Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Monument Mining Limited

Publié le 11 avril 2016

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Vancouver, B.C., April 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) 'Monument' or the 'Company' is pleased to announce that significant intercepts assay results have been received for the Buffalo Reef Central ('BRC') and Felda Land ('Felda') deposits at Selinsing Gold Mine driving by Monument fiscal 2016 exploration programs ('FY2016 Exploration'). The FY2016 Exploration includes definition and extensional drilling and associated metallurgical test work to update resource statement that may potentially increase the life of mine for another five years. In parallel sulphide ore treatment test work, mine optimization and economic study are progressing towards completion of an updated NI43-101 technical report.

Highlight of the best intercepts and exploration progress at BRC and Felda

HOLE ID From(m) To (m) Au g/t Interval Length /Grade
MBRDD454 98.55 117.25 5.82 18.70m @ 5.82g/t
MBRDD458 135.3 141.3 5.03 6.00m @ 5.03g/t
MBRDD458 215.3 224 9.54 8.70m @ 9.54g/t
MBRDD463 174.2 177.4 6.13 3.20m @ 6.13g/t
MBRDD470 147.1 160.5 5.22 13.40m @ 5.22g/t
MBRDD493 62.3 67 13.77 4.70m @ 13.77g/t
MBRDD493 123.8 141.1 5.45 17.3m @ 5.45g/t

FY2016 Exploration at BRC and Felda deposits included 71 exploration holes for 3,548 meters RC drilling and 5,964 meters DD drilling, plus 19 holes for 1,797 meters of metallurgical drilling (Figure 1'Drill hole Location Plan for composited assays greater than 1.0g/t'). 10,582 assay results have been received, confirming the good continuity of the known mineralization envelopes and their extensions down-dip. A follow-up drilling program to extend resources is being planned to follow after the completion of an ongoing metallurgical drilling program.

Table 1 'Significant Drill Intercepts > 1.0g/t -- DD holes' is attached to this News Release, showing a breakdown of fire assay best intercept results completed by SGS Lab for intervals of mineralization greater than 1.0 g/t Au along with collar information for the DD drill holes, in both local mine grid and national MRSO grid system. The majority of the infill and extensional drilling was angled at 60° towards the local mine grid west, and has confirmed the existing oxide and sulphide mineralized zones and also intersected a number of down-dip quartz stibnite high grade intervals, beyond the currently defined shallower, quartz-ankerite mineralization.

Figure 1--Drill hole Location Plan for composited assays greater than 1.0g/t

The Table 2 in this news release shows the collar coordinates of highlighted exploration HQ diameter DD (prefix MBRDD) and RC (prefix MBRRC) in corresponding intercepts listed in the Table 1.

FY2016 drill holes, including the mineralized assay results greater than 1.0g/t Au at BRC/Felda highlighted at Figure 1 above, together with holes prior to FY2016, are all being used in the ongoing Resource estimation. The drill hole orientation for exploration drilling was designed to target perpendicular to mineralization for true thickness. The drill hole intercepts reported in this statement represent composited sample intervals obtained from drilling.

Exploration Focus at Gold Portfolio in Malaysia

The following Figure 2 shows a regional geology map and gold mining context for the central gold belt surrounding Selinsing Gold Mine area in Pahang State, Malaysia.

Figure 2. Central Gold Belt of Malaysia and locations of Selinsing, Buffalo
Reef and other significant mines

The Company's exploration focus is to substantially replace gold inventory in the surrounding areas of the Selinsing Gold Mine in order to extend the economically recoverable life of mine to support sustainable production for another 5 years.

Previous exploration through 2013 to 2015 has provided better understanding of the geology, lithologies, structural, hydrothermal alteration and weathering controls on the mineralization of the properties in the Selinsing Gold Mine area, which supported and will continue to support together with FY2016 exploration identification of extensions of the known mineralization and new occurrences hosted in the same major, north south structure.

The fiscal 2016 drilling and geological program includes exploration and extensional drilling, resource definition drilling, and infill drilling for improving the confidence in the continuity of the (high) grade intercepts and the knowledge of the geometry of the mineralized bodies, resulting in promotion of Inferred to Indicated Resource categories, and from Indicated to Measured Resource categories. The drilling has also been conducted aiming to collect samples for metallurgical test work, specifically for ongoing sulphide gold recovery test work.

Buffalo Reef exploration is the current focus and is concentrated in BRC and Felda areas. Drilling was generally orientated east-west, with drill spacing of 40m by 40m infilled to 20m by 20m. The results have been highly encouraging so far; continuing to investigate extensions of the same type of mineralization along the strike structure and down-dip is planned.

The priority for the next few years' exploration will be primarily carried out at the Company owned property/tenements due to existing good geological, structural and mineralization controls; and metallurgical, mining knowledge that has already been accumulated. All together this will increase the possibility of finding new discoveries quicker, and with a higher likelihood of success.

As additional promising targets are: (i) the down-dip and East extension of Felda and BRC, where there is a good chance of continuing to intercept high grade stibnite sulphide mineralization, and; (ii) Buffalo Reef South (BRS) extension to southeast and east (towards Felda), given the higher average grade of this deposit in comparison with BRC, Felda and Buffalo Reef North (BRN), possible south extension of same structure occurring in Felda and BRC, and potential to find additional Oxide Resources.

The incorporation of geometallurgical aspects to the database will guide Monument's drill programs towards potential future mining and gold production.

Buffalo Reef Gap (BRG) is a green field prospect located in the main structure between BRC and BRN, leading to an expectation of finding new mineralization envelopes. Bukit Ribu and Peranghi are targets also hosted in the same major North-South structure, with artisanal mining activities for Peranghi in the past, among other evidences of mineralization from Monument's own drilling. Those areas represent further long term exploration potential.

Follow up of Remaining FY2016 Exploration Programs

The remaining FY2016 exploration plan is to complete the ongoing metallurgical drilling (Hallide leach -- Pilot Plant test work sulphide sampling) and resource definition drilling in BRC and Felda areas, and extend exploration drilling in Felda Land.

The drilling data have been validated for geology analysis, grade shell interpretation and ongoing resource modelling. It was observed that the medium to high grades are in a good part associated to higher intensity of quartz vein zones, however many vein zones are actually barren rocks. The mineralization shows predominantly a tabular shape concordant with the regional shearing structuring, getting thicker and more rounded in depth, in the high grade stibnite sulphide occurrences. Infill and extensional drilling has been successful in confirming a good continuity of these bodies in a section or from one section to another, increasing the reliability of the interpretation.

Roger Stangler, Chief Managing Geologist of the Company, MEng, MAusIMM, MAIG, has prepared, reviewed, supervised the preparation and approved the scientific and technical disclosure in the news release as a Qualified Person under NI43-101 standards.

About Monument

Monument Mining Limited (TSX-V:MMY, FSE:D7Q1) is an established Canadian gold producer that owns and operates the Selinsing Gold Mine in Malaysia. Its experienced management team is committed to growth and is advancing several exploration and development projects including the Mengapur Polymetallic Project, in Pahang State of Malaysia, and the Murchison Gold Projects comprising Burnakura, Gabanintha and Tuckanarra in the Murchison area of Western Australia. The Company employs approximately 300 people in both regions and is committed to the highest standards of environmental management, social responsibility, and health and safety for its employees and neighboring communities.

Robert F. Baldock, President and CEO
Monument Mining Limited
Suite 1580 -1100 Melville Street
Vancouver, BC V6E 4A6

FOR FURTHER INFORMATION visit the company web site at www.monumentmining.com or contact:

Richard Cushing, MMY Vancouver T: +1-604-638-1661 x102 [email protected]
Wolfgang Seybold, Axino GmbH T: +49 711-82-09-7211 [email protected]

'Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.'

Forward-Looking Statement

This news release includes statements containing forward-looking information about Monument, its business and future plans ('forward-looking statements'). Forward-looking statements are statements that involve expectations, plans, objectives or future events that are not historical facts and include the Company's plans with respect to its mineral projects and the timing and results of proposed programs and events referred to in this news release. Generally, forward-looking information can be identified by the use of forward-looking terminology such as 'plans', 'expects' or 'does not expect', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates' or 'does not anticipate', or 'believes', or variations of such words and phrases or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will be taken', 'occur' or 'be achieved'. The forward-looking statements in this news release are subject to various risks, uncertainties and other factors that could cause actual results or achievements to differ materially from those expressed or implied by the forward-looking statements. These risks and certain other factors include, without limitation: risks related to general business, economic, competitive, geopolitical and social uncertainties; uncertainties regarding the results of current exploration activities; uncertainties in the progress and timing of development activities; foreign operations risks; other risks inherent in the mining industry and other risks described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Material factors and assumptions used to develop forward-looking statements in this news release include: expectations regarding the estimated cash cost per ounce of gold production and the estimated cash flows which may be generated from the operations, general economic factors and other factors that may be beyond the control of Monument; assumptions and expectations regarding the results of exploration on the Company's projects; assumptions regarding the future price of gold of other minerals; the timing and amount of estimated future production; the expected timing and results of development and exploration activities; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; exchange rates; and all of the factors and assumptions described in the management discussion and analysis of the Company and the technical reports on the Company's projects, all of which are available under the profile of the Company on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities laws.

MONUMENT MINING LIMITED
Table 1: Significant Drill Intercepts > 1.0g/t -- DD holes

No. Hole ID Hole Type *Intercept Width (m) Intercept Grade Au (g/t) Intercept Description Mineralization Type From (m) To (m) End Of Hole Depth (m)

1 MBRDD445 DD 14.85 1.58 14.85m @ 1.58 g/t Sulfide 79.80 94.65 130.40
2 MBRDD446 DD 8.20 2.60 8.20m @ 2.60 g/t Oxide 39.80 48.00 110.30
3 MBRDD447 DD 12.10 1.21 12.10m @ 1.21 g/t Sulfide 99.80 111.90 141.80
4.75 1.45 4.75m @ 1.45 g/t Sulfide 125.05 129.80
4 MBRDD449 DD 16.50 2.53 16.50m @ 2.53 g/t Sulfide 90.80 107.30 120.80
7.50 1.67 7.50m @ 1.67 g/t Sulfide 111.80 119.30
5 MBRDD451 DD 36.60 2.56 36.60m @ 2.56 g/t Sulfide 73.70 110.30 158.30
15.00 2.74 15.00m @ 2.74 g/t Sulfide 113.30 128.30
6 MBRDD453 DD 8.70 2.90 8.70m @ 2.90 g/t Sulfide 81.10 89.80 152.30
7.30 1.74 7.30m @ 1.74 g/t Sulfide 96.80 104.10
5.15 1.94 5.15m @ 1.94 g/t Sulfide 108.10 113.25
7 MBRDD454 DD 10.40 1.31 10.40m @ 1.31 g/t Sulfide 73.80 84.20 154.10
8.90 2.33 8.90m @ 2.33 g/t Sulfide 87.80 96.70
18.70 5.82 18.70m @ 5.82 g/t Sulfide 98.55 117.25
6.50 3.38 6.50m @ 3.38 g/t Sulfide 120.80 127.30
5.25 2.90 5.25m @ 2.90 g/t Sulfide 139.10 144.35
8 MBRDD458 DD 6.00 5.03 6.00m @ 5.03 g/t Sulfide 135.30 141.30 234.80
4.50 1.24 4.50m @ 1.24 g/t Sulfide 144.80 149.30
7.50 1.50 7.50m @ 1.50 g/t Sulfide 161.30 168.80
8.70 9.54 8.70m @ 9.54 g/t Sulfide 215.30 224.00
9 MBRDD459 DD 3.85 1.32 3.85m @ 1.32 g/t Sulfide 106.45 110.30 131.30
10 MBRDD462 DD 11.80 1.71 11.80m @ 1.71 g/t Sulfide 113.50 125.30 155.80
11 MBRDD463 DD 11.00 2.01 11.00m @ 2.01 g/t Sulfide 100.80 111.80 207.80
6.50 4.75 6.50m @ 4.75 g/t Sulfide 149.50 156.00
3.70 1.75 3.70m @ 1.75 g/t Sulfide 164.60 168.30
3.20 6.13 3.20m @ 6.13 g/t Sulfide 174.20 177.40
16.12 1.77 16.12m @ 1.77 g/t Sulfide 179.60 195.72
12 MBRDD470 DD 13.40 5.22 13.40m @ 5.22 g/t Sulfide 147.10 160.50 179.30
5.10 3.26 5.10m @ 3.26 g/t Sulfide 166.30 171.40
13 MBRDD474 DD 5.10 3.06 5.10m @ 3.06 g/t Sulfide 125.05 130.15 152.10

No. Hole ID Hole Type *Intercept Width (m) Intercept Grade Au (g/t) Intercept Description Mineralization Type From (m) To (m) End Of Hole Depth (m)
14 MBRDD486 DD 4.50 1.11 4.50m @ 1.11 g/t Oxide 14.00 18.50 188.30
3.00 1.02 3.00m @ 1.02 g/t Oxide 27.50 30.50
9.40 1.99 9.40m @ 1.99 g/t Sulfide 136.90 146.30
7.00 1.76 7.00m @ 1.76 g/t Sulfide 167.30 174.30
15 MBRDD489 DD 3.90 3.56 3.90m @ 3.56 g/t Sulfide 83.30 87.20 138.70
16 MBRDD493 DD 4.70 13.77 4.70m @ 13.77 g/t Sulfide 62.30 67.00 171.30
17 MBRDD499 DD 3.00 1.90 3.00m @ 1.90 g/t Oxide 39.80 42.80 103.80
4.20 1.57 4.20m @ 1.57 g/t Sulfide 60.20 64.40
18 MBRDD504 DD 17.30 5.45 17.30m @ 5.45 g/t Sulfide 123.80 141.10 201.60
8.60 3.44 8.60m @ 3.44 g/t Sulfide 145.60 154.20
4.95 1.46 4.95m @ 1.46 g/t Sulfide 157.87 162.82
19 MBRDD507 DD 6.00 3.76 6.00m @ 3.76 g/t Sulfide 128.30 134.30 146.60
20 MBRDD510 DD 3.30 1.17 3.30m @ 1.17 g/t Oxide 42.50 45.80 150.00
7.50 1.78 7.50m @ 1.78 g/t Sulfide 123.40 130.90

Note:
* Intercepts widths represent approximate true mineralization widths.
** Intercepts stated are all included in the database used for the NI43-101 new Resource Model.
LEGEND: Gold (Au) SELECTION PARAMETERS:
1.0 to 3.0 g/t Bottom cut (g/t) 1.00
3.0 to 5.0 g/t Minimum Interval Length (m) 3.00
5.0 to 10.0 g/t Maximum Internal Dilution (m) 1.50
10.0 to 13.77 g/t


MONUMENT MINING LIMITED
Table 2: Significant Drill Intercepts: Collar coordinates in local mine grid & national grid

No. Hole ID Hole Type Collar coordinates in local mine grid & national grid Dip Mine Azimuth MRSO Azimuth
Mine East Mine North Mine RL MRSO
East MRSO North MRSO RL
1 MBRDD445 DD 762.46 4,579.68 491.25 421,289.14 472,630.12 99.44 -60.0 269.9 261.9
2 MBRDD446 DD 729.83 4,609.00 498.01 421,252.73 472,654.58 106.20 -61.0 264.6 256.6
3 MBRDD447 DD 783.13 4,560.53 494.06 421,312.28 472,614.05 102.25 -62.0 264.7 256.7

4 MBRDD449 DD 763.61 4,540.05 496.04 421,295.82 472,591.04 104.23 -62.0 267.8 259.8

5 MBRDD451 DD 749.67 4,520.12 499.57 421,284.80 472,569.36 107.76 -63.0 262.1 254.1

6 MBRDD453 DD 739.72 4,499.61 504.96 421,277.82 472,547.66 113.15 -62.0 261.0 253.0

7 MBRDD454 DD 752.55 4,480.41 505.12 421,293.21 472,530.44 113.31 -61.0 266.4 258.4

8 MBRDD458 DD 818.31 4,238.16 492.98 421,392.21 472,299.77 101.17 -60.0 266.3 258.3

9 MBRDD459 DD 776.06 4,459.60 503.34 421,319.40 472,513.13 111.53 -61.0 269.8 261.8
10 MBRDD462 DD 770.24 4,439.58 505.06 421,316.44 472,492.48 113.25 -62.0 266.2 258.2
11 MBRDD463 DD 795.09 4,200.09 498.52 421,374.54 472,258.83 106.71 -60.0 255.5 247.5

12 MBRDD470 DD 798.22 4,182.60 500.14 421,380.09 472,241.95 108.33 -62.0 265.0 257.0

13 MBRDD474 DD 781.85 4,419.95 503.69 421,330.68 472,474.67 111.88 -62.0 269.4 261.4
14 MBRDD486 DD 751.22 3,944.96 500.80 421,366.79 472,000.07 108.99 -62.0 267.3 259.3

15 MBRDD489 DD 643.80 3,514.72 499.54 421,320.60 471,559.04 107.73 -61.0 268.7 260.7
No. Hole ID Hole Type Collar coordinates in local mine grid & national grid Dip Mine Azimuth MRSO Azimuth
Mine East Mine North Mine RL MRSO
East MRSO North MRSO Elev
16 MBRDD493 DD 718.79 3,820.39 507.88 421,352.10 471,872.19 116.07 -63.0 265.2 257.2
17 MBRDD499 DD 623.81 3,629.94 516.22 421,284.69 471,670.33 124.41 -58.0 265.6 257.6

18 MBRDD504 DD 840.03 3,878.81 495.87 421,463.97 471,946.99 104.06 -64.0 265.8 257.8

19 MBRDD507 DD 759.66 3,838.18 500.55 421,390.08 471,895.52 108.74 -59.0 259.4 251.4
20 MBRDD510 DD 666.58 3,919.32 527.35 421,286.57 471,962.85 135.54 -63.0 304.6 296.6

Lire la suite de l'article sur www.publicnow.com

Monument Mining Limited

PRODUCTEUR
CODE : MMY.V
ISIN : CA61531Y1051
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Monument Mining est une société de production minière d'or basée au Canada.

Son principal projet en production est SELINSING en Malaisie et ses principaux projets en exploration sont MENGAPUR et BUFFALO REEF en Malaisie.

Monument Mining est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 51,6 millions CA$ (37,8 millions US$, 35,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 21 janvier 2011 à 0,74 CA$, et son plus bas niveau récent le 09 avril 2020 à 0,04 CA$.

Monument Mining possède 322 720 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Monument Mining Limited
13/02/2013Announces Closing of First Tranche of Brokered Private Place...
17/10/2012Announces Private Placement
12/10/2011Announces Private Placement of up to $70=2C000=2C000
12/08/2010Closes $13.0 Million Financing
22/07/2008Closes $38.1 M Private Placement and Convertible Note Financ...
Nominations de Monument Mining Limited
08/01/2014Receives Notice of Nominations for Election of Directors
08/01/2014Receives Notice of Nominations for Election of Directors
28/10/2013Appoints Executive General Manager, Monument Malaysia Group
20/09/2012Appoints Chief Operating Officer
29/06/2012Appoints Gerald Ruth to Board
25/01/2012Grants Share Purchase Options to its Directors
21/12/2011Appoints Graham Dickson as Chairman of the Board
09/06/2010Grants 1,600,000 options to CHF investor relation firm
09/06/2010Engages CHF in Investor Relations and Updates $12 Million Fi...
30/06/2009Appoints New Director
17/12/2008Appoints New Directors and Names George Brazier Chairman of ...
25/08/2008Appoints General Manager and Mine Manager
20/06/2008Appoints AXINO AG to provide Investor Relation Services (Rev...
Rapports Financiers de Monument Mining Limited
29/11/2013Reports First Quarter Fiscal 2014 Results
30/05/2013Reports Third Quarter Fiscal 2013 Results
01/06/2012=E2??s 2012 Third Quarter Results
01/03/20122012 Second Quarter Results
05/01/2012=E2??s 2012 First Quarter Results
30/05/2011 2011 Third Quarter Results
09/05/2011 Third Quarter Production and Sales Results
01/03/2011 2011 Second Quarter Results
Projets de Monument Mining Limited
15/05/2013Central Australian Phosphate and Monument Mining to Establi...
01/05/2013s Its Interest In Central Australian Phosphate Limited
30/04/2013(Selinsing)s Selinsing and Buffalo Reef Resources
19/03/2013Abandons Earn=2DIn on Mersing Project
26/10/2012Attending Singapore and German Resource Conferences
25/10/2012(Selinsing)to Vigorously Defend Opportunistic Claim Filed Against Seli...
09/10/2012(Mengapur)Signs Harmonization Agreement on Mengapur Project
26/03/2012(Selinsing)Exposes Gold Thieves at Selinsing Gold Mine
21/02/2012(Mengapur)Closes Acquisition of 70% of the Mengapur Polymetalic Projec...
02/02/2012(Mengapur)Receives Final Acceptance from the TSX=2DV to Close the Meng...
03/12/2011(Mengapur)Enters into Definitive Agreement for Acquisition of 70% of ...
15/09/2011Grows Gold Project Pipeline
26/07/2011(Selinsing)Releases Positive Drill Results from Selinsing Property in M...
22/07/2011(Selinsing)to Expand Tailings Storage Facility at Selinsing Gold Mine i...
01/06/2011(Mengapur)Agrees to Acquire a 70% interest in the Mengapur Polymetalic...
29/05/2011(Buffalo Reef)REPORTS NI43-101 RESOURCES AT BUFFALLO REEF PROPERTY
03/03/2011(Selinsing)to Increase Gold Production
21/02/2010(Selinsing)Starts Commissioning CIL Circuit While Gravity Circuit is in...
04/11/2009(Selinsing)Pours First Gold From Gravity Circuit
01/09/2009(Selinsing)Obtains Power Connection at the Selinsing Gold Project and
20/07/2009(Selinsing)Commences Open-Pit Mining at the Selinsing Gold Project
11/02/2009(Buffalo Reef)Confirms Amended Plan for Gold Production from Phase I Gravi...
02/02/2009(Buffalo Reef)Releases Drill Results, Selinsing Developments and Director’...
07/03/2008(Buffalo Reef)Releases Positive Drill Results?Phase II Program at Buffalo ...
04/03/2008(Buffalo Reef)Positive Drill Results?Phase II Program at Buffalo Reef
07/02/2008(Buffalo Reef)'s Phase I Drill Program Confirms Previous Drill Results on ...
Communiqués de Presse de Monument Mining Limited
11/07/2016Monument Announces Significant Intercepts Assay Results at N...
13/06/2016Monument Collects Judgment and Adds Peter Kestel Personally ...
31/05/2016Monument Reports Third Quarter Fiscal 2016 Results
09/05/2016Monument Announces Not to Proceed with Matala
02/05/2016Monument Withdraws Technical Disclosure regarding Matala Pro...
11/04/2016Monument Announces Significant Intercepts Assay Results at B...
24/03/2016Monument Comments on Unusual Trading Activity
23/03/2016Monument files NI43-101Technical Report for Resource Estimat...
30/11/2015Monument Reports First Quarter Fiscal 2016 Results
21/11/2015Monument Mining Announces Results of Annual General Meeting ...
30/09/2015Monument Commissions Intec Pilot Plant at Selinsing
30/09/2015Monument's Fiscal 2015 Results
28/09/2015Monument Progresses Mine Development at Burnakura Site
17/08/2015Monument Murchison Gold Project Update
12/08/2015Monument Files Amended Technical Report for Murchison Gold P...
31/07/2015Monument Litigation Update
02/04/2015Monument files NI43-101Technical Report for Resource Estimat...
02/04/2015Monument files NI43-101 Technical Report for Resource Estima...
23/03/2015Monument Mining Announces Results of Annual General Meeting ...
08/03/2015Monument Reports Second Quarter Fiscal 2015 Results
27/02/2015Monument Reports Second Quarter Fiscal 2015 Results
27/02/2015Monument Delays Start-up of Iron and Copper Project at Menga...
18/02/2015Monument Announces Mineral Resource on Alliance/New Alliance...
16/02/2015Monument Files Claim Against Summer Empire Sdn. Bhd. and Kes...
13/02/2015Monument Announces Adjournment of Shah Alam High Court Trial...
07/02/2015Monument Issues Shares for Intec Transaction
06/02/2015Monument Issues Shares for Intec Transaction
02/02/2015Monument Secures Intec License to Exploit Sulphide Gold and ...
21/01/2015Monument Update Selinsing Litigation
20/01/2015Monument Update Selinsing Litigation
19/01/2015Monument Announce RC Assay Results from Federal City Drillin...
23/12/2014Monument Announces Termination of Proposed Transaction with ...
01/12/2014Monument Reports First Quarter Fiscal 2015 Results - Gold Pr...
30/11/2014Monument Reports First Quarter Fiscal 2015 Results
18/11/2014Monument Receives Order to Extend Time for Holding Annual Ge...
18/11/2014Monument Announces Second Round of RC Assay Results at Murch...
18/11/2014Extension of Closing Date for Proposed Transaction, 189 KB
17/11/2014Monument Extends Closing Date of Proposed Transaction with G...
12/11/2014Monument Completes Tuckanarra Gold Project Acquisition in We...
08/11/2014Monument to Extend Time for Holding Annual General Meeting
27/10/2014Monument Extends Close Date of Tuckanurra Acquisition
20/10/2014Monument Updates Selinsing Litigation
06/10/2014Monument Updates Selinsing Litigation
30/09/2014Monument's Fiscal 2014 Results
28/01/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
28/01/2014Files Lawsuit Against GoldMet and George Molyviatis to enfor...
20/01/2014Warns Shareholders to Be Wary of the Dissident Group Attempt...
23/05/2013(Selinsing)Files Technical Report for Selinsing and Buffalo Reef
01/05/2013Reports Third Quarter Gold Production of 13=2C255 Ounces
24/04/2013Confirms Indicative Non=2DBinding Conditional Proposal to ac...
15/04/2013(Buffalo Reef)Starts Mining and Processing Oxide Materials at Buffalo Reef
02/04/2013Announces Results of Annual General Meeting of Shareholders
13/03/2013President and CEO to Speak at Hong Kong Conference
22/02/2013Settles Legal Disagreement
21/02/2013Welcomes Support from Major Shareholder
08/02/2013Further Comments on GoldMet Disclosure
08/02/2013Comments on GoldMet Disclosure=3A No Agreement Reached
17/01/2013Provides Update to Shareholders
11/01/2013Reports Record Second Quarter Gold Production of 15=2C902 Ou...
14/11/2012Has Engaged Mackie Research Capital Corporation as Financial...
10/11/2012to Extend Time for Holding Annual General Meeting
02/10/2012=E2??s 2012 Annual Results=3A Gross Revenue of $61.7 M with ...
24/08/2012(Mengapur)Confirms Historic Drilling Results at Mengapur Polymetalic P...
16/08/2012(Selinsing)Completed Selinsing Gold Plant Expansion
07/08/2012(Mengapur)Provides Updates on Mengapur Project and Private Placement
30/07/2012=E2??s 2012 Fourth Quarter Production Result
24/07/2012Received $12 Million through Exercise of Stock Purchase Warr...
19/06/2012and PLSB Working Together Harmonizing Oxide Magnetite Iron O...
14/05/2012=E2??s 2012 Third Quarter Production
09/05/2012Announces Senior Management Appointments
25/04/2012to Attend The INVEST 2012 Conference in Stuttgart
25/01/2012=E2??s 2012 Second Quarter Production
04/01/2012Announces Results of Annual and Special General Meeting of S...
20/12/2011Reminds Shareholders to Vote
16/12/2011(Mengapur)Discusses Mengapur Property Iron Ore Production Information
15/12/2011Provides Details of Annual General and Special Meeting
13/12/2011Annual General and Special Meeting Important Reminder
26/10/2011=E2??s 2012 First Quarter Production
29/09/2011=E2??s 2011 Annual Results
08/08/2011=E2??s 2011 Fourth Quarter Production and Sales Results
15/01/2010Fundamental Research Report Update #2
21/12/2009to Raise $12.0 M in Convertible Debenture and Forward Gold S...
18/09/2009to Issue Shares for Debt to Avocet Mining PLC
08/07/2009Moves to New Office
13/05/2009Releases Selinsing Gold Project Update
13/02/2009 Grants Stock Purchase Options to its Key Staff and Consulta...
24/12/2008Amends Selinsing Gold Project Construction Plan
24/09/2008Fundametal Initial Research Report
20/08/2008Announces TSXV’s Acceptance of its Ball Mill Acquisition fro...
15/08/2008Grants Stock Purchase Options to its Directors Officers unde...
08/08/2008Commences Action for Injunction and Damages
28/07/2008Closes Avocet Mill Transaction For Future Plant Upgrade
08/07/2008Acquires Package of Additional Adjacent Land - Update
20/06/2008Notice of Change of Business Address
26/05/2008Acquires Second Mill for Future Production Plant Upgrade
13/05/2008Monument Announces $38.0 M Capital Raising to Commence Plant...
21/01/2008Acquires Package of Additional Adjacent Land
25/10/2007 Q1 Project Development Update
13/09/2007Commences Exploration Program
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MMY.V)FRANKFURT (D7Q1.F)
0,160+6.67%0,107+10.31%
TSX-V
CA$ 0,160
10/05 14:12 0,010
6,67%
Cours préc. Ouverture
0,150 0,155
Bas haut
0,155 0,160
Année b/h Var. YTD
0,130 -  0,195 -5,88%
52 sem. b/h var. 52 sem.
0,080 -  0,195 60,00%
Volume var. 1 mois
130 315 -11,11%
24hGold TrendPower© : -40
Produit Gold
Développe
Recherche Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20246,67%0,200,13
2023114,29%0,150,07
2022-41,67%0,130,06
202133,33%0,210,09
2020125,00%0,120,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,84 AU$+1,75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,28 US$-0,39%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,71 GBX+4,41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,13 CA$+1,19%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+7,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,91 CA$-4,02%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,08 US$-1,52%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$-5,26%Trend Power :