Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Antioquia Gold Inc.

Publié le 08 août 2012

Antioquia Gold Achieves Positive Results from Phase 1 Drilling Program at Cisneros

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Precious Metals |
Marketwire
 
 
Antioquia Gold Inc.
TSX VENTURE: AGD
OTCQX: AGDXF
Other Recent News | Printer Friendly Version

August 8, 2012
Antioquia Gold Achieves Positive Results from Phase 1 Drilling Program at Cisneros
CALGARY, ALBERTA--(Marketwire - Aug. 8, 2012) - Antioquia Gold Inc. ("Antioquia Gold") (TSX VENTURE:AGD)(OTCQX:AGDXF) has completed Phase 1 of a planned 3-phase 20,000 metre diamond drilling program at its flagship Cisneros Project in Colombia.

Phase 1 commenced on April 26, 2012 and focused exclusively on the Guayabito deposit. The program has resulted in expanding the length of known mineralized structures along strike to approximately 300 meters and has confirmed continuity to a depth of almost 500 meters, with all structures remaining open along strike and depth. Significantly, several new mineralized structures were encountered with excellent potential gold values. Plan and section views of the previous structures and the 2012 extension are illustrated in Figures 1 and 2 attached (or link to www.antioquiagoldinc.com for all figures).

To date, Antioquia Gold has received the results of 9 of 13 completed holes from the 5,069 meters of Phase 1 drilling with positive gold values that reinforce the significant dimensional increase of the Guayabito deposit. Values include 13.93 g/t Au over a length of 4.70 meters and 3.70 g/t Au over a length of 10.48 meters. Antioquia Gold expects to receive the results for the remaining 4 holes in the next 2 to 3 weeks. Highlights of the results for the holes received to date can be found in Table 1 below.

Table 1 - Highlights of Phase 1 Drilling at Guayabito Deposit

---------------------------------------------------------------------------
Drill Hole                From             To  Length (m)(i)       Au (g/t)
---------------------------------------------------------------------------
GYB12-068                46.50          50.25           3.75           5.12
---------------------------------------------------------------------------
GYB12-068                55.15          59.85           4.70          13.92
---------------------------------------------------------------------------
including                57.10          59.85           2.75          21.26
---------------------------------------------------------------------------
GYB12-068               136.00         137.40           1.40          28.12
---------------------------------------------------------------------------
GYB12-068               183.80         185.50           1.70          13.58
---------------------------------------------------------------------------
GYB12-069               260.50         262.20           1.70           6.64
---------------------------------------------------------------------------
GYB12-070               261.85         263.20           1.35           9.45
---------------------------------------------------------------------------
GYB12-070               340.20         342.30           2.10           4.13
---------------------------------------------------------------------------
GYB12-070               430.00         433.80           3.80           6.30
---------------------------------------------------------------------------
GYB12-070               454.65         465.13          10.48           3.70
---------------------------------------------------------------------------
including               454.65         456.75           2.10           9.52
---------------------------------------------------------------------------
including               459.35         465.13           5.78           5.06
---------------------------------------------------------------------------
including               461.75         465.13           3.38           7.37
---------------------------------------------------------------------------
GYB12-070               517.80         519.40           1.60           8.94
---------------------------------------------------------------------------
GYB12-072               142.20         144.10           1.90           2.77
---------------------------------------------------------------------------
GYB12-073                78.95          80.65           1.70          11.55
---------------------------------------------------------------------------
GYB12-073               256.90         266.10           9.20           4.31
---------------------------------------------------------------------------
including               256.90         260.65           3.75           9.27
---------------------------------------------------------------------------
including               256.90         258.55           1.65          16.20
---------------------------------------------------------------------------

Notes: (i) Intervals reported are drilled thickness and may not represent
true width.
Drill holes GYB12-074, GYB12-075, GYB12-077 and GYB12-080 intersected the
intended structures, are geochemically anomalous, but low in Au. 
Four drill holes; GYB12-071, GYB12-076, GYB12-078 and GYB12-079 were
abandoned due to technical difficulties.
 

The 2012 Phase 1 drill results can be found on Antioquia Gold's website: www.antioquiagoldinc.com.

As stated in the March 21, 2012 News Release, Antioquia Gold's 2012 drill program is designed to add and delineate additional ounces of gold at the Guayabito and Guaico deposits; expand and delineate the 2011 Papi/Ivana discovery and conduct further work at the Chapulin, La Manuela, Soroma and Chamuela structures (see Figure 3).

Phase 2, consisting of approximately 5,000 meters of drilling divided equally between the Guaico and Papi/Ivana targets, began June 26, 2012 with the mobilization of a second drill.

"We are very satisfied with the work at Guayabito so far this year. Stepping out and expanding the deposit, confirming continuity along strike and depth as well as receiving a bonus of new mineralized structures with only 13 holes, is very encouraging. Phase 3 drilling is currently being planned for the fall of 2012 to expand Guayabito further," commented Ian Fraser, Chief Geologist.

In addition to the 3-phase 20,000 meter drill program, Antioquia Gold continues with its regional exploration program on the other 90% of the Cisneros property with seven (7) new sectors identified at the beginning of 2012 and work on the 2011 targets, Bareno and Los Planes. This program is comprised of geological mapping, prospecting, soil geochemical profiles and the possibility of additional IP geophysical surveys. The Cisneros property, as evidenced by the occurrence/location of the Guayabito and Guaico deposits, and Papi, Chapulin, Soroma, La Manuela and Chamuela structures, has the potential to host multiple gold deposits (refer to Figure 4).

About Antioquia Gold Inc.

Antioquia Gold has been exploring for precious metals in Colombia since 2007 and has accumulated a land package of close to 40,000 hectares located throughout Colombia. Antioquia Gold's principal asset, which is being actively explored, is its 5,630 hectare Cisneros Project, located 55 kilometers northeast of Medellin in the Department of Antioquia, Colombia. At the Cisneros Project the Company has conducted extensive geochemical and geophysical programs over the entire property and has identified to date eleven (11) exploration zones. On the original discovery zone it has drilled over 37,000 meters and is well versed in the understanding of the deposit type and the project's path to resource definition and production.

To ensure reliable sample results Antioquia has a rigorous QA/QC program in place that monitors the chain of custody of the samples and includes the insertion of blanks, preparation duplicates, field duplicates, and certified reference standards in each batch of samples. Core is photographed and sawed in half with one half retained in a secured facility for future reference if needed. Sample preparation (crushing and pulverizing) is performed at ACME laboratories in Medellin, Colombia.

Samples prepared by ACME (Medellin) are direct shipped to ACME Laboratories in Vancouver Canada, an ISO certified laboratory for analysis. Assay for gold (36 elements) is performed initially by 1Dx30g Agua Regia Digestion. Au values greater than 3000 ppb is then subject to a Metallic Assay.

This press release has been prepared under the supervision of Ian Fraser, P. Geol., Chief Geologist for Antioquia Gold Inc. and a Qualified Person as defined by National Instrument 43-101.

On behalf of Antioquia Gold Inc.

Richard Thibault, President & CEO

For further information on Antioquia Gold Inc., visit our website at www.antioquiagoldinc.com.

You can also follow Antioquia Gold on twitter: @AntioquiaAGD

To receive Company news by email, contact info@antioquiagoldinc.com and mention "Antioquia Gold" news in the subject line.

Forward-Looking Statements:

This news release may contain certain forward-looking information. All statements included herein, other than statements of historical fact, including, but not limited to, statements about the seven additional regional exploration zones adding significant exploration potential to the overall property, the Company's plans for exploration in 2012, including the plans for 20,000m of drilling, are forward-looking statements. Forward-looking statements are based on management's assumptions and are subject to risks and uncertainties. There can be no assurance that any forward-looking statement will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information due to a number of factors beyond the Company's control. These assumptions, risks and uncertainties include, among other things, management's assumptions about government permitting, equipment procurement and the availability of the necessary consultants and capital, as well as the risks of delay in any of these activities and the risks inherent in Antioquia Gold's operations, including the risks that the Company may not find any minerals in commercially feasible quantity or raise enough money to fund its exploration plans. These and other risks are described in the Company's Annual Information Form and other public disclosure documents filed on the SEDAR website maintained by the Canadian Securities Administrators. The Company does not undertake to update any forward-looking information except as may be required by applicable securities laws.

To view the maps accompanying this press release please click on the following link: http://media3.marketwire.com/docs/AntiFigs88.pdf
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:
Antioquia Gold Inc.
Investor Relations Manager
403-457-4653
info@antioquiagoldinc.com
www.antioquiagoldinc.com
INDUSTRY: Manufacturing and Production - Mining and Metals

If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Antioquia Gold Inc.

EXPLORATEUR
CODE : AGD.V
ISIN : CA0371801063
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Antioquia Gold. est une société d’exploration minière d'or basée au Canada.

Son principal projet en exploration est CISNEROS en Colombie.

Antioquia Gold. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 1,5 millions CA$ (1,2 millions US$, 1,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 08 janvier 2010 à 0,69 CA$, et son plus bas niveau récent le 27 septembre 2023 à 0,01 CA$.

Antioquia Gold. possède 306 790 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Antioquia Gold Inc.
30/07/2010Antioquia Gold's Prolific Progress in Colombia
Financements de Antioquia Gold Inc.
25/02/2014Announces Closing of Private Placement of Units
20/12/2013Announces Closing of Private Placement of Units
07/11/2013Announces Private Placement of Units
30/05/2013Announces Private Placement Closing
08/05/2013Announces Private Placement Closing
20/02/2013Antioquia Gold Inc. Closes Non-brokered Private Placement
19/02/2013Closes Non-brokered Private Placement
07/11/2012Antioquia Gold Inc. Announces Amendment to Warrant Terms
07/11/2012Announces Amendment to Warrant Terms
31/10/2012Antioquia Gold Inc. Closes First Tranche of Private Placemen...
31/10/2012Closes First Tranche of Private Placement
16/10/2012Antioquia Gold Reprices Private Placement
16/10/2012Reprices Private Placement
17/09/2012Antioquia Gold Inc. Announces Private Placement
17/09/2012Announces Private Placement
17/05/2012Antioquia Gold Inc. Closes Private Placement
21/04/2011Extends Warrants Due to Expire April 22, 2011
21/01/2011Announces a $7.8 Million Non-Brokered Private Placement
Nominations de Antioquia Gold Inc.
11/12/2013Announces Appointment of New Director
19/04/2013Announces Directors' Resignations and Board Restructuring
15/03/2013Announces VP Resignation
19/07/2012Antioquia Gold Appoints New Director
09/06/2011Antioquia Gold Appoints New Director
Projets de Antioquia Gold Inc.
29/08/2013(Cisneros)Announces a Resource Estimate =?ISO-8859-1?Q?=20for=20Cisner...
12/08/2013Miranda Applies For Four Exploration Licenses In The Antioqu...
08/08/2012Antioquia Gold Achieves Positive Results from Phase 1 Drilli...
27/04/2012Antioquia Gold Inc=2E Initiates 2012 Drilling Program at Cis...
02/02/2012Antioquia Gold Inc=2E Expands Discovery andDelineation of Go...
16/12/2011Antioquia Gold Changes Financial Year End and Provides Drill...
22/09/2011Antioquia Gold Inc=2E Signs Letter of Intent With Trident Go...
21/09/2011Antioquia Gold Inc=2E Intersects 16=2E21 g/t =?ISO-8859-1?Q?...
15/09/2011Antioquia Gold Inc=2E Intersects 22=2E3 g/tAu Over 3=2E1m In...
12/09/2011Antioquia Gold Inc=2E Continues to Expand the Cisneros Proje...
22/07/2011Antioquia Outlines Significant Advances at Cisneros Project,...
28/06/2011Antioquia Gold Intersects High-Grade Gold at =?ISO-8859-1?Q?...
30/05/2011(Cisneros)Discovers Two New Gold Zones at Cisneros Project, Colombia
06/05/2011Antioquia Gold Inc=2E: The Company's Systematic Approach to ...
22/02/2011(Cisneros)Antioquia Gold Commences 2011 Drilling Program at Cisneros i...
22/02/2011(Cisneros)Commences 2011 Drilling Program at Cisneros in Colombia
01/12/2010(Cisneros)Defines 20+ New Drill Targets from IP Ground Geophysical Pro...
01/12/2010Antioquia Defines 20+ New Drill Targets from IP Ground Geoph...
Communiqués de Presse de Antioquia Gold Inc.
29/07/2016Guaico Comedor
29/07/2016Geomecanica Geologia
29/07/2016Guaico - Portal, Shop and Water Treatment Plant
29/07/2016Guaico - Office, Warehouse, 1st Aid Clinic
26/07/2016Antioquia Announces New Director and Cisneros Project Update
02/06/2016Antioquia Announces Suspension of Shares for Debt Transactio...
02/06/2016Antioquia Announces Shares for Debt Transaction
05/05/2016Cisneros Project Update Photos
05/05/2016Antioquia Announces Cisneros Project Update
18/03/2016Antioquia Announces Cisneros Project Update
18/01/2016Antioquia Announces Cisneros Project Update
18/01/2016Jim Decker 32 m in Guaico Tunnel Jan 13 2016
18/01/2016Explosives Magazine Jan 13 2016
18/01/2016Cat 3 cu m Scoop
18/01/2016Generator
18/01/2016Felipe Ferraro + Julian Villarruel 32m
18/01/2016Guaico Portal Overview Jan 13 2016
18/01/2016HAMM Compactor
18/01/2016Guaico Portal 2 Jan 13 2016
18/01/2016Julián Villarruel Felipe Ferraro Jim Decker Mick Gavrolvic
18/01/2016Light Vehicle Sevice Bay
14/10/2015Antioquia Announces Start-Up at Cisneros with Initiation of ...
13/10/2015Antioquia Announces Start-Up at Cisneros with Initiation of ...
24/09/2015Antioquia Announces Exercise of Warrants By Infinita Prosper...
23/09/2015Antioquia Announces Exercise of Warrants by Infinita Prosper...
20/08/2015eResearch Update Report
11/08/2015Antioquia Announces Exercise of Warrants By Infinita Prosper...
18/06/2015Antioquia Announces Exercise of Warrants By Infinita Prosper...
18/06/2015Infinita Prosperidad Minera S.A.C. Exercises Warrants of Ant...
13/03/2015Antioquia Gold Announces Appointment of New President and Ch...
18/02/2015Antioquia Gold Announces Appointment of New President and Ch...
20/05/2014Antioquia Gold Inc: Financing & Concordia Betulia Deal with ...
01/04/2014Antioquia Gold Announces Closing of Private Placement of Uni...
09/01/2014Announces Corporate Advisory Agreement With Westmount Capita...
01/05/2013Announces Management Appointment, Private Placement and Long...
27/09/2012Antioquia Gold Completes Phase 2 Drilling and Extends Guaico...
27/09/2012Completes Phase 2 Drilling and Extends Guaico Mineralization...
12/09/2012Antioquia Gold Reports Additional Positive Dri =?ISO-8859-1?...
11/09/2012(Cisneros)Reports Additional Positive Drilling Results at Cisneros, In...
21/03/2012Antioquia Gold Inc=2E Reports on 2011 Activities and 2012 Pl...
08/03/2012Website
07/02/2012Antioquia Gold Inc=2E Defines New Regional G =?ISO-8859-1?Q?...
08/09/2011Antioquia Gold Inc. Commences Trading on the U.S.-OTCQX
28/06/2011(Cisneros)Intersects High-Grade Gold at Guaico Prospect, Cisneros Proj...
27/05/2011Antioquia Gold Discovers Two New Gold Zones =?ISO-8859-1?Q?=...
11/05/2011Antioquia Gold Retains Contrary Investors Cafe
11/05/2011Retains Contrary Investors Cafe
21/04/2011Antioquia Gold Extends Warrants Due to Expire April 22, 2011
12/04/2011Antioquia Gold Mobilizes Second Drill Rig at Cisneros in Col...
12/04/2011(Cisneros)Mobilizes Second Drill Rig at Cisneros in Colombia
25/03/2011Unveils 2011 Exploration Program in Colombia; Grants Stock O...
25/03/2011Antioquia Gold Unveils 2011 Exploration Program in Colombia;...
17/02/2011Antioquia Commences Airborne Geophysical Survey at Cisneros
17/02/2011Commences Airborne Geophysical Survey at Cisneros
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (AGD.V)
0,005+0.00%
TSX-V
CA$ 0,005
27/09 11:24 -
0%
Cours préc. Ouverture
0,005 0,005
Bas haut
0,005 0,005
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
0,005 -  0,015 -66,67%
Volume var. 1 mois
70 000 -%
24hGold TrendPower© : 37
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 15/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
2023-50,00%0,020,01
2022-71,43%0,040,01
2021-30,00%0,060,03
2020150,00%0,090,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,16 US$-0,81%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,71 CA$+2,65%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,19 CA$-0,25%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,63 US$-0,15%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :