Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Loncor Resources Inc.

Publié le 17 février 2012

Loncor Resources Reports Further High GradeIntersections at Its Makapela Prospect in DR

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Marketwire

 
 
Loncor Resources Inc.
TSX VENTURE: LN
NYSE Amex: LON
Other Recent News | Printer Friendly Version

February 17, 2012
Loncor Resources Reports Further High Grade Intersections at Its Makapela Prospect in DRC

- Results include 2.95 metres grading 23.08 g/t Au, 2.84 metres grading 22.98 g/t Au, 2.67 metres grading 10.30 g/t Au and 2.34 metres grading 10.38 g/t Au

- Four drills continue working on the Makapela Prospect to delineate the mineralized zones in the Main, North and Sele Sele pit areas as well as testing new sub-parallel structures

TORONTO, ONTARIO--(Marketwire - Feb. 17, 2012) - Loncor Resources Inc. (the "Company" or "Loncor") (TSX VENTURE:LN)(NYSE Amex:LON) is pleased to announce further encouraging drilling results at the Company's Makapela prospect, Ngayu Gold Project, northeastern Democratic Republic of the Congo (the "DRC").

Exploration at Makapela is focusing on a quartz vein system within a sequence of basalts, thin units of banded iron formation, and dolerite sills. The veins are being exploited by artisanal miners in three large pits (Main, North and Sele Sele) which are each between 170 metres and 290 metres in length, located along a strike of 2.2 kilometres. Soil geochemical results indicate that the mineralization continues between these three artisanal workings under a thick soil cover.

Results have been received for an additional ten drill holes which intersected Veins 1 and 2 in the area of the Main and North pits (Table 1 and Figure 1). Results are also reported for four drill holes which targeted potential new veins and vein extensions, indicated by soil, auger and rock chip anomalies (Table 2 and Figure 2). These fourteen drill holes are in addition to the 37 previously announced drill hole results for the Makapela prospect. The current drill holes intersected mineralization at vertical depths of between 34 metres and 435 metres below surface. The holes were inclined at between minus 50 degrees and minus 68 degrees, and averaged 203 metres in depth with a maximum downhole depth of 521 metres. Core recovery averaged 98% within the mineralized sections, with the exception of hole NMDD046 which is to be re-drilled (see footnote to Table 1).

Table 1 - Latest Drill Hole Results for Veins 1 and 2, Makapela             
-----------------------------------------------------------
Hole          Easting     Northing    Azimuth   Inclination
                  UTM          UTM                         
-----------------------------------------------------------
NMDD040        552307       218116        290           -50
-----------------------------------------------------------
NMDD045        551679       217801        110           -57
-----------------------------------------------------------
NMDD046        551992       218132        110           -50
-----------------------------------------------------------
NMDD049        551877       217661        110           -50
-----------------------------------------------------------
NMDD050        551992       218132        110           -68
-----------------------------------------------------------
NMDD051        551877       217661        110           -67
-----------------------------------------------------------
NMDD052        552048       218282        110           -50
-----------------------------------------------------------
NMDD053        551928       217812        110           -50
-----------------------------------------------------------
NMDD055        552048       218282        110           -71
-----------------------------------------------------------
NMDD056        551928       217812        110           -66
-----------------------------------------------------------


------------------------------------------------------------
Hole                         Mineralization                 
           -------------------------------------------------
                Vein    From      To   Width    True   (g/t)
                         (m)     (m)     (m)   Width   Au(i)
                                                 (m)        
------------------------------------------------------------
NMDD040            2  361.07  367.41    6.30    5.26    3.33
------------------------------------------------------------
NMDD045            1  502.28  505.09    2.81    1.87    3.89
------------------------------------------------------------
NMDD046        2(ii)  114.40  115.80    1.40    0.98   24.74
------------------------------------------------------------
NMDD049            1  102.95  105.62    2.67    1.83   10.30
------------------------------------------------------------
NMDD050            2  170.90  175.12    3.14    1.43    3.14
------------------------------------------------------------
NMDD051            1  173.68  175.44    1.76    0.66    5.61
------------------------------------------------------------
NMDD052            2  116.94  119.28    2.34    1.77   10.38
------------------------------------------------------------
NMDD053            1       No significant mineralization    
------------------------------------------------------------
NMDD055            2  165.94  171.40    5.46    3.05   13.29
           -------------------------------------------------
           Includes:  167.96  170.91    2.95    1.65   23.08
------------------------------------------------------------
NMDD056            1  119.02  127.63    8.61    3.65   10.65
           -------------------------------------------------
           Includes:  119.65  122.49    2.84    1.20   22.98
           -------------------------------------------------
                And:  125.85  127.63    1.78    0.75   12.31
------------------------------------------------------------
                                                                            
(i)  Assay results reported are uncut.                                      
                                                                            
(ii) The intersection of 1.40 m @ 24.74 g/t Au has complete core recovery,  
     but potentially mineralized zones with very poor recovery occur        
     immediately above and below this intersection. The hole will be re-    
     drilled.                                                               
                                                                            
     Results for drill holes NMDD039 and NMDD054 are awaited, and drill hole
     NMDD041 was abandoned.                                                 

Vein 1 has been intersected on the Main pit trend over a potential strike length of 480 metres down to a maximum vertical depth of 435 metres (open at depth and along strike). The average true width of Vein 1 intersected in the 15 holes drilled to date is 1.80 metres with an average grade of 11.88 g/t Au. Vein 1 tends to have a glassy, white massive texture and pyrite is much less common than in Vein 2. The vein is hosted by basalt and dolerite, crosscuts the lithologic strike and is possibly a splay off Vein 2.

Vein 2 has been intersected on the North pit trend over a strike length of 800 metres, the most significant grades occurring in the central section over a potential strike length of 480 metres. In this central area, which has so far been drilled by 18 holes to a maximum vertical depth of 312 metres, the mineralization has an average true width of 3.51 metres with an average grade of 11.17 g/t Au. Vein 2 has a smokey grey, brecciated texture with common disseminations and stringers of pyrite and local pyrrhotite. The vein appears to have followed a shear zone within and on the margins of a 2 to 4-metre thick unit of banded iron formation, and is parallel to the lithological strike.

Approximately 2,000 metres to the north of the North pit, the probable continuation of Vein 2 at the Sele Sele pit has been intersected over a potential strike length of 480 metres. The mineralization is generally wider, but lower grade than on the North pit trend. The best intersection drilled is 15.68 true thickness metres grading 5.35 g/t Au.

Potential new veins and vein extensions have been identified by the Company's soil, auger and rock-chip sampling programmes, and drill testing of these targets has commenced. As shown in Figure 2, six drill holes have been completed to date, and results for the first four holes have been received (Table 2). The most significant intersection (3.60 metres grading 4.43 g/t Au) is on the Bamako trend, located 1 kilometre SSE of the Main pit. This geochemically anomalous zone, supported by rock chips of up to 18.8 g/t Au, has a strike of about 1.5 kilometres, and additional drilling is planned to further assess its potential.

Table 2 - Drill Holes Testing Potential New Veins and Vein Extensions,      
Makapela                                                                    
-----------------------------------------------------------
Hole          Easting     Northing    Azimuth   Inclination
                  UTM          UTM                         
-----------------------------------------------------------
NMDD042        551768       217188        110           -50
-----------------------------------------------------------
NMDD043        552740       220201        110           -50
-----------------------------------------------------------
NMDD044        552087       219011        110           -50
-----------------------------------------------------------
NMDD048        552254       216814        110           -50
-----------------------------------------------------------


-----------------------------------------------------------
Hole                        Mineralization                 
           ------------------------------------------------
               Vein    From      To   Width    True   (g/t)
                        (m)     (m)     (m)   Width   Au(i)
                                                (m)        
-----------------------------------------------------------
NMDD042              No significant mineralization         
-----------------------------------------------------------
NMDD043     Sele S.   93.87   98.27    4.40    3.47    3.08
-----------------------------------------------------------
NMDD044           2   95.24   97.39    2.15    1.50    2.23
-----------------------------------------------------------
NMDD048      Bamako   40.73   44.33    3.60    2.76    4.43
-----------------------------------------------------------
                                                                            
(i)  Assay results reported are uncut.                                      
     Results for drill holes NMDD047 and NMDD057 are awaited.               

President & CEO Peter Cowley commented: "We are pleased with these latest results from Makapela which indicate good continuity on Reefs 1 and 2 while the initial exploratory drilling on new targets in the immediate vicinity of Makapela is encouraging and will require follow-up drilling."

Drill cores for assaying were taken at a maximum of one metre intervals and were cut with a diamond saw with one-half of the core placed in sealed bags by Company geologists and sent to the SGS Laboratory (which is independent of the Company) in Mwanza, Tanzania. The core samples were then crushed down to minus 2 mm, and split with one half of the sample pulverized down to 90% passing 75 microns. Gold analyses were carried out on 50g aliquots by fire assay. Internationally recognized standards and blanks were inserted as part of the Company's internal QA/QC analytical procedures.

Qualified Person

The exploration results disclosed in this press release have been reviewed, verified (including sampling, analytical and test data) and compiled by the Company's geological staff based in Beni, DRC, under the supervision of Dr. Howard Fall (Aus.I.M.M), the Company's Exploration Manager and a "qualified person" (as such term is defined in National Instrument 43-101).

Loncor Resources Inc. is a Canadian gold exploration company focused on two key projects in the Democratic Republic of the Congo ("DRC") - the Ngayu and North Kivu projects. The Company has exclusive gold rights to an area covering 4,550 km2 that covers most of the Ngayu Archaean greenstone belt in Orientale province in the northeast portion of the DRC. Loncor also owns or controls 55 exploration permits in North Kivu province, covering 17,760 square kilometres, located west of the city of Butembo. Both areas have historic gold production. Led by a team of senior exploration professionals with extensive African experience, Loncor's strategy includes an aggressive drilling program to follow up on initial known targets as well as covering the entire greenstone belt with regional geochemical and geophysical surveys. Additional information with respect to the Company's projects can be found on the Company's web site at www.loncor.com.

Forward-Looking Information: This press release contains forward-looking information. All statements, other than statements of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding drilling and other exploration results, potential mineral resources, potential mineralization and the Company's exploration plans) are forward-looking information. This forward-looking information reflects the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking information is subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking information, and even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things, risks related to the exploration stage of the Company's properties, the possibility that future exploration results will not be consistent with the Company's expectations, changes in world gold markets and equity markets, political developments in the DRC, uncertainties relating to the availability and costs of financing needed in the future, the uncertainties involved in interpreting exploration results and other geological data and the other risks involved in the mineral exploration business. Forward-looking information speaks only as of the date on which it is provided and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking information are reasonable, forward-looking information is not a guarantee of future performance and accordingly undue reliance should not be put on such information due to the inherent uncertainty therein.

To view "Figure 1 - Makapela veins 1 and 2 in the area of the Main and North pits," please visit the following link: http://media3.marketwire.com/docs/LON1702figure1.pdf.

To view "Figure 2 - Four drill holes which targeted potential new veins and vein extensions, indicated by soil, auger and rock chip anomalies," please visit the following link: http://media3.marketwire.com/docs/LON1702figure2.pdf.




Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Loncor Resources Inc.
Peter N. Cowley
President and Chief Executive Officer
+ 44 (0) 790 454 0856

or

Loncor Resources Inc.
Arnold T. Kondrat
Executive Vice President
1 (416) 366-2221 or 1 (800) 714-7938

or

Loncor Resources Inc.
Naomi Nemeth
Investor Relations
1 (416) 366-2221, ext. 2802 or 1 (800) 714-7938
www.loncor.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click .

Loncor Resources Inc.

EN DÉVELOPPEMENT
CODE : LN.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Loncor Resources est une société d’exploration minière basée au Canada.

Loncor Resources est en développement de projets d'or et de platine en Republique Democratique Du Congo.

Son principal projet en développement est NORTH KIVU en Republique Democratique Du Congo et ses principaux projets en exploration sont BAS CONGO, MAKAPELA et NGAYU en Republique Democratique Du Congo.

Loncor Resources est cotée au Canada. Sa capitalisation boursière aujourd'hui est 60,6 millions CA$ (57,2 millions US$, 42,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 05 février 2009 à 0,15 CA$, et son plus haut niveau récent le 25 février 2011 à 3,75 CA$.

Loncor Resources possède 151 439 732 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Loncor Resources Inc.
09/10/2012Closes Financings
19/09/2012Announces Financings
Nominations de Loncor Resources Inc.
28/06/2013Announces Election of Directors
Projets de Loncor Resources Inc.
09/04/2013Loncor Resources Increases and Upgrades Mineral Resources at...
01/04/2013Loncor Resources Form 20-F Filed on EDGAR; Annual Financials...
25/10/2012(Ngayu)Reports Further Drill Intersections at Its Ngayu Project in ...
17/02/2012Loncor Resources Reports Further High GradeIntersections at ...
30/01/2012Loncor Resources Reports on Initial Bottle Roll Metallurgica...
26/01/2012Loncor Resources Reports on the Discovery Dr =?ISO-8859-1?Q?...
28/11/2011Loncor Resources Drills High Grade Intersectio =?ISO-8859-1?...
19/05/2011Loncor Resources: Major New Gold Discovery in Central Africa
01/04/2011(Ngayu)INTERSECTS 6.28 METRES GRADING 17.64 G/T AU, 3.25 METRES GRA...
16/03/2011(Ngayu)REPORTS ON COMMENCEMENT OF A REGIONAL GEOCHEMICAL BLEG SURVE...
06/01/2011(Makapela)Loncor Intersects 7.19 Metres Grading 64 g/t Au and 10.86 Me...
Communiqués de Presse de Loncor Resources Inc.
25/04/2013Moves to Toronto Stock Exchange
23/04/2013Completes the First Phase of IP Surveys at its Nagasa Prospe...
01/04/2013Form 20-F Filed on EDGAR; Annual Financials Filed on SEDAR
25/10/2012Loncor Resources Reports Further Drill Intersections at Its ...
09/10/2012Loncor Closes Financings
12/12/2011Loncor Completes Regional Assessment of Ngayu Greenstone Bel...
12/09/2011(Ngayu)Regional BLEG Geochemical Survey at Ngayu Project in the DR ...
06/09/2011Presenting at the Precious Metals Summit
05/05/2011Receives Award of Excellence From Regional Government, Orien...
25/04/2011TO COMMENCE TRADING ON NYSE AMEX
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (LN.V)
0,400+0.00%
TSX-V
CA$ 0,400
29/11 10:24 -
0%
Cours préc. Ouverture
0,400 0,400
Bas haut
0,400 0,400
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,400 -%
Volume var. 1 mois
1 000 -%
24hGold TrendPower© : -33
Produit
Développe Gold - Platinum
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,49 AU$+0,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,76 US$+1,29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-0,92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,59 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,15 CA$+0,80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-7,84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-2,72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,54 US$+0,40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :