Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Fancamp Announces First Assay Results From the Lac Lamelee Iron Project Diamond Drilling Program
Published : October 22, 2012

Best Assay Interval of 302 Metres Grading 28.08% Fe(T) (40.07% Fe2O3) in Drill Hole LS-12-06

Drill Program Expanded by 2,500 Metres to Test Further Strike and Down-Dip Potential

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   K Street |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 22, 2012) - Fancamp Exploration Ltd. (TSX VENTURE:FNC) is pleased to announce the first series of Iron assay results from the ongoing summer-fall NQ diamond drilling program at the Company's wholly owned Lac Lamêlée South Iron Project, located 100 km southwest of Fermont (Quebec) in the heart of the Fermont-Wabush-Labrador City Iron Camp.

Fancamp has completed over 11,000 metres in 33 drill holes to date, having surpassed the 10,000 metres initial program planned. Iron assay results are available for the first 6 drill holes (LS-12-01 to 06) of the planned 39-hole campaign and the best intervals are summarized below*. Results are pending for the remaining holes.

Diamond
Drill
Hole #
From
(m)
To
(m)
Core
Length
(m)
FeT
(%)
Fe2O3
(%)
LS-12-01 81.0 226.5 145.5 29.64 42.39
  including 112.5 192.0 79.5 31.74 45.40
  including 144.5 192.9 48.4 36.82 52.66
LS-12-02 246.0 354.0 108.0 21.72 31.07
  including 295.5 333.0 37.5 23.83 34.08
LS-12-03 15.0 127.0 112.0 31.74 45.39
LS-12-04 25.6 76.4 50.8 33.22 47.51
  including 25.6 52.9 27.3 35.27 50.45
  124.7 194.9 70.2 27.64 39.53
  217.0 266.1 49.1 30.41 43.48
  including 241.3 266.1 24.8 32.80 47.03
LS-12-05 91.0 248.5 157.5 32.08 45.87
  including 191.0 225.0 34.0 37.29 53.33
  401.2 434.0 32.8 22.73 32.50
LS-12-06 4.5 306.6 302.1 28.08 40.07
  including 4.5 191.0 186.5 30.70 43.90

* The selected composite assay results are not necessarily representative of the average grade or thickness of the mineralized zones or potential resource. Intervals are down-hole lengths and not necessarily true widths of the mineralized zones. Grades are calculated from Fe(T)% sample assays completed by the ALS Laboratory Group. Certain iron formation lithologies contain variable amounts of Iron in silicates which may reduce the recoverable Iron grade.

Based on these early encouraging results Fancamp expanded its drilling program from 10,000 metres to 12,500 metres as the Company completes its second phase of the program with the objective of establishing the highest quality National Instrument ("NI") 43-101 compliant Mineral Resources. The entire program is expected to be completed in November 2012 with the completion of the Mineral Resources estimates due for early 2013. 

This summer's activities also included outcrop stripping and channel sampling at key iron formation locations, blasting at two locations to collect small bulk samples representative of the magnetite and hematite mineralization, and a detailed ground magnetometer survey over the full strike of the known and projected iron formations.

The character of the iron mineralization changes from the northeast to the southwest. Consequently the mineralization has been divided into three structurally distinct zones:

  • the Mountain Pond Zone to the northeast,
  • the centrally located "91-92" Zone, and
  • the Tanguay Zone in the southwest.

These three zones span a distance of approximately 2.5 kilometres. The Mountain Pond Zone is comprised of a steeply south dipping, steeply west-northwest plunging, tightly folded to isoclinal syncline with a curvilinear axial plane striking SE to E and dipping steeply to the south-southwest.

Proceeding to the southwest into the "91-92" Zone, the fold is isoclinal and the axial plane strikes W-SW, dipping steeply northwest. At this point the northern limb of the structure appears to transition into leaner iron formations with lower iron grades.

The Tanguay Zone is offset from the "91-92" Zone by a late-stage fault with a horizontal displacement of about 300 metres. This zone appears to be complexly folded as the stratigraphy is repeated in several drill holes. Lithologies generally trend to the southwest-northeast and dip to the northwest at moderate angles.

The drill programs of 2011 and the current program were designed to calculate resources to vertical depths of 350 metres, however two holes were drilled to vertical depths of 600 - 650 metres indicating that the target iron formation extends to at least those depths.

Quality Assurance, Quality Control Protocols

Drill core boxes arrive at the Fancamp core logging facility on the Lac Lamêlée South Iron Project. Boxes are opened and depth tags are verified for errors. Each box is labeled with embossed aluminum tape stapled to box end. Numbers indicated hole and box numbers as well as "from" and "to" footages. Sampling is continuous through mineralized intervals and intermittent in other lithologies. Within mineralized intervals, samples taken are 2 metres in length of half-sawed core, or up to lithological or structural boundaries. One standard per hole is included within the sampling of mineralized zones up to 250 metres of hole length. Holes deeper than 250 metres contain a second standard. There is one blank sample and one duplicated sample per 80 metres of core. Some 26 samples of varying lithologies have been quartered and sent to the principal laboratory and a second laboratory. Approximately 50 Davis Tube and density test have been conducted on a range of important lithologies. One-half of the sample is returned to the core box with the sample tag number stapled at the down-hole end of the sample interval. The other half is packaged in a plastic bag accompanied by its stapled sample tag number. The sample number is also written with felt pen on the bag. 

Core logging is conducted using GeoticLog and Geotic Graph software. Data is transcribed for GEMCOM software. Geology is described using 13 lithological units and several sub-lithologies. Other parameters described in the logs include structure, magnetic susceptibility, rock quality data and mineralization. Rock quality data is described at varying intervals according to their common fracture characteristics, recovered lengths, RQD length (total lengths of sections over 10 centimetres) and number of fractures over the interval. Recovery and RQD percentages are calculated. Mineralization is described as a visual percentage of magnetite and/or hematite and a ratio of magnetite to hematite is generally estimated.

Sample bags are secured with staples and/or cable ties. Sample batches are tabulated for shipping control. Sample requisitions are included in the first bag of each batch. Samples are placed in large rice bags for shipping, all secured with a cable tie. Batches are separated into two groups corresponding to the two drills working on the project. Samples are transported from camp to a shipping depot in Wabush (Newfoundland and Labrador). Batches are placed on pallets and wrapped in plastic to secure the bundles. Samples are shipped by commercial transport to the ALS Laboratory Group facilities in Val-d'Or (Quebec). Shipping waybills are kept for tracking shipments as required.

Core samples received at the laboratory are sorted and verified against the original list to ensure that all samples have been received to check for discrepancies. The samples were entered into the laboratory information management system. The sorted samples are dried in the original sample bags to ensure that any damp fines did not remain upon transfer to drying containers. Once dry the samples were crushed 70% to under 2 millimetres. Each sample was then riffle split and an aliquot was pulverized 85% to under 75 microns. Samples were then analyzed using the fusion XRF whole rock package which provide the analysis of Al2O3, CaO, Cr2O3, Fe(T), K2O, MgO, SiO2, TiO2, and single temperature Loss On Ignition, as well as As, Ba, Cl, Co, Cu, Mn, Ni, P, Pb, S, Sn, Sr, V, Zn, and Zr. Each batch was accompanied by QAQC measures provided by the laboratory as well as those conducted during the sampling. These included the analysis of blanks, duplicates and certified standard reference materials. All QAQC standards are control charted to ensure that the data passes quality control prior to final release.

Upon completion of analysis and verification by the laboratory chemist, results were entered into the information management system and approved. Reports are then generated and a final quality control check is done by an independent person. This person also did the final certification of the data. Data was then transferred to Fancamp.

This news release was prepared, reviewed and approved by Mr. Mike Flanagan, P. Geo., the Lamêlée South Project Manager, and Mr. Jean Lafleur, M.Sc., P. Geo., a Director of Fancamp and Chairman of the Board. Both individuals are Qualified Persons under NI 43-101 standards.

ON BEHALF OF THE BOARD

Peter H. Smith, PhD, P. Eng., President

Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.

S.E.C. Exemption: 12(g)3-2(b)

No stock exchange or securities regulatory authority has reviewed or accepted responsibility for the adequacy or accuracy of this release.

Fancamp Exploration Ltd.
Peter H. Smith, PhD, P. Eng.
President
(514) 481-3172
www.fancampexplorationltd.ca
or
Bay Street Connect
Michael D'Amico
Investor Relations
(647) 500-6023
michael@baystreetconnect.com

Fancamp Exploration Ltd.

EXPLORATEUR
CODE : FNC.V
ISIN : CA30710P1027
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Fancamp Expl. est une société d’exploration minière d'or et de cobalt basée au Canada.

Fancamp Expl. détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont FERMONT IRON, BEAUCE, MCFAULDS FANCAMP, GAMACHE TWP, LAC MECHANT et LAC ROCHER au Canada.

Fancamp Expl. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 10,6 millions CA$ (7,8 millions US$, 7,3 millions €).

La valeur de son action a atteint son plus bas niveau récent le 28 décembre 2001 à 0,01 CA$, et son plus haut niveau récent le 07 mars 2008 à 3,15 CA$.

Fancamp Expl. possède 151 800 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Fancamp Exploration Ltd.
23/08/2013Announces Completion of Second Tranche of Private Placement
14/08/2013Announces Completion of C$ 940,000 Private Placement
28/03/2011Closes Final Tranche of Brokered Financing
22/03/2011Closes First Two Tranches of Brokered Financing
15/03/2011Increases Brokered Financing
Nominations de Fancamp Exploration Ltd.
11/09/2013Proposes Changes to the Board of Directors
09/10/2012Appoints Jean Lafleur Chairman of the Board
Projets de Fancamp Exploration Ltd.
13/03/2013Announces Positive Pilot Test Results for the Production of ...
24/05/2011(Mcfaulds Fancamp)Drilling at McFaulds Lake Property, Ring Of Fire, Northern O...
03/02/2011(Desolation Lake)to Focus on Deeply Buried Targets in James Bay Lowlands
Communiqués de Presse de Fancamp Exploration Ltd.
29/10/2015KWG, Bold & Fancamp Extend Koper Lake Option
13/07/2015Fancamp Announces Receiving Samples of TiO2-Concentrates and...
26/03/2015Drill Program Demonstrates High Grade Gold Vein Continuity o...
26/03/2015Fancamp Exploration Ltd.: Drill Program Demonstrates High Gr...
03/03/2015Fancamp Reaches New Agreement With Pangang Group Limited
26/01/2015Fancamp's Optioned Oxford Brook, New Brunswick Property; VMS...
23/12/2014Fancamp Provides an Update of Activities on the High Grade G...
22/12/2014Fancamp Grants Options
19/11/2014Fancamp Acquires Options on Bonanza Grade Gold Quartz Vein P...
31/10/2014Fancamp Announces Voting Results
27/10/2014Fancamp Exploration Ltd.: Update, Magpie Test Results
22/10/2014Fancamp Tests High Grade Gold Quartz Vein System on Its Robi...
14/10/2014Fancamp Reports Assay Results of 5 Intercepts From 3 Holes R...
08/10/2014Fancamp Signs Final Agreement With Uragold Bay Resources
17/09/2014Fancamp and Uragold Bay Sign a Letter of Intent Regarding th...
18/08/2014Fancamp Appoints New Director
04/07/2014Fancamp Announces a Normal Course Issuer Bid
14/05/2014Fancamp Acquires New Palladium Prospect Option in the Labrad...
07/05/2014Fancamp Grants Stock Options
05/05/2014Fancamp Enters Into Rights Agreement Governing Certain Inves...
30/10/2013Announces Voting Results and Allocates Stock Options
25/10/2013Highlights Milestones Achieved
18/09/2013Announces the Approval of an Advance Notice Policy
16/09/2013, Champion and Gimus Secure Deal to Develop Fancamp's Lac La...
04/09/2013Provides Positive Metallurgical Testing Updates on the Magpi...
06/08/2013Makes a Key Management Addition
18/07/2013Delivering on Business Plan, as Company Sells C$2.1 Million ...
27/05/2013Announces Adoption of New Shareholders Rights Plan
02/05/2013Lac Lamelee South Iron Project Yields Inferred Mineral Resou...
16/01/2013Reports Unpublished Results on the Recently Acquired Namex P...
14/01/2013Options Remaining 40% Interest in Koper Lake Project From th...
08/01/2013Options Two Highly Prospective Claim Blocks in the Chapais C...
13/11/2012Issues Third Set of Assay Results From the Lac Lamelee South...
06/11/2012Releases Second Assay Results From the Lac Lamelee South Iro...
31/10/2012Announces Voting Results and Management Changes
22/10/2012Announces First Assay Results From the Lac Lamelee Iron Proj...
22/10/2012Announces That a Leading Proxy Advisory Firm Recommends That...
22/10/2012Announces That a Leading Proxy Advisory Firm Recommends That...
22/10/2012Announces That a Leading Proxy Advisory Firm Recommends That...
19/10/2012Alerts Shareholders to Concerned Shareholder's Circular: Mr....
28/09/2012Announces Exploration Work on the Gaspe Gold Property
29/06/2011Magpie Drilling to Begin
20/05/2011Announces First Tranche Closing of Brokered Financing by the...
21/04/2011Drilling at McFaulds Lake Property, Ring of Fire, Northern O...
08/04/2011Announces $10,000,000 Brokered Financing by the Magpie Mines...
01/03/2011Fermont JV Resource Estimate/Lac Lamelee Drill Program
16/02/2011Increases Interest in Lac Lamalee Iron Property to 100%
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FNC.V)
0,070+0.00%
TSX-V
CA$ 0,070
26/04 13:23 -
0%
Cours préc. Ouverture
0,070 0,070
Bas haut
0,070 0,070
Année b/h Var. YTD
0,070 -  0,090 -12,50%
52 sem. b/h var. 52 sem.
0,070 -  0,130 -36,36%
Volume var. 1 mois
35 000 -6,67%
24hGold TrendPower© : 24
Produit
Développe
Recherche Gold - Iron - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-30,00%
202325,00%0,130,09
2022-27,27%0,160,08
2021-8,33%0,170,09
2020100,00%0,150,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :