Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Katanga Mining announces first quarter 2015 production results and date for release of Q1 2014 financial results
Published : May 04, 2015
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cobalt | Copper |

Katanga Mining announces first quarter 2015 production results and date for release of Q1 2014 financial results

ZUG, Switzerland, May 4, 2015 /CNW/ - Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces first quarter 2015 production results and date for release of Q1 2015 financial results.

Highlights during the three months ended March 31, 2015, and Outlook






Three months ended



March 31,

2015

December 31,

2014

March 31,

2014



Mining





Waste mined

tonnes

6,365,592

7,956,147

6,136,002

Ore mined

tonnes

1,848,269

1,863,967

1,330,891

Average copper grade

%

3.57

4.22

4.03

Contained copper in ore mined

tonnes

65,907

78,606

53,636

Processing





Ore milled

tonnes

1,975,903

1,722,177

1,514,216

Finished copper cathode

tonnes

37,133

42,807

31,574

Finished cobalt

tonnes

852

884

478

Mining

  • During Q1 2015 the Company increased the ore production by 39%, when compared to Q1 2014, this is principally due to an increase of 58% at KOV Open Pit where 4 new Caterpillar 793D haul trucks were commissioned in Q2 2014.  KTO contributed with a 13% increase in ore production, compared to Q1 2014 due to higher stope availability resulting from increased backfilling and development.  Waste tonnes mined were 4% higher than Q1 2014.
  • Q1 2015 ore tonnes mined were comparable to Q4 2014, despite dewatering issues encountered at KOV during the DRC rainy season.  This effect also resulted in the lower average copper grade achieved as higher grade material at the pit bottom was not as accessible. The Q1 2015 contained copper increased by 23% compared to Q1 2014 and reduced by 16% compared to Q4 2014.
  • In Q1 2015, the Company commissioned:
    • Two new Caterpillar R2900G loaders to increase the underground mining volumes;
    • One new fuel truck for use underground;
    • Two Caterpillar D11 dozers and one Caterpillar 834K dozer to optimize mined waste management; and
    • Six new Atlas Copco 282 Rocket Boomers used for roof support and rehabilitation underground.

Processing

  • Ore milled at KTC during Q1 2015 reached a record level driven by the increased volumes milled at CM5 (commissioned in Q4 2014 as part of the Phase 5 project).  CM5 is currently milling at 90% of design capacity.
  • Finished copper metal produced at Luilu increased by 18% over Q1 2014 driven by the increased volumes throughput partly offset by the lower mined grades.  Finished copper metal produced was a 13% decrease over Q4 2014 driven by the lower mined grades specifically at KOV Open Pit where mining was affected by inclement weather leading to variable grade feed at KTC.
  • Cobalt metal produced totalled 884 tonnes for Q1 2015, a 66% increase from Q1 2014 due to the increased volume fed together with improved recoveries thereon.
  • In Q1 2015, the Company commissioned the following at Luilu in order to improve throughputs and recoveries:
    • An upgrade to the existing water filtration plant;
    • A new oxide receiving thickener; and
    • Enhancements to the roaster for utilities, calcine cooling and gas treatment.

Outlook

  • During Q2 2015, the Company expects to commission:
    • Five new Caterpillar 793D haul trucks operating in KOV to increase ore and waste mining capacity; and
    • Improvements to the froth skimmers in the KTC oxide flotation section.

The Company expects to release its first quarter 2015 financial results on or about May 14, 2014.

This press release was prepared under the supervision of Tim Henderson, Technical Consultant, Katanga and a "qualified person" as such term is defined in NI 43-101. Mr. Henderson has reviewed and approved the contents of this press release.

About Katanga Mining Limited
Katanga Mining Limited operates a major mine complex in the Democratic Republic of Congo producing refined copper and cobalt. The Company has the potential to become Africa's largest copper producer and the world's largest cobalt producer. Katanga is listed on the Toronto Stock Exchange under the symbol KAT.

Forward Looking Statements
This press release may contain forward-looking statements, including, but not limited to, the commissioning of new haul trucks and improvements to froth skimmers at KTC. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements. The key assumptions that have been made in connection with the forward-looking statements include: there being no significant disruptions affecting the operations of the Company whether due to labour disruptions, supply disruptions, power disruptions, rollout of new equipment, damage to equipment or otherwise; permitting and development, being consistent with the Company's current expectations; continued recognition of the Company's mining concessions and other assets, rights, titles and interests in the Democratic Republic of Congo ("DRC"); political and legal developments in the DRC being consistent with its current expectations; prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels; and labour and material costs increasing on a basis consistent with the Company's current expectations.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the actual results of current exploration activities; actual results and interpretation of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of copper and cobalt; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, development or construction activities, delays due to strikes or other work stoppage, both internal and external to the Company, as well as those factors disclosed in the Company's current annual information form and other publicly filed documents. Although Katanga has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events, or otherwise, except in accordance with applicable securities laws.

SOURCE Katanga Mining Limited

For further information: Johnny Blizzard, CEO, Tel: +41 (041) 766 71 10; Matthew Colwill, CFO, Tel:+41 (041) 766 71 10

Katanga Mining Limited

PRODUCTEUR
CODE : KAT.TO
ISIN : CA4858471077
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Katanga est une société développant des projet miniers de cuivre basée au Royaume-Uni.

Katanga est productrice de cuivre, de cobalt en Republique Democratique Du Congo, en développement de projets de cobalt et de cuivre en Republique Democratique Du Congo, et détient divers projets d'exploration en Republique Democratique Du Congo.

Son principal projet en production est KAMOTO UNDERGROUND en Republique Democratique Du Congo, ses principaux projets en développement sont KINSEVERE et KOV en Republique Democratique Du Congo et ses principaux projets en exploration sont MASHAMBA EAST, LAILU, GREENFIELD, KAMOTO CONCENTRATOR, KANANGA, MUSONOIE et KOLWEZI en Republique Democratique Du Congo.

Katanga est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 295,6 millions CA$ (220,0 millions US$, 195,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 02 mars 2007 à 9,98 CA$, et son plus bas niveau récent le 03 avril 2020 à 0,05 CA$.

Katanga possède 1 907 380 413 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Katanga Mining Limited
21/02/2019Suspended cobalt sales, higher costs fuel Katanga's Q4 loss
18/12/2018Glencore's Katanga says it agreed settlement in Canadian pro...
13/12/2017Shares in Toronto-listed Katanga Mining surge 50% on Congo m...
21/11/2017Top Glencore executive quits Katanga board after accounting ...
10/04/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
Rapports annuels de Katanga Mining Limited
2007 Annual Report
Nominations de Katanga Mining Limited
25/09/2013appoints new Chief Operating Officer
22/09/2011Announces Appointment of New CEO
09/05/2011(KAT.TO) Press release: Katanga Mining appoints new COO
07/04/2011APPOINTS NEW CFO
22/12/2009Appointment of CEO
05/11/2009(KAT.TO) Press Release: KAT Announces Appointment of New Dir...
29/05/2007Appoints Agent for Copper and Cobalt Marketing
Rapports Financiers de Katanga Mining Limited
14/11/2014Announces 2014 Third Quarter Financial Results, Commitment o...
08/08/2014announces 2014 second quarter financial results
09/05/2011(KAT.TO) Press release: Katanga Mining announces First Quart...
11/02/2011 Katanga Mining announces 2010 Fourth Quarter and Year End R...
06/08/2010Q2 Financial Results
10/02/20102009 Fourth Quarter and Year-End Resuls
19/05/2009(KAT.TO) Press Release: KAT Announces First Quarter Results
Projets de Katanga Mining Limited
08/03/20162 dead, 5 missing after landslide at Congo copper mine
08/06/2011(KAT.TO) Press release: Interest Payment on Katanga Notes
12/08/2008(Kamoto Underground)Project Update & 2Q 2008 Financials
18/12/2007(Kamoto Underground) Successfully Produces First Copper Cathode
Communiqués de Presse de Katanga Mining Limited
07/06/2016Katanga Mining Announces Resignation of Chief Operating Offi...
13/05/2016Katanga Mining Announces 2016 First Quarter Results and Elec...
04/05/2016Katanga Mining Announces First Quarter 2016 Production Resul...
03/11/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
03/11/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
11/09/2015Katanga Mining Announces Suspension of Copper and Cobalt Pro...
11/09/2015IIROC Trade Resumption - KAT
11/09/2015IIROC Trading Halt - KAT
06/09/2015Katanga Mining Announces Review of Business
13/08/2015Katanga Mining Announces 2015 Second Quarter Financial Resul...
12/08/2015Katanga Mining announces 2015 second quarter results
12/02/2015Katanga Mining Announces 2014 Year End Financial Results and...
11/02/2015Katanga Mining announces 2014 year end financial results and...
11/02/2015Katanga Mining Announces 2014 Year End Operational Highlight...
11/02/2015Katanga Mining Annoucnes Ore Reserves and Mineral Resources
10/02/2015Katanga Mining Announces Ore Reserves and Mineral Resources
10/02/2015Katanga Mining Announces 2014 Year End Operational Highlight...
05/01/2015Katanga Mining Appoints New Chief Operating Officer
05/01/2015Katanga Mining Appoints New Chief Operating Officer
26/11/2014Katanga Mining Announces Execution of Extended and Increased...
26/11/2014Katanga Mining announces execution of extended and increased...
26/11/2014announces execution of extended and increased loan facilitie...
14/11/2014Katanga Mining Announces 2014 Third Quarter Financial Result...
03/11/2014Katanga Mining announces third quarter 2014 production resul...
03/11/2014announces third quarter 2014 production results and date for...
15/05/2014announces 2014 first quarter results and election of directo...
05/05/2014announces first quarter 2014 production results and date for...
10/02/2014announces 2013 year end operational highlights, and outlook
14/11/2013announces 2013 third quarter financial results and appoints ...
30/10/2013announces Q3 2013 production results and date for release of...
12/08/2013announces Q2 2013 production results and date for release of...
10/05/2013announces 2013 first quarter results and election of directo...
11/02/2013announces 2012 year end operational highlights, outlook and ...
14/11/2012Announces 2012 Third Quarter Results and Appoints New Direct...
30/10/2012Announces Q3 2012 Production Results and Date for Release of...
01/09/2011Completes Continuance to the Yukon Territory
22/08/2011Proceeds to Procure Long-Lead Items for the Phase 4 Expansio...
05/08/2011announces departure of CEO
31/03/2011ANNOUNCES FILING OF AIF AND INDEPENDENT TECHNICAL REPORT
08/06/2010Interest Payment on Katanga Notes
07/10/2009(KAT.TO) Press Release: KAT Announces Termination of Remaini...
23/09/2009KAT Completes Acquisition of KOL
08/09/2009(KAT.TO) Press Release: KAT Announces Accelerated Developmen...
28/08/2009(KAT.TO) Press Release: KAT Announces Signing of Share Purch...
27/07/2009Signing of Finalised Joint Venture Agreement
17/06/2009(KAT.TO) Press Release: KAT Extends Deadline for Ineligible ...
11/06/2009(KAT.TO) Press Release: KAT Completes US$172.3 Million Early...
02/06/2009(KAT.TO) Press Release: KAT Announces Exchange of US$265.3 M...
14/05/2009(KAT.TO) Press Release: KAT Comments on Trading of Common Sh...
11/02/2009(KAT.TO) Press Release: Convertible Loan Facility
12/01/2009(KAT.TO) Press Release: Loan Facility
12/01/2009(KAT.TO) Press Release: Authorized Share Capital
07/01/2009(KAT.TO) Press Release: Proxy Cut-off
24/12/2008(KAT.TO) Press Release: Convertible Loan Facility
26/11/2008Luilu plant resumes copper and cobalt metal production
21/11/2008(KAT:TO) Press Release: Kolwezi Concentrator Update 21 Nov 2...
12/11/2008(KAT.TO) Press Release: Damage to Luilu Transformer
04/11/2008KAT Project Update & 3Q Financials Call November 7
16/06/2008Announces Intended Resignation of CEO
12/06/2008Interest Payment on KAT Notes June 12
21/02/2008Receives Summary Findings of DRC Mining Contract Review
08/02/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
29/01/2008(KAT.TO) Press Release: KAT Progresses Consolidation of Join...
22/01/2008Operations Integrated
11/01/2008(KAT.TO) Press Release: KAT Completes Merger with Nikanor to...
10/12/2007Interest Payment on KAT Notes
27/11/2007 Starts Luilu Metallurgical Plant on Schedule
06/11/2007 Recommended Merger of Katanga and Nikanor to Create a Leadi...
05/11/2007 Announce Completion of US$150 Million Loan
02/11/2007Receives Shareholder Approval for Increase in Authorized Sha...
11/10/2007 Site Progress Update
04/10/2007Announces US$150 Million Loan Following Review of Strategic ...
06/09/2007Response to Withdrawal of Unsolicited Offer
29/08/2007Recommends No Action in Response to Unsolicited Offer
22/08/2007Sets Special Meeting Date
09/08/2007Continues to Protect Shareholders from Creeping Takeover Att...
02/08/2007Site Progress Update
18/07/2007Announces Concentrator Commissioning
17/07/2007Clarifies Interest Capitalization on Unsecured Subordinated ...
06/07/2007Statement Regarding Letter from CAMEC
28/06/2007Change in Shareholdings
22/05/2007Site Update from Katanga Mining Limited (KAT.TO)
18/05/2007Focused on Growth Strategy
15/05/2007Clarification Statement
10/05/2007Enacts Shareholder Rights Plan to Prevent Creeping Takeover
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (KAT.TO)Other OTC (KATFF)
0,155+0.00%0,117+0.00%
TORONTO
CA$ 0,155
05/06 14:19 -
0%
Cours préc. Ouverture
0,155 0,160
Bas haut
0,155 0,160
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,155 -%
Volume var. 1 mois
130 625 -%
24hGold TrendPower© : 23
Produit Cobalt - Copper
Développe Cobalt - Copper
Recherche Cobalt - Copper - Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 09/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202024,00%0,160,05
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :