Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

East Asia Minerals Corporation

Publié le 07 novembre 2007

Drills 0.18% Uranium Over 9.3 Metres In First 2007 Follow-Up Hole At Enger, Mongo

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Uranium |
======================================================================
East Asia Minerals Drills 0.18% Uranium Over 9.3 Metres In First
2007 Follow-Up Hole At Enger, Mongolia
======================================================================

VANCOUVER, B.C. -- Wednesday, November 7, 2007 -- East Asia Minerals
Corporation (TSXV-EAS) reports it has intersected high grade uranium
mineralization in its initial follow-up drilling to promising assays
encountered during the Company's 2006 drilling of its Enger project,
located 150 kilometres southeast of Ulaanbaatar, Mongolia.

This second pass drill program was designed to continue fences drilled
in 2006 and to explore for extensions to the uranium mineralization.
Previous East Asia drilling had confirmed the existence of uranium
mineralization recorded from historical Soviet work. Results from the
initial EAS drill holes significantly improved on grades and widths of
the mineralization reported by the Soviets, and demonstrated that the
mineralization remains open to the east, west and at depth.

Hole EN-2007-11, the initial hole of the 2007 campaign, was collared 36
metres south along section and up-dip of EN-2006-12. The hole was
completed at 211.17 metres depth and encountered 0.180% Uranium over
9.3 metres, including 0.574% Uranium over 2.0 metres, 0.143% Uranium
over 1.4 metres, and 0.282% Uranium over 0.8 metres. Uranium
mineralization occurs in Lower Cretaceous lignite bearing sediments and
as sub-horizontal horizons in rhyolite associated with fracture zones.
The section remains open up-dip to the south where it was tested by
hole EN-2007-13.



----------------------------------------------------------------------
Drill Hole From (m) To (m) Interval (m) Uranium (%)
----------------------------------------------------------------------
EN-2007-11 90.4 92.9 2.5 0.038
----------------------------------------------------------------------
And 104.5 113.8 9.3 0.180
----------------------------------------------------------------------
Incl. 105.2 107.2 2.0 0.574
----------------------------------------------------------------------
Incl. 107.8 109.2 1.4 0.143
----------------------------------------------------------------------
Incl. 111.8 112.6 0.8 0.282
----------------------------------------------------------------------

Hole EN-2007-13 was drilled to 151.7 metres. Down hole radiometrics
and geological logging demonstrate the upper uranium target was
encountered between 33.37 to 60.72 metres depth as sub-horizontal
mineralized units within rhyolite, associated with a fracture zone.
Assays are pending.

Hole EN-2007-14 was collared in the southeast area of the mineralized
zone to test the remaining up-dip extension to multiple and strong
uranium intersections encountered along section EN-2006-01, 02 and 03.
These include 2.5 metres of 0.232 U3O8 in hole ENDD002 (June 26, 2006
news release) and 2.5 metres of 0.410 U3O8 in hole ENDD003 (July 6,
2006 news release). Although assays are pending, visual indications
and radiometrics indicate that the mineralization may have been faulted
off between EN-2007-14 and nearest hole EN-2006-03. The mineralization
continues down dip and remains open to the north of this four-hole
section.

The last hole of the follow-up program, EN-2007-15, was collared in the
southwest area of the mineralized zone to test the south and up-dip
extension to EN-2006-08. Results are pending.

The above reported uranium mineralization remains open, and following
receipt of all assays and detailed compilation further drilling will be
proposed. Additionally, there remain two untested radiometric
anomalies, in particular a south-southeast structural response
extending from the current drilling area, and a localized strong
radiometric response in the northeast quadrant of the property.

Michael Hawkins, President and CEO of East Asia Minerals Corporation,
commented that "although Enger is similar to the structural environment
of Western Prospector's Gurvanbulag deposit (22,679,160 lbs at 0.25%
U3O8), preliminary modeling demonstrates that Enger's rhyolite and
sedimentary setting compares well to the Streltsovka caldera hosted
uranium environment in eastern Russia's Transbaikkalia region, near the
Chinese-Mongolia border." Streltsovka hosts the world's largest
uranium deposits associated with a volcanic setting and is one of
Russia's largest resources of uranium metal. Over 600 million pounds
of U3O8 have been produced and current resources in 20 deposits
averages 0.2%. Like Enger, the uranium occurs primarily in altered
rhyolite as veins, and also (like Enger) stratigraphically in
sediments.

Elsewhere in the East Asia Minerals' uranium portfolio, results have
been received for the last two holes of the Ulaan Nuur property where
the Company reported multiple mineralized sections up to 0.205% Uranium
in drill hole UN002 (October 23, 2007 news release). The Company is
very pleased that the initial programs at the Ingiin Nars and Ulaan
Nuur projects have validated the historic Soviet reporting of
significant in-situ-leach (ISL) amenable uranium mineralization at both
properties (refer to October 23, 2007 news release).



----------------------------------------------------------------------
Drill Hole From (m) To (m) Interval (m) Uranium (%)
----------------------------------------------------------------------
UN003 257.5 258.8 1.3 0.029
----------------------------------------------------------------------
And 263.9 264.7 0.8 0.177
----------------------------------------------------------------------
UN004 222.5 223.8 1.3 0.095
----------------------------------------------------------------------

Samples reported were assayed at ACTLABS in Ulaanbaatar, Mongolia.
Lionel Martin, P.Geo., the designated QP within the meaning of 43-101,
has reviewed and approves the content of this release.

About East Asia Minerals Corporation
East Asia Minerals is an Asian-based, Canadian mineral exploration
company with uranium, gold and copper assets in Mongolia and Indonesia.
The Company owns the Ingiin-Nars, Ulaan Nuur and Enger uranium
properties and a 75% interest in the Khok Adar copper oxide discovery
in Mongolia. In Indonesia, it has a 70 to 85% interest in five
advanced gold and gold-copper projects located in Aceh Province in
Sumatra and North Sulawesi. East Asia currently has 55,185,372 shares
outstanding. Its shares are listed for trading on the TSX Venture
Exchange under the symbol "EAS".

Forward Looking Statements - This News Release contains forward looking
information within the meaning of the Ontario Securities Act and the
Alberta Securities Act, which involve known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements of the Company, or industry results, to be
materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements.
Forward-looking statements are subject to a variety of risks and
uncertainties which could cause actual events or results to differ from
those reflected in the forward-looking statements, including, without
limitation, risks and uncertainties relating to the interpretation of
drill results and the estimation of mineral resources and reserves, the
geology, grade and continuity of mineral deposits, the possibility that
future exploration, development or mining results will not be
consistent with our expectations, metal recoveries, accidents,
equipment breakdowns, title matters and surface access, labour disputes
or other unanticipated difficulties with or interruptions in
production, the potential for delays in exploration or development
activities or the completion of new or updated feasibility studies, the
inherent uncertainty of production and cost estimates and the potential
for unexpected costs and expenses, commodity price fluctuations
(including uranium, fuel, steel and construction items), currency
fluctuations, failure to obtain adequate financing on a timely basis
and other risks and uncertainties. Should one or more of these risks
and uncertainties materialize, or should underlying assumptions prove
incorrect, actual results may vary materially from those described in
forward-looking statements. Accordingly, readers are advised not to
place undue reliance on forward-looking statements. The words
anticipate, believe, estimate and expect and similar expressions, as
they relate to us or our management, are intended to identify forward
looking statements relating to the business and affairs of the Company.
Except as required under applicable securities legislation, we
undertake no obligation to publicly update or revise forward-looking
statements, whether as a result of new information, future events or
otherwise.

The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release.

To receive or stop receiving EAS news via email, please email
Info@EAminerals.com and state your preference in the subject line.

FOR FURTHER INFORMATION, visit the Company's website at
www.EAminerals.com, or contact:

Michael Hawkins, President and CEO
Vancouver
T: +1-778-997-2183
E: Hawkins@EAminerals.com

Nick Kohlmann, Corporate Communications
Toronto
T: +1-416-792-8734
E: Kohlmann@EAminerals.com

======================================================================
Copyright (c) 2007 EAST ASIA MINERALS CORPORATION (EAM) All rights
reserved. For more information visit our website at
http://www.eaminerals.com/ or send mailto:info@eaminerals.com
======================================================================
.

East Asia Minerals Corporation

EXPLORATEUR
CODE : EAS.V
ISIN : CA2705411056
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

East Asia Minerals est une société d’exploration minière d'or et d'argent basée au Canada.

East Asia Minerals détient divers projets d'exploration en Indonesie.

Ses principaux projets en exploration sont KHOK ADAR, ENGER, ULAAN NUUR et INGIIN-NARS en Mongolie et TANGSE, TAKENGON, BARISAN 2 PORPHYRY PROJECTS, ABONG, SANGIHE, MIWAH, UPPER TENKERENG et BARISAN en Indonesie.

East Asia Minerals est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 8,3 millions CA$ (6,3 millions US$, 5,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 14 mai 2010 à 8,73 CA$, et son plus bas niveau récent le 01 janvier 2016 à 0,01 CA$.

East Asia Minerals possède 53 790 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de East Asia Minerals Corporation
18/10/2007Upcoming Conference Schedule
Rapports annuels de East Asia Minerals Corporation
Annual report 2007
Financements de East Asia Minerals Corporation
10/10/2011Announces $10,000,000 Private Placement
13/07/2011Announces Completion of $10 Million Underwritten Private Pla...
29/06/2011Announces $10 Million Underwritten Private Placement of Comm...
05/05/2010Closes Non-Brokered Private Placement of $18.85 Million
03/05/2010Finalizes Private Placement Terms
19/06/2009Closes Private Placement of $4.641 Million
06/06/2009Finalizes Private Placement Terms
14/05/2008Announces Private Placement of up to C$37.5 million by way o...
Attributions d'options de East Asia Minerals Corporation
25/07/2011(Barisan)Provides Additional Information on Shareholder Eligibility f...
12/07/2011(Barisan)Declares Barisan Gold Corporation Dividend
Nominations de East Asia Minerals Corporation
29/10/2012Further Strengthens its Board of Directors With the Appointm...
24/09/2012Continues to Enhance Its Management Team With the Appointmen...
06/08/2012Appoints Investor Relations Team
26/07/2011Announces Management Change
04/05/2011Announces Change in Board of Directors
12/02/2011Directors : resignation of John Gingerich and Robert Parsons...
06/05/2010Appoints Edward C. Rochette as Director
13/10/2009Appoints Robert Parsons as Director
29/09/2009Appoints Michael Nayyar as Chief Financial Officer
08/07/2008Appoints Royle as VP Exploration & Business Development
Projets de East Asia Minerals Corporation
29/08/2013(Sangihe)Support Villagers at Sangihe Island With a Water Purificatio...
14/05/2013(Sangihe)Further Positive Results from Phase 1 Drilling Program at Ea...
16/04/2013(Miwah)' Miwah Gold Project Closer to Reclassification in Aceh, Ind...
15/04/2013(Sangihe)Additional Positive Results from Phase 1 Drilling Program at...
28/01/2013(Miwah)Restarts Exploration Program at Its Miwah Gold Project in In...
09/10/2012(Sangihe)to Drill 4,600 Metres at the Sangihe Project, Indonesia
12/09/2012(Sangihe)Reinitiates Drilling Program and Site Development Work at th...
23/08/2011Provides Gold Project Update to Shareholders
10/06/2011(Miwah)Files NI43-101 Resource Estimate Technical Report on the Miw...
09/05/2011(Miwah)Announces NI43-101 Resource Estimate for Miwah; Growth Poten...
05/04/2011(Miwah)Encounters 3.1 g/t Gold Over 23 Metres Within 84 Metres Grad...
22/03/2011(Miwah)Encounters 3.2 g/t Gold Over 34 Metres Within 172 Metres Gra...
15/03/2011(Miwah)Confirms Connection Between Miwah Bluff and Block M With 2.2...
01/03/2011(Sangihe)Begins Phase II Drill Program at Sangihe Gold Project
22/02/2011(Miwah)' Drilling on Track for NI43-101 Resource Estimate at Miwah;...
24/08/2010(Miwah)Verifies Miwah Drill Results via Independent Qualified Third...
03/08/2010(Barisan)Intercepts Favourable Alteration and Mineralization at Lower...
27/07/2010(Miwah)Encounters 4.27 g/t Gold Over 21.9 Metres Within 149.3 Metre...
15/07/2010(Miwah)Continues to Drill Gold at Miwah; Encounters 3.07 g/t Gold O...
12/07/2010(Miwah)Receives Remaining Gold Assays for EMD033, Expanding Miwah M...
07/07/2010(Miwah)Expands Miwah Main Zone With Partial Assays of 1.68 g/t Gold...
15/06/2010(Miwah)Extends Miwah Further West With 2.19 g/t Gold Over 43 Metres...
07/06/2010(Miwah)Advances the Miwah Main Zone North; Encounters 2.01 g/t Gold...
25/05/2010(Miwah)Extends the Miwah Main Zone to the West; Encounters 2.08 g/t...
13/05/2010(Miwah)Further Opens the Miwah Main Zone; Encounters 1.77 g/t Gold ...
26/04/2010(Miwah)New Signal Area Yields 6.8 g/t Gold and Significantly Expand...
06/04/2010(Miwah)Extends Miwah Gold Mineralization North, South and in Lower ...
15/03/2010(Miwah)Intercepts 2.15 g/t Gold Over 59.1 Metres Within 157 Metres ...
08/03/2010(Barisan)Receives Indonesia Government Approved IUP "Mining License" ...
04/03/2010(Miwah)Intercepts New Zone Grading 1.68 g/t Gold Over 24 Metres Wit...
17/02/2010(Miwah)Drills 9.29 g/t Gold Over 21 Metres Within 81 Metres Grading...
09/02/2010(Miwah)Drills 1.16 g/t Gold Over 21 Metres Within 109 Metres Gradin...
19/01/2010(Miwah)Updates Progress at Aceh; Expands South Miwah Bluff
11/01/2010(Miwah)Drills 1.64 g/t Gold Over 70.2 Metres Within 132.9 Metres Gr...
14/12/2009(Miwah)Drills 1.95 g/t Gold Over 58 Metres Within 101 Metres Gradin...
15/12/2009(Miwah)Moon River Significantly Expands Potential Size of Miwah
09/12/2009(Miwah)Receives Indonesia Government IUP "Mining Licence"; Confirms...
30/11/2009(Miwah)Drills 1.41 g/t Gold Over 91.5 Metres Within 153.7 Metres Gr...
13/11/2009(Miwah)Intersects 183.5 Metres Grading 1.28 g/t Gold, Including 2.1...
03/11/2009(Miwah)Completes Planning for NI43-101 Resource Drilling at Miwah
07/10/2009(Miwah)Drills More Gold at Miwah; Including 3.14 g/t Gold Over 28 M...
11/09/2009(Miwah)Resource Definition Drill Program at Miwah Gold Project
10/09/2009(Miwah)Drills 4.81 g/t Gold Over 30 Metres Within 100 Metres Gradin...
27/08/2009(Miwah)Intersects 5.38 g/t Gold Over 20.3 Metres Including 9.25 g/t...
24/08/2009(Miwah)Encounters 106.46 g/t Gold Over 4.60 Metres in Rock Sawn Cha...
10/08/2009(Miwah)Encounters 4.31 g/t Gold Over 51 Metres in Wider Interval of...
29/07/2009(Miwah)Encounters 3.29 g/t Gold Over 66 Metres in Wider Interval of...
07/07/2009(Miwah)High-Grade South Miwah Bluff Gold Discovery; 83.59 g/t Gold ...
02/03/2009(Barisan)Encounters Significant Porphyry Gold Mineralization at Lower...
21/01/2009(Miwah)Encounters Additional 200 Metres of 4.11 g/t Gold in Miwah C...
01/12/2008(Barisan)Intercepts 646 metres of Gold and Copper in Tengkereng Porph...
11/11/2008(Abong)Intersects 14 metres of 6.31 g/t gold and Further Expands Ab...
22/09/2008(Barisan)Commences Aceh Porphyry Copper-Gold Drilling Program
10/09/2008Encounters More High Grade Gold in Miwah Trenches Including ...
08/09/2008(Abong)Intersects More High Grade Gold at Abong Including 11 Metres...
02/07/2008(Sangihe)Extends Binebase Oxide Gold Mineralization 300 Metres Southe...
15/05/2008(Abong)Encounters 6.29 g/t Gold Over 11.0 Metres, Contributing to U...
01/05/2008(Sangihe) to Drill Sedi High Grade Gold Zone and Reports 122 g/t Gold...
04/02/2008(Sangihe)Continues to Expand Binebase With 1.52 g/t Gold, 80.03 g/t S...
28/01/2008(Barisan)Drills 4.84 g/t Gold Over 9 Metres in Near Surface Abong Jas...
14/01/2008Continues to Delineate High Grade Gold at Surface at Abong a...
08/01/2008(Sangihe)Drills 35.95 Metres of 4.03 g/t Gold and 188.28 g/t Silver a...
30/10/2007Reports High Grade Gold, Including Channel Samples of 17 Met...
Communiqués de Presse de East Asia Minerals Corporation
11/08/2015IIROC Trading Resumption - EAS
06/08/2015IIROC Trading Halt - CBI; EAS
06/08/2015TSX Venture Exchange Cease Trade Order
07/07/2015East Asia Minerals Corporation: Sale of 50% of Sangihe Gold ...
26/03/2015Unaware of Any Material Change
26/03/2015East Asia Minerals Corporation: Unaware of Any Material Chan...
04/12/2014East Asia Minerals Announces Private Placement
07/07/2014Maine's Two Largest Utilities Agree to Co-develop Transmissi...
31/03/2014Positive Initial Results From Metallurgical Tests at East As...
08/10/2013Takes Steps to Meet Current Challenges
29/05/2013(Sangihe)Positive Drilling Results from East Asia Minerals' Sangihe I...
09/05/2013Adopts Shareholder Rights Plan
08/04/2013Announces Annual and Special General Meeting Dates and Adopt...
07/01/2013Retains TMX Equicom for Investor Relations Services
07/11/2012Grants Stock Options
16/10/2012Fall 2012, Business Excellence Magazine article on East Asia...
15/10/2012Announces Options Grant
18/09/2012Enters Into Strategic Advisor Agreement With Dr. Fadel Muham...
02/08/2012Advised of Lawsuit Withdrawal
10/07/2012Provides Clarification
07/09/2011Provides Mongolia Uranium Program Update
15/08/2011Provides Corporate Update to Shareholders
27/06/2011Makes Progress on Spin-Off of Subsidiaries
03/05/2011Announces Acquisition of 50% of Carbon Conservation Pty Ltd.
21/04/2011Provides an Update on Spin-Off of Subsidiaries
10/08/2010Intercepts 0.4 g/t Gold, 0.2% Copper Over 415.1 Metres, Endi...
01/06/2010Receives Indonesia Government Approved IUP "Mining Licence" ...
05/05/2010Updates Progress and Plans for Indonesia
02/03/2010Drills 3.28 g/t Gold Over 61 Metres Within 116 Metres Gradin...
05/02/2010Named By TSX Venture As One Of The TSX VENTURE 50
05/02/2010Receives Indonesia Government Approved IUP "Mining Licences"...
14/01/2010Meet with East Asia Minerals Corporation's Management in Van...
05/10/2009Updates Progress at Miwah Gold Project-Indonesia
13/05/2008Signs Heads of Agreement With Austindo Resources for Majorit...
06/06/2009Discovers New Extension to Miwah Gold Zone, Grading Up to 12...
26/02/2009Meet with East Asia Minerals Corporation's Management in Tor...
26/01/2009Comments on the New Indonesian Mineral and Coal Mining Law, ...
22/01/2009Meet with East Asia Minerals Corporation's Management in Van...
04/09/2008Drills 103.15 Metres of 1.81 g/t Gold at Bawone
06/08/2008Extends Abong Gold System 600 Metres and Discovers New Gold ...
30/07/2008Drills 41 Metres of 1.61 g/t Gold in New Sulphide Zone at Bi...
28/07/2008Encounters 27 Metres of 4.35 g/t Gold in Miwah Trench
05/06/2008Encounters 14.0 Metres of 9.41 g/t Gold in Miwah Trench Samp...
03/06/2008Announces Termination of Negotiations With Austindo Resource...
02/06/2008Reports Strong Progress With Abong and Sangihe Drill Program...
02/04/2008Gold Potential Firming up at East Asia Minerals' Abong Prosp...
25/03/2008Continues to Extend Binebase-Bawone Gold Zone
19/03/2008Expands Abong Jasperoid Prospect in Excess of 1.5 Kms Strike...
25/02/2008Expands Binebase Towards Bawone, With 2.72 g/t Gold Over 29....
19/02/2008 Continues to Drill Aerially Extensive Gold at Abong Jaspero...
15/01/2008Binebase Continues to Deliver-East Asia Drills 2.67 g/t Gold...
11/12/2007Confirms Additional Gold Zones and Commences Drilling at Abo...
03/12/2007ntersects More Gold Over Significant Thicknesses at Bawone a...
27/11/2007Drills More Uranium at Enger, Mongolia, and Summarizes 2007 ...
07/11/2007Drills 0.18% Uranium Over 9.3 Metres In First 2007 Follow-Up...
29/10/2007to Distribute 58% of CAD$1.30 Cash Payment As a Return of Ca...
25/10/2007Intercepts 16 Metres of 2.7 g/t Gold at Brown sugar Zone
23/10/2007 Drills up to 0.2% U3O8 at Ulaan Nuur, Mongolia
18/10/2007Receives Shareholder Approval for Return of Capital
18/10/2007Intercepts 32 Metres of 4.18 g/t Gold in Channel Sample at B...
16/10/2007October 2007 President's Message to Shareholders
16/10/2007 Intercepts 95 Metres of 2.15 g/t Gold at the Bawone Prospec...
11/10/2007Minerals Restructures Management
10/10/2007Declares CAD$1.30 per share Cash Dividend
21/09/2007Announces Closing of Sale of Ooshiin Govi Property for CAD$8...
18/09/2007Reports Indonesia Exploration Progress and Extensions to Gol...
06/09/2007Announces Shareholder Approval to Sell Ooshiin Govi Property...
30/08/2007Extends Sangihe Mineralization and Starts Drilling
01/08/2007Identifies New Ingiin-Nars Uranium Targets And Commences Dri...
27/07/2007Signs Agreement With CFMM (A Subsidiary Of Areva NC) To Sell...
17/07/2007Expands Sangihe and Tangse Targets
03/07/2007Acquires Drilled Uranium Resource at Ingiin-Nars Uranium Dep...
03/05/2007Adds Ulaan Nuur To Airag Uranium Project in Mongolia
01/05/2007acquires Tangse porphyry copper-molybdenum and Barisan coppe...
26/04/2007President's Message to Shareholders
24/04/2007Announces Management Changes and Focus on Uranium Assets
12/03/2007Drills Uranium Mineralization at Ooshiin Govi
26/02/2007Acquires Takengon Gold Project in Indonesia
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (EAS.V)
0,155+0.00%
TSX-V
CA$ 0,155
20/10 14:05 -
0%
Cours préc. Ouverture
0,155 0,160
Bas haut
0,150 0,160
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,155 -%
Volume var. 1 mois
136 958 -%
24hGold TrendPower© : -37
Produit
Développe
Recherche Copper - Gold - Lead - Molybdenum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2020210,00%0,220,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,28 US$+0,16%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-1,71%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,66 CA$+0,95%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,03 CA$-1,23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,89 US$+0,34%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :