9738 search
NexGen Energy Ltd.
TORONTO NXE.TO 13,20 CA$ 39,24%

Arrow Scissor Hole AR-16-91c2 Intersects 22.4 m of Off-Scale Radioactivity

Publié le 16 juin 2016

55be0211-2040-41bc-982f-b84757f33ae4.pdf

Arrow Scissor Hole AR-16-91c2 Intersects 22.4 m of Off-Scale Radioactivity

Vancouver, BC, June 16, 2016 - NexGen Energy Ltd. ("NexGen" or the "Company") (TSXV:NXE, OTCQX:NXGEF) is pleased to announce further results from our on-going spring drilling program on our 100% owned Rook I Property, Athabasca Basin, Saskatchewan.

Scissor drilling from southeast to northwest at the Arrow Deposit has confirmed and increased the known width of the higher grade A2 sub-zone (the "Sub-Zone"). Hole AR-16-91c2 has intersected 22.4 m of off-scale radioactivity (>10,000 to >61,000 cps) including a 3.0 m interval of minimum-greater-than-61,000 cps. The central part of the radioactive intersection consists of widespread massive to semi-massive pitchblende mineralization and was drilled 38 m up-dip and northeast of hole AR-15-44b.

The A2 High Grade Domain is associated with dense accumulations of massive to semi-massive pitchblende. It is currently outlined by 23 holes. Assay results for 5 holes from the Sub-Zone remain pending and the Company continues to drill with 2 rigs currently running.

Table 1: Higher Grade A2 Sub-Zone Angled Drill Holes

2015

AR-15- 59c22

AR-15- 54c12

AR-

15-

58c12

AR-15- 622

AR-15- 44b2

AR-15- 49c22

AR-15- 57c32

Total composite mineralization =

75.5m

42.0m

86.0m

143.0m

135.6m

73.5m

62.5m

Total Off-scale (>10,000 to 29,999 cps)3 =

11.4m

5.9m

14.3m

17.8m

30.3m

15.7m

4.4m

Total Off-scale (>30,000 to 60,999 cps)3 =

4.5m

3.0m

3.9m

10.6m

7.8m

5.2m

2.5m

Total Off-scale (>61,000 cps)3 =

1.0m

0.5m

2.0m

2.0m

1.5m

2.2m

1.8m

Continuous GT (Grade x Thickness) =

371

277

200

and 345

787

655

605

319

2016

AR-16- 81c31

AR-16- 76c41

AR-

16-

76c12

AR-16- 76c32

AR-16- 63c12

AR-16- 63c32

AR-16- 86c11

AR-

16-

74c12

AR-16- 63c22

AR-16- 91c2

AR-16- 64c32

AR-

16-

64c22

AR-

16-

64c12

AR-

16-

72c22

AR-

16-

78c12

AR-16- 78c41

Total composite mineralization =

48.5m

105.7m

73.5m

67.5m

55.5m

147.0m

90.0m

88.0m

138.0m

89.0m

102.0m

76.0m

74.0m

93.0m

64.0m

120.5m

Total Off-scale (>10,000 to 29,999 cps)3 =

5.2m

19.9m

14.8m

14.9m

6.9m

22.1m

8.8m

21.2m

17.1m

13.4m

18.8m

16.0m

10.3m

7.0m

11.6m

25.8m

Total Off-scale (>30,000 to 60,999 cps)3 =

4.0m

1.0m

2.8m

5.0m

0.5m

3.0m

2.3m

1.2m

9.9m

6.0m

2.5m

4.7m

3.7m

0.5m

3.0m

6.2m

Total Off-scale (>61,000 cps)3 =

2.5m

0.0m

5.3m

4.5m

0.0m

0.5m

2.0m

0.0m

13.9m

3.0m

0.0m

5.5m

0.0m

1.7m

2.5m

5.5m

Continuous GT (Grade x Thickness) =

Assays Pending

Assays Pending

762

761

203

274

and 124

Assays Pending

160

and 35

638

and 604

Assays Pending

172

and 92

541

338

156

and 45

485

Assays Pending

1 radioactivity results previously released

2 radioactivity and assays results previously released

3 minimum radioactivity using RS-120 gamma spectrometer

A2 Shear:

  • AR-16-91c2 (38 m up-dip and northeast from AR-15-44b) intersected 89.0 m of total composite mineralization including 22.4 m of total composite off-scale radioactivity (>10,000 - >61,000 cps) within a 171.5 m section (425.5 to 597.0 m), featuring 3.0 m of minimum-greater-than-61,000 cps in the Sub-Zone.

    Arrow, Activities & Financial

  • The land-based and basement hosted Arrow Deposit currently covers an area of 870 m by 280 m with a vertical extent of mineralization commencing from 100 m to 920 m, and remains open in most directions and at depth.

  • The spring 2016 program comprising 7,500 m of drilling will be transitioning to the summer 2016 program in late-June.

  • The Company has cash on hand of of approximately $100 million.

A drill hole location map, three-dimensional view of the A2 High Grade Domain, and an A2 long section featuring the Sub-Zone are shown in Figures 1 to 3.

Garrett Ainsworth, Vice-President, Exploration and Development, commented: "Scissor drill holes have been utilized to verify the thickness of high grade mineralization in the A2 sub-zone, and to test high grade mineralization in the A1 shear that was initially discovered by hole AR-16-84c1. Scissor hole AR-16-91c2 validates and expands upon the robust and high grade nature of sub-vertical mineralization contained within the A2 sub-zone."

Leigh Curyer, Chief Executive Officer, commented: "Infilling the currently defined area of Arrow mineralization is delivering growth throughout the deposit both in terms of grade and volume. This scissor hole, along with others previously completed, confirm Arrow's stacked sub-vertical nature which has been instrumental in developing Arrow in a time and cost efficient manner."

Figure 1: Arrow Deposit Drill Hole Locations

Figure 2: Three Dimensional View of the Arrow Deposit High-Grade Domain

Les autres articles de la compagnie
Hong Kong Billionaire Li Bets on Uranium With NexGen Deal
Canada wildfire moves into Saskatchewan, but little risk to
IIROC Trading Resumption - NXE
IIROC Trading Halt - NXE
Articles en illimité et contenus premium Je m'abonne
Editoriaux
et Nouvelles
Actions
Minières
Or et
Argent
Marchés La Cote
search 9738
search