Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Troymet Exploration Corp.

Publié le 10 mai 2016

Troymet Commences RC Drill Program at Wildcat Project - Utah

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Bismuth | Depression | Junior | Precious Metals | Utah |

Troymet Commences RC Drill Program at Wildcat Project - Utah

May 10, 2016

May 10, 2016 - Troymet Exploration Corp. (TSXV: TYE) ('Troymet' or the Company') is pleased to report that it has secured permits to drill its Wildcat gold-silver project in Juab County, Utah, held under option from Renaissance Gold Inc. (TSXV: REN).A drill contract has been signed and crews have been mobilized to prepare drill platforms. Drilling is expected to start in mid-May 2016. The Phase I drill program is budgeted at 1,220 metres of reverse circulation drilling in 9 holes, ranging from 67 to 213 metres, in the 'High Grade Hill', 'Core' and 'SE' target areas (Wildcat Maps).As part of its planning the Company has permitted 14 drill sites. The project is road accessible.

The High Grade Hill target contains unusually high grade gold in jasperoid. Silver, bismuth, antimony, tellurium and mercury are also highly anomalous (Corporate Presentation). The Core target encompasses a significant structural intersection on the Joy Fault coupled with a possible volcano-structural depression and/or vent complex. This structural setting is the focus of a 2 km long rock chip geochemical zoning pattern where gold progressively increases towards the Joy Fault. The pattern includes proximal bismuth, copper and silver and peripheral lead, tellurium and arsenic relative to the Joy Fault.Principal component analysis shows that factor 2 scores, related to a precious-metals related assemblage (?), progressively increase in strength as the Joy Fault is approached. This indicates that the metal-bearing hydrothermal system is located in a structurally complex magnetic low, suggestive of pervasive alteration and demagnetization (News Release of January 19, 2016). A fence of two holes drilled in 1990, at the extreme north end of the structural zone, intersected 7.6 metres of 0.56 g/t Au and 3.0 metres of 0.43 g/t Au in the shallow hole. The undercut hole intersected 22.9 metres of 1.27 g/t gold. As well, the High Grade Hill discovery occurs in the Core target.

The SE target encompasses the Rattler and Rattler Breccia drill targets, which are adjacent to a large recessive zone developed along the Joy Fault on the margin of the Thomas Caldera.The Rattler anomaly is developed in carbonate rocks immediately adjacent to the Joy Fault in contrast to the Rattler Breccia, which is developed in a structurally complex location on the Joy Fault. Neither target has been previously drilled. The Rattler comprises a 300 metre long soil anomaly parallel to the Joy Fault averaging approximately 0.3 ppm tellurium, with mercury and gold concentrations of up to 4.9 ppm and 0.122 ppm, respectively (News Release of July 27, 2015).The target contains strong pathfinder element anomalies and is interpreted to be 'leakage' from mineralization in more favorable host rocks at depth (<100 metres) or from mineralization in hydrothermal breccias associated with the Joy Fault.The Rattler Breccia and adjacent carbonate host rocks are strongly anomalous in gold and other trace elements associated with epithermal and carbonate-hosted gold deposits. (News Release of November 24, 2015).

Troymet, through its wholly owned subsidiary Troymet USA LLC ('Troymet USA'), holds an option to acquire a 70% interest in the Wildcat property from Renaissance Exploration, Inc. ('RenEx'), a wholly owned subsidiary of Renaissance Gold Inc.Under the terms of option agreement, Troymet USA has retained RenEx as its contractor to take advantage of RenEx's expertise and established infrastructure.Troymet USA is exclusively responsible for the planning, execution and supervision of all exploration programs.

Qualified Person

President and CEO, Kieran Downes, P. Geo., a Qualified Person as defined by National Instrument 43-101, has reviewed and verified the technical information provided in this release.

About Troymet Exploration Corp.

Troymet Exploration Corp. is a junior exploration company with a solid treasury and with projects in British Columbia (Redhill and Golden Eagle), Manitoba (McClarty Lake) and Utah (Wildcat).Troymet operates the Wildcat, Redhill and Golden Eagle projects.Hudbay Minerals Inc. is the operator of the McClarty Lake joint venture and must contribute $1,151,052 in joint venture expenditures before Troymet is required to fund its participating interest.Troymet retains a 2% net smelter returns royalty (NSR) on the Key property, British Columbia, which was sold to New Gold Inc. in 2013.

TROYMET EXPLORATION CORP.

Kieran Downes, Ph.D., P.Geo.
President, CEO & Director

For further information, contact:
Investor Relations
Tel: 250-729-0453
Email: [email protected]

Website: www.troymet.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

This news release contains certain forward-looking information.All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties.In particular, this news release contains forward-looking information in respect of: the Wildcat Project, including the exploration potential and analogous deposit potential of the Wildcat Project; future data analysis, sampling plans and exploration plans on the Wildcat Project; exploration targets and the potential of such exploration targets; and the Phase I drill program of the Wildcat Project, including the commencement of drilling, the budgeted metres to be drilled and the number of drill holes in Phase I.There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information.This forward-looking information reflects Troymet's current beliefs and is based on information currently available to Troymet and on assumptions Troymet believes are reasonable.These assumptions include, but are not limited to: the current share price of Troymet's common shares and the ability to raise future equity financing, if needed, at prices acceptable to Troymet͖; Troymet's current and initial understanding and analysis of the Wildcat Project; the ability of Troymet to discover viable exploration targets and the results of exploration on the Wildcat Project; Troymet's general and administrative costs remaining constant; Troymet's cost assumptions for its exploration programs at the Wildcat Project and the market acceptance of Troymet's business strategy.Forward-looking information is subject to known and unknown risks, uncertainties and other factors which may cause the actual results, level of activity, performance or achievements of Troymet to be materially different from those expressed or implied by such forward-looking information.Such risks and other factors may include, but are not limited to: the early stage development of Troymet and its projects, and in particular, the Wildcat Project; general business, economic, competitive, political and social uncertainties; capital market conditions and market prices for securities, junior market securities and mining exploration company securities; commodity prices; the actual results of current exploration and development or operational activities; competition; changes in project parameters as plans continue to be refined; accidents and other risks inherent in the mining industry; lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting Troymet; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals.A description of other assumptions used to develop such forward-looking information and a description of other risk factors that may cause actual results to differ materially from forward-looking information can be found in Troymet's disclosure documents on the SEDAR website at www.sedar.com. Troymet does not undertake to update any forward-looking information except in accordance with applicable securities laws.

You can view the Previous News item:April 26th, 2016, Troymet Commences Induced Polarization Survey at Redhill

Back to the main News page, or press the Back button on your browser.

Lire la suite de l'article sur www.publicnow.com

Troymet Exploration Corp.

EXPLORATEUR
CODE : TYE.V
ISIN : CA8977731071
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Troymet est une société d’exploration minière d'argent et d'or basée au Canada.

Ses principaux projets en exploration sont MCCLARTY LAKE, KEY, WHEATCROFT et GOLDEN EAGLE au Canada.

Troymet est cotée au Canada. Sa capitalisation boursière aujourd'hui est 609 281 CA$ (452 325 US$, 397 720 €).

La valeur de son action a atteint son plus haut niveau récent le 26 novembre 2010 à 0,41 CA$, et son plus bas niveau récent le 28 juin 2019 à 0,01 CA$.

Troymet possède 121 856 225 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Troymet Exploration Corp.
18/09/2013Cancels Private Placement
26/09/2011s Exploration Programs
19/08/2011Closes $1,844,850 Private Placement
29/07/2011Increases Private Placement to $1,500,000
08/12/2009Announces $500,000 Private Placement
09/07/2008Completes $1,300,000 Unit Private Placement
Projets de Troymet Exploration Corp.
25/03/2015(Key)Reports: New Gold Completes Expenditure Commitment on the Ke...
19/03/2015(Mcclarty Lake)Announces That McClarty Lake JV Identifies New VMS Targets
11/12/2013(Key)Completes Sale of Key Property
19/11/2013(Key)Signs Agreement to Sell Key Property
15/04/2013(Mcclarty Lake)Reports on the 2013 Drill Program at McClarty Lake Project
14/01/2013(Key)Reports Assays From Key Project
14/01/2013(Key)Reports Assays From Key Project
08/11/2012(Key)Completes Drilling on Key Project
04/10/2012(Key)Mobilizes Drill to the Key Project
18/09/2012(Key)Resumes Exploration & Schedules Drilling on Key Project
14/08/2012(Mcclarty Lake)& Hudbay Sign Joint Venture Agreement on McClarty Lake Proje...
24/07/2012(Key)s Progress and Expands Program at Key Gold Project
29/05/2012(Key)Initiates Exploration Program on Key Project
01/03/2012(Key)Focuses on Key Project
16/02/2012(Golden Eagle)Intersects 1.27 g/t Gold over 36.45 metres at Golden Eagle
12/01/2012(Mcclarty Lake)s Exploration Progress at McClarty Lake
30/11/2011(Golden Eagle)Completes Drilling at Golden Eagle
12/10/2011(Golden Eagle)Mobilizes Drill to Golden Eagle Project
13/06/2011(Key)Completes Phase I Exploration on Key Project
06/06/2011(Mcclarty Lake)Reports HudBay Earnback Complete on McClarty Lake Project
05/04/2011(Key)s Drill Program on Key Project
30/03/2011(Mcclarty Lake)Optionee HudBay Drilling at McClarty Lake
03/03/2011(Key)s Drill Programs at Key & McClarty Lake Projects
15/02/2011(Mcclarty Lake)Drilling at McClarty Lake
10/02/2011(Key)Drilling on Key Property
21/06/2010(Key)Confirms Regional Structures on Key Project
10/06/2010(Key)Identifies Structures on Key Project
20/05/2010(Key)Mobilizes Crews to Key Project
28/04/2010(Key)Reports Anomalous Gold at Key - Plans Summer Drill Program
13/04/2010(Key)to Drill on Key Project
08/03/2010(Mcclarty Lake)Confirms VMS Target on 100% Owned McClarty Claims
17/02/2010(Golden Eagle)Confirms New Gold Targets
28/01/2010(Mcclarty Lake)Commences Winter Program
14/01/2010(Mcclarty Lake)Winter Program
21/12/2009(Golden Eagle)Identifies 9 New Target Areas
02/10/2009(Golden Eagle)Mobilizes Drill
21/10/2009(Golden Eagle)Completes Drilling
06/11/2009(Mcclarty Lake)Plans to Drill the Mac Target
10/09/2009(Golden Eagle)Commences Exploration Program at Golden Eagle Project
25/06/2009(Golden Eagle)Updates Skarn Zone, Golden Eagle Project
16/06/2009(Golden Eagle)Targets Bulk-Tonnage Gold at Golden Eagle
24/02/2009(Golden Eagle)Confirms Intrusion Related Gold System on Golden Eagle Proje...
13/08/2008(Key)Completes Airborne VTEM Survey at the Key Project
13/06/2008(Mcclarty Lake) Hudson Bay to Earn Back Interest in Troymet's McClarty Lake...
15/05/2008(Mcclarty Lake)Reports Final Drill Results from McClarty Lake
25/04/2008(Mcclarty Lake) Preliminary Geological and Geophysical Observations at McCl...
09/04/2008(Mcclarty Lake) First McClarty Lake Holes Intersect Zinc, Copper and Gold
17/03/2008(Mcclarty Lake)Intersects Massive Sulphide Mineralization at McClarty Lake ...
05/03/2008(Mcclarty Lake) Completes VTEM Survey on McClarty Lake VMS Property
28/02/2008(Mcclarty Lake)Drilling Underway at McClarty Lake VMS Project
11/02/2008(Mcclarty Lake)Drill to McClarty Lake VMS Project
09/01/2008(Mcclarty Lake) Commence Winter Exploration Program at McClarty Lake VMS Pr...
Communiqués de Presse de Troymet Exploration Corp.
25/07/2016Troymet Identifies New Drill Targets & Expands Prospective A...
11/07/2016Troymet Starts Detailed Sampling of Gold and 3DIP Anomalies ...
20/06/2016Troymet Reports Significant 3DIP Results at Redhill
02/06/2016Troymet Completes Wildcat Drill Program
10/05/2016Troymet Commences RC Drill Program at Wildcat Project - Utah
10/05/2016Renaissance Gold Obtains Drill Permit for Wildcat Project
26/04/2016Troymet Commences Induced Polarization Survey at Redhill
04/04/2016Troymet Starts Field Program at Redhill
20/01/2016Renaissance Gold Exploration Update
19/01/2016Troymet Targets the Core Area at Wildcat
15/12/2015Troymet’s Joint Venture Partner Plans Ground Geophysics at M...
15/12/2015Troymet's Joint Venture Partner Plans Ground Geophysics at M...
24/11/2015Troymet Targets the Rattler Breccia at Wildcat
29/10/2015Troymet Identifies New Copper and Gold Soil Anomalies at Red...
20/10/2015Troymet Identifies Significant Copper and Gold Soil Anomalie...
07/10/2015Troymet Reviews Initial Drill Targets on Alpha Zone
16/09/2015Troymet Completes Redhill Field Program
20/08/2015Troymet Shareholders Approve All Matters at AGM
27/07/2015Troymet Updates Wildcat SE Target Area Progress
14/07/2015Troymet Appoints New Auditor
09/07/2015Troymet Options Redhill Project From Homegold
19/03/2015Troymet Announces That McClarty Lake JV Identifies New VMS T...
23/02/2015Troymet Options Wildcat Project from Renaissance Gold
16/01/2015Troymet Grants 1.35 Million Stock Options
16/01/2015Grants 1.35 Million Stock Options
08/12/2014Troymet Terminates Thelon Option & Provides Corporate Update
20/10/2014Troymet Reports Significant Skarn Zone Prospecting Results
20/08/2014Troymet Announces Corporate Update
18/07/2014Troymet Shareholders Approve All Matters at AGM
02/06/2014Troymet Announces Appointment of CFO
13/05/2014Troymet Announces the Resignation of Brian Cebryk as CFO of ...
28/04/2014Troymet Announces Adoption of Advance Notice By-Law
19/02/2014Provides Corporate Strategy Update
14/06/2013(Mcclarty Lake)Receives Assays from Hudbay for McClarty Lake
19/04/2013Shareholders Approve All Matters at AGM
25/03/2013Files AGM Materials and Announces AGM Matters
23/01/2013(Mcclarty Lake)s McClarty Lake Planning
10/07/2012(Golden Eagle)Files NI 43-101 Technical Report for Golden Eagle Gold Proje...
12/06/2012(Key)Files NI 43-101 Technical Report for Key Gold Project
19/01/2012(Key)Identifies Large Geochemical Soil Anomalies and Additional D...
09/05/2011(Key)Intersects Porphyry Style Mineralization on Key Project
11/04/2011(Mcclarty Lake)Identifies Extension of Discovery Horizon at McClarty Lake P...
25/01/2010Update on Status
23/02/2010Expands Geophysical Survey at McClarty
23/01/2010Completes $500,000 Financing
11/08/2009s Activities
04/09/2008Extends Tannis Zone at Golden Eagle Project
07/08/2008Commences Drilling at Golden Eagle Project
01/08/2008Provides Operational Update
16/01/2008Tax Rollover Election Reminder to Former Signet Shareholders
26/09/2007Announces Base Metal Discovery at McClarty Lake VMS Project
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TYE.V)
0,005+0.00%
TSX-V
CA$ 0,005
28/06 17:00 -
0%
Cours préc. Ouverture
0,005 0,010
Bas haut
0,005 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,005 -%
Volume var. 1 mois
1 743 000 -%
24hGold TrendPower© : -11
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,24%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :