Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Mariana Resources Ltd

Publié le 22 mars 2011

- Half-Year Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Lanthanum |

Uranium Resources Plc ('Uranium Resources' or 'the Company')

Half-Year Results

 

Uranium Resources Plc, the AIM listed uranium exploration and development company operating in Tanzania, announces its results for the six month period ended 31 December 2010.

 

Managing Director's Report

 

During the period under review we have made strong progress on all fronts in building a uranium focussed resource development company.  In particular, we have undertaken a very successful drilling programme at our flagship Mtonya project ('Mtonya') in southern Tanzania.  The results of the 2010 programme have enabled us to verify our geological and structural model of Mtonya and demonstrated that conditions favourable for roll-front uranium mineralisation exist well below the already known horizons.  Furthermore the characteristics of the intercepted sandstone and other strata suggest that Mtonya would be amenable to in-situ uranium recovery.  This technology is currently the most cost-effective and environmentally-friendly process for extracting uranium.

 

In addition to Mtonya, we are currently building a pipeline of projects on our extensive exploration holdings in Tanzania.  We are using the same comprehensive approach as we utilised at Mtonya to evaluate, prioritise and advance our other targets, which include Likuyu, Foxy, Eland and Pedro.

 

Exploration Update

 

Mtonya

 

The Company's main asset is its 1,200 sq km Mtonya uranium project located approximately 100 km east of the district capital of Songea.  Its geology comprises Usagaran orogenic basement rocks and clastic sediments of the Luwegu subbasin.  Roll-front style uraniferous mineralisation is hosted by the Karoo sandstone units and is thought to be analogous to that of Mantra's Nyota deposit, which contains a Measured and Indicated Resource of 65.5 million pounds U3O8

 

A comprehensive analysis of the results of earlier exploration drilling was followed by an extensive and thorough compilation of regional data, such as airborne and heliborne magnetics and radiometrics, satellite imagery and topography.  Synthesising these various data has led to adjustments in our exploration strategy and the development of new drill targets at Mtonya.

 

Following this analysis, we designed the 2010 drilling programme which was launched in June last year.  The 2010 programme was designed to verify our geological and structural model and generate both near-surface and deep mineralisation targets.  The programme comprised 11 vertical diamond drill holes totalling 4,170 m.  These holes, 300 m to 500 m deep and 500 m to 4,000 m apart, were positioned in three intersecting fences covering a large area 8 km long and 4 km wide.

 

The data obtained during the 2010 drilling programme confirmed our expectations and demonstrated that conditions favourable for roll-front uranium mineralisation exist well below the already known horizons.  Of particular note were holes 1, 2, 8, 9, 10 and 11 which intersected beds of permeable arkose sandstone and extensive zones of reduction and pervasive oxidation down to a depth of 400 m.  The lithological composition of the host rock units, porosity, location and extent of the oxidised zones indicate ideal geological settings for multiple mineralised roll-fronts.  The scale and intensity of the observed redox processes is particularly encouraging as they are considered adequate for producing significant uranium deposits.  Roll-front uranium deposits form in flat-lying, permeable clastic sediments at the interface of advancing oxidising groundwater and reducing conditions.  The intensity of oxidation and its spatial extent are indicative of the duration of these processes and volume of the sedimentary rock that has been altered and depleted of uranium and associated elements.


Of particular importance are the characteristics of the intercepted sandstone (grain size, porosity and permeability), thicknesses of these sandstone beds and the 'stacked' nature of sandstone strata confined between impermeable mudstone units.  All of these features make Mtonya ideal for hosting a sandstone-hosted roll-front deposit that is amenable to in-situ uranium recovery ('ISR').  This technology is currently the most cost-effective and environmentally-friendly process for extracting uranium.  The uranium minerals are dissolved by pumping a slightly acidic solution (much like table vinegar) in the ground and pumping out pregnant solution to the surface where the minerals are recovered by conventional methods.  There is very little land disturbance and no waste rock or tailings is produced.  This technology has been advanced to the point where it is controllable, safe, and an environmentally benign method of mining.  In addition, the low capital and operating cost requirements (in comparison to conventional open-pit or underground mining) make uranium deposits amenable to ISR very attractive exploration targets.

 

The ongoing in-depth interpretation of geological and geochemical results of the 2010 programme will significantly narrow our search radius and generate defined drill targets for the 2011 programme.  To compress the timeframe and minimise exploration risks, the Company is utilising sophisticated geological and geochemical modelling to process the 2010 data.  Since acquiring control of the Tanzanian projects, we have developed a complex, proprietary geological model by using remote sensing, geophysical, field mapping, and structural interpretation data.  This model is continuously enhanced and updated.

 

Within the areas with previously known mineralisation, the drilling produced contiguous intercepts with significant U3O8 grades in holes 1, 9, 10, and 11, reaching 731 ppm U3O8

 

Details of the significant uranium grades are given in the table below.

 

Table 1. 2011 Mtonya Drilling Results (composited intercepts, 100 ppm cutoff)

 

Drill Hole

Longitude

Latitude

From, m

To, m

Width, m

U3O8 ppm

URAMT 01

36.52

-10.56

76.60

79.60

3..00

122

92.60

96.60

4..00

215

Including 731 ppm U3O8 at 93.6-94.6 m

URAMT 09

36.54

-10.54

20.00

26.00

6..00

157

URAMT 10

36.52

-10.55

15.60

18.10

2..50

144

46.70

54.60

7..90

141

Including 436 ppm U3O8 at 50.6-52.0 m

66.60

69.40

2..80

163

Including 425 ppm U3O8 at 67.6-68.4 m

74.30

75.80

1..50

106

URAMT 11

36.47

-10.55

7..00

11.00

4..00

239

Including 460 ppm U3O8 at 10.0-11.0 m

14.00

16.00

2..00

142

29.00

34.00

5..00

118

 

The 2010 drilling programme has provided the Company with important data which is particularly noteworthy because of the extensive lateral coverage, far-reaching depths, large-diameter core, and geochemical assays (33 elements) on all of core.  The drill core was thoroughly logged and systematically photographed before and after splitting and sampling.  The Company adheres to the industry's best quality assurance practices and protocols.

 

Uranium Resources intends to undertake further drilling on this project in 2011 and will publish details of this programme in due course.

 

Likuyu

 

The Likuyu target area ('Likuyu') is located about 65 km northeast of Songea.  The 197 sq km area is underlain by the Precambrian basement gneisses to the west and the Mesozoic Karoo clastic sediments to the east and southeast.  The project area occupies the western margin of the Luwegu Rift and is in part comprised of the same sedimentary sequences that host Mantra's Nyota deposit, about 50 km to the east.

 

A number of prominent northwest-southeast airborne radiometric anomalies and uranium occurrences have been identified in the project area during previous reconnaissance campaigns.  The airborne anomalies appear to be trailing the northeast-trending regional structures similar to the Mkuju River fault along which Mantra's Nyota deposit is hosted.  The presence of uranium anomalism, similar structural framework and the same lithologies indicates a good potential for Nyota-like deposits in this area.

 

Likuyu is one of the Company's priority targets for the 2011 exploration programme and we plan to conduct a ground follow-up, mapping traverses and rock sampling in H1 2011 with a view to generating exploration targets for drilling by the end of 2011.

 

Foxy

 

The Foxy project ('Foxy') is situated some 60 km to the southeast of Mtonya.  The area covers approximately 914 sq km and is underlain by the Karoo clastic sediments within a sub-basin that opens up to the north into the Luwegu basin.  In a setting similar to that of Mantra's Nyota deposit and Mtonya, Foxy features a 400 m long radiometric anomaly which was identified by a heliborne radiometric survey and a 13,400 ppm U3O8 grab sample collected during the 2007 reconnaissance programme.  The same reconnaissance work also isolated several 'hotspots' ranging up to 20,000 cps ('counts per second') along two northeast-southwest trends (about 0.5 sq km on surface) during a ground scintillometer survey.  In a limited follow-up campaign, we drilled 19 reverse circulation shallow holes that identified limited and poddy near-surface uranium mineralisation.  The Company is now working on making a very thorough compilation of data for Foxy and augmenting its regional database to enhance the understanding of the project with a view to generating drill targets based on the geological model.  The exploration strategy for Foxy will be developed once this analysis is completed.

 

Eland

 

The Eland project is located in south-western Tanzania, about 105 km to the south of Mtonya.  The area covering some 197 sq km is thought to be underlain by Precambrian basement gneiss with a large, scarp-like outcrop of fenitized gneiss and nepheline syenite in the southern part of the tenement.  The occurrence is situated in the hanging wall of a significant NE-striking, NW-dipping structure.

 

In 2008, the Company undertook a field follow-up on a contrast radiometric anomaly (with an average tenor of 300 cps over an area of 0.6 sq km).  During follow-up work over 70 rock samples were collected.  These samples defined a U-Th-Nb-Ta anomaly with magnetic and geochemical characteristics typical for Nb-Ta-REE carbonatite deposits.  Significant rare-earth deposits of this type are being developed in Tanzania by Montero Mining and Exploration Ltd (Wigu Hill) and in Malawi by Lynas Corporation Ltd (Kangakunde).  During the uranium-focussed field programme in 2008, samples were analysed only for La, Ce and Y and not for the entire suite of rare earth elements and no fieldwork was conducted in the central part of the inferred carbonatite complex.  In 2010, we carried out a thorough review of all available data on Eland with the objective of determining the merits of further work.  The management views Eland as a valid carbonatite target and is planning a REE-focussed field programme on the property in 2011.

 

Pedro

 

The Pedro target is located in the Ruhuhu basin, some 70 km northwest of the district capital of Songea.  The target area comprises radiometric anomalies hosted in the coarse arkose sandstone of the Karoo age.  The area was identified through reviewing historical airborne data and a follow-up heliborne radiometric survey.  In 2007, we conducted a limited ground fieldwork programme with helicopter support when a grab sample grading 2,400 ppm U3O8 was collected.  The geology of Pedro appears to bear similarities with Paladin Energy Ltd's Kayelekera deposit and is being considered for follow-up work.  The Company is currently conducting a thorough collation of all available data and review of past work in order to generate field follow-up targets.

 

Regional Generative Work

 

As the compilation of data and enhancement of the Company's databases continues, we remain confident that new exploration opportunities will be generated on our ground.  We consider most of our holdings in Tanzania prospective for a number of commodities.

 

Financial Results

 

With Uranium Resources being at the exploration stage, we are not producing revenue and as such I am reporting a pre-tax loss of �560,135 (31/12/09 half-year: �256,414; 30/06/10 full year: �641,714) (including a share based payments charge of �144,000 (31/12/09: �Nil; 30/06/10: �Nil)) for the six months ended 31 December 2010. 

 

During the period under review, we completed two placings, raising approximately �1.7 million through investors including our cornerstone shareholder, Estes Limited. 

 

Outlook

 

2010 was a very productive year for Uranium Resources, particularly the last six months covered by these half-year results.  Having confirmed our geological model at Mtonya, we look forward to executing the 2011 drill programme.  In addition, we are developing a pipeline of projects by advancing other properties in Tanzania.

 

Finally, I would like to take this opportunity to thank my fellow directors and our shareholders for their dedication and support through what has been a transitional period for the Company, and look forward to what I believe will be a fruitful future.

 

Alex Gostevskikh

 

Competent Persons declaration

 

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information assessed by Alex Gostevskikh who is a Member of the Mining and Metallurgical Society of America. Mr Gostevskikh has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Gostevskikh consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

For further information please visit www.uraniumresources.co.uk or contact:

 

Alex Gostevskikh

Uranium Resources plc

Tel: +255 (0) 752 968 062

Ross Warner

Uranium Resources plc

Tel: +44 (0) 7760 487769

Hugh Warner

Uranium Resources plc

Tel: +61 (0) 413 621 652

Samantha Harrison

Ambrian Partners Ltd (Nomad)

Tel: +44 (0) 20 7634 4700

Ben Wright

Ambrian Partners Ltd (Nomad)

Tel: +44 (0) 20 7634 4700

Jeremy King

Optiva Securities Ltd

Tel +44 (0)20 3137 1904

Jason Robertson

Optiva Securities Ltd

Tel +44 (0)20 3137 1906

Hugo de Salis

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

Felicity Edwards

St Brides Media & Finance Ltd

Tel: +44 (0) 20 7236 1177

 

Definitions

 

U - Uranium; Th - Thorium; Nb - Niobium; Ta - Tantalum; La - Lanthanum; Ce - Cerium; Y - Yttrium; REE - Rare Earth Elements

 

 

UNAUDITED CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

FOR THE SIX MONTHS ENDED 31 DECEMBER 2010

 

     

 

 

Half-year ended

31 Dec 2010

(Unaudited)

 

Half-year ended

31 Dec 2009

(Unaudited)

 

Year ended

30 June 2010

(Audited)

 

Notes

 

 

 

Administrative expenses

 

(414,254)

(322,620)

(710,228)

Share-based payments charge

 

(144,000)

-

-

Foreign exchange (loss) / gain

 

(1,955)

62,971

65,279

Total operating expenses

 

(560,209)

(259,649)

(644,949)

Group operating loss

 

(560,209)

(259,649)

(644,949)

Interest receivable

 

74

3,235

3,235

Loss before taxation

 

(560,135)

(256,414)

(641,714)

Taxation

 

-

-

-

Loss for the period

 

(560,135)

(256,414)

(641,714)

 

 

 

 

 

Other comprehensive income

 

 

 

 

Exchange differences on translating foreign operations

 

(45,232)

-

108,707

Total comprehensive loss attributable to the equity holders of the parent

 

(605,367)

(256,414)

(533,007)

 

 

 

 

 

Loss per share (pence)

 

 

 

 

Basic

4

(0.12p)

(0.09p)

(0.18p)

Diluted

4

(0.12p)

(0.09p)

(0.18p)

 


 

UNAUDITED CONSOLIDATED STATEMENTS OF FINANCIAL POSITION

AS AT 31 DECEMBER 2010

 

     

 

31 Dec 2010

(Unaudited)

31 Dec 2009

(Unaudited)

30 June 2010

(Audited)

 

Note

 

 

 

 

 

Assets

 

 

 

 

Non-current assets

 

 

 

 

Property, plant & equipment

 

8,661

-

10,187

Exploration & evaluation assets

6

4,190,365

1,325,591

3,323,406

 

 

4,199,026

1,325,591

3,333,593

 

 

 

 

 

Current assets

 

 

 

 

Receivables

 

27,390

228,725

13,213

Cash and cash equivalents

 

691,640

2,201,961

365,529

 

 

719,030

2,430,686

378,742

Total Assets

 

4,918,056

3,756,277

3,712,335

 

 

 

 

 

Liabilities

 

 

 

 

Current liabilities

 

 

 

 

Trade and other payables

 

(134,042)

(186,647)

(131,954)

 

 

 

 

 

Total Liabilities

 

(134,042)

(186,647)

(131,954)

Net Assets

 

4,784,014

3,569,630

3,580,381

 

 

 

 

 

Equity

 

 

 

 

Share capital

7

481,744

291,000

406,494

Share premium

 

6,834,411

3,094,360

5,244,661

Share application

 

-

1,978,451

-

Share-based payments reserve

 

1,421,879

1,869,879

1,869,879

Foreign exchange reserve

 

63,475

-

108,707

Retained losses

 

(4,017,495)

(3,664,060)

(4,049,360)

Total Equity

 

4,784,014

3,569,630

3,580,381

 


 

UNAUDITED CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

FOR THE SIX MONTHS ENDED 31 DECEMBER 2010

 

 

Share capital

Share premium

Share application

Share-based payment reserve

Foreign currency translation reserve

Retained losses

Total shareholders equity

 

 

 

 

 

 

 

 

 

As at 1 July 2009

291,000

3,094,360

-

1,869,879

-

(3,407,646)

1,847,593

Total comprehensive income

-

-

-

-

-

(256,414)

(256,414)

Transactions with owners:

 

 

 

 

 

 

 

Shares subscribed for, but not yet issued

-

-

1,996,800

-

-

-

1,996,800

Cost of shares subscribed for, but yet not issued

-

-

(18,349)

-

 

-

-

(18,349)

Total transaction with owners

-

-

1,978,451

-

-

-

1,978,451

Balance at 31 December 2009

291,000

3,094,360

1,978,451

1,869,879

-

(3,664,060)

3,569,630

 

 

 

 

 

 

 

 

As at 1 July 2009

291,000

3,094,360

-

1,869,879

-

(3,407,646)

1,847,593

Total comprehensive income

-

-

-

-

108,707

(641,714)

(533,007)

Transactions with owners:

 

 

 

 

 

 

 

Issue of share capital

115,494

2,168,650

-

-

-

-

2,284,144

Cost of share issue

-

(18,349)

-

-

-

-

(18,349)

Total transaction with owners

115,494

2,150,301

-

-

-

-

2,265,795

Balance at 30 June 2010

406,494

5,244,661

-

1,869,879

108,707

(4,049,360)

3,580,381

 

 

 

 

 

 

 

 

Total comprehensive income

-

-

-

-

(45,232)

(560,135)

(605,367)

Transactions with owners:

 

 

 

 

 

 

 

Issue of share capital

75,250

1,624,750

-

-

-

-

1,700,000

Cost of share issue

-

(35,000)

-

-

-

-

(35,000)

Cancellation of options

-

-

-

(592,000)

-

592,000

-

Share based payments

-

-

-

144,000

-

-

144,000

Total transaction with owners

75,250

1,589,750

-

(448,000)

-

592,000

1,809,000

Balance at 31 December 2010

481,744

6,834,411

-

1,421,879

63,475

(4,017,495)

4,784,014

 

 

 

 

 

 

 

 

 


 

UNAUDITED CONSOLIDATED STATEMENT OF CASH FLOWS

FOR THE SIX MONTHS ENDED 31 DECEMBER 2010

 

 

 

 

Half-year ended

Half-year ended

Year ended

 

 

31 Dec 2010

31 Dec 2009

30 June 2010

 

 

(Unaudited)

(Unaudited)

(Audited)

 

 

Cash flows from operating activities

 

 

 

Operating loss

 

(560,209)

(259,649)

(644,949)

Adjustments for non-cash items:

 

 

 

Share-based payments charge

 

144,000

-

-

Depreciation

 

1,262

-

178

(Increase) / decrease in receivables

(14,177)

(9,761)

12,292

Increase / (decrease) in payables

12,052

74,349

(28,323)

 

Net cash used in operating activities

 

(417,072)

 

(195,061)

 

(660,802)

 

 

 

 

 

Investing activities

 

 

 

 

Acquisition of subsidiaries, net of cash acquired

 

-

(193,459)

(1,418,815)

Funds used for exploration and evaluation

 

(921,891)

(90,474)

(225,444)

Funds used for plant and equipment

 

-

-

(10,365)

Interest received

 

74

3,235

3,235

 

Net cash used in investing activities

 

(921,817)

 

(280,698)

 

(1,651,389)

 

 

 

 

 

Financing activities

 

 

 

 

Proceeds from share application/issue of shares

1,700,000

1,996,800

1,996,800

Cost of share application

 

(35,000)

(18,349)

(18,349)

 

Net cash from financing

 

 

1,665,000

 

1,978,451

 

1,978,451

 

 

 

 

 

Increase / (decrease) in cash and cash equivalents

 

326,111

 

1,502,692

 

(333,740)

 

 

 

 

 

Cash and cash equivalents at beginning of the period

 

365,529

 

699,269

 

699,269

Cash and cash equivalents at the end of the period

 

691,640

 

2,201,961

 

365,529

 

 

 

 

 

 


 

NOTES TO THE UNAUDITED HALF-YEARLY FINANCIAL REPORT FOR THE SIX MONTHS ENDED 31 DECEMBER 2010

 

1         General information

 

Uranium Resources Plc ('the Company') is domiciled in England. The condensed consolidated half-year accounts of the Company for the six months ended 31 December 2010 comprise the Company and its subsidiaries (together referred to as 'the Group'). 

 

The condensed half-year accounts for the period 1 July 2010 to 31 December 2010 are unaudited. In the opinion of the Directors the condensed half-year accounts for the period presents fairly the financial position, and results from operations and cash flows for the period in conformity with the generally accepted accounting principles consistently applied. The condensed half-year accounts incorporate unaudited comparative figures for the interim period 1 July 2009 to 31 December 2009 and the audited financial year to 30 June 2010.

 

The financial information contained in this half-year report does not constitute statutory accounts as defined by section 434 of the Companies Act 2006.

 

The comparatives for the full year ended 30 June 2010 are not the Company's full statutory accounts for that year. A copy of the statutory accounts for that year has been delivered to the Registrar of Companies.  The auditors' report on those accounts was unqualified, included references to the going concern note in the accounts to which the auditors drew attention by way of emphasis without qualifying their report and did not contain a statement under section 498 (2) - (3) of the Companies Act 2006.

 

2         Accounting policies

 

The condensed half-year accounts have been prepared using policies based on International Financial Reporting Standards (IFRS and IFRIC interpretations) issued by the International Accounting Standards Board ("IASB") as adopted for use in the EU. The condensed half-year accounts have been prepared using the accounting policies which are expected to be applied in the Group's statutory financial statements for the year ending 30 June 2011.

 

Basis of preparation and going concern

 

During the period ended 31 December 2010 the Group made a loss of �560,135 (31/12/09: �256,414, 30/06/10: �641,714). Included in this loss is a share based payments charge of �144,000 (31/12/09: �Nil, 30/06/10: �Nil).  At the period end date the Group had net assets of �4,784,014 (31/12/09: �3,569,630, 30/06/10: �3,580,381) and cash balances of �691,640 (31/12/09: �2,201,961, 30/06/10: �365,529). 

 

The Group currently has cash balances of approximately �300,000 and therefore will require further funds to meet its budgeted operating and committed drilling costs of �1,000,000 for the period ending 31 March 2012 (being 12 months from approval of these half-year results).  The Directors are confident that they will be able to raise the additional funds and continue to meet their obligations, as they fall due.  In coming to this conclusion, the Directors noted their previous capital raisings and the continued support received from its major shareholder, Estes Limited.

 

The operations of the Group are currently being financed from funds which the Company raised from private and public placings of its shares.  The Group has not yet earned revenue as it is still in the exploration phase of its business. The Group is reliant on the continuing support from its existing and future shareholders..

 

The Board believes that the Group will have sufficient cash and other resources to fund its activities and to continue its operations for the foreseeable future and for the Group to continue to meet its liabilities as they fall due, and for at least the next twelve months from the date of approval of these financial statements.  The financial statements have, therefore, been prepared on the going concern basis.

 

3         Taxation

 

No taxation has been provided due to losses in the period.

 

4         Loss per share

 

The basic loss per share has been calculated using the loss attributable to equity shareholders for the financial period of �560,135 (six months ended 31 December 2009: �256,144; year ended 30 June 2010: �641,714) and the weighted average number of ordinary shares in issue of 448,198,913 (31 December 2009: 291,000,000; 30 June 2010: 349,888,887).

 

The diluted loss per share has been calculated using a weighted average number of shares in issue and to be issued of 494,462,615 (31 December 2009: 360,000,000; 30 June 2010: 418,888,887). The diluted loss per share has been kept the same as the basic loss per share as the conversion of share options decreases the basic loss per share, thus being anti-dilutive.

 

5     Subsidiary undertakings

 

Subsidiary undertakings

Principal activities

Percentage of ordinary share capital held

Direct

 

 

Deep Yellow Tanzania Limited

Uranium exploration

100%

URA (St Henri) Limited

Applied for exploration licences

100%

WML Uranium Holdings Limited

Holding company

100%

Indirect

 

 

Western Metals Tanzania Limited

Uranium exploration

100%

Western Metals Exploration Limited

Applied for exploration licences

100%

Western Metals Uranium Limited

Applied for exploration licences

100%

 

 

 

 

The Directors have assessed the carrying value of the investments in subsidiaries, all of which are incorporated in Tanzania, and in their opinion no impairment provision is considered necessary. 

 


 

6          Exploration and evaluation assets

 

 

Unaudited

31 Dec 2010

Unaudited

31 Dec 2009

Audited

30 June 2010

Exploration and evaluation

 

 

 

Cost

 

 

 

At beginning of period

3,356,184

1,268,644

1,268,644

Acquired during the period

-

-

1,707,343

Additions

909,125

89,725

261,871

Currency translation adjustment

(42,166)

-

118,326

Total cost

4,223,143

1,358,369

3,356,184

Impairment

 

 

 

At beginning of period

(32,778)

(32,778)

(32,778)

Impairment charge

-

-

-

Total impairment

(32,778)

(32,778)

(32,778)

Net book value

4,190,365

1,325,591

3,323,406

 

The exploration and evaluation ("E & E") asset represents costs incurred in relation to the Group's Tanzanian licences. These amounts have not been written off to the statement of comprehensive income as exploration expenses, as commercial reserves have not yet been established or the determination process has not been completed, and there are no indicators of impairment. The outcome of ongoing exploration and evaluation, and therefore whether the carrying value of E & E assets will ultimately be recovered, is inherently uncertain. The Directors have assessed the value of the uranium exploration and evaluation expenditure carried as intangible assets and in their opinion no further provision for impairment is currently necessary. 

 

7.         Share capital and share options

 

Unaudited

31 Dec 2010

Unaudited

31 Dec 2009

Audited

30 June 2010

Authorised share capital

 

 

 

10,000,000,000 ordinary shares of 0.1p each

10,000,000

10,000,000

10,000,000

 

 

 

 

Allotted, called up and fully paid share capital

 

 

 

481,743,750 (31/12/09: 291,000,000; 30/06/10 406,493,750) ordinary shares of 0.1p each

481,744

291,000

406,494

 

During the period the Company issued the following Ordinary 0.1 pence fully paid shares for cash:


 

Date

Issue Price

Number of

Shares

Nominal Value

1 July 2009

Opening balance

291,000,000

291,000

31 December 2009

Closing balance

291,000,000

291,000

4 January 2010

Placing at 1.92p per share for cash

104,000,000

104,000

12 January 2010

Consideration shares at 2.50p per share

11,493,750

11,494

30 June 2010

Closing balance

406,493,750

406,494

23 July 2010

Placing at 2.00p per share for cash

40,000,000

40,000

26 November 2010

Placing at 2.55p per share for cash

35,250,000

35,250

31 December 2010

Closing balance

481,743,750

481,744

 

Share options and warrants

 

The following equity instruments have been issued by the Company and have not been exercised at 31 December 2010:

 

Date of grant

Number of options

Exercise price

Exercisable between

28 November 2006

15,000,000

2.5p

Up to 28 November 2011

28 November 2006

15,000,000

5.0p

Up to 28 November 2011

15 April 2007

2,500,000

2.5p

Up to 28 November 2011

15 April 2007

2,500,000

5.0p

Up to 28 November 2011

24 July 2008

2,000,000

5.0p

Up to 23 July 2013

24 July 2008

2,000,000

15.0p

Up to 23 July 2013

24 July 2008

2,000,000

35.0p

Up to 23 July 2013

12 July 2010

8,000,000

2.5p

1 January 2011 to 23 July 2013

12 July 2010

10,000,000

5.0p

Up to 23 July 2013

12 July 2010

10,000,000

10.0p

Up to 23 July 2013

 

69,000,000

 

 

 

On the 12 July 2010, the Company cancelled 28,000,000 options with exercise prices at 5p, 15p & 35p and issued 28,000,000 options with exercise prices at 2.5p, 5p and 10p.


 

8.         Share based payments

 

The assessed fair value at the grant date has been determined using the Black-Scholes Model that takes into account the exercise price, the term of the option, the share price at grant date, the expected price volatility of the underlying share, the expected dividend yield and the risk free interest rate for the term of the option.  Share based payments are recognised over the vesting period of the options.

 

During the period, the Company granted options to Directors, management and consultants as tabled below. 

 

The inputs into the Black Scholes model are as follows:

 

Grant date

Share price at date of grant

Exercise price

Volatility

Option life

Dividend yield

Risk-free investment rate

Fair value per option

12/07/2010

1.77p

2.50p

83%

23/07/2013

0%

1.37%

0.8p

12/07/2010

1.77p

5.00p

83%

23/07/2013

0%

1.37%

0.5p

12/07/2010

1.77p

10.00p

83%

23/07/2013

0%

1.37%

0.3p

 

Expected volatility was determined by calculating the historical volatility of the Group's share price for the past three years.

 

The Group recognised �144,000 (30 June 2010: �Nil; 31 December 2009: �Nil) related to equity-settled share based payment transactions during the period.

 

 

**ENDS**

 

 

 

Felicity Edwards

St Brides Media and Finance Ltd

Chaucer House

38 Bow Lane

London

EC4M 9AY

 

Tel: +44 (0) 207 236 1177

Mob: +44 (0) 7748 843871

Fax: +44 (0) 207 236 1188

Email: felicity@sbmf.co.uk

Web: www.stbridesmedia.co.uk

 

 

 

Mariana Resources Ltd

EXPLORATEUR
CODE : MARL.L
ISIN : GB00B12GJ720
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Mariana Res. est une société d’exploration minière d'argent et d'or basée en Australie.

Ses principaux projets en exploration sont BUENAVENTURA et PERRO CHICO au Chili et LA BORITA, CAÑADON LARGO, LOS CALANDRIAS, LOS AMIGOS (ARGENTINA) et SIERRA BLANCA en Argentine.

Mariana Res. est cotée au Royaume-Uni. Sa capitalisation boursière aujourd'hui est 18,3 milliards GBX (20,6 milliards US$, 18,1 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 10 juin 2016 à 0,34 GBX, et son plus haut niveau récent le 10 juillet 2017 à 100,00 GBX.

Mariana Res. possède 182 602 930 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Mariana Resources Ltd
2008 Annual report
Nominations de Mariana Resources Ltd
18/11/2013Anglo Asian Mining - Appointment of Director of Geology in A...
17/09/2013Goldplat - Appointment of New Non Exec, as Company continues...
05/12/2011=e2?? Appointment of new COO and Vice President of
29/06/2011Horizonte Minerals - Appoints Brazil General Manager
28/03/2011Goldplat - Appointment of Gold Recovery Operations Managing ...
Rapports Financiers de Mariana Resources Ltd
22/09/2011Anglo Asian Mining - Interim Results - Profit before tax up ...
22/03/2011 - Half-Year Results
Projets de Mariana Resources Ltd
17/02/2014Live Interview with CEO Glen Parsons and SPEC BUY Research -...
17/02/2014Discovered bulk tonnage gold-copper-silver potential at Sole...
15/01/2014Anglo Asian Mining - Q4 Operations and FY 2013 Update– Gedab...
20/12/2013Anglo Asian - Gedabek Gold Mine Update Azerbaijan
29/11/2013Raises £2.67M to advance Company Maker Copper-Gold Projects ...
04/11/2013Soledad Gold-Copper-Silver Project in Peru Option Moving Ahe...
15/10/2013Commences Drilling at Condor de Oro Gold/Copper Porphyry Pro...
30/09/2013Definitive Agreement for Condor de Oro gold-copper project P...
02/09/2013Sula Iron & Gold - Drilling Confirms Significant Iron Prospe...
11/07/2013Anglo Asian - Q2 2013 Gedabek mine Azerbaijan update, on tra...
08/07/2013Anglo Asian: Copper Sales Update at flagship Gedabek gold-co...
28/06/2013Project Update
28/06/2013Anglo Asian - AGM Statement - Highly profitable, low cost mi...
03/05/2013RFC Ambrian comment: Maiden resource at Mtonya uranium disco...
29/01/2013Premier African Minerals - Multi-Commodity Southern Togo Pro...
15/01/2013=?iso-8859-1?Q?Plexus_-_=A3700,000_New_Contract_Win_with_Gle...
09/01/2013Anglo Asian Mining - Positive FY 2012 Gold Production Update...
09/01/2013Anglo Asian Mining - SP Angel BUY research follwoing positiv...
08/01/2013Premier African Minerals - Successfully acquired two highly ...
08/10/2012Anglo Asian Mining - Positive Q3 2012 Operations Update– Ged...
04/10/2012Signs LOI with Condor on the Condor de Oro Project in Northe...
20/09/2012Anglo Asian: FAIRFAX BUY note target price 69p (current sp 4...
25/06/2012Ferrex plc - Canaccord Comment - BUY 12p - Scoping Study Upd...
23/05/2012Anglo Asian Mining Fairfax Research BUY to 70p - current sp ...
23/05/2012Anglo Asian Final Results - 60% increase in PBT to US$31.6 m...
14/05/2012Goldplat - Progress Update on Kilimapesa Gold Operating Mine...
14/05/2012Anglo Asian Mining - Approval to Establish Second Mine in Az...
10/05/2012Anglo Asian - Gold Recovery Enhancement - Decsion to Build N...
23/04/2012Anglo Asian - Notice of Discovery for Gold at Ordubad Contra...
12/04/2012Anglo Asian Mining - Q1 2012 Operations Update - Gedabek Gol...
06/03/2012Exploration Update Southern Argentina and Northern Chile.
24/02/2012(Sierra Blanca)completes purchase of Sierra Blanca JV interest in Argentina
16/02/2012Goldplat - Fairfax BUY recommendation 'Signs Agreement with ...
13/01/2012Resource - Target Price: =A30.22 current sp 10.75 =?iso-8859...
14/09/2011Noricum - Bonanza High Grade Gold Samples from Altenberg V =...
11/07/2011Stratex - Centamin to make offer for Stratex's option joint ...
04/07/2011Horizonte Minerals - Commences a 3,000m Drilling Programme a...
29/06/2011National Milk Records - Purchase of new freehold site to con...
15/06/2011Uranium Resources - Appointed Dimitri Pashov as Non-executiv...
15/06/2011Anglo Asian Mining - Gedabek Gold/Copper Mine and Gosha Cont...
13/06/2011Ascent - Peti=B9ovci Project Update - drilling of Pg -11awel...
13/06/2011Goldplat - Kenyan Gold Project - Kilimapesa Gold Update
26/05/2011Anglo Asian Mining (Gold production Azerbaijan) - Final Resu...
26/05/2011Horizonte Minerals - Nickel and Gold Exploration Update - Br...
17/05/2011Stratex International - signed an option/joint venture agree...
10/05/2011Horizonte Minerals - Further High Grade Nickel Drill Results...
19/04/2011Stratex - New Epithermal Gold Discovery in the Afar region E...
12/04/2011Goldplat - WHI Securities Research - BUY - Expanding gold re...
12/04/2011Third Drill Campaign Completed - Las Calandrias Gold Project...
06/04/2011Anglo Asian Mining - Q1 Operations Update - Gedabek Gold/Cop...
29/03/2011Horizonte Minerals - High Grade Nickel Drill Results at Arag...
07/03/2011Ascent Resources - Issue of new equity
07/03/2011Horizonte Minerals - Final Results: Focussed nickel and gold...
21/02/2011Stratex - Gold Discovery northern Ethiopia
14/02/2011IOCG Exploration Update and acquisition of new gold project ...
14/02/2011Goldplat - Permission Granted to Commence Development and Mi...
14/02/2011Horizonte Minerals - Positive Results from the Falcao Gold P...
16/08/2010(Buenaventura)Drilling Update at Buenaventura IOCG Project, Northern Chile
02/08/2010(Los Calandrias)signs 10,000m drilling contract for flagship Las Calandrias ...
Communiqués de Presse de Mariana Resources Ltd
17/02/2014Goldplat - Gold Recovery in Africa - Operations and Trading ...
31/01/2014St Brides Client News Weekly and Stock to Watch 31.01.14
28/01/2014Enters Second Year of Option at Condor de Oro Project, Peru ...
31/12/2013Sula Iron and Gold - Strengthens Board - New Technical Direc...
20/12/2013High Grade Gold and Visible Copper Discovered at New Condor ...
06/11/2013SP Angel BUY 20p reserach - Goldplat Premiminary Results - M...
06/11/2013Goldplat - Preliminary Results - Market leaders in Gold Reco...
05/11/2013London Presentation
10/10/2013Anglo Asian BUY Research Commentary - rallies 5.7% up on Rec...
10/10/2013Anglo Asian - Record Gold Production of 20,242oz for Q3 2013...
24/09/2013Sula - Confirm Prospectivity of Ferensola Iron Deposit in Si...
16/09/2013Goldplat - broker SP Angel BUY 18p (118% increase to current...
16/09/2013Goldplat - Director Change
13/09/2013Half Year Report for 2013
11/09/2013Anglo Asian: Record Month of Gold Production (7,600oz) at Ge...
10/09/2013Horizonte - Final Resource Drill Results from World-Class Ar...
05/08/2013Wishbone - Interim Results - Delivering on strategy to acqui...
11/07/2013Anglo Asian - BUY comment SP Angel - 54p price target (70% i...
11/07/2013Board Change
28/06/2013Sula Iron & Gold Interim Results - on track to define maiden...
27/06/2013=?iso-8859-1?Q?Horizonte_(HZM)_Secures_=A38M_Financing_Facil...
04/06/2013Goldplat - Strategic Review and Consultancy Termination - fo...
04/06/2013Premier African Minerals: Ammendment of Terms for sale of To...
01/05/2013Goldplat: Market Leading Gold Recovery Operations SA and Gha...
24/04/2013Goldplat - South Africa Gold Recovery Operations 100% Black ...
19/02/2013Winners of ‘Best Oil and Gas Plc’ Award at the Stock Market ...
25/01/2013Ferrex - Completes =A32.165M Placing to fast-track developme...
08/01/2013Horizonte Minerals - Positive results from ongoing nickel re...
16/10/2012Plexus Holdings - Final results ahead of market expectations...
27/09/2012Anglo Asian Mining - Fairfax BUY research target sp 69p (60%...
27/09/2012Anglo Asian Mining - Interim Results - PBT US$10.5million, g...
18/09/2012Ferrex - Resource upgrade at Nayega Manganese Project Togo t...
23/07/2012Uranium Resources - RFC Ambrian BUY note - High-grade interc...
26/06/2012Private & Commercial Finance Group - Final Results show pr =...
29/03/2012Uranium Resources - Exploration Update at Mtonya Project, Ta...
05/12/2011Plexus Holdings - Breakthrough Licensing, Manufacturing, Dis...
26/10/2011Uranium Resources - Ambrian Coverage Initiation & 2011 Drill...
25/10/2011Anglo Asian Mining - Exploration Update, Positive Infill Dri...
13/09/2011Goldplat - Final Results - 76% increase in profit before t =...
06/09/2011=?iso-8859-1?Q?Plexus_Holdings_-_=A3800,000_Contract_Win_wit...
23/08/2011=?iso-8859-2?Q?Ascent_Resources_-_Pg-10_Drilling_Results_-_P...
15/08/2011releases its Half-Yearly Report and the Quarterly Management...
12/08/2011Stratex: Best results so far at Megenta Gold Project Ethiopi...
11/07/2011Half Million Ounce Gold Equivalent Maiden Resource For Las C...
07/06/2011Goldplat - Banka Gold Mining Lease Ghana - Technical report
03/06/2011Uranium Resources - 2011 Exploration Update
26/05/2011Goldplat - Completion of purchase of Banka Mining Licence - ...
24/05/2011Ascent Resources - Peti=B9ovci Project in Slovenia - Pg-11A ...
24/05/2011Stratex - Strategic Alliance Agreement with Antofagasta to E...
24/05/2011=?iso-8859-1?Q?Plexus_Holdings_-_Secures_=A3550,000_HP/HT_co...
12/05/2011Goldplat - Conclusion of payment to IGE for Kilimapesa Gol =...
11/05/2011Kalahari Minerals - Annual General Meeting Statement
03/05/2011GoIndustry-DoveBid - Final Results - Back to Profitability
12/04/2011Goldplat - Gold Producer in Africa - Operations Update
11/04/2011=?iso-8859-1?Q?Plexus_Holdings_-_BG_Egypt_=A3200,000_contrac...
29/03/2011Stratex - Gold Resource doubled at =D6ks=FCt Project Turke =...
29/03/2011Plexus Holdings - Multi-well contract with Centrica Consorti...
08/03/2011=?iso-8859-1?Q?Plexus:_=A3700,000_Contract_Win_with_Statoil_...
07/03/2011Goldplat - Interim Results: Operating profits increased 17.1...
01/03/2011Horizonte - Araguaia nickel project maiden resource - 76.6 M...
28/02/2011Sratex International - Discovers New Epithermal Gold Mineral...
22/02/2011Anglo Asian Mining - Notice of Gold Discovery and Exploratio...
16/02/2011FoxDavies Daily Monitor - Ascent Resources (sp 8.75p BUY, 20...
16/02/2011=?iso-8859-2?Q?Ascent_Resources_-_Peti=B9ovci,_Slovenia_Dril...
23/07/2010Subscription to raise £800,000
23/06/2010Placement to Raise £6.75 million
31/05/2007DMM And Mariana Resources Join Forces
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AIM (MARL.L)
100,00+0.76%
AIM
GBX 100,00
10/07 21:35 0,750
0,76%
Cours préc. Ouverture
99,25 99,00
Bas haut
98,00 100,00
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  100,00 -%
Volume var. 1 mois
160 266 -%
24hGold TrendPower© : 2
Produit
Développe
Recherche Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 09/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :