Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Excelsior Mining Corp.

Publié le 07 juillet 2015

Excelsior Announces Updated Mineral Resource Estimate

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

Excelsior Announces Updated Mineral Resource Estimate

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jul 7, 2015) - Excelsior Mining Corp. (TSX VENTURE:MIN)(3XS.F)(EXMGF) ("Excelsior" or the "Company") is pleased to announce an updated mineral resource estimate at the Gunnison Copper Project in Arizona. The prior North Star mineral resource, reported in January, 2014, has now been updated to include the results of 13 additional diamond drill holes, totalling 17,110 feet that were completed in December, 2014. The drill program was designed to convert a large part of the inferred mineral resource into the measured & indicated mineral resource categories.

Updated North Star Resource (Oxide and Transition at 0.05% cut-off)(1), (2)
Short Tons
(Millions)
Total Cu
(%)
Pounds
of Cu
(Billions)
Change in
Cu Pounds
(%)
Measured 199 0.36 1.43 +18.4
Indicated 667 0.26 3.53 +30.3
Measured & Indicated 866 0.29 4.95 +26.6
Inferred 173 0.17 0.58 -58.8
(1) Rounding as required by reporting guidelines may result in apparent discrepancies between tons, grade, and contained metal content.
(2) The 0.05% Total Cu cutoff was chosen to define resources potentially available to in-situ leaching.

The combined measured & indicated mineral resources estimate has increased by 26.6% as a result of the conversion of some of the 1.39 billion pounds of Cu (388 million short tons at 0.21% Cu) in the inferred mineral resource category into the measured & indicated categories.

The total mineral resource estimate for the North Star Deposit is based on results from 122 drill holes totalling 158,785 feet and is effective as of June 1, 2015. Mr. Michael M. Gustin, with the independent firm Mine Development Associates of Reno, Nevada, is a Qualified Person as defined by NI 43-101 and is responsible for this mineral resource estimate. He has verified, reviewed and approved the technical disclosure contained in this news release. Mr. Gustin has verified the data underlying the results by reviewing the drilling, sampling, assay, and quality assurance and quality control data, as well as the geologic interpretations completed by Excelsior. The estimate is classified as a measured, indicated or inferred mineral resource, consistent with the CIM definitions referred to in NI 43-101. Excelsior is not aware of any environmental, permitting, legal, title, taxation, socio-political, marketing or other issues which may materially affect its estimate of mineral resources.

The North Star mineral resources were modeled to respect the detailed lithologic, structural, and oxidation modeling completed by Excelsior. Copper mineral domains were interpreted on 100-foot spaced, east-west vertical cross sections that span the 2.3-mile north-south and 1.3-mile east-west extents of the deposit. These domains were then used to explicitly constrain the estimation of copper grades into 50 x 100 x 25 foot (x, y, z) model blocks using 20-foot composites and inverse-distance interpolation. The grade estimation is further controlled by the incorporation of a number of unique search ellipses that reflect the various orientations of the modeled structural zones, as well as the strike and dip of the favorable stratigraphic units in areas unaffected by the structures.

All samples were prepared from manually split half-core sections on site in Arizona. Split drill core samples were then sent to Skyline Assayers & Laboratories ("Skyline") in Tucson, Arizona, an independent laboratory, for Total Copper and Sequential Copper analyses. Skyline is accredited with international standard ISO/IEC 17025:2005 General Requirements for the Competence of Testing and Calibration Laboratories. Total Copper, Acid Soluble Copper and Cyanide Soluble Copper were analyzed. Excelsior has no relationship with Skyline Labs other than Skyline being a service provider. Standards, blanks, and duplicate assays are included at regular intervals in each sample batch submitted from the field as part of an ongoing Quality Assurance/Quality Control Program.

About Excelsior

Excelsior is a mineral exploration and development company that is advancing the Gunnison Copper Project. The Excelsior management team consists of experienced professionals with proven track records of advancing mining projects into production. Further information about the Gunnison Copper Project can be found in the technical report filed on SEDAR at www.sedar.com entitled: "Gunnison Copper Project, NI 43-101 Technical Report, Prefeasibility Study" dated February 14, 2014.

For more information on Excelsior, please visit our website at www.excelsiormining.com.

ON BEHALF OF THE EXCELSIOR BOARD

Mark J. Morabito, Executive Chairman

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward looking information contained in this news release includes, but is not limited to, statements with respect to (i) the details of the mineral resource estimate; and (ii) the advancement of the Gunnison Project.

Such forward-looking information can be identified by the use of the word "will". Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and mineral reserves, the realization of resource and reserve estimates, copper and other metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Gunnison Project in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the permitting process, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Gunnison Project, risks relating to variations in mineral resources and reserves, grade or recovery rates resulting from current exploration and development activities, risks relating to the ability to access infrastructure, risks relating to changes in copper and other commodity prices and the worldwide demand for and supply of copper and related products, risks related to increased competition in the market for copper and related products and in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Gunnison Project may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, environmental risks and the additional risks identified in the "Risk Factors" section of the Company's reports and filings with applicable Canadian securities regulators.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information is made as of the date of this news release. Except as required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking information.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release, and no securities regulatory authority has either approved or disapproved of the contents of this release.

Lire la suite de l'article sur finance.yahoo.com

Excelsior Mining Corp.

CODE : MIN.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Excelsior Mining est une société développant des projet miniers basée au Canada.

Son principal projet en développement est GUNNISON en USA.

Excelsior Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 149,0 millions CA$ (114,2 millions US$, 105,8 millions €).

La valeur de son action a atteint son plus bas niveau récent le 29 novembre 2013 à 0,10 CA$, et son plus haut niveau récent le 01 février 2017 à 0,91 CA$.

Excelsior Mining possède 167 360 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de Excelsior Mining Corp.
16/05/2016Excelsior Appoints New Chief Financial Officer
16/05/2016Excelsior Fully Integrates Johnson Camp Production Facility
16/05/2016Excelsior Advances Permitting Process
16/12/2015Excelsior Announces Incentive Stock Option Grants and Extens...
20/08/2015Excelsior Announces Results of AGM
28/07/2015Hydrology Pump Tests Confirm Favourable Conditions for In-Si...
21/07/2015Metallurgical Fracture Simulation Tests Validate Prefeasibil...
07/07/2015Excelsior Announces Updated Mineral Resource Estimate
26/03/2015Announces Completion of Hydrology Drill Program and Releases...
26/03/2015Excelsior Announces Completion of Hydrology Drill Program an...
11/02/2015Excelsior Mining Named to 2015 TSX Venture 50
29/01/2015Excelsior Provides Feasibility Study Work Program Update
15/01/2015Excelsior Announces Graduation to Tier 1 of the TSX Venture ...
15/01/2015Announces Graduation to Tier 1 of the TSX Venture Exchange
07/01/2015Excelsior Exercises Option and Acquires Gunnison Project
02/12/2014Excelsior Announces Officer Appointments
05/11/2014Successful Metallurgical Drill Program Concludes at Gunnison
05/11/2014Excelsior Mining Corp.: Successful Metallurgical Drill Progr...
28/10/2014Excelsior Commences Hydrological Program
21/10/2014Excelsior Announces Closing of Greenstone Transaction and Ne...
15/10/2014Excelsior Commences Resource Upgrade Drill Program
09/10/2014Excelsior Announces Regulatory Approval of Greenstone Transa...
07/10/2014Excelsior Reaffirms Positive Economic Impact of Gunnison Pro...
15/09/2014Excelsior Provides Details on Metallurgical Drill Program
09/09/2014Excelsior Commences Feasibility Data Collection Program
05/09/2014Excelsior Announces Closing of First Tranche of US$10M Finan...
13/08/2014IIROC Trading Resumption - MIN
13/08/2014Excelsior Announces Strategic Partnership and US$10 M Financ...
13/08/2014IIROC Trading Halt - MIN
07/08/2014Excelsior Provides Marketing Update and Extends Stock Option...
29/07/2014Excelsior Mining Corp.: Callinan Royalties Corp. Exercises $...
27/06/2014Excelsior Mining Corp. Closes $4 Million Bought Deal Financi...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MIN.V)
0,890+2.30%
TSX-V
CA$ 0,890
01/02 15:52 0,020
2,3%
Cours préc. Ouverture
0,870 0,870
Bas haut
0,870 0,910
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,890 -%
Volume var. 1 mois
364 588 -%
24hGold TrendPower© : 44
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/02/2014
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,31 US$+3,10%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$-1,49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,00 CA$+2,56%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-1,07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,40 US$-0,39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :