Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Banro Corporation

Publié le 13 août 2013

Announces Q2 2013 Financial Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar | Report |
Marketwired
 
 
Banro Corporation
TSX: BAA
NYSE MKT: BAA
NYSE Amex: BAA
Other Recent News | Printer Friendly Version

August 13, 2013
Banro Announces Q2 2013 Financial Results
TORONTO, CANADA--(Marketwired - Aug. 13, 2013) - Banro Corporation ("Banro" or the "Company") (TSX:BAA)(NYSE MKT:BAA)(NYSE Amex:BAA) today announced its financial and operating results for the second quarter of 2013.

HIGHLIGHTS

--  Q2 production of 19,347 ounces of gold (19,602 ounces in Q1 2013) 
--  Q2 cash costs of $789/ounce ($840/ounce in Q1 2013) 
--  Revenue in Q2 of $24.5 million from sales of 18,252 ounces of gold (Q1
    2013 revenue of $33.2 million from the sales of 20,456 ounces of gold) 
--  Gross earnings from mining operations in Q2 of $2.5 million (Q1 2013
    gross earnings from mining operations of $11.0 million) 
--  Net loss in Q2 of $3.1 million or ($0.01) per share (Q1 2013 net income
    of $6.3 million or $0.03 per share) 
--  Cash and cash equivalents of $43.2 million at June 30, 2013 ($17.3
    million at March 31, 2013)
 
All dollar amounts in this press release are expressed in thousands of dollars and, unless otherwise specified, in United States dollars.

Q2 2013 SUMMARY

(i)Financial

The table below provides the summary of financial and operating results for the three and six-months ended June 30, 2013 and 2012 as well as the first quarter of 2013:

----------------------------------------------------------------------------
                     H1 2013(1) H1 2012(1)    Q2 2013    Q2 2012    Q1 2013 
----------------------------------------------------------------------------
Selected Financial                                                          
 Data                                                                       
Revenues                 57,653          -     24,484          -     33,169 
Total mine operating                                                        
 expenses(2)            (44,166)         -    (21,951)         -    (22,215)
Gross earnings from                                                         
 mining operations       13,487          -      2,533          -     10,954 
Net income (loss)         3,215     (7,641)    (3,054)    (4,171)     6,269 
Basic net                                                                   
 earnings/loss per                                                          
 share ($/share)           0.01      (0.04)     (0.01)     (0.02)      0.03 
----------------------------------------------------------------------------
Key Operating                                                               
 Statistics                                                                 
----------------------------------------------------------------------------
Average gold price                                                          
 received ($ per oz)      1,489          -      1,342          -      1,621 
Gold sales (oz)          38,708          -     18,252          -     20,456 
Gold production (oz)     38,949          -     19,347          -     19,602 
All-in cash cost per                                                        
 ounce ($/oz)(3)          1,113          -      1,086          -      1,141 
Cash cost per ounce                                                         
 ($/oz)(3)                  815          -        789          -        840 
Gold margin ($/oz)(3)       675          -        553          -        816 
----------------------------------------------------------------------------
Financial Position                                                          
----------------------------------------------------------------------------
Cash and cash                                                               
 equivalents             43,182    106,135     43,182    106,135     17,293 
Gold bullion                                                                
 inventory at market                                                        
 value(4)                 4,521          -      4,521          -      3,240 
Total assets            757,692    597,300    757,692    597,300    669,424 
Long term debt          156,642    152,687    156,642    152,687    155,664 
----------------------------------------------------------------------------
                                                                            
(1)  For the six-month periods ended June 30, 2013 and 2012                 
(2)  Includes depletion and depreciation                                    
(3)  All-in cash cost per ounce, cash cost per ounce and gold margin are    
     non-IFRS measures. Refer to non-IFRS measures section of the Q2 2013   
     MD&A for additional information. All-in cash cost per ounce, cash cost 
     per ounce and gold margin for Q1 2013 have been restated on a          
     production basis as compared to a sales basis in prior periods         
(4)  This represents 3,793 ounces of gold bullion inventory, with a cost of 
     $2,567, shown at the June 30, 2013 closing market price of $1,192 per  
     ounce of gold.                                                         

--  Revenues during the three-month period were $24,484 compared with
    revenue of $33,169 for the first quarter of 2013, which was the second
    full quarter of commercial production at Twangiza. 
    
--  Mine operating expenses, including depletion and depreciation, for the
    three month period ended June 30, 2013 were $21,951 compared to $22,215
    for the first quarter of 2013. Production costs for the second quarter
    of 2013 were $15,265 compared to $16,475 in the first quarter of 2013.
    There are no comparative figures in the prior year for the first two
    quarters since the Company's Twangiza Gold Mine entered commercial
    production in September 2012. 
    
--  Gross earnings from mine operations for the second quarter of 2013 were
    $2,533 (compared to $10,954 for the first quarter of 2013).
 
(ii) Operational

--  The Twangiza Gold Mine recorded no serious injuries up to the end of the
    second quarter of 2013. 
    
--  In the second quarter of 2013, 235,730 tonnes of ore were processed at
    Twangiza at a head grade of 2.91 g/t Au and a recovery rate of 83.4% to
    produce 19,347 ounces of gold. Ore throughput was 34% less than
    anticipated due to the unavailability of major items of equipment
    resulting from mechanical and electrical failures as well as from work
    stoppages due to the installation of the new crushers; however, head
    grade was marginally higher than planned, slightly offsetting the lower
    throughputs. 
    
--  During the second quarter, 18,252 ounces of gold were sold at an average
    gold price of $1,342 per ounce (compared to an average price of $1,621
    per ounce obtained during Q1 2013) for total revenues of $24,484
    (compared to total revenues of $33,169 during Q1 2013). 
    
--  The Company continues its expansion of the Twangiza plant's operating
    capacity from 1.3Mpta to 1.7Mpta. The expansion project is on schedule
    for completion within the fourth quarter of 2013.
 
(iii) Construction & Development

--  During the second quarter of 2013, the Company spent a further $44,781
    in cash, including $3,164 of additional capital assets, for the
    construction and development of its Namoya gold mine. 
    
--  Management continued the optimization of Namoya construction efforts to
    ensure cost containment and greater efficiencies in order to meet
    internal project deadlines. 
    
--  Regarding construction activities, 100% of earth moving equipment has
    been purchased, and 100% of accommodation materials and 60% of process
    plant equipment and goods have been delivered to site. 100% of process
    plant site earthworks have been completed with final grading and
    compaction of leach pad on-going, 100% of excavation of the heap leach
    ponds completed and 25% of excavation work completed at the tailings
    management facility ("TMF") with full completion scheduled for the
    fourth quarter of 2013. The target for first production at Namoya
    remains Q4 2013. 
    
--  As a result of scope changes as well as certain delays in the
    development schedule, 2013 gold production from the Namoya Mine is
    expected to be in the range of 7,000 to 10,000 ounces and the total
    Namoya project development capital forecast has increased from $208
    million to $224.3 million. This increase comprises an $8.2 million
    increase in transportation costs, $3.5 million of additional mining
    fleet purchased to effect future cost savings, $3.6 million in scope
    changes to the project, and $1 million for contingencies. An amount of
    $18.7 million of pre-commercial production expenses that were originally
    forecast to be fully offset by revenue expected from production of
    16,000 to 22,000 ounces at the Namoya Mine is now expected to be only
    partially offset by production revenue that is expected from the revised
    forecast of 7,000 to 10,000 ounces.
 
(iv) Exploration

--  Exploration activities were focused on grass root target generation and
    delineation of new mineral prospects. The program consisted of gridding,
    surface geological mapping, soil and stream sediments sampling, rock
    chip sampling, trenching/channel sampling and auger drilling. Planned
    exploration expenditures for the remainder of the year have been reduced
    further to focus on core activities.
 
(v) Financing Matters

--  The establishment of credit facilities during the first quarter of 2013
    for $30 million was completed with two commercial banks in the DRC,
    Rawbank and Ecobank, each for $15 million, and at rates of 9% and 8.5%
    interest respectively. The Rawbank facility is repayable in six equal
    monthly installments, renegotiated to start in January 2014 while the
    Ecobank facility is repayable on a quarterly basis from March 31, 2014. 

--  In April 2013 the Company announced the closing of its previously
    announced short-form prospectus offering (the "Offering") and concurrent
    private placement (the "Concurrent Offering"). The Offering consisted of
    50,219 common shares of the Company priced at C$1.35 per share for gross
    aggregate proceeds of C$67,795 and 116 series A preference shares of the
    Company priced at $25.00 per share for gross aggregate proceeds of
    $2,900. The Concurrent Offering consisted of 1,200 preferred shares of a
    subsidiary of the Company (the "Subco Shares") and 1,200 associated
    series B preference shares of the Company priced at $25.00 per Subco
    Share and series B preference share for gross aggregate proceeds of
    $30,000. The foregoing share amounts are in thousands. 

--  There is approximately $20,000 in additional borrowing room available
    within the limits of the Company's Note Indenture.
 
Twangiza Mine

During the second quarter of 2013, gold output from the plant remained consistent with the first quarter of 2013. With the installation of new ore processing equipment (mineral sizer, secondary and tertiary crushers) during the latter part of the second quarter, greater throughput is expected moving forward.

----------------------------------------------------------------------------
TWANGIZA MINE                                         Q2 2013        Q1 2013
                                                                            
----------------------------------------------------------------------------
Gold sales (oz)                                        18,252         20,456
----------------------------------------------------------------------------
Gold produced (oz)                                     19,347         19,602
----------------------------------------------------------------------------
Material mined (t)                                  1,070,462        973,904
----------------------------------------------------------------------------
Ore mined (t)(1)                                      405,283        492,529
----------------------------------------------------------------------------
Waste mined (t)                                       665,179        481,375
----------------------------------------------------------------------------
Strip ratio (t:t)(2)                                     1.64           0.98
----------------------------------------------------------------------------
Ore milled (t)(1)                                     235,730        239,100
----------------------------------------------------------------------------
Head grade (g/t)(3)                                      2.91           3.04
----------------------------------------------------------------------------
Recovery (%)                                             83.4           84.5
----------------------------------------------------------------------------
Cash cost per ounce ($US/oz)(4)                           789            840
----------------------------------------------------------------------------
                                                                            
(1)  The difference between ore mined and ore milled results from           
     stockpiling of lower grade or marginal material.                       
(2)  Strip ratio is calculated as waste mined divided by ore mined.         
(3)  Head grade refers to the indicated grade of ore milled.                
(4)  Cash cost per ounce is a non-IFRS measure. Refer to non-IFRS measures  
     section of the Q2 2013 MD&A for additional information.                
                                                                            
----------------------------------------------------------------------------
Cost per tonne ore milled           H1 2013(1)        Q2 2013        Q1 2013
                                      ($000's)       ($000's)       ($000's)
----------------------------------------------------------------------------
Mining Costs                              12.7           13.0           12.2
Processing Costs                          32.7           33.1           32.3
Overhead                                  21.4           18.6           24.4
----------------------------------------------------------------------------
Total cost per tonne ore milled           66.8           64.7           68.9
----------------------------------------------------------------------------
                                                                            
(1) For the six-month period ended June 30, 2013                            
                                                                            
----------------------------------------------------------------------------
Cost per ounce produced             H1 2013(1)        Q2 2013        Q1 2013
                                      ($000's)       ($000's)       ($000's)
----------------------------------------------------------------------------
Mining Costs                               155            159            149
Processing Costs                           399            403            394
Overhead                                   261            227            297
----------------------------------------------------------------------------
Total cash cost per ounce                  815            789            840
----------------------------------------------------------------------------
                                                                            
(1) For the six-month period ended June 30, 2013
 
Mining

A total of 1,070,462 tonnes of material were mined during the second quarter of 2013, which was 32% higher than forecast, with a total of 405,283 tonnes of ore mined at a grade of 2.77 g/t Au. The stripping ratio for the period was 1.64, which was higher than the stripping ratio of 0.98 observed in the first quarter of 2013. A significant amount of waste material mined was required for the ongoing construction of the TMF. The higher strip ratio was also in preparation for Q3 mining activities.

Processing & Engineering

The second quarter of 2013 was consistent with the first quarter of 2013 with some significant improvements experienced in throughput during the latter part of June 2013. Throughput exceeding 4,000 tonnes per day (required to achieve the 1.3Mtpa nameplate design capacity) was observed on some days as compared to below 2,500 tonnes per day prior to the installment of the new equipment as part of the plant expansion project. Recoveries during the second quarter of the year were at an average of 83.4% (compared to 84.5% in Q1 2013) with a head grade of 2.91 g/t Au (compared to 3.04 g/t Au in Q1 2013) and a total of 19,347 (compared to 19,602 ounces in Q1 2013) ounces of gold were produced.

Twangiza Plant Optimization and Expansion

Having commenced the process of upgrading the Twangiza metallurgical plant in the fourth quarter of 2012, work continued with the procurement, manufacture and shipment of major items of equipment and materials required to increase future plant throughput capacity to 1.7Mtpa and optimization of the plant. This expansion is to be completed in Q4 2013.

As part of the plant expansion project, the mineral sizer and, both secondary and tertiary crushers were replaced with larger and more robust units. These units were installed and operational during the second quarter with the sizer being installed later in June 2013.

The operation of the new carbon regeneration kiln has shown continuous improvement of carbon activities and subsequent absorption while the two new air blowers on the existing carbon-in-leach ("CIL") circuit have provided increased dissolved oxygen levels as expected. The ultimate goal of these process plant improvements is to increase both throughput and recovery rates. The addition of four new CIL tanks (being installed in Q3 2013) followed by the refurbishment and installation of the six original tanks (scheduled for Q4 2013) is expected to bring recoveries up toward the 90% range when a throughput capacity of 1.7 Mtpa has been achieved.

Equipment required for the new CIL tanks (agitators, inter-stage screens, carbon transfer pumps and second linear trash screen) have recently arrived at site. The equipment is expected to be installed before the end of the third quarter of 2013 once the installation of the new tanks and equipment support structures is complete. The four new CIL tanks are expected to be in operation by the end of the third quarter of 2013 following the electrical reticulation and controls installation.

Once the four new CIL tanks are operational, the six existing smaller CIL leach tanks will be bypassed and the refurbishing of those six tanks, including the replacement of the inter-stage static carbon screens and carbon transfer airlift pumps with electromechanical units and the related commissioning thereof, will commence with completion expected during the fourth quarter of 2013.

The second complete (modular) elution system to accommodate the increase in throughput, at 1.7Mtpa, and increased gold production, as well as supplement the existing aged system currently in operation, is being manufactured and is expected to be shipped during the third quarter, subsequent to which it will be installed and commissioned during the fourth quarter of 2013.

The expansion remains on schedule for completion by the end of Q4 2013.

Sustaining Capital Activities

During the six months ended June 30, 2013 and subsequently up to the date of this release, the following progress was made in the key areas indicated below with respect to sustaining capital activities at the Twangiza Gold Mine:

- Resettlement

As of the date of this release, 242 households have been resettled at the Cinjira relocation site. It is expected that a further 19 households will be compensated and resettled during 2013. Discussions with the local authorities to find new resettlement sites to facilitate mining at the north pit in 2014 are ongoing.

- Mine Infrastructure

The finalizing and commissioning of the new fuel storage and metallurgical plant fire suppression system took place during March 2013.

- Tailings Management Facility (TMF)

The bulk fill, sand drainage, clay seal and the protective waste curtain were simultaneously extended beyond the design height of the 2 year wall to 2033.5 RL. Bulk filling at the 5 year wall has since received resource deployment with all waste rock from the mine going down to build the dam wall. This is necessary as mining takes advantage of the dry weather and the suitability of the material from the mining operations before the wet season sets in. De-silting of diversion canals has also commenced to open up drains in preparation for the wet season. A total of 314,936 tonnes of clay/bulkfill material was placed on both the wall and toe and 18,947 tonnes of sand was placed on the 2 year wall.

Namoya Mine Development

Development activities for the planned open-pit heap leach gold mine at Namoya continued through the second quarter of 2013 with additional progress expected between the date of this release and the expected completion of the construction efforts in the fourth quarter of 2013, when commissioning is planned to commence.

Key Achievements during the quarter and up to the date of this release

- Mechanical & Other Equipment

Orders for all long lead mechanical equipment and electrical equipment have been placed and both road and sea freighting commenced to site. To date, approximately 60% of the process plant equipment and material has been delivered to site or is on route to site.

- Resettlement

Four local construction companies were mobilized for resettlement construction. All 207 planned houses have been completed. Construction of two schools, a church, and a market have also been completed. All 207 households have been resettled into their new homes. Water has been made available to the resettlement area, with installation of supply pipes from the Kibiswa River completed. The resettlement process was completed as expected at the end of the second quarter of 2013.

- Access Roads

The 420 kilometre main access road to Namoya from Uvira has been rehabilitated. The section from Baraka to Namoya is practically complete with the mountain portion opened up and widened. Ten bridges have been upgraded, increasing the logistics capacity of freighting materials and equipment to the Namoya site. The road construction team that is still deployed is conducting maintenance work.

- Metallurgical Plant Engineering Design, Earthworks and Construction

The engineering design is 99% complete while the earthworks design has been finalized. Earthworks to the plant site are effectively complete. Earthworks in the areas such as the primary crusher, the conveyor belt, the primary product stockpile, and the crushed product stockpile have been completed with approximately 55% of overall construction complete. The heap leach pad and ponds, civil construction, and lining works are in progress and expected to be completed by the end of the third quarter of 2013. Mine pit development has commenced at Seketi and stockpiling of low, medium, and high grade ore is in process. Mwendamboko pit mining development is scheduled to be completed and ready for mining by the end of the third quarter of 2013.

- Plant Construction Materials

Construction aggregate source has been secured; the crusher/washing/screening plant for providing aggregate to the required size as per specification has been installed and fully commissioned. Production of the aggregate and sand required for the process plant civil work is 90% completed with production of aggregate for the TMF and pad underdrains to commence by the middle of the third quarter of 2013.

- Tailings Management Facility (TMF)

The construction of the TMF access road is 100% complete and bush clearing of the TMF footprint has been completed. Bulk earthworks for the return water dam component of the TMF are 100% complete and bulk excavation works at the TMF basin is 25% complete. The design of the TMF is complete with all geotechnical work and construction drawings. The TMF will consist of an initial 620,000 cubic meters earthwall at a 12 metre height with a storage capacity of 2 years of tailings and is expected to be completed during early fourth quarter of 2013.

- Personnel Resourcing

As activity increases in and around the development of the Namoya mine site, the recruitment and training of employees continues in order to maintain steady progress of construction. There are currently 1,997 employees on site and it is expected that at peak construction, which will be from the second quarter of 2013, there will be approximately 2,100 employees to help ensure timely completion of the Namoya mine construction and readiness for commissioning in the fourth quarter of 2013. The Company intends to continue to train personnel and develop appropriate systems in support of the commissioning date and during the operating phase of the Namoya mine.

Exploration

With Banro's focus being on the enhancements at the Twangiza plant and the development at Namoya, exploration programs have been curtailed with a remaining focus on low-cost exploration activities at both mine sites and sufficient low cost activities at Kamituga and Lugushwa to maintain a presence on the properties.

At Twangiza, a small exploration team conducted geological mapping, rock chip sampling and BLEG (bulk leach extractable gold) stream sediment sampling to delineate previously identified anomalies.

At Namoya, encouraging results from an infill drilling program were released (see Banro press release dated July 15, 2013). The exploration activities in the second quarter of 2013 centered on refining the Namoya geological and mineralization model in preparation of a full feasibility report.

At Lugushwa, a program of rock and soil sampling was conducted during Q2 2013 involving 2,322 auger samples (equivalent to 1,872.30 metres), 64 rock channel samples (roughly 64 metres) and 1,047 soil samples from 42 kilometres of line extended from an existing grid.

At Kamituga, a program of mapping, soil and channel sampling and auger drilling was undertaken in addition to an infill diamond drilling program using an in-house explorer drill rig. In Q2 2013, five drill holes targeting extensions of mineralized zones were completed at the Kibukila prospect; one hole was drilled to test the depth of mineralization in the main target zone at the G22 prospect; and wildcat drilling was conducted at the G15 prospect (366.70 metres) to test three mineralization zones delineated from previous auger and channel sampling.

With respect to regional exploration targets, no ground exploration was undertaken in Q2 2013.

Direct exploration expenditures for the last two quarters of the year are expected as follows:

----------------------------------------------------------------------------
Exploration and evaluation budget                                    H2 2013
                                                                    ($000's)
----------------------------------------------------------------------------
Twangiza project                                                         683
Namoya project                                                           644
Lugushwa project                                                         962
Kamituga project                                                       1,301
Banro Congo Mining SARL                                                  132
----------------------------------------------------------------------------
                                                                       3,722
----------------------------------------------------------------------------
 
An additional $3.8 million is expected to be spent on support services for the operations in the DRC and included in exploration and evaluation expenses.

Qualified Person

Daniel K. Bansah, the Company's Vice President, Head of Operations and Projects and a "qualified person" as such term is defined in National Instrument 43-101, has reviewed and approved the technical information in this release.

Conference Call

Banro will host an investor conference call on Wednesday August 14, 2013 at 11:00am EST.

Q2 2013 Financial Results Conference Call Information                       
Toll Free (North America):                +1-800-446-4472                   
Toronto Local & International:            +1-905-695-6622                   
                                                                            
Q2 2013 Financial Results Conference Call REPLAY                            
Toll Free Replay Call (North America):    +1-800-408-3053  Passcode 1509220 
Toronto Local & International:            +1-905-694-9451  Passcode 1509220
 
The conference call replay will be available from 2:00pm EST on Wednesday August 14, 2013 until 11:59pm EST on Wednesday August 28, 2013.

Banro Corporation is a Canadian gold mining company focused on production from the Twangiza oxide mine and development of three additional major, wholly-owned gold projects, each with mining licenses, along the 210 kilometre long Twangiza-Namoya gold belt in the South Kivu and Maniema provinces of the Democratic Republic of the Congo. Led by a proven management team with extensive gold and African experience, Banro's plans include the construction of its second gold mine at Namoya, at the south end of this gold belt, as well as the development of two other projects, Lugushwa and Kamituga, in the central portion of the belt. The initial focus of the Company is on oxides, which have a low capital intensity to develop but also attract a lower technical and financial risk to the Company as the Company develops this prospective gold belt. All business activities are followed in a socially and environmentally responsible manner.

For further information, please visit our website at www.banro.com.

Cautionary Note Concerning Forward-Looking Statements

This press release contains forward-looking statements. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding estimates and/or assumptions in respect of future gold production (including the timing thereof), costs, cash flows and gold recoveries and the Company's development plans and objectives) are forward-looking statements. These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company.
Factors that could cause actual results or events to differ materially from current expectations include, among other things: uncertainty of estimates of capital and operating costs, production estimates and estimated economic return; the possibility that actual circumstances will differ from the estimates and assumptions used in the economic studies of the Company's projects; failure to establish estimated mineral resources and mineral reserves (the Company's mineral resource and mineral reserve figures are estimates and no assurance can be given that the intended levels of gold will be produced); fluctuations in gold prices and currency exchange rates; inflation; gold recoveries being less than those indicated by the metallurgical testwork carried out to date (there can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in large tests under on-site conditions or during production) or less than those expected following the expansion of the Twangiza plant; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; political developments in the DRC; lack of infrastructure; failure to procure or maintain, or delays in procuring or maintaining, permits and approvals; lack of availability at a reasonable cost or at all, of plants, equipment or labour; inability to attract and retain key management and personnel; changes to regulations affecting the Company's activities; the uncertainties involved in interpreting drilling results and other geological data; and the other risks disclosed under the heading "Risk Factors" and elsewhere in the Company's annual information form dated March 26, 2013 filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

CONTACT INFORMATION:
Banro Corporation
Naomi Nemeth
Vice President, Investor Relations
+1 (416) 366-9189 or +1-800-714-7938, Ext. 2802
info@banro.com
www.banro.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Banro Corporation

PRODUCTEUR
CODE : BAA
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Banro est une société de production minière d'or basée au Canada.

Banro détient divers projets d'exploration en Republique Democratique Du Congo.

Ses principaux projets en production sont LUGUSHWA et KAMITUGA en Republique Democratique Du Congo et ses principaux projets en développement sont TWANGIZA et NAMOYA en Republique Democratique Du Congo.

Banro est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 120,8 millions US$ (102,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 août 2007 à 9,96 US$, et son plus bas niveau récent le 26 mai 2017 à 0,07 US$.

Banro possède 1 098 579 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Banro Corporation
2008 Annual report
Annual Report 2007
Financements de Banro Corporation
18/07/2016Enters Into Gold Dore Purchase and Financing Arrangement wit...
26/02/2016Closes Balance of US$98.75 Million Financing
16/02/2016Closes US$67.5 Million Stream Financing
31/12/2015Announces US$98.75 Million Financing With Resource FinanceWo...
18/08/2014Announces Financing Plan and Certain Senior Management Chang...
28/02/2014Closes US$40 Million Financing
25/04/2013Closes US$100 Million Financing
12/04/2013Announces Pricing of Previously Announced Financing Plan
27/03/2013Announces Financing Plan for US$100 Million
21/02/2013Announces Financing Package for up to US$90 Million
29/03/2011Receives Receipt for Final Short Form Prospectus
24/02/2011Announces Closing of C$56,875,000 Financing
04/02/2011Announces C$56,875,000 Private Placement
Nominations de Banro Corporation
30/06/2016Announces Election of Directors
28/06/2013Announces Election of Directors
28/03/2013Appoints Peter V. Gundy to Board of Directors
30/11/2009Appoints Michael Beckett to Board of Directors
10/09/2007Announces Senior Appointments For Its Operations In D.R.Cong...
21/08/2007Appoints Mike Prinsloo Chief Executive Officer
Rapports Financiers de Banro Corporation
08/11/2016Announces Q3 2016 Financial and Operating Results
11/05/2016Announces Q1 2016 Financial Results
28/03/2016Announces Year End 2015 Financial Results
12/11/2013Announces Q3 2013 Financial Results
11/11/2013Provides Notice of Q3 2013 Financial Results Release & Inves...
13/08/2013Announces Q2 2013 Financial Results
08/08/2013Provides Notice of Q2 2013 Financial Results Release & Inves...
08/05/2013Announces Q1 2013 Financial Results
03/05/2013Provides Notice of Q1 2013 Financial Results Release & Inves...
27/03/2013Announces Year End 2012 Financial Results
Projets de Banro Corporation
09/01/2014(Twangiza)Provides Q4 2013 Production Update for =?ISO-8859-1?Q?=20its...
31/12/2013(Namoya)Pours First Gold at Namoya Mine, Democratic Republic of the ...
10/10/2013(Twangiza)Provides Q3 2013 Production Update for =?ISO-8859-1?Q?=20its...
15/07/2013Intersects High Grade Gold Mineralization Including 39=2E60 ...
10/07/2013(Twangiza)Provides Q2 2013 Production Update for =?ISO-8859-1?Q?=20Its...
18/03/2013Files 43-101 Technical Report on Lugus =?ISO-8859-1?Q?hwa=20...
11/10/2011(Twangiza)Corp's Twangiza Mine Pours First Gold in the Democratic Repu...
14/03/2011(Twangiza)Phase 1 Mining Of The Oxide Cap At Twangiza Indicates Annual...
24/01/2011(Namoya)Preliminary Assessment of its Namoya Heap Leach Gold Project...
20/07/2009(Twangiza)Files NI 43-101 Technical Report on Twangiza Updated Feasibi...
08/06/2009(Twangiza)Update of Twangiza Feasibility Study Increases Proven and Pr...
02/03/2009(Twangiza)Files NI 43-101 Technical Report On Twangiza Feasibility Stu...
26/01/2009(Twangiza)Feasibility Study Of Twangiza Gold Project Indicates Gold Pr...
17/11/2008(Lugushwa)Intercepts Broad Zones of Gold Mineralization at its Lugushw...
19/08/2008(Namoya)intersects 29.00 metres grading 5.59 g/t Au, 7.70 metres gra...
18/08/2008(Twangiza)Files NI 43-101 Technical Report on Twangiza Pre-feasibility...
16/07/2008Moves Ahead With Bankable Feasibility Study Of Twangiza And ...
07/07/2008(Twangiza)Pre-Feasibility Study of its Twangiza Gold Project Indicates...
06/06/2008(Twangiza)Outlines Major New Mineralized Gold Structure At Mufwa Withi...
29/05/2008(Twangiza)Intersects 16.60 metres grading 8.03 g/t Au and 47 metres gr...
29/04/2008(Namoya)Intersects 18.62 metres Grading 20.15 g/t Au and 7.25 metres...
23/08/2007(Lugushwa)Intersects Wide Zones of Gold Mineralization at its Lugushwa...
08/06/2007(Namoya)Increases Indicated Mineral Resource At Namoya By 36% To 938...
08/05/2007(Twangiza)Continues to Interesect Wide Zones of Gold Mineralisation at...
20/02/2007(Namoya) Announces Further Drilling Results from its Namoya Project
Communiqués de Presse de Banro Corporation
26/07/2016Provides Corporate Update
26/07/2016Banro Provides Corporate Update
11/07/2016Banro Achieves Record Gold Production Results in Q2 as Namoy...
30/06/2016Banro Announces Election of Directors
18/06/2016Banro and Banro Group (Barbados) Limited Declare Dividends P...
16/06/2016Banro Provides Information for Holders of Series A Preferenc...
13/06/2016Banro Foundation Wins "Community Development and Local Conte...
20/05/2016Banro Declares Dividends Payable on Series A Preference Shar...
11/05/2016Banro Announces Q1 2016 Financial Results
11/05/2016Banro reports 1Q loss
19/04/2016Banro Announces Reserve Growth of 9% to 3.18 Million Ounces ...
11/04/2016Banro Announces Q1 Production Results
30/03/2016Banro and Banro Group (Barbados) Limited Declare Dividends P...
28/03/2016Banro reports 4Q loss
28/03/2016Banro Announces Year End 2015 Financial Results
24/03/2016Banro Provides a Corporate Update
31/12/2015Banro Announces US$98.75 Million Financing With Resource Fin...
17/12/2015Sustainable Agriculture and Infrastructure Construction High...
19/10/2015Banro Wins "Best Performer in Social Investment" Award at th...
13/10/2015Banro Announces Q3 Production Results
30/09/2015Banro Provides a Corporate Update
30/09/20159:25 pm Banro receives notice from NYSE MKT regarding its lo...
18/09/2015Banro Reports High Grade Drill Results at Namoya and Provide...
12/08/2015Banro Announces Q2 2015 Financial Results; Achieves Record Q...
12/08/2015Banro reports 2Q loss
30/07/2015Banro Files NI 43-101 Technical Report for Twangiza Relating...
09/07/2015Banro Announces Q2 Production Results
20/06/2015Banro and Banro Group (Barbados) Limited Declare Dividends P...
16/04/2015Pan American Silver Enters Into New $300M Credit Facility - ...
15/04/2015Gold Fields (GFI) Issues Cost and Production Outlook for Q1 ...
13/04/2015Gold Field Inks Wage Agreement with South Deep for 3 Years -...
09/04/2015Newmont (NEM) to Construct Phase 1 of Long Canyon Mine - Ana...
07/04/2015Banro Announces Record Q1 Production Results
07/04/2015Banro Announces Year End 2014 Financial Results
06/04/2015Banro Announces Record Q1 Production Results
01/04/2015Banro Provides Notice of Year End 2014 Financial Results Rel...
13/03/2015Banro and Banro Group (Barbados) Limited Declare Dividends P...
13/03/2015Banro and Banro Group (Barbados) Limited Declare Dividends P...
12/03/2015Banro Provides Update on Note Indenture Consent Solicitation
12/03/2015Banro Provides Update on Note Indenture Consent Solicitation
06/03/2015Banro Announces US$100 Million Financing and Provides Brief ...
06/03/2015Banro Provides Information for Holders of Series A Preferenc...
06/03/2015Banro Provides Information for Holders of Series A Preferenc...
27/02/2015Banro Announces US$100 Million Financing and Provides Brief ...
05/01/2015Banro Provides Q4 2014 Gold Production and Brief Operations ...
05/01/2015Banro Provides Q4 2014 Gold Production and Brief Operations ...
08/12/2014Barrick Closes Copper Joint Venture Deal with Ma'aden
03/12/2014Vale Unveils Capital Expenditure Budget for 2015
02/12/2014Paramount Gold and Silver (PZG) Surges: Stock Up 22.7%
02/12/2014AuRico Gold (AUQ) Jumps: Stock Adds 11.3% in Session
02/12/2014Alamos Gold (AGI) Shows Strength: Stock Moves Up 7.7%
01/12/2014Agnico Eagle Closes Acquisition of Cayden Resources
25/11/2014Should You Get Rid of Gold Resource (GORO) Now?
20/11/2014Weakness Seen in Allied Nevada Gold (ANV): Stock Plunges 27%
20/11/2014Primero Mining (PPP) Falls: Stock Goes Down 7.2%
12/12/2013Announces Corporate and Board Appointments and Provides a Br...
13/09/2013Provides Information for Holders of Series A Preference Shar...
24/04/2013Job Creation and Community Development Highlight Banro's 201...
10/04/2013(Twangiza)Provides Q1 2013 Production Update for Its Twangiza Gold Min...
19/03/2013Provides an Operations Personnel Update
31/01/2013Increases Oxide and Free-milling Ounces of Gold by 45%
14/01/2013(Twangiza)Provides Q4 2012 Production Update for its Twangiza Gold Min...
25/09/2012Foundation's "Celebrate the Congo" =?ISO-8859-1?Q?=20Event=2...
29/08/2012(Twangiza)Declares Commercial Production at Twangiza Gold Mine and Pro...
15/09/2011to be Added to the S&P/TSX Composite Index
15/08/2011(Twangiza)Corp's Twangiza Phase I Gold Mine Plant Entering Cold Commis...
12/07/2011CEO Simon Village presents corporate overview at Objective C...
27/06/2011(Namoya)Intercepts Further Significant Gold Mineralization While Fea...
13/06/2011Foundation and Co-Sponsors Raise $80,000 in Charitable Fundi...
05/05/2011to Host Investor Meetings on West Coast and South East Unite...
21/04/2011Signs Memorandum of Understanding with China Gold Internatio...
19/04/2011Provides Update
26/07/2010The Arrival Of Its Refurbished Gold Plant At Twangiza And P...
11/05/2010Announces Financing
14/10/2009Foundation and the Saramabila Community Celebrate Handover o...
11/08/2009Welcomes The DRC Government's Final Ratification Of The Fisc...
26/06/2009Closes CDN$100,001,700 Financing
17/06/2009Announces Terms of CDN $100,001,700 Financing
01/06/2009Provides Update on Share Trading Activity
25/02/2009Mining Convention And Titles Confirmed By DRC Government
23/09/2008Announces Exercise of Over-Allotment Option
17/09/2008Announces Closing Of Financing
11/09/2008Announces Pricing For Financing
02/09/2008Files Preliminary Short-Form Prospectus For Proposed Financi...
01/08/2008intercepts 192 metres grading 2.02 g/t Au,...at its Twangiza...
28/07/2008Provides Update On Share Trading Activity
04/03/2008Issues Corporate Update
19/02/2008Comments on Correspondence Received from the DRC Minister of...
06/02/2008 and CARE International to partner for sustainable community...
24/12/2007Peter Cowley to Retire as President
20/09/2007Continues to Interesect Significant Near Surface Gold Minera...
03/07/2007Preliminary Economic Assessment of Namoya Gold Project Indic...
21/03/2007Responds To Statements Regarding Status Of Properties Applie...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AMEX (BAA)TORONTO (BAA.TO)
0,110+0.00%0,150-63.86%
AMEX
US$ 0,110
21/12 15:59 -
0%
Cours préc. Ouverture
0,110 0,110
Bas haut
0,100 0,110
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,110 -%
Volume var. 1 mois
1 400 074 -%
24hGold TrendPower© : -28
Produit Gold
Développe Gold
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :