March 2016 Quarterly Report-160427 ASX

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Cash | Mines |

March 2016 Quarterly Report-160427 ASX

Quarterly Report

SARACEN MINERAL HOLDINGS LIMITED

ACN: 009 215 347

QUARTERLY REPORT: MARCH 2016

Corporate Details:

27th April 2016

ASX code: SAR

Corporate Structure:

Ordinary shares on issue: 800.8m

Unvested employee performance rights: 20.2m

Market Capitalisation: A$813m (share price A$1.015)

Cash & Bullion (31 March): A$34.3m Debt (31 March): Nil

Directors:

Mr Geoff Clifford

Non-Executive Chairman

Mr Raleigh Finlayson Managing Director

Mr Mark Connelly Non-Executive

Mr Martin Reed Non-Executive

Ms Samantha Tough Non-Executive

Substantial Shareholders:

Wroxby 8.2%

Paradice Investment Management 8.0% Van Eck 7.4%

Karara Capital 6.1%

Group Resources and Reserves:

Resources 7.6Moz (30 June 2015)

Reserves 1.5Moz (30 June 2015)

Registered Office:

Level 4

89 St Georges Terrace Perth WA 6000

Telephone: +61 8 6229 9100

Facsimile: +61 8 6229 9199

For further details contact:

Troy Irvin Telephone +61 8 6229 9100

[email protected]

Ramping up to ~300,000ozpa as Thunderbox prepares for first commercial production

Production

  • Quarterly gold production of 43,059oz (Carosue Dam 33,749oz, Thunderbox 9,310oz)

  • Quarterly all-in sustaining cash costs (AISC) of A$1,183/oz, YTD AISC A$1,065/oz (within FY16 outlook range of A$1,025-1,075/oz)

  • FY16 group production outlook increased to 175-195,000oz

  • Improved June quarter anticipated at Carosue Dam as deferred high-grade ore is processed, and Thunderbox achieves commercial production

  • Thunderbox commissioning almost complete with commercial production anticipated in the current June quarter, doubling total group production to an annualised rate of ~300,000oz

  • Development of Carosue Dam's Deep South underground mine continues with commercial production anticipated in the current June quarter

  • Cash and equivalents at 31 March of A$34.3m ($42.1m at 31 December 2015), exceeding outlook which stated cash and bullion "in excess of $20m" at 31 March 2016

  • Operational cash flow generated at Carosue Dam for the quarter (including movement in gold in transit) was A$26.0 million

  • Subsequent to the March quarter, Saracen purchased the Norilsk royalty (1.5% NSR) reducing Thunderbox's AISC to ~A$1000/oz

  • Resources at Carosue Dam's Karari mine increase by 240,000oz to 873,000oz (up 38%), and Reserves increase by 114,447oz to 212,447oz (up 117%), relative to 30 June 2015 (after mining depletion)

  • Karari extended approximately 100m down dip with an intersection of 12.0m @ 5.1g/t from 557m

  • New drill platforms at Karari being developed, aimed at extending mine life beyond the current five year plan at Carosue Dam

  • Three LTIs occurred during the quarter; TIFR steady at 368

Development

Financial

Exploration and growth

Health and safety

Group Summary

Table 1 - Consolidated production and sales summary

Group Units Sep Q 2015 Dec Q 2015 Mar Q 2016 YTD FY16

Recovered Gold

oz

38,140

44,265

43,059

125,464

AISC*

A$/oz

1,025

1,009

1,183

1,065

Sold Gold

oz

39,391

44,049

36,891

120,331

Average Sale Price

A$/oz

1,593

1,590

1,675

1,617

Sales Revenue

A$m

62.8

70.0

61.8

194.6

  • AISC applies to Carosue Dam production only, Thunderbox costs are capitalised (until commercial production)

    Carosue Dam Operations

    Table 2 - Carosue Dam - Key metrics

    Carosue Dam Units Sep Q 2015 Dec Q 2015 Mar Q 2016 YTD FY16

    Underground Mining

    Ore Mined

    t

    143,000

    248,000

    275,000

    666,000

    Mine Grade

    g/t

    4.30

    4.54

    2.94

    3.83

    Contained Gold

    oz

    19,759

    36,229

    26,051

    82,039

    Mill Production

    Ore Milled

    t

    577,000

    569,000

    565,000

    1,711,000

    Mill Grade

    g/t

    2.25

    2.62

    2.02

    2.30

    Contained Gold

    oz

    41,753

    47,854

    36,733

    126,340

    Recovery

    %

    91.3%

    92.5%

    91.9%

    91.9%

    Recovered Gold

    oz

    38,140

    44,265

    33,749

    116,154

    Underground Mining

    Ore mined from underground continues to increase, rising to 275kt in the March quarter. Increased ore from the development of the Deep South mine was offset by lower production from Red October, where exploration drilling is prioritised. Table 2 includes production from:

    • Karari - 11.4koz @ 2.5g/t (v December quarter 15.1koz @ 3.1g/t)

      Ore grade and production was lower than the December quarter due to predominantly development ore only being mined from the Dhoni lode. Stoping is set to increase in the current June quarter and the head grade is expected to revert to ~3.0g/t in line with the Reserve grade.

    • Red October - 11.9koz @ 3.8g/t (v December quarter 21.1koz @ 6.7g/t)

      Gold production was lower than the previous quarter due to the planned development of the Deep South mine, with resources shared between the two mines. This has also enabled exploration drilling to be conducted from the base of the Red October mine (results expected in the current June quarter).

    • Deep South - 2.7koz @ 2.3g/t (v December quarter nil)

99% of ore production was from development, with stoping commencing late in the quarter. Ore grades are set to increase to ~3.5g/t in the current June quarter with stoping ramping up.

Despite the softer quarter from underground mining, Carosue Dam generated operational cash flow of A$26.0 million resulting in A$34.3m cash and equivalents at 31 March 2016. This comfortably exceeded the outlook of "in excess of A$20m", reinforcing Saracen's cash flow credentials.

Combined underground mine production is expected to revert back to +30koz in the current June quarter with the commencement of stoping activities at both Deep South and the Dhoni lode at Karari.

Processing

Milling was impacted by adverse weather during the quarter, with heavy rains in the last two weeks of March restricting road haulage of ore from the Deep South and Red October mines.

The closing ore stockpile at the end of the quarter was 1.3Mt @ 0.9g/t for 37,996oz. These ounces will only incur processing and administration costs, equivalent to ~A$1,097/oz AISC or A$14 million in deferred free cash flow using latest costs and a A$1,518/oz gold price (average hedge price).

Outlook

A stronger June quarter is expected as deferred high grade ore is processed and stoping activities at both Deep South and Karari ramp up.

June quarter to date (to 25 April) Carosue Dam has performed strongly, with mine production of

~9,100oz @ 3.2g/t and mill production of ~12,500oz @ 2.5g/t. This sets the foundations for a strong finish to FY16.

Thunderbox Operations

Table 3 - Thunderbox - Key metrics

Thunderbox Units Sep Q 2015 Dec Q 2015 Mar Q 2016 YTD FY16

Open Pit Mining

Total Mining

bcm

2,420,000

4,247,000

3,679,000

10,346,000

Ore Mined

t

84,000

326,000

410,000

Mine Grade

g/t

0.80

0.98

0.94

Contained Gold

oz

2,159

10,258

12,417

Mining Cost

A$/bcm

$3.57

$2.73

$3.78

$3.30

Mining Cost

A$m

$8.6

$11.6

$13.9

$34.1

Mill Production

Ore Milled

t

345,000

345,000

Mill Grade

g/t

0.92

0.92

Contained Gold

oz

10,230

10,230

Recovery

%

91.0%

91.0%

Recovered Gold

oz

9,310

9,310

Open Pit Mining

3.7 million bcm were excavated from Thunderbox (Zone A) during the quarter, with 345,000 tonnes of ore mined for 10,230oz at an average grade of 0.92g/t. By the end of the quarter, the pit floor of the cutback had reached the same level as the base of the old pit, allowing for ease of access, increased tonnage of higher grade, footwall ore and simplified scheduling of mining going forward.

Total mining expenditure was A$13.9 million (inclusive of load and haul, drill and blast, grade control, supervision and overheads), compared to budgeted costs of A$18.0 million (23% lower).

Material mined was slightly lower than budgeted movement of 3.9 million bcm (10% under performance), primarily due to inclement weather.

Unit mining costs for the quarter were 2% lower than budget and 25% below YTD budget (A$3.30/bcm v A$4.39/bcm).

Figure 1 - Thunderbox Open Pit (looking north) - Consistent and persistent

Figure 1 identifies both the lower grade hanging wall lode in the background and the higher grade, bulk, foot wall lode in the foreground.

Processing

Commercial production is anticipated in the current June quarter, doubling total group production to an annualised rate of ~300,000oz.

The laboratory was commissioned, the pebble crusher installed and the first of the spark ignition gas generators for the powerhouse has arrived on site. Plant throughput has reached nameplate capacity.

The first gold pour at Thunderbox took place during the quarter with a total of 9,310oz produced.

The current June quarter will see the commissioning of the tailings thickener, the electrical commissioning of the scats pebble crusher and the commencement of works on the new gravity circuit to be commissioned in July.

Outlook

A stronger June quarter is expected with increased tonnage of the higher grade foot wall ore becoming available for milling.

June quarter to date (to 25 April) Thunderbox has performed strongly. Mine production of ~6,368oz @ 1.6g/t and mill production of ~6,000oz @ 1.3g/t comfortably exceed the mine and mill head grade for the March quarter of 0.9-1.0g/t.

Lire la suite de l'article sur www.publicnow.com

Saracen Mineral Holdings Ltd

PRODUCTEUR
CODE : SAR.AX
ISIN : AU000000SAR9
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Saracen Minerals Holdings est une société de production minière d'or basée en Australie.

Saracen Minerals Holdings détient divers projets d'exploration en Australie.

Ses principaux projets en production sont CAROSUE DAM et SOUTH LAVERTON en Australie, ses principaux projets en développement sont RED OCTOBER, SAFARI BORE et PORPHYRY en Australie et ses principaux projets en exploration sont ENTERPRISE, WHIRLING DERVISH, KARARI, PORPHYRY UNDERGROUND, DEEP SOUTH, WALLBROOK, DEEP SOUTH UNDERGROUND, MEXICO, TWIN PEAKS, BUTCHER WELL, MONTYS DAM, MARGARET, YUNDAMINDERA, ELLIOTS LODE et MILLION DOLLAR en Australie.

Saracen Minerals Holdings est cotée en Australie. Sa capitalisation boursière aujourd'hui est 3,8 milliards AU$ (2,9 milliards US$, 2,4 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 12 juillet 2013 à 0,09 AU$, et son plus haut niveau récent le 31 juillet 2020 à 6,75 AU$.

Saracen Minerals Holdings possède 807 550 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Saracen Mineral Holdings Ltd
30/01/2008Upgrade in Resources to 2.6m Ounces
Projets de Saracen Mineral Holdings Ltd
20/08/2015150820 ASX - KOTH and Kailis acquisition
04/11/2009(Carosue Dam)Major Gold Ore Reserves increase at Carosue Dam
25/05/2009(South Laverton)South Laverton Gold Project – 60% Ore Reserve Increase
29/01/2008(Whirling Dervish)Whirling Dervish - Substantial Resource Increase
Communiqués de Presse de Saracen Mineral Holdings Ltd
18/08/2016Corporate Update -
29/07/2016RBC - SAR Outperform PT$1.80
27/07/2016FY17 Exploration and production outlook
07/07/2016June Qtr Pre-release 160707
15/06/2016UK Asia Corporate Presentation 160614
24/05/2016Resources Rising Stars Corporate Presentation 160524
19/05/2016RBC - Saracen Upside PT $1.50
17/05/2016RBC - Saracen Outperform -160512
11/05/2016Deep South ramp-up
10/05/2016Commercial production declared at Thunderbox -160510ASX
04/05/2016SAR Corporate Presentation - 160504
03/05/2016SAR Added to ASX200
27/04/2016March 2016 Quarterly Report-160427 ASX
21/04/2016Purchase of Thunderbox royalty - 160421 ASX
14/04/2016Saracen Ready to Flex its Muscles - RBC
13/04/2016Karari Resource and Reserve Growth - 160413 ASX
06/04/2016160406 ASX - March Qtr Pre-release
01/02/2016Thunderbox commissioning underway - 160201 ASX
29/01/2016Dec 2015 Quarterly
21/01/2016High Grade Gold Intersections at Pinnacles JV Gold Project -...
15/01/2016160115 Hartleys upgrade target price to 88c
11/01/2016160111 ASX - December Qtr Pre-release
22/12/2015151222 ASX - TBO update
25/11/2015151125 ASX - TBO update
15/10/2015Low Cost Growth Presentation - MBL
15/10/2015151015 ASX - CDO Robust 5 Year Outlook
07/10/2015Sept 2015 Qtly production summary
30/09/2015Full Year Statutory Accounts
16/09/2015Thunderbox progress & guidance
27/08/20152015 Financial Year Results
05/08/2015SAR Presentation Diggers 2015
03/08/2015150731 ASX Thunderbox Site Visit Presentation
22/07/2015June 2015 Quarterly Final
08/07/2015Kalpini Project - High grade intersections
07/07/2015June 2015 Quarterly
03/07/2015150702 ASX - Karari Drilling Update
10/06/2015150609 ASX - Blue Manna Exploration Update
09/04/2015March 2015 Quarterly Report
23/03/2015150323 ASX - MBL Debt Hedging Thunderbox Decision
17/11/2014Notice of General Meeting/Proxy Form
05/11/2014Capital return and special dividend
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (SAR.AX)
4,69+0.00%
AUSTRALIA
AU$ 4,69
12/02 10:00 -
0%
Cours préc. Ouverture
4,69 4,69
Bas haut
4,69 4,69
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  4,69 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -32
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2021-1,26%5,224,64
202047,52%6,752,82
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :