Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

VanEck Vectors Global Alternative Energy ETF

Publié le 04 novembre 2014

Nine-month sales 2014 : €447 million

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Gabon | Gaz | Mozambique | Myanmar |

Nine-month sales 2014 : €447 million


Paris, 4 November 2014

No. 23-14

Nine-month sales 2014: €447 million

+3% on the first nine months of 2013

Consolidated sales for the first nine months of 2014

Chg.

-5%



+3%

Consolidated sales for the first nine months of 2014 amounted to €446.8 million, up 3% on the same
period in 2013. This change is due in particular to the following factors:
- inclusion of non-Group Caroil sales in the amount of €34.2 million;
- adverse effect of the €/US$ exchange rate in comparison to the first nine months of 2013;
- application of the terms of the new Ezanga exploration and production sharing contract in

Gabon, namely a share for Maurel & Prom of 80% in the fields in production, compared to

85% previously, and cost oil of 70% versus 75%, in return for a significant extension to the term of the operating contract relating to the fields.

As at 30 June 2014, the Group no longer had any hedges in place on oil prices. For the first nine months of 2013, the impact on sales was -€2.3 million.

From 1 January 2013, in the event of under-collection, the Group recognises an entitlement under "Other receivables" against income. The production sold and sales figures relating to the first nine months of 2013 have been restated to reflect this change of method, with an impact of -€4 million on sales.

CA_4NOV14_no 23_14 Page 1 of 4

Production in barrels of oil per day (bopd) for the first nine months of 2014

Chg.

14/13

+2%

-3%

-4%

At present, production from fields in Gabon has reached a plateau of 25,000 bopd, corresponding to approximately 90% of current theoretical production capacity. This level of production follows work undertaken since the start of the year on the water injection and oil producing wells. An increase in production implies that work on the homogenous areas is halted so that the injection of water can resume and pressure can be built up in the reservoirs. This situation, which is added to the timing of the supply of special equipment, does not allow to establish a timetable as of today for the evolution of the production.

The first horizontal well drilled on these fields is in progress, with commissioning expected in the coming weeks. The results of this well will provide key information with a view to establishing a more precise schedule for the upscaling of production.


Lastly, in the south-east part of the Onal field, the Niembi-1 exploration well is currently being drilled. The results of this well are expected within six weeks. The drilling site is located next to existing production facilities, which would allow, in case of success, a rapid development of the discovery.

9 months

2014

5,236,356

total barrels over the period

Q1 2014 Q2 2014 Q3 2014

9 months

2014

5,236,356

9 months

2013*

Total production sold 1,730,977 1,737,184 1,768,195

9 months

2014

5,236,356

5,284,376

* Restated to reflect the change in accounting method

9 months

2014

5,236,356

CA_4NOV14_no 23_14 Page 2 of 4



Change in sale prices

9 months

2014

106.6

106.6

-

Change in sale prices

Q1 2014 Q2 2014 Q3 2014

9 months

2014

106.6

106.6

-

9 months

2013

9 months

2014

106.6

106.6

-

Average sale price

107.0 108.6 104.1

9 months

2014

106.6

106.6

-

106.2

Gabon 107.0 108.6 104.1

Colombia - - -

9 months

2014

106.6

106.6

-

106.2

105.7

9 months

2014

106.6

106.6

-

Signature of a Gas Sales Agreement for Mnazi Bay and Msimbati Gas fields in Tanzania

Maurel & Prom, along with Mnazi Bay license partners Wentworth and Tanzania Petroleum Development Corporation (TPDC), has signed a gas sales and purchase agreement with TPDC for the long-term sale of natural gas from the Mnazi Bay and Msimbati fields in southern Tanzania to the government owned and operated Mtwara to Dar es Salaam pipeline and Madimba central processing facility ("Pipeline Project") currently under construction and scheduled for completion and commissioning in Q1 2015.
Pursuant to the Mnazi Bay GSA, the Mnazi Bay Partners are contracted to supply to the Pipeline Project up to a maximum 80 mmcf/day of natural gas during the first eight months with the option to increase over time to a maximum 130 mmcf/day of natural gas for up to 17-year supply period. The gas will be sold and purchased at the inlet to a 16 inch pipeline connecting the Mnazi Bay gas production facility to the Madimba central processing facility.
The initial delivery is expected to begin during the period 22 January 2015 and 22 April 2015 and be at a fixed price of US$3.00 per mmbtu (approximately US$3.07 per mcf).

Update on exploration activities in Mozambique

The operator Anadarko began drilling the Tembo-1 well on the Rovuma onshore permit (Maurel & Prom: 28%) in June 2014. The well has now reached a depth of 2,965 m. Drilling will continue in order to reach the final target of 4,397 m. The rig will then be used to drill a second exploration well, Kifaru-1, situated in the north-east part of the permit.

Update on the activities of SAINT-AUBIN ENERGIE

In Alberta (Saint-Aubin Energie: 25% share), production of bitumen has begun in the SAGD pilot. Two to four months would be needed to reach the production plateau and allow knowing the economics of the project before to decide a probable extension of the pilot.

In Quebec, on Anticosti Island (Saint-Aubin Energie: 21.7%), the first phase of the exploration programme began in July 2014. Four drilling rigs are currently in operation. To date, four surveys have been conducted and two others are pending.

The presence of the Macasty formation was confirmed in the four completed stratigraphic wells. The drilling of Chicotte revealed a Macasty thickness of 67.5 metres, at Lac-Martin the thickness recorded was 30 metres, at Jupiter-Sud it was over 60 metres and at the eastern extremity of Anticosti Island (and thus the Macasty formation), drilling by Bell measured a thickness of 13 metres. During these drillings, a number of shows of gas and fluorescence were observed.

CA_4NOV14_no 23_14 Page 3 of 4


The stratigraphic drilling programme will be suspended during the winter season, and is due to resume in May 2015. This first phase, consisting of 15 to 18 wells, is due to be completed in summer 2015.
Following the analysis of all of these results, three drilling sites with fracturing will be chosen for initial drilling in summer 2016.
In addition, the Hydrocarbures Anticosti joint venture announced on 23 October 2014 that a strategic partnership agreement has been entered into with the Quebec company Gaz Métro, with the aim of recovering associated natural gas from Anticosti Island.

In Myanmar, following the results of a first exploration well, drilled in 2013, a second exploration well is scheduled for 2015.


For more information, go to www.maureletprom.fr

Communication: MAUREL & PROM

Tel: +33 (0)1 53 83 16 45 [email protected]

This document may contain forward-looking statements regarding the financial position, results, business and industrial strategy of Maurel & Prom. By nature, forward-looking statements contain risks and uncertainties to the extent that they are based on events or circumstances that may or may not happen in the future. These projections are based on assumptions we believe to be reasonable, but which may pr ove to be incorrect and which depend on a number of risk factors such as, fluctuations in crude oil prices, changes in exchange rates, uncertainties related to the valuation of our oil reserves, actual rates of oil production and the related costs, operational problems, political s tability, legislative or regulatory reforms, or even wars, terrorism and sabotage.

Maurel & Prom is listed for trading on Euronext Paris - Compartment A

CAC® mid 60 - SBF120® - CAC® Mid & Small - CAC® All-Tradable - CAC® All-Share - CAC PME - Eligible for the French "PEA - PME" investment

scheme

ISIN FR0000051070 / Bloomberg MAU.FP / Reuters MAUP.PA

CA_4NOV14_no 23_14 Page 4 of 4

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Gabon | Mozambique | Myanmar | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Gabon | Mozambique | Myanmar | Tous

VanEck Vectors Global Alternative Energy ETF

CODE : MAU.PA
ISIN : FR0000051070
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Maurel et Prom est une société de production minière et de pétrole basée en France.

Maurel et Prom est cotée en France. Sa capitalisation boursière aujourd'hui est 231,2 millions (257,1 millions US$, 231,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 29 décembre 1994 à 0,50 , et son plus haut niveau récent le 02 juillet 2004 à 99,50 .

Maurel et Prom possède 47 442 200 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de VanEck Vectors Global Alternative Energy ETF
05/05/2015Influential meeting planners group picks AC for gathering
19/03/2015Anticosti Hydrocarbons L.P. Provides Update and Results of i...
02/02/2015Production levels resume in Gabon
23/01/20152014 full-year sales and activity
20/01/20152015 Financial Calendar
20/01/2015Full-year balance on the liquidity contract made with Natixi...
31/12/2014Tembo-1 Exploration Well Drilling Complete in Mozambique
19/12/2014Group strengthens its financial structure
03/12/2014Positive results of two wells in Gabon
04/11/2014Nine-month sales 2014 : €447 million
23/10/2014Strategic agreement signed between Anticosti Hydrocarbons an...
23/10/2014Strategic Agreement Signed Between Anticosti Hydrocarbons an...
07/08/2014Bernard Horn's Polaris Global Value Fund Second Quarter 2014...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
PARIS (MAU.PA)
4,87+0.12%
PARIS
€UR 4,87
18/09 18:35 0,010
0,12%
Cours préc. Ouverture
4,87 4,88
Bas haut
4,84 4,90
Année b/h Var. YTD
4,80 -  6,80 -12,88%
52 sem. b/h var. 52 sem.
4,44 -  6,93 -1,38%
Volume var. 1 mois
50 374 -12,41%
24hGold TrendPower© : 8
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-19,97%6,874,70
202351,68%6,963,12
202283,33%5,642,19
202126,01%2,901,62
2020-39,34%3,001,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,04 AU$-0,21%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 +4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
8,91 US$-2,73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,59 GBX-3,26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$+10,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,06 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
12,67 +0,88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,34 CA$+6,25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+2,70%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 -2,21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
40,37 US$-0,22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :
Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !
Accédez directement au site.