Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Fission Winter Drill Program Successfully Expands J Zone to Approx. 370m; Five Mineralized Discoveries Now Targeted Within Discovery Bay Corridor
Published : April 27, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Uranium |

KELOWNA, BRITISH COLUMBIA--(Marketwire - April 27, 2011) - FISSION ENERGY CORP. ("Fission" or the "Company") (News - Market indicators)(OTCQX:FSSIF) and its Limited Partner, the Korea Waterbury Uranium Limited Partnership ("the Waterbury Consortium"), announce the completion of their Waterbury Lake 2011 winter program, resulting in the successful expansion of the J Zone uranium discovery to an east west strike length of 370m, expanding the strike length by more than 3x since drilling began in January. Newly discovered basement mineralization was identified in seven drill holes in the western part of the J Zone below the overlapping unconformity mineralization from Line 225W to Line 315W. The J Zone remains open laterally in all directions.

Five areas of uranium mineralization have now been identified at Waterbury Lake within the Discovery Bay Corridor over a distance of approximately 1.5 kilometers trending west from the Fission/Hathor property boundary. From east to west, these are: J East, J Zone, PKB, Talisker, and the new discovery made by Hole WAT11-153A in the Discovery Bay Corridor to the west of the J Zone. While the primary focus has been to expand the J Zone high grade uranium discovery, targeted regional exploration drilling resulting in the discovery of these new zones has confirmed the presence of a large mineralized system with the potential for discovering multiple mineral occurrences that warrant follow-up drilling.

The winter program at Discovery Bay totalled 23,384m in seventy-four drill holes. Fifty were drilled at the J Zone, thirteen holes at PKB, two at J East and nine regional exploration holes in the Discovery Bay Corridor. Additional results from exploration drilling carried out in the Oban Corridor, located 4 km north of the J Zone, are forthcoming.

Updated drill hole maps and a table summarizing Drill Core Hand-Held Scintillometer Readings can be found on the Company's website at http://www.fission-energy.com/s/WaterburyLake.asp.

J Zone Summary

Fifty holes were drilled in the J Zone. Thirty-three intersected mineralization, successfully expanding the J Zone boundary to the west, east and north. Unconformity mineralization was intersected as far west as L240W (Hole WAT11-188), and basement mineralization as far west as L315W (Hole WAT11-174). Importantly, evidence of continued high grade mineralization is demonstrated by Hole WAT11-131, the strongest high grade hole to date (14.5m grading 7.84% U3O8, including 2.0m of 46.15% U3O8; see press release dated March 29th). The remaining mineralized holes (assays pending), have successfully extended the boundary beyond by last summer's drill program, including seven drill holes (Holes WAT11-174, 178, 186, 188, 190, 192A and 194), which have intersected new mineralization in the basement rocks west of line 225W. This newly discovered basement mineralization opens up an entirely new area to the west that requires follow-up drilling.

Fission has now successfully expanded the J Zone to an approximate 370m strike length X up to 50m wide, and is now defined by sixty-four mineralized holes. High grade uranium mineralization, predominantly at the unconformity, was found in forty-five closely spaced drill holes, most of which were vertically drilled, from L045E to L165W. Unconformity and underlying basement mineralization are present in twelve holes from L165W to L240W, and new basement mineralization in seven holes from L240W to L315W has extended the J Zone's perimeter further to the west.

Highlights of the latest drill holes completed (assays pending) include:

Hole WAT11-188, an angled hole collared 10m northeast of Hole WAT11-178 intersected intervals totalling 23.0m of variable to "off-scale" (cps >9999) radioactivity within a 40.25m wide section (225.25m-265.50m) in the basement rocks. Two intercepts totalling 0.20m of "off-scale" (cps >9999) (262.00-262.53) with the intervening intercepts averaging a maximum cps of 9700.

Hole WAT11-149, a vertical step-out collared 10m west of Hole WAT11-131 on Line 150W, intersected 11.5m (202.00m-213.50m) of well developed mineralization at the unconformity with a maximum cps of 9400.

Hole WAT11-154, a vertical step-out collared 10m north of Hole WAT11-149 on Line 150W, intersected 9.5m (194.5m-204.00m) of well developed mineralization at the unconformity including 0.17m of "off-scale" (cps >9999) radioactivity.

Hole WAT11-178, an angled hole drilled in the western part of the J Zone extension intersected 2.50m (252.50m-255.00m) of well developed mineralization in the basement, including 0.17m of "off-scale" (cps >9999) radioactivity.

J Zone

        * Mineralization (>300 cps / 0.5M minimum)      
Hole ID Grid Line Az Dip From-To (m) Width (m) CPS Max Peak  Clay 
Alter-
ation
From-To (m)
 Unconfor- mity
Depth (m)
Total Depth (m)
WAT11-149(1) 150W 0 -90 202.0-214.0 12.0 320-9400 186-227 201.6 302
        231.5-233.0 1.5 370-660      
WAT11-151(1) 150W 0 -90 201.0-207.0 6.0 <300-1000 191-212 203.3 299
        212.0-213.0 1.0 300-600      
WAT11-152A(1) 120W 0 -90 192.0-197.1 5.1 <300-1155 190-218 196.6 299
        209.5-218.0 8.5 <300-4100      
WAT11-154(1) 150W 0 -90 192.0-204.0 12.0 <300->9999 190-208 195.7 299.0
WAT11-155(1) 120W 0 -90 no significant
mineralization
    193-206 200.5 317.0
WAT11-157(1) 045NE 330 -83 203.5-208.5 5.0 <300-2500 164-172 201.2 302.0
              194-211    
WAT11-158A(1) 165W 0 -90 no significant
mineralization
    187-201 201.1 302
WAT11-163B(2) 090SW 0 -90 no significant
mineralization
    146-161 195.1 329
              193-196    
WAT11-164(2) 150W 0 -90 190.5-191.0 0.5 440 180-211 192.8 326
        214.5-215.5 1.0 310-900      
WAT11-167(2) 195W 0 -90 223.5-225.5 2.0 <300-1300 197-206 202.1 310
WAT11-170(2) 165W 0 -90 202.6-211.6 9.0 <300-3000 191-213 200.1 320
WAT11-173(2) 180W 0 -90 222.5-223.5 1.0 300-330 191-209 199.2 320
WAT11-174(2) 315W 158 -66 250.0-253.0 3.0 460-3000 188-202 224.0 326
WAT11-175C(2) 165W 0 -90 193.0-194.0 1.0 670-710 189-206 190.5 299
        198.0-199.0 1.0 460-1200      
WAT11-177(1) 180W 0 -90 229.5-230.0 0.5 2100 176-198 196.1 314
WAT11-178(1) 255W 156 -62 252.5-255.0 2.5 350->9999 186-202 234.2 314
              215-231    
WAT11-180(1) 210W 0 -90 no significant
mineralization
    191-203 200.2 299
WAT11-183(1) 225W 0 -90 no significant
mineralization
    191-202 200.2 317
WAT11-185(1) 225W 0 -90 204.0-208.5 4.5 <300-900 182-200 198.0 305
        213.0-214.5 1.5 350-470      
WAT11-186(1) 285W 0 -90 252.75-253.25 0.5 320 178-200 230.7 302
WAT11-187(1) 195W 0 -90 194.5-195.0 0.5 300 182-236 197.0 308
WAT11-188(1) 240W 146 -62 225.25-231.25 6.0 <300-3600 201-254 230.3 320
        234.25-243.25 9.0 <300-6300      
        249.5-251.5 2.0 480-1100      
        259.5-265.5 6.0 <300->9999      
WAT11-189(1) 195W 0 -90 no significant
mineralization
    172-209 203.0 302
WAT11-190(1) 225W 149 -56 256.0-257.0 1.0 730-800 221-257 253.0 341
        262.0-262.5 0.5 380      
WAT11-192(1) 285W 166 -65 248.5-256.5 8.0 <300-1900 216-248 230.0 308
WAT11-194(1) 240W 147 -65 238.0-243.5 5.5 <300-4000 230-258 227.1 320
        254.0-257.5 3.5 <300-2900      

PKB

PKB is located is located ~90m to the west of the J Zone. Of the 13 holes drilled this winter, eight intersected mineralization at or near the unconformity. Mineralization has been defined over an east-west strike length of 45m and up to 40m wide north-south. Of the latest seven holes, two intersected weak to anomalous radioactivity at the unconformity (WAT11-162, and 168), one hole, WAT11-160, intersected mineralization in the basement directly below the unconformity, while four holes (WAT11-165, 171,181, 184A) did not find significant mineralization. Hole WAT11-160 was the best hole intersecting 6.5m of variable radioactivity just below the unconformity, with a maximum cps peak of 3500. PKB remains open in all directions. Follow-up drilling is planned during the summer.

PKB

        * Mineralization (>300 cps / 0.5m minimum)      
Hole ID Grid Line Az Dip From-To (m) Width (m) CPS Max Peak Clay
Alter-
ation From-To (m)
Unconfor-
mity
Depth (m)
Total Depth (m)
WAT11-160(2) 450W 0 -90 206.0-212.5 6.5 <300-3500 200-212 200.9 305
WAT11-162(2) 420W 0 -90 197.5-199.5 2.0 <300-650 194-206 205.0 311
        205.0-205.5 0.5 530      
WAT11-165(2) 450W 179 -70 no significant
mineralization
    191-214 214.1 305
WAT11-168(2) 405W 0 -90 197.85-205.35 7.5 <300-640 173-204 204.9 299
WAT11-171(2) 360W 0 -90 no significant
mineralization
    201-206 205.3 302
WAT11-181(1) 360W 165 -60 no significant
mineralization
    190-197 240.8 320
WAT11-184A(1) 360W 162 -56 no significant
mineralization
    209-220 247.9 344

J East

J East is located ~30m to the east of the J Zone. Fission believes J East is an extension of the Roughrider Deposit located immediately east of the property boundary. In addition to Hole WAT11-129 completed in February (assay pending) one additional hole WAT11-148B was drilled to test the northwest extension of J East. Weak mineralization was encountered over a narrow 0.50m width within the basement rocks, suggesting that mineralization in J East has limited potential.

J East

        * Mineralization (>300 cps / 0.5m minimum)      
Hole ID Grid Line Az Dip From-To (m) Width (m) CPS Max Peak Clay
Alter-
ation
From-To (m)
Unconfor- mity
Depth (m)
Total Depth (m)
WAT11-148B(1) 090NE 329 -87 298.5-299.0 0.5 350 174-185 198.7 338

Discovery Bay Corridor

The Discovery Bay Corridor is a broad continuous east-west trending lithological and structurally controlled corridor that hosts the J Zone uranium discovery, in addition to Fission's, PKB, Talisker and Hole WAT 11-153A mineralized discoveries to the west, and Hathor's Roughrider discoveries to the east. Earlier magnetic geophysical surveys, which confirmed the Corridor's ~3 km long strike length, was recently followed-up this winter with a ground-based Time Domain Electromagnetic (TDEM) geophysics survey which further defined a 2.25 km long significant parallel east-west conductor within the prospective corridor.

A total of nine regional exploration holes were drilled in the Discovery Bay Corridor, west of the J Zone. Three holes (WAT11-153A, 191, 195A) were mineralized. Hole WAT11-153A, which intersected mineralization near the unconformity approximately 1.5 km west of the J Zone (see news release dated March 1, 2011), is the farthest hole drilled west of the J Zone to date. Six holes (WAT11-126, 130, 147, 150 and 156, 193) although not mineralized, exhibited well developed clay alteration and favourable basement rocks (graphitic metapelitic rocks) that highlight the potential to host proximal uranium mineralization. Follow-up drilling is planned for the summer.

Discovery Bay Corridor

        * Mineralization (>300 cps / 0.5m minimum)      
Hole ID Grid Line Az Dip From-To (m) Width (m) CPS Max Peak Clay
Alter-
 ation
From-To (m)
Unconfor- mity
Depth (m)
Total Depth (m)
WAT11-156(1) 765W 340 -84 no significant
mineralization
    192-209 197.0 308
WAT11-191(1) 1110W 190 -76 212.75-213.25 0.5 900 178-191 213.1 350
WAT11-193(1) 780W 0 -90 no significant
mineralization
    195-200 212.0 305
WAT11-195A(1) 540W 181 -53 277.5-281.0 3.5 <300-430 254-275 262.8 350
                   
(1) Hand held Exploranium GR-110G total count gamma-ray scintillometer
(2) Hand held Radiation Solutions RS-121 Super Gamma Scintillometer
 
*refer to table (Hand Scintillometer for results of anomalous radioactivity)
All depths are down-hole measurements

All holes reported herein were terminated within unaltered basement rocks. Given that the mineralization thus far encountered in the J-Zone appears to be almost flat-lying, drill intercepts of unconformity related zones reported from vertical holes are approximately true thickness.

All holes were radiometrically surveyed with a Mount Sopris 2GHF Triple Gamma probe. The triple gamma probe uses both a Na-I scintillation crystal and a ZP1320 High-Flux Geiger-Mueller tube pair, which allows better resolution in strongly radiometric intervals.

Natural gamma radiation in drill core that is reported in this news release was measured in counts per second (cps) using either a hand held Exploranium GR-110G(1), or a Radiation Solutions RS-121(2) total count gamma-ray scintillometer. The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured, and should be used only as a preliminary indication of the presence of radioactive materials. All intersections are down-hole, core interval measurements and true thickness is yet to be determined.

Split core samples from the mineralized section of core will be taken continuously through the mineralized intervals and submitted to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) of Saskatoon for analysis, which includes U3O8 (wt %) and fire assay for gold. All samples sent for analysis will include a 63 element ICP-OES, uranium by fluorimetry (partial digestion) and boron. Chemical results will be released when received. Further updates will be provided.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy, P.Geol. President and COO for Fission Energy Corp., a Qualified Person.

FISSION ENERGY CORP. is a Canadian based resource company specializing in the strategic acquisition, exploration and development of uranium properties and is headquartered in Kelowna, British Columbia. FISSION ENERGY CORP. Common Shares are listed on the TSX Venture Exchange under the symbol "FIS" and on the OTCQX Exchange under the symbol "FSSIF".

Korea Waterbury Uranium Limited Partnership ("Waterbury Consortium") is a consortium primarily comprised of Korean-based companies. The Consortium is led by Korea Electric Power (KEPCO). Other participating companies include: Korea Hydro & Nuclear Power, Korea Nuclear Fuel Co., Hanwha Corp. and Gravis Capital Corp., a private Canadian uranium investment company.

Fission Energy owns 60% and the Korea Waterbury Uranium Limited Partnership owns 40% of the Waterbury Lake Uranium Limited Partnership.

Korea Electric Power Corporation (KEPCO) is a Korean government-invested diversified energy company with over $83-billion (U.S.) in assets. The company is involved in the generation, transmission and distribution of electrical power from nuclear, hydro, coal, oil and LNG sources worldwide. Korea Electric Power provides electricity to almost all households in Korea and operates 20 nuclear power plants in the country with six more under development. The company has over 30,000 employees and is listed on the Korean Stock Exchange and the New York Stock Exchange. (www.kepco.co.kr)

This press release contains "forward-looking information" that is based on Fission's current expectations, estimates, forecasts and projections. This forward-looking information includes, among other things, statements with respect to Fission's development plans. The words "will", "anticipated", "plans" or other similar words and phrases are intended to identify forward-looking information.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause Fission's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, but are not limited to: uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and development; changes in economic conditions or financial markets; increases in input costs; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological or operational difficulties or inability to obtain permits encountered in connection with exploration activities; and labour relations matters. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. Fission disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

ON BEHALF OF THE BOARD

Ross McElroy, President & COO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Fission Energy Corp.
Bob Hemmerling
Investor Relations
TF: 877-868-8140
info@fission-energy.com
www.fission-energy.com

Fission Energy Corporation

EXPLORATEUR
CODE : FIS.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Fission Energy est une société d’exploration minière de nickel et d'uranium basée au Canada.

Fission Energy détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont NORTH SHORE, FORT MCLEOD, MINOR BAY, ZOO BAY, DAVY LAKE, WATERBURY LAKE, PATTERSON LAKE, DIETER LAKE, DUDDRIDGE LAKE, CARIBOU MOUNTAINS et SOUTH SHORE au Canada, THE MACUSANI PROPERTY au Perou et TORWALT LAKE en Australie.

Fission Energy est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 118,3 millions CA$ (115,3 millions US$, 88,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 23 mai 2008 à 1,64 CA$, et son plus bas niveau récent le 17 octobre 2008 à 0,09 CA$.

Fission Energy possède 124 534 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Fission Energy Corporation
07/04/2010Completes $9.2 Million with Private Placements
30/07/2009Closes Private Placement Financing
01/06/2009Announces Private Placement Financing
Nominations de Fission Energy Corporation
24/02/2011Appoints Raymond Ashley VP Exploration & Retains Trident Fin...
Projets de Fission Energy Corporation
25/02/2013Corp=2E: 4 Step-Out Holes Hit Off-Scale; Expand Discovery Zo...
15/01/2013to Commence $4.0m Exploration Program at PLS
07/01/2013=?ISO-8859-1?Q?Fission=20to=20Commence=2021,000m,=20=245=2E5...
25/10/2012Expands High Grade Boulder Field by 2=2E35km at PLS: Assays ...
08/08/2012(Waterbury Lake)Corp=2E: Waterbury Lake Regional Target Assay Results; Miner...
05/07/2012Corp=2E Completes Acquisition of Pitchstone Exploration Ltd=...
25/06/2012Corp=2E: Drilling Begins at J =?ISO-8859-1?Q?=20Zone,=20Wate...
23/04/2012=?ISO-8859-1?Q?FIS,=20PXP=20-=20Fission=20Energy=20Corp=2E,=...
23/04/2012Enters into Agreement to Acquire Pitchstone Exploration Ltd=...
15/02/2012New Ground Staked on South Flank of PLS Property
31/01/2012Corp=2E: Four Drill Holes Intersect Mineralization Widening ...
26/01/2012(Waterbury Lake)Increases Waterbury Lake Winter 2012 Exploration Budget by 2...
17/01/2012FIS - Fission Energy Corp=2E - Initial J-Zone Resource Estim...
14/12/2011Corp=2E: PLS Property Trenching Yields Boulder Assays as Hig...
27/07/2011(Patterson Lake)/ESO Patterson Lake South JV ReportsHigh Grade Boulders Up t...
06/07/2011Dundee Capital Markets: Nearing a Discovery at Another Proje...
13/06/2011(Waterbury Lake)to Commence Two Drill $3=2E6 Million Summer Exploration Prog...
29/03/2011(Waterbury Lake)Intersects 14.5m of 7.84% U3O8 on 60m Step-Out
01/03/2011(Waterbury Lake)Discovers New Mineralization Near the Unconformity 1.3 km We...
22/02/2011(Waterbury Lake)Expands J Zone to 203m; Mineralization Extended at New PKB D...
17/08/2010(Waterbury Lake)Western Vertical Step-Out Drilling at Fission's Waterbury La...
09/08/2010(Waterbury Lake)Summer Drill Program Continues to Expand J-Zone to the North...
03/08/2010(Waterbury Lake)First Vertical Step-Out at Fission's Summer Drill Program In...
26/07/2010(Waterbury Lake)Commences Summer Drill Program at J-Zone High Grade Uranium ...
30/06/2010(Waterbury Lake)& KEPCO Agree to Accelerate Exploration at Waterbury Lake: E...
24/06/2010(Davy Lake)Commences Drilling at Davy Lake, Athabasca Basin
21/06/2010(Waterbury Lake)J-Zone High Grade Mineralization Continues to West & Remains...
28/04/2010(Waterbury Lake)Vertical Step Outs Intersect 18m of 1.32% U308 and 8.5m of 1...
12/04/2010(Patterson Lake)And Eso Stake New Uranium Target at Patterson Lake South Joi...
04/03/2010(Waterbury Lake)Intersects 17m of 3.99% U308 Including 7.0m Grading 7.48% U3...
24/02/2010Extends J-Zone as Latest Drilling Intersects 16m & 5.65m of ...
22/02/2010(Waterbury Lake)Intersects 12m of 3.64%U308 Including Mineralization as High...
16/02/2010Intersects 13.5m of Highly Radioactive Mineralization at Unc...
09/02/2010Fission Intersects 4m Zone of High Radioactivity at Unconfor...
17/02/2009(Duddridge Lake)Fission and Great Bear Agree to Extension of Duddridge Lake ...
14/01/2009(Waterbury Lake)Drilling Commences at Fission Energy's Waterbury Lake Uraniu...
23/09/2008(Waterbury Lake)First Phase Drill Program at Waterbury Lake Northeast Identi...
Communiqués de Presse de Fission Energy Corporation
26/04/2013Corp=2E Closes Arrangement with Denison Mines Corp=2E and Co...
24/04/2013JV Totals 66m U308 in 2Zones: With 6m @35% in 49=2E5m @6=2E2...
23/04/2013Receives Securityholder Approval of Plan of Arrangement With...
22/04/2013Corp=2E: PLS JV Hits 10=2E5m of 29=2E26% U3O8 Within 53m of ...
15/04/2013Corp=2E: JV Hits 9=2E9m Off-Scale Within 26=2E5m Interval at...
10/04/2013Corp=2E: 23m of High GradeUranium Including 2m of 12=2E4% U3...
06/04/2013Corp=2E: Drilling at Waterbury Expands Mineralization at Wes...
03/04/2013Corp=2E: 4 Step-Outs Hit Off-Scale at PLS=2E Strike of R390E...
01/04/2013Corp=2E: PLS Step-Out Hole at R780E Hits Off-Scale With 70 m...
25/03/2013Corp=2E: PLS JV Hits 34m of 4=2E92% U3O8 in Upper Zone of PL...
19/03/2013Corp=2E: Six Holes Hit "Off =?ISO-8859-1?Q?-Scale=22=20Miner...
18/03/2013=?ISO-8859-1?Q?Fission=20Energy=20Corp=2E:=20780=20Meter=20(...
13/03/2013Corp=2E: 18=2E9m Total "Off-Scale" Radioactivity Within 67=2...
19/02/201357.5m of Mineralization At PLS With 11.65m Off-scale On 385m...
14/02/2013Acquires Additional Ground South of PLS
07/02/2013Corp=2E and Alpha Minerals Inc=2E: 2nd Step-Out Hole at PLS ...
22/01/2013Completes C$2 Million Non-Brokered Private Placement
12/11/2012Step-Out Drilling Hits More "Off-Scale" Radioactivity at PLS
12/11/2012Step-Out Drilling Hits More "Off-Scale" Radioactivity at PLS
05/11/2012Discovery Hole Hits "Off-Scale" Near Surface at PLS
16/10/2012Drills 16=2E5m Grading 1=2E07% U3O8 Including 1=2E5m of 8=2E...
09/10/2012to Resume Drilling Near PLS High Grade Uranium Boulder Field
20/08/2012Hits More "Off-Scale" Radioactivity as J Zone Continues to G...
30/07/2012Reports Final 2012 Winter J Zone Assays
24/07/2012Corp=2E: PLS Results Indicate Presence of Uranium-Rich Syste...
18/07/2012Corp=2E: Three Holes with "Off-Scale" Radioactivity Enhance ...
13/06/2012TSX Venture Exchange Grants Fission Tier 1 Status
04/06/2012Dundee Capital Markets: J-Zone Extends In Three Directions; ...
04/06/2012Corp=2E: 40 of 49 Holes Hit =?ISO-8859-1?Q?=20Mineralization...
25/04/2012Drilling Intersects Significant Basement Mineralization at P...
27/02/2012Corp=2E: Drill Rig Mobilizedat PLS High Grade Boulder Field ...
21/02/2012Corp=2E: Three Step-Out Holes with "Off-Scale" Radioactivity...
08/02/2012Launches Social Media Program for Investors and Analysts
16/01/2012Announces Preliminary NI 43-101 Resource Estimate at J Zone ...
16/01/2012Commences Expanded $2.76m Winter Program at PLS
14/01/2012Grants Stock Options
24/10/2011(Patterson Lake)Corp=2E: Trenching Begins atHigh Grade Boulder Field at Patt...
22/09/2011Uranium Reaction - Japan "determined" to =?ISO-8859-1?Q?=20r...
16/09/2011Mickey Fulp: Looking Past the Summer Uranium Doldrums
02/09/2011Takeover Bid May Stabilize or End Uranium's Slide
01/09/2011URANIUM REACTION - Cameco's Bid for Hathor May be the Starte...
01/09/2011FIS - Fission Energy Corporation - On Strike with Hathor's R...
30/08/2011Cameco Bid for Hathor Suggests Higher Valuation for Fission
26/08/2011=?ISO-8859-1?Q?Fission=20Energy=20Corp=2E=20-=20(FIS/TSXV,=2...
26/08/2011Versant Partners - Cameco Goes Hostile for Hathor; Positive ...
25/08/2011URANIUM REACTION: Point of Maximum Pessimism
18/08/2011=?ISO-8859-1?Q?Fission=20Commences=202,000m=20Drill=20Progra...
27/07/2011"Dundee Capital Markets - New Uranium Discovery=3F Boulder A...
26/07/2011Dundee Capital Markets "Final Assays of 2=2E27% U3O8 / 7m - ...
26/07/2011(Waterbury Lake)Corp=2E: Waterbury Lake Winter 2011 Drill Assays Delineate J...
15/07/2011Rob Chang of Versant Partners provides his views on Uranium
05/07/2011More "Off-Scale" Radioactive Boulders andMore Claims Located...
27/06/2011Discovers Uranium Boulder Train With "Off-Scale" Radioactivi...
22/06/2011The Energy Report-Rob Chang: Best Uranium Stock to Rebound i...
06/06/2011(Patterson Lake)and ESO Commence Ground Work at Patterson Lake South, Athaba...
24/05/2011Resourcestockdigest - Audio interview with Dun =?ISO-8859-1?...
27/04/2011Winter Drill Program Successfully Expands J Zone to Approx. ...
02/03/2011Dundee Capital Markets - Uranium Discoveredin 1km Step-out A...
16/02/2011to Evaluate Alternatives at Macusani, Peru
10/04/2010Terminates Duddridge Lake Option Agreement
06/04/2010Latest Vertical Step-Out Drilling Identifies 2.19m "Off-Sca...
29/03/2010Step-Outs Intersect Highly Radioactive Mineralization 140m W...
22/03/2010Hits "Off-Scale" Radioactivity on 3 more Vertical Step-Out H...
08/03/2010Drills Four More Vertical Step-Out Holes That Extend the J-Z...
22/02/2010WA nickel-cobalt project advances to prefeasibility
12/11/2008George Sanders & Frank Estergaard Join Fission Energy's Boar...
26/09/2008David Miller Steps Down From Fission's Board Of Directors
09/09/2008Promotes Ross Mcelroy To President And Chief Operating Offic...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FIS.V)OTHER OTC (FSSIF)
0,950+2.15%0,920+2.22%
TSX-V
CA$ 0,950
29/04 15:59 0,020
2,15%
Cours préc. Ouverture
0,930 0,920
Bas haut
0,910 0,950
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,950 -%
Volume var. 1 mois
483 296 -%
24hGold TrendPower© : 10
Produit
Développe
Recherche Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 11/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,69 US$-0,09%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,73 GBX+1,39%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,05 CA$-9,09%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,63 CA$-0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,72 CA$-1,59%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+7,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,18 CA$+10,10%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
49,71 US$-0,24%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :