Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Cardero's Sheini Ironstone Produces Pig Iron Grading 93.2% from Highly Metallized DRI Product
Published : September 17, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Ghana | Manganese | Report |

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sept. 17, 2013) - Cardero Resource Corp. ("Cardero" or the "Company") (News - Market indicators)(NYSE MKT:CDY)(FRANKFURT:CR5) is pleased to announce that metallurgical test work has progressed to successful production of pig iron. Test work at Cardero Materials Testing Laboratory ("CMTL"), a wholly owned subsidiary of the Company), previously demonstrated that a highly metallized Direct Reduced Iron ("DRI") product could be produced from Sheini Ironstone. Recent work has utilized highly metallized DRI product (+95% metallic iron) to produce a pig iron grading 93.2% iron. The results from the described metallurgical tests strongly suggest that a finely disseminated iron resource, such as Sheini Ironstone, can be successfully utilized as feedstock to a process whereby a value added iron product can be produced at low cost using inexpensive raw materials.

Successful Pig Iron Production

Sheini DRI produced by CMTL was used as feed material to conduct a smelting test in the electric arc furnace ("EAF"). Sheini DRI was briquetted with thermal coal (high silica ash containing), and a small quantity of binder for the smelting demonstration. Hot metal was generated from cold Sheini DRI containing briquettes at 1475° Celsius with minimal production of slag. The EAF was tapped after 85 minutes and the hot metal poured into a variety of casts and buttons (Plate 1). The lab EAF trial produced 12.70 kilograms of pig iron from 16.2 kilograms of Sheini DRI, with only 0.88 kilograms of slag generated. A cast was sent to McCreath & Son, Inc. for a certified pig iron analysis.

Plate 1: Hot metal products after pouring at CMTL.

The results of the certified pig iron analysis are presented in Table 1.

Table 1: Pig iron analysis.
 
  Sheini Pig Iron
Phosphorus % 0.2
Silicon % 3.89
Manganese % 0.05
Carbon % 2.55
Sulfur % 0.13
Assumed Fe % 93.18
Fe-Unit % Recovery 95.9

A short video of the pig iron production process is available for viewing on the Company website at:
http://www.cardero.com/s/sheini_iron.asp.

Large-Scale Magnetizing Reduction Roast

Results of bench-scale magnetizing reduction roast were previously released (see NR13-13, May 13, 2013). Larger scale testing of the magnetizing reduction roast process was subsequently undertaken and served several purposes: 1) to demonstrate a commercially viable process that could efficiently roast large volumes of raw Sheini Ironstone; 2) to roast sufficient raw Sheini Ironstone to investigate various beneficiation techniques and develop a processing flow sheet; and 3) to roast, beneficiate, and generate sufficient Sheini DRI product to conduct a bench-scale smelting test.

Large-scale roasting investigations were conducted with a rotary kiln. Testing involved first establishing the capabilities with regards to the roasting process of the rotary kiln ("Rotary Kiln Tests"), and then conducting focused magnetizing reduction roast tests with the rotary kiln ("Roasting Tests"). The Rotary Kiln Tests helped to establish basic kiln parameters including: raw material feed techniques and rates, positive air flow through the kiln, establishing an inert atmosphere within the kiln, roasting temperature, and residence time of material within the kiln. The Roasting Tests were focused more specifically on the raw-Ironstone top-size.

In the large scale tests with the rotary kiln, raw Ironstone was mixed together with the thermal coal reductant and fed into the furnace retort with the expectation that the free material rotating in the kiln pipe would produce maximum reduction benefits.

The roasted products from both Rotary Kiln Tests and Roasting Tests were used to investigate several beneficiation and liberation techniques. Processes investigated included: pre- and post-grind screening, pre- and post-grind Dry Low Intensity Magnetic Separation, a hydro-cyclone, and Wet Low Intensity Magnetic Separation. A commercially viable processing flow sheet was developed from these investigations, which was employed to beneficiate the roasted material generated in large- scale rotary kiln "Production Roasts."

Fifty-eight kilograms of raw Sheini Ironstone were roasted during three Production Roasts. Raw ironstone was prepared for the roasts by crushing to 100% minus 1 mm in a roll crusher, splitting into 58 one-kilogram charges, and then adding appropriate amounts of thermal coal and lime. The rotary kiln roasts were conducted at a temperature of 1150°C over a six day period. After processing, the highly-metallized DRI product (+95% metallic iron) was homogenized and a representative split was collected for certified analysis at several independent laboratories. The results of these analyses are presented in Table 2. The large-scale magnetizing reduction roasts with the rotary kiln ultimately produced a composited DRI sample weighing 21.3 kilograms at approximately 76% iron-grade and approximately 60% iron-unit recovery from 58 kilograms of raw Sheini Ironstone.

ABOUT THE SHEINI HILLS IRON DEPOSIT

The Sheini Hills iron deposit is located in northeastern Ghana. A maiden Mineral Resource Estimate was completed for the deposit by SRK Consulting (UK) Limited ("SRK") for Cardero, in which SRK reported a total Inferred Mineral Resource of 1.312 billion tonnes with mean grade of 33.8% iron. The resource at Sheini consists of two types of ore: 1. Ironstone (1.045 billion tonnes @ 35.2% iron), and 2. Detrital (266.9 million tonnes @ 28.2% iron). The inferred mineral resource was largely calculated from the 11,400 metre diamond drill core and reverse circulation drilling program completed over a strike length of approximately 9 kilometres.

For details with respect to the work done to date and the assumptions underlying the current resource estimates, see the technical report entitled "Mineral Resource Estimate for the Sheini Hills Iron Project, Ghana, January 2013" dated January 14, 2013 with an effective date of January 7, 2013 and available under the Company's profile at www.sedar.com.

Table 2: Summary of certified assays and titrations performed on representative splits of the composited DRI concentrate produced during large-scale production roasts in the rotary kiln.
 
   
   
  CC#GHSTO-DRI Composite Certified Lab Results 
Fetotal % >74.80
Femetallic % 76.19
Fe Recovery % 59.72
Al2O3 % 1.57
C % 0.97
CaO % 1
K2O % 0.083
MgO % 0.13
Mn % 0.061
Na2O % 0.061
P % 0.151
S % 0.19
SiO2 % 12.25
TiO2 % 0.14
V % 0.008

QUALIFIED PERSON

Mr. Glenn Hoffman, MMSA QP, the President and CEO of Cardero Iron Ore Company Ltd. and a qualified person as defined by National Instrument 43-101, has reviewed the scientific and technical information that forms the basis for this news release. Mr. Hoffman is not independent of the Company as he is an officer of a subsidiary and holds common shares and incentive stock options in Cardero.

The metallurgical test work is designed and directly observed on site by Mr. Hoffman, who is responsible for all metallurgical testing and the quality control/quality assurance.

QA/QC

The work program at CMTL is supervised by Glenn Hoffman, who is responsible for all aspects of the work, including the quality assurance/quality control program. On-site personnel at the CMTL laboratory perform testing to strict protocol, rigorously collecting and tracking samples which are prepared, security sealed, and shipped to a variety of accredited and ISO certified laboratories for additional sample preparation and analysis. Quality control is assured by the use of international and in-house standards. The specific laboratories used for the analyses reported in this news release are ALS Global in Reno, Nevada, and Andrew S. McCreath & Son, Inc. in Harrisburg, Pennsylvania. ALS's quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025: 1999. Andrew S. McCreath & Son, Inc. is accredited to ISO 17025 by the American Association of Laboratory Accreditation (A2LA) as a commercial chemical laboratory. Total iron was measured by ALS Global through x-ray fluorescence (XRF) analysis. In XRF analysis a material is bombarded with gamma rays causing inner orbital electrons of an atom to be expelled and outer orbital electrons to fill, or fall into the empty spaces. As this happens energy is released and can be measured to determine the elemental make-up of the material. Metallic iron was measured by Andrew S. McCreath & Son, Inc. through metallic iron titration. In a titration a reagent or "titrant" is prepared in solution and reacted with a solution of the "titrand," or analyte in question to determine the concentration of the analyte.

ABOUT CARDERO RESOURCE CORP.

The common shares of the Company are currently listed on the Toronto Stock Exchange (symbol CDU), the NYSE MKT (symbol CDY) and the Frankfurt Stock Exchange (symbol CR5). For further details on the Company readers are referred to the Company's web site (www.cardero.com), Canadian regulatory filings on SEDAR at www.sedar.com and United States regulatory filings on EDGAR at www.sec.gov.

On Behalf of the Board of Directors of Cardero Resource Corp.

Henk van Alphen, CEO and President

The Cautionary Statements are available at following address: http://media3.marketwire.com/docs/cardero-cautionary-statements.pdf



Cardero Resource Corp.
Keith Henderson
604-408-7488 Ext. 3887
or
Cardero Resource Corp.
604 408-7488 or Toll Free: 1-888-770-7488
604 408-7499 (FAX)
info@cardero.com
www.cardero.com
Données et statistiques pour les pays mentionnés : Ghana | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Ghana | Tous

Cardero Resources Corp.

PRODUCTEUR
CODE : CDU.TO
ISIN : CA14140U1057
CUSIP : 14140U
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Cardero Res. est une société de production minière de charbon et de fer basée au Canada.

Cardero Res. est productrice de charbon, de fer, d'or au Mexique, et détient divers projets d'exploration au Perou.

Son principal projet en production est LA ENCANTADA au Mexique et ses principaux projets en exploration sont ORGANULLO, LOS MANANTIALES et CHINGOLO en Argentine, FRANCO et BAJA au Mexique et AMABLE MARIA, KATANGA, PAMPA DE PONGO et PAMPA EL TORO au Perou.

Cardero Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 5,3 millions CA$ (4,1 millions US$, 3,6 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 avril 2012 à 9,90 CA$, et son plus bas niveau récent le 01 avril 2016 à 0,08 CA$.

Cardero Res. possède 36 528 364 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Cardero Resources Corp.
06/08/2013Announces Financing to Fund Payment to Secured Creditors
06/08/2013Announces Financing to Fund Payment to Secured Creditors
23/04/2013Acquires 4 Carbon Creek Coal Licenses Completes Secured Note...
16/04/2013Extends Carbon Creek Coal License Option Period and Arranges...
11/02/2013Closes Final Tranche of Non-Brokered Financing
31/10/2012Increases Non-Brokered Private Placement and Debt Financing
23/10/2012Announces Non-brokered Private Placement and Debt Financing
11/08/2008exercised the 2,000,000 common share purchase warrants of In...
Nominations de Cardero Resources Corp.
20/03/2013Announces Resignation of CEO
Projets de Cardero Resources Corp.
13/05/2013Receives Positive Iron Metallurgical Test Work Results, Shei...
06/01/2012Resource Corp. News Release Friday, Jan. 6/12
21/04/2010(Baja)Cardero Baja IOCG Project Update
02/02/2010(Pampa De Pongo)Updates Project Development Strategy
18/12/2009(Pampa De Pongo)Cardero Receiving Final USD 88 million for Pampa de Pongo Ir...
19/08/2009(Pampa De Pongo)Provides Update on Purchase Agreement for Pampa de Pongo
21/07/2009(Pampa El Toro)Receives Initial Mineral Resource Estimate For Pampa El Toro
21/05/2009(Pampa De Pongo)Receives USD 10 million deposit for Pampa de Pongo
19/05/2009(Pampa De Pongo)Nanjinzhao Requests Revisions to Pampa de Pongo Purchase Agr...
18/02/2009(Pampa El Toro)Successfully Produces Bench-Scale Pig Iron From Pampa El Tor...
12/02/2009(Pampa De Pongo)Nanjinzhao Makes Early USD 2 Million Payment
06/01/2009(Longnose Titanium Deposit)Acquires Longnose Titanium Deposit
13/11/2008(Marcona)Resource Corp. News Release
09/09/2008(Pampa De Pongo)Pampa de Pongo Iron Deposit Metallurgical Assessment
23/07/2008(Pampa De Pongo)Positive Results
22/07/2008(Pampa De Pongo)Positive preliminary pilot-scale metallurgical assessment re...
28/05/2008(Pampa De Pongo)Receives Drill Permit for Pampa de Pongo Project; 43-101 Inf...
20/05/2008(Pampa El Toro)Completes Processing of 40-Tonne Concentrate at the Pampa El...
09/05/2008(Pampa De Pongo)Initiates Pilot-Scale Metallurgical Assessment
29/04/2008(Pampa De Pongo)Completes Phase I Testing of Magnetic Separation Pilot Plant
23/04/2008(Pampa De Pongo)Receives Positive Metallurgical Test Results
18/04/2008(Pampa De Pongo)Announces Magnetic Survey Results & Exploration Potential
11/03/2008(Pampa De Pongo)Announces Delivery and Installation of the Eriez Dry Magneti...
07/01/2008(Pirquitas)Options Mina Pirquitas Silver Project, Juyuy Province, Argen...
19/11/2007 Initiates Geophysical Study at Former high-grade Incahuasi ...
01/11/2007(Baja)Settles Lawsuit Over Baja Project
25/10/2007Initiates Geophysical Study at La Poma High-Grade Silver-Lea...
22/08/2007(Huachi)IP Results Extend Huachi Copper-Gold Porphyry System
30/03/2006(La Encantada)High-grade copper intersected at Picale target, Baja Mexico
Communiqués de Presse de Cardero Resources Corp.
15/07/2016Cardero Announces Voluntary Delisting from the TSX and Concu...
01/07/2016Cardero Reports Results of Annual General Meeting Held June ...
14/06/2016Cardero Confirms Gold Mineralization in Near-Surface Oxide Z...
15/03/2016Cardero reports 1Q loss
03/12/2015Cardero Reports NI 43-101 Resource Estimate for Zonia Copper...
28/10/2015RETRANSMISSION: Cardero Closes Option to Acquire The Zonia C...
23/10/2015Cardero Closes First Tranche of Non-Brokered Financing
19/10/2015TSX Delisting Review - Cardero Resource Corp. (Symbol: CDU)
16/10/2015Cardero Receives Conditional TSX Approval for Comprehensive ...
15/09/2015TSX Delisting Review - Cardero Resource Corp. (Symbol: CDU)
27/08/2015Announces Reports and Results of Annual and Special Meeting ...
27/08/2015Cardero Resource Corp Announces Reports and Results of Annua...
27/07/2015Cardero Announces Acquisition of the Advanced Zonia Copper O...
27/07/2015Announces Acquisition of the Advanced Zonia Copper Oxide Pro...
22/06/2015Cardero Resource Corp. Acquires Securities of Centenera Mini...
22/06/2015Resource Corp. Acquires Securities of Centenera Mining Corpo...
24/03/2015Cardero Announces Proposed Reverse Takeover of Artha Resourc...
02/03/2015IIROC Trading Halt - CDU; TRP.PR.G
08/01/2015Cardero Announces New NI 43-101 Resource Estimate for the Cu...
06/01/2015Cardero Announces New NI 43-101 Resource Estimate for the Cu...
23/09/2014Announces Acquisition of Additional Coal License Application...
23/09/2014Cardero Announces Acquisition of Additional Coal License App...
02/06/2014Cardero Withdraws from Peace River Partnership Coal Lease
07/04/2014Repays US$3,700,000 and Announces Election of Robert van Doo...
07/04/2014Cardero Repays US$3,700,000 and Announces Election of Robert...
17/09/2013Sheini Ironstone Produces Pig Iron Grading 93.2% from Highly...
14/08/2013NYSE-MKT Accepts Cardero's Plan of Compliance
29/07/2013Announces Demand for Payment From Secured Creditors
02/07/2013Receives Deficiency Letter from the NYSE-MKT
09/05/2013Carbon Creek Project Selected for Streamlined Environmental ...
29/04/2013Announces Results from 2013 Annual General Meeting
31/01/2013Reports Results of Ghana Investigation
07/01/2013Appoints Andrew Muir as Director, Investor Relations
08/11/2012Files Prefeasibility Study 43-101 Technical Report for the C...
20/09/2012Announces Final Drill Results From Sheini Hills Iron Project...
13/09/2012Announces Final Results from Ferricrete Reverse Circulation ...
04/09/2012Provides Update on Pre-Feasibility Study & 2012 Drill Progra...
30/08/2012Announces Further Positive Results From Ferricrete Reverse C...
08/08/2012Announces Additional Drill Results from the Sheini Hills Iro...
31/07/2012Receives Results of Airborne Magnetic Survey: Identifies Ou...
25/07/2012Receives Additional Positive Drill Results from Sheini Hills...
23/07/2012Receives 2012 Exploration Permit; Initiates Extensive Feasib...
25/06/2012Maintains It Followed Best Business Practices Regarding Acqu...
15/06/2012Receives Positive Drill Results, Sheini Hills Iron Project, ...
22/05/2012and Ridley Terminals Announce Long-Term Port Allocation for ...
09/05/2012Carbon Creek Environmental Assessment Process Commences with...
30/04/2012Subsidiary Enters Into Letter of Intent on Sheini Hills Proj...
26/03/2012Grants Incentive Stock Options
06/03/2012Withdraws From Trefi Deposit Purchase LOI
29/02/2012Completes Large Diameter Drill Program at Carbon Creek Metal...
23/01/2012Ghanaian Partner Issued 3 Prospecting Licenses, JV Agreement...
17/01/2012Receives Loan Repayment from Trevali Mining Corporation
06/01/2012Receives Final Preliminary Economic Assessment ("PEA") for C...
12/12/2011Receives Draft Preliminary Economic Assessment For Carbon Cr...
29/11/2011Closes CAD 7.628 Million Private Placement Financing
26/10/2011Ghanaian Partner to Be Issued 3 Prospecting Licenses Over Sh...
23/09/2011Supports the Government's BC Jobs Plan
12/09/2011(Organullo)Options Organullo Gold Project, Northwest Argentina, to Arth...
17/08/2011Commences Extensive Program of Geological, Engineering and E...
06/07/2011Resource Appoints Guy Gilron as Vice President, Environment ...
08/06/2011Names Michael Hunter President & Files NI 43-101 Resource Es...
26/05/2011Shareholders Approve Acquisition of Coalhunter Mining Corpor...
18/04/2011Receives Additional Positive Drill Results From Longnose Res...
21/06/2010Secures 49.5% Interest in Coalhunter Mining Corporation
03/06/2010President & CEO Glenn Hoffman Receives Prestigious Society
30/10/2009Completes Completes $1,000,000 Investment in Trevali Resourc...
26/10/2009Completes $1,000,000 Investment in Wealth Minerals Ltd.
12/09/2009Resource Corp. News Release
17/06/20092009 Project Development Strategy
11/02/2009Announces Nanjinzhao Makes Early US$2 Million Payment
10/09/2008Completes Option Agreement on TiTac Iron-Titanium-Vanadium D...
11/06/2008Signs Formal Exploration Alliance Agreement with Newmont in ...
29/11/2007Provides Iron Project Update
26/09/2007and Newmont Propose to Form Strategic Gold Exploration Allia...
17/07/2007Hochschild Completes Early Purchase of Cardero's Los Mananti...
26/04/2007Drilling Commences at the Former Incahuasi Gold Mine, NW Arg...
24/04/2007Latest Drill Results-Huachi Copper-Gold Porphyry, Argentina
27/03/2007Options Los Manantiales Gold Property To Hochschild Mining H...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CDU.TO)FRANKFURT (CR5.F)
0,145-9.38%11,10+0.00%
TORONTO
CA$ 0,145
29/07 12:30 -0,020
-9,38%
Cours préc. Ouverture
0,160 0,150
Bas haut
0,145 0,150
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,145 3,57%
Volume var. 1 mois
2 300 3,57%
24hGold TrendPower© : -20
Produit Gold
Développe
Recherche Bismuth - Copper - Gold - Iron - Lead - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :