Report for Bombore Feasibility Study and R...
13/11/2012(Bombore)Positive Drill Results Support Further Growth at Bombore
04/09/2012(Bombore)35,000 m of Positive Drill Results Support Further Growth at...
27/08/2012(Bombore)Bombore Gold Project Reaches World Class Size
22/02/2012(Bombore)Provides Positive Update on its Bombore Gold Project
03/02/2012(Sega)Sells Sega Project to Cluff Gold for $29.6M
10/01/2012(Bombore)Reports Continued Positive Results at Bombore Gold Project
28/11/2011Brighton Expands Niger Uranium Discovery to 14 km2 of Minera...
18/08/2011Orezone Confirms Heap Leach Potential of Sulphide Resources ...
18/08/2011(Sega)Confirms Heap Leach Potential of Sulphide Resources at Sega
08/08/2011Orezone Expands Bombor\303\251 Gold Project ...
08/08/2011(Bombore)Expands Bombore Gold Project Area 60% With New Permit
26/07/2011(Bombore)Reports Higher Gold Grades and Improved Continuity at Bombor...
21/06/2011(Bombore)Bombor=E9 Gold Project Has PositivePreliminary Economic Asse...
20/06/2011Orezone Bombor\303\251 Gold Project ...
11/04/2011(Sega)Confirms Positive Metallurgical Results for Sega Gold Deposi...
24/03/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
23/03/2011(Bombore)Positive Drill Results at Bombore Continue to Confirm Model
24/02/2011(Zeline 1 & Zeline 4)/Brighton Makes Significant New Uranium Discovery in Niger: ...
06/07/2010(Bombore)Fourth Round of Positive Drill Results at Bombore
16/06/2010(Bombore)Positive Results Continue From Bombore Infill and Expansion ...
13/05/2010Additional PositiveInfill and Expansion Drilling Results at ...
25/03/2010(Bombore)Bombore Auger Drilling Results Indicate Possible 2.5km of Ex...
28/01/2010(Bombore)Commences $2 Million Drill Program at Bombore
05/01/2010(Sega)Increases Sega Project Gold Resources
08/12/2009(Bombore)Improves on Final Bombore Metallurgical Results
14/10/2009(Bombore)Confirms Bombore Gold Deposit is Amenable to Heap Leaching
29/07/2009(Bombore)Completes Drilling Below Surface Resources at Bombore
24/06/2009(Bombore)Orezone Confirms Mineralization at Bombore Below Surface Res...
10/11/2008(Bombore)Almost Triples Gold Resource at Bombore Project
30/06/2008(Essakane)2008 Technical report
Communiqués de Presse de Orezone Gold Corp.
04/12/2015Orezone Approved to Move from TSX to TSX-V
16/09/2015Orezone Provides Update on Bomboré Permitting and Bondi Proj...
16/09/2015Orezone Provides Update on Bombore Permitting and Bondi Proj...
21/07/2015Orezone Closes C$6.5M Investment
06/07/2015Orezone Arranges C$6.5M Investment that Includes Ross Beaty
27/01/2015Sandstorm Gold Announces 10 Royalty Agreements
27/01/2015Orezone Closes US$3 Million Financing and Secures an Additio...
27/01/2015Sandstorm Gold Announces 10 Royalty Agreements
27/01/2015Orezone Closes US$3Million Financing
24/11/2014Bombore Gold Project Feasibility Study Update
10/11/2014Orezone update on Operations in Burkina Faso
10/11/2014Orezone Update on Operations in Burkina Faso
03/11/2014Orezone update on Bomboré and Burkina Faso
03/11/2014Orezone Update on Bombore and Burkina Faso
14/10/2014Bombore Gold Project Feasibility Study Update
08/09/2014Bombore Gold Project Feasibility Study Update
10/07/2014Positive Metallurgical and Drilling Results at Bombore
04/06/2014Positive Metallurgical Test Results at Bombore
23/05/2014Orezone Gold Corporation: Results of Annual General Meeting
21/05/2014Orezone Appoints Chief Operating Officer
20/06/2013News Release
20/06/2013(Bombore)Shifts Focus of Bombore Study to Heap Leach Scenario
04/06/2013(Bondi)Positive Metallurgical and Drill Results from the Bondi Proj...
24/05/2013Results of Annual General Meeting
24/05/2013Results of Annual General Meeting
29/04/2013(Bombore)Increases and Upgrades the Bombore Gold Project Resource
04/02/2013(Bombore)Bombore FS and Resource Update Will Include +400,000m of Dri...
31/05/2012(Bombore)Bombore Drill Program Continues with Positive Results
23/05/2012(Sega)Completes the Sale of Sega to Cluff Gold for $26.5M
30/03/2012(Bombore)Completes 215,000 Drill Program at Bombore
07/02/2012to Consolidate Brighton Energy Corporation
07/12/2011Brighton Energy Makes Another Near-Surface Uranium Discovery...
12/09/2011(Bombore)Positive Results Continue at Bombore With Seven Drills Opera...
26/05/2011(Bombore)Reports Additional Positive Drill Results at Bombore Gold Pr...
16/05/2011.: Brighton Energy Discovers Additional Uranium Mineralizati...
06/04/2011Expands Board and Management Team
07/03/2011Burkina Faso is Ra
17/02/2010Brighton Energy Limited Receives Niger Uranium Permit Approv...
08/07/2009Ron Little named Ernst & Young Entrepreneur of the Year Fina...
25/02/2009IAMGOLD Completes Acquisition of Orezone
20/02/2009Obtains Final Court Approval for IAMGOLD Transaction
19/02/2009Shareholders Approve Arrangement with IAMGOLD
13/02/2009 Updates Status of Shareholder Vote
29/09/2005An emerging producer in Burkina Faso, West Africa
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ORE.TO)
0,800-1.23%
TORONTO
CA$ 0,800
24/04 13:34 -0,010
-1,23%
Cours préc. Ouverture
0,810 0,800
Bas haut
0,800 0,800
Année b/h Var. YTD
0,690 -  0,900 -5,88%
52 sem. b/h var. 52 sem.
0,690 -  1,61 -48,05%
Volume var. 1 mois
15 155 -4,76%
24hGold TrendPower© : -19
Produit
Développe
Recherche Copper - Gold - Molybdenum - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 10/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-19,19%
2023-21,43%1,650,82
20222,44%1,811,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :