Wildcat announces positive prefeasibility study results and initial mineral reserve for Hermosa project
Published : December 10, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Aluminium | Copper | Lithium | Manganese | Nickel | Report | Zinc |

Wildcat announces positive prefeasibility study results and initial mineral reserve for Hermosa project

VANCOUVER, Dec. 10, 2013 /CNW/ - Wildcat Silver Corporation (TSX: WS) ("Wildcat") announces positive results from its pre-feasibility study for its Hermosa project located in Santa Cruz County, Arizona. The pre-feasibility study includes the contribution from the projects' two primary metals, silver and electrolytic manganese metal (EMM), and three by-product metals, gold, zinc and copper. The Company also announces an updated resource estimate and an initial mineral reserve for Hermosa.

Highlights(1)

  • After-tax NPV (5%) of $830 million, after-tax IRR of 21.3%, and payback of 2.8 years(2)
  • Average silver production of 12.2 million ounces per year for the first five years and 5.7 million ounces per year for the life of mine (LOM)
  • Average EMM production of 110 million pounds per year for the LOM
  • Average cash costs of $4.35 per ounce silver and $0.74 per pound of EMM for the first five years and $4.45 per ounce of silver and $0.73 per pound of EMM for the LOM (2,3)
  • Average silver cash costs, considering all other metals as by-products(2), of $(4.37) per ounce for the LOM
  • Mine life of 18 years
  • Initial capital expenditures of $834.6 million including $189.3 million for a 55,000 tons per annum (tpa) EMM plant
  • The mineral resource includes a proven and probable mineral reserve of 59.7 million tons averaging 2.43 ounces per ton (opt) silver, containing 145 million ounces. The proven and probable mineral reserve also includes 43.5 million tons averaging 8.31% manganese, containing 7.2 billion pounds
  • Measured and indicated mineral resource of 189.6 million tons averaging 1.29 opt silver, containing 245 million ounces.  The measured and indicated mineral resource also includes 91.2 million tons averaging 5.67% manganese, containing 10.3 billion pounds
  • Inferred mineral resource of 49.6 million tons averaging 1.02 opt silver, containing 50 million ounces.  The inferred resource also includes 16.3 million tons averaging 3.80% manganese, containing 1.3 billion pounds

1)    Results are reported on a 100% ownership basis (Wildcat's interest in Hermosa is 80%). All dollars are U.S. dollars and all tons are short tons unless noted otherwise throughout this press release.
2)    Based on metal prices of: $23.50/oz Ag, $1,250/oz Au, $1.19/lb EMM, $0.92/lb Zn, $3.25/lb Cu
3)    Cash costs are calculated on a co-product basis whereby production costs are allocated to silver and manganese based on the relative revenues of each metal. Silver cash costs are net of gold, zinc and copper by-products.

The pre-feasibility study reflects the results of significant metallurgical and engineering test-work completed, which principally focused on using magnetic separation for the recovery of manganese and by-product metals. The Company has now successfully produced a 35% manganese concentrate that will be used as the feed-stock to an EMM plant. The stand-alone nature of the EMM facility provides the Company greater flexibility as that part of the project could be financed separately or phased in and funded through cash flow from production.

"The results of this pre-feasibility study demonstrate the size and economically robust nature of the Hermosa project," said Richard Warke, Wildcat's Chairman and Chief Executive Officer. "Our detailed and extensive metallurgical test-work has paid off as we now have the ability to produce EMM domestically, which makes Hermosa the only North American producer allowing us to service the local steel and aluminium industry. With manganese being defined as a strategic metal in the USA and with worldwide demand surging, entering into the domestic manganese market as one of the lowest cost EMM producers worldwide provides Wildcat a tremendous opportunity. When considered in conjunction with its substantial silver production, Hermosa has become a very unique and valuable mining project." 

Economic Analysis

The base case economics in the pre-feasibility study assume metal prices of $23.50 per ounce silver, $1,250 per ounce gold, $0.92 per pound zinc and $3.25 per pound copper.  The assumed forecast average realized price of EMM flake of $1.19 per pound is based on the current market price expected to be obtained based on current conditions in the target markets as projected from independent research by a third party consultant. For comparison, the average realized price assuming a three-year trailing price for the target markets would be $1.40 per pound.

A summary of the economic analysis is provided below.

  Base Case
After-tax NPV (0%) $1.50 billion
After-tax NPV (5%) $830 million
After-tax NPV (7.5%)      $611 million   
After-tax IRR 21.3%
Payback 2.8 years

Sensitivity analysis for the base case on an after-tax NPV and after-tax IRR, including all by-product metals, at varying silver and EMM prices is summarized below.

    After-tax NPV (5%)   After-tax IRR
 Silver Price 
($/oz)
  EMM Price ($/lb)   EMM Price ($/lb)
  $1.07 $1.19 $1.31   $1.07 $1.19 $1.31
$19.00 $468M $574M $685M   14.5% 16.1% 17.8%
$23.50 $724M $830M $942M   19.8% 21.3% 22.8%
 $29.00   $1,038M   $1,144M   $1,255M     26.2%   27.5%   28.9% 

Mining and Processing

The Hermosa project is based on a conventional open pit operation expected to produce run of mine (ROM) ore over 10.5 years with an additional 7.5 years of processing to come from the reclaiming of stockpiles, for a total mine life of 18 years. Average annual production is estimated to be 12.2 million ounces of silver for the first five years and 5.7 million ounces per year for the LOM, for a total of 103 million recoverable silver ounces.

The mine plan incorporates the mining of 60 million tons of ore and 338 million tons of waste for a total of 398 million tons of material mined. The waste to ore (strip) ratio is therefore estimated at 5.67:1, which includes the inferred mineral resource as waste.   A summary of the production and operating metrics from the pre-feasibility study for the Hermosa project is provided below:

Average annual silver production (first 5 years)  
Average annual silver production (LOM)
Average annual EMM production (LOM)
Average annual gold production (LOM)
Average annual zinc production (LOM)*
Average annual copper production (LOM)*
Total recovered silver
Total recovered EMM
Average silver grade
Average Mn grade
Mine life
  12.2 million oz  
5.7 million oz
110 million lbs
10,000 oz
10 million lbs
3 million lbs
103 million oz
1.98 billion lbs
2.43 opt
8.1%
18 years

* Annual production for zinc and copper averaged over 10.5 years of Manto Oxide processing

Hermosa's capacity is expected to be 13,700 tons per day (tpd) or 5.0 million tons per annum (tpa).  The plant will accommodate the two major types of ore present in the Hermosa open pit: Manto Oxide and Upper Silver.   Average throughput is expected to be 4.3 million tpa for the first ten years when Manto Oxide ores are primarily being processed and 1.9 million tpa for the remainder of the mine life when the Upper Silver ore is processed.

The Manto Oxide ore, which represents approximately 73% of the total ore reserve, will be fine crushed, passed through magnetic separation, calcined and then leached. The leached filtrate will proceed to the Merrill Crowe process for the recovery of silver and gold to produce a silver/gold doré on site.  The Hardshell ore type, which is a subset of the Manto Oxide ore, makes up 4.2% of the total ore and will be processed the same as the Manto Oxide ores except that it will not be passed through magnetic separation.  Silver recoveries for the Manto Oxide ore average 79%, including Hardshell ore at 59%, while gold recoveries average 90% for both types of ore.  The use of magnetic separation for the Manto Oxide ores at the front end of the process enables the non-magnetic fraction, which has a very low metal content and represents approximately 44% by weight of the ROM ore, to go directly to the tailings facility. This allows for a greater throughput rate at relatively lower capital and operating costs.

Zinc in solution after the Merrill Crowe process will be recovered using existing SX/EW technology producing zinc cathodes on site.  Copper in solution after the Merrill Crowe process will be recovered using SART technology and precipitated as a high grade copper concentrate (79% Cu).  Overall, approximately 8% of the contained zinc and 61% of the contained copper is expected to be recovered.

The tails will be processed through a Wet High Intensity Magnetic Separator (WHIMS) to produce a manganese concentrate averaging approximately 35% Mn.  These concentrates will be further processed through the onsite stand-alone 55,000 tpa EMM facility.  The EMM facility is expected to produce high grade manganese flake metal for sale in the North American marketplace.  The balance of the manganese concentrate recovered in excess of that required to produce 55,000 tons of EMM will be stored on site for future processing. The stand-alone nature of the EMM facility provides the Company greater flexibility as it could be financed separately or deferred and phased in and funded through cash flow from production.

Upper Silver ores make up the remaining 27% of the total ore tons.  These ores will be processed by fine crushing, leaching and recovery of silver and gold in the Merrill Crowe circuit to produce a silver/gold doré on site.  These ores contain no appreciable zinc, copper or manganese.  Recoveries of silver and gold average 46% and 90%, respectively.

A summary of the average recoveries for each ore type are as follows:

Silver recovery (Manto Oxide)
Silver recovery (Upper Silver)
Manganese recovery (Manto Oxide)
Gold recovery (Manto Oxide and Upper Silver)  
Copper recovery (Manto Oxide)
Zinc recovery (Manto Oxide)
   79%   
46%
28%
90%
61%
8%

The bench and pilot plant test-work incorporated in this pre-feasibility was performed by Hazen Research Inc. in Golden, Colorado and included the processing of approximately 14 tons of Manto Oxide and Upper Silver Zone material.  Metallurgical development work will continue, with the focus on advancing it to feasibility level.

Capital Costs

The total capital cost for constructing the Hermosa project is estimated at $835 million including a $105 million contingency. The capital cost includes $189 million for the EMM plant for the recovery of the manganese. Sustaining capital expenditures are estimated to total $113 million over the life of mine.   A summary of the capital cost estimate is provided below:

Hermosa Pre-feasibility Study CAPEX ($ millions)  
General site
Mining and predevelopment
Process plant
Tailings
Other infrastructure
EPCM
Owner's Cost
Other
Contingency
$34.5
$40.3
$338.4
$28.0
$100.5
$85.5
$48.3
$54.1
$104.9
Total CAPEX $834.6

Operating Costs

Average annual cash costs are estimated at $4.35 per ounce of silver and $0.74 per pound of EMM for the first five years and $4.45 per ounce of silver and $0.73 per pound of EMM, for the life of mine. Cash costs are calculated whereby common production costs are allocated to silver and manganese based on the relative revenues of each metal in each year. Silver cash costs are net of gold, zinc and copper by-products.  Average annual silver cash costs for the life of mine considering all other metals as by-products are $(4.37) per ounce.

Total operating costs are estimated at $39.49 per ton of ROM ore and include mining, processing, general and administration (G&A), refining, treatment and transportation costs and other costs (royalties, reclamation and property and severance taxes). Total mining cost is $1.26 per ton mined or $8.41 per ton of ore processed. The processing cost per ton is estimated at $24.69, which includes a cost of operating the EMM plant of $11.88 per ton.

The operating cost breakdown as estimated in the pre-feasibility study is as follows:

Operating costs (per ton of ore processed)   
   Mining $8.41
   Processing $24.69
   G&A $1.57
   Refining, treatment & transportation    $2.08
   Other $2.74
Total operating costs $39.49

Mineral Reserve and Resource Estimate

As part of the pre-feasibility study, as well as recently completed re-assays on historical drill data, Wildcat has completed an updated mineral resource estimate, which includes its initial mineral reserve estimate for Hermosa. The mineral reserve and resource estimate includes drill and assay data up to June 2013 which contains a total of 349 drill holes totalling 256,242 feet and is summarized below.  It should be noted that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resources are inclusive of mineral reserves.

Hermosa Mineral Reserve Estimate (1) (3) (4)
Ore Type Tons
(000s)
Ag
 (opt) 
Au
(opt)
 Mn (2) 
%
 Zn (2) 
%
 Cu (2) 
%
Contained Ag
 Ounces (000s) 
 Contained 
Mn lbs
(000s)
Proven Mineral Reserve
Manto Oxide 22,262 2.97 0.004 8.83 1.85 0.07 66,164 3,933,000
Upper Silver 7,454 2.19 0.003 N/A N/A N/A 16,314 N/A
Hardshell 1,351 1.67 0.002 4.37 0.63 0.05 2,259 118,000
Total Proven  31,067  2.73  0.003  8.58 1.78 0.07 84,737 4,051,000
Probable Mineral Reserve
Manto Oxide 18,773 2.17 0.003 8.25 1.88 0.07 40,713 3,097,000
Upper Silver 8,687 2.05 0.003 N/A N/A N/A 17,782 N/A
Hardshell 1,130 1.63 0.002 3.78 0.57 0.05 1,844 85,000
Total Probable 28,589 2.11 0.003 7.99 1.80 0.07 60,339 3,182,000
Proven & Probable Mineral Reserve
Manto Oxide 41,035 2.60 0.003 8.57 1.86 0.07 106,877 7,030,000
Upper Silver 16,140 2.11 0.003 N/A N/A N/A 34,096 N/A
Hardshell 2,481 1.65 0.002 4.10 0.61 0.05 4,103 203,000
Total
 Proven & Probable 
59,656 2.43 0.003 8.31 1.79 0.07 145,076 7,233,000
(1)   Tons are reported to the nearest thousand (1,000). Gold and silver are reported in ounces per ton, all other
metals are reported in percentages.  Therefore, different totals may be calculated due to rounding errors.
(2)  Average grade is based only on material processed for the specific product.
(3)  Based on Hermosa Mineral Reserve Criteria:

Hermosa Mineral Reserve Criteria
Ore Type Recovery Process Cost
Ag Au Mn Zn Cu  Process  G&A
 Manto Oxide   80.2% 90.0% 28.3% 7.4% 61.1% $13.78/t  $1.44/t 
 Upper Silver 46.0% 90.0% 0.0% 0.0% 0.0% $10.97/t $3.03/t
 Hardshell  56.0%   90.0%   22.4%   25.0%   64.0%  $25.08/t $2.41/t

The unit cost of operating the EMM plant has been netted from the manganese price.

(4)   Metal Prices Used:

Hermosa Mineral
   Reserve Metal Prices   
Metal Price
Ag
Mn
Au
Zn
Cu
$22.00/oz
$0.82/lb
$1,250/oz
$0.82/lb
$3.00/lb

Hermosa Mineral Resource Estimate (Inclusive of Reserve) (1)(3)(4)(5)(6)
Ore Type Tons
(000s)
Ag
 (opt) 
Au
(opt)
 Mn (2) 
%
 Zn (2) 
%
 Cu (2) 
%
 Pb (2) 
%
 Contained Ag 
Ounces
(000s)
 Contained 
Mn lbs
(000s)
Measured Mineral Resource
 Manto Oxide (Inc. Hardshell) 37,136 2.06 0.003 6.60 1.55 0.06 N/A 76,569 4,898,000
 Upper Silver 38,978 1.07 0.003 N/A N/A N/A N/A 41,551 N/A
 Skarn 2,398 1.25 0.001 N/A 1.70 0.07 1.49 2,996 N/A
 Total Measured 78,512 1.54  0.003  6.60 1.56 0.06 1.49 121,115 4,898,000
Indicated Mineral Resource
 Manto Oxide  (Inc. Hardshell) 54,067 1.24 0.002 5.03 1.59 0.06 N/A 67,010 5,443,000
 Upper Silver 51,501 0.97 0.002 N/A N/A N/A N/A 50,033 N/A
 Skarn 5,488 1.18 0.001 N/A 1.75 0.07 1.46 6,496 N/A
 Total Indicated 111,056 1.11 0.002 5.03 1.60 0.06 1.46 123,539 5,443,000
Measured & Indicated Mineral Resource
 Manto Oxide (Inc. Hardshell) 91,202 1.57 0.002 5.67 1.57 0.06 N/A 143,579 10,341,000
 Upper Silver 90,479 1.01 0.002 N/A N/A N/A N/A 91,584 N/A
 Skarn 7,886 1.20 0.001 N/A 1.74 0.07 1.47 9,492 N/A
 Total Measured & Indicated   189,568  1.29 0.002 5.67 1.59 0.06 1.47 244,654 10,341,000
(1)  Tons are reported to the nearest thousand (1,000). Gold and silver are reported in ounces per ton, all other metals are reported
in percentages.  Therefore, different totals may be calculated due to rounding errors.
(2) Average grade is based only on material processed for the specific material
(3) Mineral resources are inclusive of mineral reserves.
(4) Mineral resources are constrained to a whittle pit shell demonstrating the potential for economic extraction
(5) Based on Hermosa Mineral Resource Criteria provided below.
(6) Metal Prices used are provided below.

Hermosa Inferred Mineral Resource Estimate (1)(3)(4)(5)(6)
Ore Type Tons
(000s)
Ag
 (opt) 
Au
(opt)
 Mn(2) 
%
 Zn(2) 
%
 Cu(2) 
%
 Pb (2) 
%
Contained Ag
 Ounces (000s) 
 Contained 
Mn lbs
(000s)
 Manto Oxide (Inc. Hardshell)   16,304 1.09 0.001 3.80 1.65 0.06 N/A 17,811 1,238,000
 Upper Silver 28,847 0.94 0.003 N/A N/A N/A N/A 27,257 N/A
 Skarn 4,471 1.20 0.001 N/A 1.88 0.07 1.60 5,369 N/A
 Total Inferred  49,622  1.02  0.002  3.80 1.70 0.06 1.60 50,437 1,238,000
(1)  Tons are reported to the nearest thousand (1,000). Gold and silver are reported in ounces per ton, all other metals are reported
in percentages.  Therefore, different totals may be calculated due to rounding errors.
(2) Average grade is based only on material processed for the specific material
(3) Mineral resources are inclusive of mineral reserves.
(4) Mineral resources are constrained to a whittle pit shell demonstrating the potential for economic extraction
(5) Based on Hermosa Mineral Resource Criteria

Hermosa Mineral Resource Criteria
Ore Type Recovery  Process Cost 
Ag Au Mn Zn Cu Pb
 Manto Oxide     85%     90%     35%     35%     85%   0% $9.00/t
 Upper Silver 60% 90% 0% 0% 0% 0% $9.00/t
 Skarn 80% 90% 0% 85% 80%   90%   $5.00/t

(6) Metal Prices Used:

  Hermosa Mineral Resource Metal Prices  
Metal Price
 Ag
 Mn
 Au
 Zn
 Cu
 Pb
$    27.06/oz
$       0.82/lb
$    1,468/oz
$       0.92/lb
$       3.54/lb
$       0.90/lb

Going Forward

Wildcat's next step for Hermosa is to advance the project into the feasibility stage.  Work on the feasibility study will focus primarily on open pit mine optimization, metallurgical testing to further optimize plant operating efficiency and metal recoveries, and assessing the geotechnical and hydrologic characterization for the area around the proposed project. A feasibility study for Hermosa is expected to be completed in the second half of 2014.

Many key opportunities exist to improve the Hermosa project, including:

  • Expanding the resource and reserve with additional drilling of in-pit inferred resources.
  • Continuing metallurgical test work to improve the recovery of primary and by-product metals.
  • Extending exploration to existing targets outside the resource area.

About Manganese

Manganese is the world's fourth most heavily consumed metal with a global output of approximately 18 million tons annually, of which more than 90% is used in the manufacture of steel. Consumption of manganese ore has more than doubled since 2000 with China consuming just over half of all output. There are currently no North American producers of manganese ore, a strategically important metal.  Most manganese used in steel making is consumed in the form of alloys such as silicomanganese and ferromanganese. Consumption of EMM, a pure manganese product produced electrolytically, is also used in steel production as well as in aluminum alloys. EMM consumption has grown approximately six fold since 2000 to approximately 1.6 million tons annually and now represents approximately 8% of the global manganese alloy market.

EMM in North America is primarily used as an alloy in the aluminum and steel industries. Increasingly high-grade steels require the purity of EMM relative to other lower grade ferromanganese alloys. In addition to the growth of EMM being used in steelmaking, EMM adoption is growing due to the use of 200 series stainless, where manganese as EMM substitutes nickel to produce a lower cost stainless steel, which is used primarily in consumer products. Another growing and relatively new source of demand for manganese is the use of EMM in lithium batteries for hybrid vehicles.

Approximately 97% of the world's EMM is produced in China, with North America importing 100% of the EMM it consumes. Global production of EMM is approximately 1.3 million tons annually.  Wildcat is expected to have a competitive advantage in the North American and certain other world markets by virtue of the on-site production. Other cost advantage benefits Hermosa has includes lower electricity costs compared to China, no inbound shipping costs of ore, stable raw material cost and a transportation cost advantage when shipping to North American consumers of EMM.  As a result, the Hermosa EMM facility is expected to be one of the lowest cost EMM producers globally.

NI 43-101 Technical Report

The complete NI 43-101 Technical Report will be filed on SEDAR (www.sedar.com) within 45 days and will also be available on the Company's website (www.wildcatsilver.com).

Pre-feasibility Study Contributors

The Hermosa Pre-feasibility study was completed by M3 Engineering & Technology Corporation (M3) of Tucson, Arizona, with the support of Metal Mining Consultants of Highlands Ranch, Colorado (Mineral reserve and mineral resource); Newfields Inc., Denver Colorado (Tailings/Coarse Rock storage); Hazen Research Inc., Golden, Colorado (processing and metallurgy); Easton Process Consulting Inc., Highlands Ranch, Colorado (metallurgy); and Mine Mappers LLC (geology/wire framing).

Qualified Person

Joshua Snider, PE, an independent Qualified Person under the standards set forth by NI 43-101, has reviewed the information in relation to the prefeasibility study in this press release.  Mr. Snider is a Civil Engineer with M3 and has over 15 years of experience in the engineering and mining industry.

Metallurgical test results have been reviewed, verified, and interpreted by Christopher Easton, BSc., Chemical Engineering, a Qualified Person under the standards set forth by NI 43-101. Mr. Easton is the president of Easton Process Consulting Inc. has 24 years of mineral processing and metallurgical engineering experience, and is a Qualified Professional Member in Metallurgy of MMSA.

Scott Wilson, President of Metal Mining Consultants, is an independent qualified person as defined by National Instrument 43-101 and has approved and verified the information in this news release in relation to the Hermosa mineral reserve and mineral resource estimates. Mr. Wilson is a Certified Professional Geologist and member of the American Institute of Professional Geologists (CPG #10965) and a Registered Member (#4025107) of the Society of Mining, Metallurgy and Exploration, Inc., a professional association and designation recognized by the Canadian regulatory authorities.

Timothy George, PE, an independent Qualified Person under the standards set forth by NI 43-101, has reviewed the information in relation to the Hermosa reserve determination and mine plan in this press release.  Mr. George is a Mining Engineer with Metal Mining Consultants.

Process design criteria and cost estimates for the EMM facility have been reviewed by Terry McNulty, D Sc, PE., a Qualified Person under the standards set forth by NI 43-101. Dr. McNulty is President of T. P. McNulty and Associates, Inc., has over 50 years of experience in mineral processing and extractive metallurgical engineering, and is a Registered Member of SME.

About Wildcat
Wildcat is a Canadian mineral exploration company focused on the development of its 80% owned Hermosa silver-manganese project located in Santa Cruz County, Arizona. When in production, Hermosa is expected to be one of the largest primary silver producers as well as the only electrolytic manganese metal producer in the USA at industry low cash costs. The recently announced pre-feasibility study (December 10, 2013) estimates, annual production of 5.7 million ounces of silver and 110 million pounds of electrolytic manganese metal (EMM) at average cash costs of $4.45 per silver ounce and $0.73 per EMM pound over an 18 year mine life.

Cautionary Note Regarding Forward-Looking Information
Certain information contained in this press release constitutes forward-looking statements.  All statements, other than statements of historical facts, are forward looking statements including statements with respect to the Company's intentions for its Hermosa project in Arizona, USA including, without limitation, the amount of mineral resources and mineral reserves, expected future mineral production, expected metal grades and metal recoveries, expected future capital and operating costs, expected realizable metal prices, expected markets for EMM, expected timing for future metallurgical and other work and expected timing for the completion of a feasibility study.   Forward-looking statements are often, but not always, identified by the use of words such as may, will, seek, anticipate, believe, plan, estimate, budget, schedule, forecast, project, expect, intend, or similar expressions.

The forward-looking statements are based on a number of assumptions which, while considered reasonable by Wildcat, are subject to risks and uncertainties.  In addition to the assumptions herein, these assumptions include the assumptions described in Wildcat's management's discussion and analysis for the period ended December 31, 2012 ("MD&A").  Wildcat cautions readers that forward-looking statements involve and are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those expressed in or implied by such forward-looking statements and forward-looking statements are not guarantees of future results, performance or achievement. These risks, uncertainties and factors include general business, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in project parameters; changes in costs, including labour, infrastructure, operating and production costs; future prices of silver and other minerals; variations of mineral grade or recovery rates; operating or technical difficulties in connection with exploration, development or mining activities, including the failure of plant, equipment or processes to operate as anticipated; delays in completion of exploration, development or construction activities; changes in government legislation and regulation; the ability to maintain and renew existing licenses and permits or obtain required licenses and permits in a timely manner; the ability to obtain financing on acceptable terms in a timely manner; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business; and the factors discussed in the section entitled "Risks and Uncertainties" in the MD&A.

Although Wildcat has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking information, there may be other risks, uncertainties and other factors that cause performance, achievements, actions, events, results or conditions to differ from those anticipated, estimated or intended.  Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Wildcat disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law.

SOURCE Wildcat Silver Corporation

For further information:

Letitia Cornacchia, Vice President, Investor Relations and Corporate Communications
Telephone: +1 416 860 6310
Email: lcornacchia@wildcatsilver.com

Wildcat Silver Corp.

EXPLORATEUR
CODE : WS.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Wildcat Silver Corp. est une société développant des projet miniers d'argent basée au Canada.

Wildcat Silver Corp. détient divers projets d'exploration en USA.

Son principal projet en exploration est HERMOSA (HARDSHELL) en USA.

Wildcat Silver Corp. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 65,9 millions CA$ (52,7 millions US$, 47,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 avril 2011 à 3,16 CA$, et son plus bas niveau récent le 03 avril 2015 à 0,22 CA$.

Wildcat Silver Corp. possède 148 040 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Wildcat Silver Corp.
2007 Annual report
Financements de Wildcat Silver Corp.
03/05/2011CLOSES $13 MILLION PRIVATE PLACEMENT WITH SILVER WHEATON
07/03/2011ANNOUNCES $13 MILLION PRIVATE PLACEMENT WITH SILVER WHEATON
16/08/2008Extends Expiry For Outstanding Warrants
12/03/2007 Wildcat Increases Private Placement
Nominations de Wildcat Silver Corp.
22/06/2013Wildcat announces AGM results including election of Donald Y...
08/08/2011Wildcat appoints William J. Pennstrom, Jr as Vice President ...
13/07/2011APPOINTS GREG LUCERO AS VICE PRESIDENT OF SUSTAINABLE DEVELO...
29/07/2008 Appoints Chairman, CEO & CFO
04/07/2008Appoints Two New Board Directors
Projets de Wildcat Silver Corp.
06/05/2013Wildcat Silver completes acquisition of Riva Gold
03/05/2013Riva Gold shareholders approve acquisition by Wildcat Silver
04/04/2013Wildcat Silver enters into a defintive agreement for the acq...
10/01/2013Wildcat drilling increases Manto Zone thickness in centre of...
01/10/2012Wildcat Silver updated PEA more than doubles expected annual...
31/05/2012Wildcat Drill Results Include 54.9 Metres of 236.8 g/t Silve...
17/05/2012Wildcat announces results for 24 additional drill holes: con...
10/05/2012Wildcat announces additional drill results, expanding Upper ...
25/04/2012Wildcat announces additional drill results, extends Upper Si...
15/09/2011Wildcat announces additional drill results including 19.8 me...
08/09/2011Wildcat drill results continue to expand Hermosa mineralizat...
19/07/2011DRILL RESULTS INCLUDE 52 METRES OF 369 G/T SILVER CONTINUING...
01/06/2011(Hermosa (hardshell))ANNOUNCES DRILL RESULTS INCLUDING 20.0 METRES OF 329.8 GRAMS...
25/04/2011(Hermosa (hardshell))ANNOUNCES ADDITIONAL DRILL RESULTS
04/04/2011(Hermosa (hardshell))DRILL RESULTS INCLUDE 37 METRES OF 407 GRAMS PER TONNE SILVE...
24/03/2011(Hermosa (hardshell))DRILL RESULTS INCLUDE 100 METRES OF 153 GRAMS PER TONNE SILV...
22/03/2011(Hermosa (hardshell))INITIAL DRILL RESULTS SUPPORT EXTENSION OF MINERALIZATION
24/11/2008(Hermosa (hardshell))Improves Processing at Hardshell
28/02/2008(Hermosa (hardshell))Drilling Highlights From Hardshell - Includes 49.9 m of 239 ...
23/07/2007(Hermosa (hardshell))Starts Drilling at Hardshell
Communiqués de Presse de Wildcat Silver Corp.
29/09/2015September 29th, 2015 AZ Mining expands Hermosa NW with high ...
03/08/2015AZ Mining to expand Hermosa land package
24/07/2015July 24th, 2015 AZ Mining to expand Hermosa land package
30/06/2015June 30th, 2015 AZ Mining AGM Results
21/08/2014Closes C$2 Million Private Placement and Commences Sulfide S...
21/08/2014Wildcat Silver Closes C$2 Million Private Placement and Comm...
15/08/2014Wildcat Silver Announces Election of Donald R. Siemens to it...
31/07/2014Wildcat Silver highlights Sulfide Skarn potential at Hermosa...
09/04/2014Wildcat signs letter agreement for Regal Resources' Sunnysid...
10/12/2013Wildcat announces positive prefeasibility study results and ...
18/07/2011to commence trading on the Toronto Stock Exchange on July 19...
05/07/2011Conditionally Approved To List On The TSX
06/06/2011Wesgold Options the 25,790 Hectare Cordoba Property, Colombi...
02/09/2008Commence Trading on TSX-V Exchange
09/01/2008FILES YEAR-END AND Q1 FINANCIAL STATEMENTS - MANAGEMENT CEAS...
23/10/2007Define Manganese Market Potential
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (WS.TO)OTHER OTC (WLDVF)
0,445-5.32%4,70-0.84%
TORONTO
CA$ 0,445
04/06 15:59 -0,030
-5,32%
Cours préc. Ouverture
0,470 0,475
Bas haut
0,445 0,475
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,445 53,45%
Volume var. 1 mois
61 631 53,45%
24hGold TrendPower© : -27
Produit
Développe
Recherche Copper - Manganese - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 26/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,32 US$+0,49%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,30 CA$+0,40%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,89 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,16 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :