Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Xtierra Inc.

Publié le 31 juillet 2014

Xtierra Reports Second Quarter Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | G Mexico | Zinc |

Xtierra Reports Second Quarter Results

TORONTO, ONTARIO--(Marketwired - Jul 31, 2014) - Xtierra Inc. (TSX VENTURE:XAG) ("Xtierra" or the "Company") announces that it has now published and filed its unaudited interim financial report for the three and six month periods ended June 30, 2014 together with its Management's Discussion and Analysis for the same period. These documents are available on the Company's website at www.xtierra.ca and on SEDAR under the Company's profile at www.sedar.com.

For the six month period ended June 30, 2014, the Company recorded a loss of $108,000 ($0.001 per share), a gain of $132,000 arising on a reduction in the fair value of the convertible notes liability.

At June 30, 2014, the Company held $220,000 in cash and cash equivalents. In April 2014 the Company secured further advances of $250,000 from its major shareholders to fund its working capital for the remainder of 2014.

At June 30, 2014, the Company had not achieved profitable operations, had an accumulated deficit since inception and expects to incur further losses in the development of its business. The continuing operations of the Company are dependent upon its ability to raise adequate financing for working capital, pre-feasibility and feasibility studies, and in the longer term to build the proposed mine at Bilbao.

On July 28, 2014, the Company announced that it had initiated a strategic review to consider alternatives in relation to its Bilbao Silver-Zinc-Lead Project (the "Bilbao Project") in Zacatecas, Mexico and has retained Jennings Capital Inc. to assist in the strategic review process.

Strategic alternatives include, but are not limited to, financing structures for the development of the Bilbao Project, the sale of all or a portion of the Company's interest in the Bilbao Project or a corporate transaction.

There are no assurances that the process will result in a transaction or, if a transaction is undertaken, as to the commercial terms or timing of such a transaction.

The following clarifies and corrects summary disclosure concerning the Bilbao Project which appeared in the Company's July 28th and April 28, 2014 news releases and prior disclosure.

The Bilbao Project

The Bilbao Project is a polymetallic sulphide and oxide replacement silver-zinc-lead-copper deposit located approximately 500km northwest of Mexico City in the southeastern part of the State of Zacatecas.

On April 28, 2014 the Company announced that it had received an updated National Instrument 43-101 ("NI 43-101") compliant resource estimate and a Preliminary Economic Assessment (PEA) on the Bilbao Project, both prepared by RungePincockMinarco (Canada) Limited (RPM). The PEA is preliminary in nature in that it includes in part inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that the results projected by the PEA will be realized with further work and actual results may vary substantially. Because inferred resources are speculative, the modifying factors that are applied to assess the potential economic viability of the project are also speculative.

As previously reported, a new Zn/Pb/Ag/Cu resource estimation of the Bilbao deposit was prepared by RPM to incorporate new drilling information acquired during 2011-2013. This resource estimation, included in the PEA, by mineral type at 3% Zn equivalent cut-off, excluding approximately 1 million tonnes of previously mined out ore, is shown in the following tables:

Indicated Resource

Mineralization Type Zn equiv.
(%)
Tonnes Zn % Pb % Ag
(ppm)
Cu %
Oxide 6.69 791,082 1.73 2.53 39 0.18
Mixed 7.93 778,336 2.52 2.48 51 0.21
Sulphide 7.56 4,555,809 2.38 1.57 72 0.18
Total 7.50 6,125,227 2.31 1.81 65 0.19

Inferred Resource

Mineralization Type Zn equiv.
(%)
Tonnes Zn % Pb % Ag
(ppm)
Cu %
Oxide 6.38 3,069,852 1.69 2.23 42 0.16
Mixed 4.43 238,923 0.59 1.13 55 0.11
Sulphide 4.31 1,201,032 0.67 0.77 60 0.11
Total 5.73 4,509,537 1.36 1.78 47 0.15

A previous resource estimation was originally carried out by Richard Parker Consulting Geologist in 2011 and included 84 drill holes. The resources reported in 2011 (including both oxide and sulphide) were 10,617,891 tonnes @ 6.48% Zn equiv. in the Indicated category and 430,000 tonnes @ 5.19% Zn equiv. in the Inferred category. (Technical Report dated April, 2011 entitled "Geology and revised Minerals resources of the Bilbao Silver-Lead-Zinc Deposit - State of Zacatecas, Mexico" by RTG Parker, Consulting Geologist).

For the purposes of the PEA, RPM has estimated that approximately 5.2 million tonnes grading 2.10% Zn, 1.40% Pb and 63.96 grams Ag per tonne of the indicated and inferred underground sulphide resources are potentially mineable. The tonnes and grade include an average dilution of 10 percent, at zero grade, as well as mining losses of 5%. The RPM PEA relies on indicated mineral resources as well as inferred mineral resources. The economic analysis in the PEA completed by RPM for a 720,000 tonne per year processing plant capacity and is based on this potentially mineable tonnage. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that the results projected by the PEA will be realized with further work and actual results may vary substantially. Because inferred resources are speculative, the modifying factors that are applied to assess the potential economic viability of the project are also speculative.

RPM's recommendations contained in the PEA identified various opportunities to increase the potentially mineable portion of the indicated and inferred sulphide resource and reduce operating costs through additional exploration and engineering to improve the overall economics of the Bilbao Project. Recommendations included:

  • Additional definition drilling targeted at the Bilbao transition and sulphide zones could lead to re-classification of inferred resources to indicated resources, potentially adding to the potentially mineable portion of the current indicated resource;
  • The potential to increase level spacing and correspondingly reduce level development, through use of cable bolts, may lead to lower mine development costs;
  • Further analysis of hydraulic and sand backfilling options, in terms of preparation and distribution, may further reduce overall operating costs;
  • There may also be opportunity to reduce operating costs significantly (~US$5/t to US$6/t) by reducing the number of stopes filled with backfill;
  • Potential also exists for deferral of ramp and associated development;
  • Inclusion of transition zone material in the mine plan should be investigated (requiring additional metallurgical testwork) to extend the life of mine and/or potentially increase the mining rate per year;
  • Further optimization of stope sequencing could lead to improved cash flow; and
  • Exploration drilling at the Bilbao 2 area, approximately 1.5 km south of Bilbao, has potential to offer additional mineral resources to the project due to the fact that current trenching, sampling and resulting soil geochemistry information identifies similarities between the two areas. An additional source of feed to the designed plant could lengthen the overall life of the mine, increase the daily production rate, or result in a combination of the two, improving the NPV and IRR of the project.

The PEA is set out in a technical report, prepared in accordance with NI 43-101, was filed on April 28, 2014 under the Company's profile on SEDAR at www.sedar.com.

Qualified Person

Scientific and technical information disclosed in this press release was prepared by or under the supervision of and approved by Gerald J. Gauthier, P.Eng., the President and Chief Operating Officer of the Company and a 'qualified person' within the meaning of NI 43-101.

About Xtierra Inc.

Xtierra Inc. is a Toronto based exploration and development company listed on the TSX Venture Exchange. Xtierra's shares trade under the symbol "XAG". Xtierra has 115,370,336 shares issued and outstanding.

Xtierra is currently evaluating the development of its Bilbao Silver-Zinc-Lead Project, located in the Central Mexican Silver Belt in the State of Zacatecas.

Cautionary Notes:

This press release may contain "forward looking information" within the meaning of applicable Canadian securities legislation. The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the content of this release.

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Xtierra Inc.

EXPLORATEUR
CODE : XAG.V
ISIN : CA98417Q1037
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Xtierra est une société d’exploration minière de zinc et de plomb basée au Canada.

Ses principaux projets en exploration sont PANFILO NATERA - MILAGROS, PINOS PROJECT, PANFILO NATERA - EL MORRO, VILLA DE RAMOS, BILBAO et LA LAGUNA PEDERNALILLO au Mexique.

Xtierra est cotée au Canada. Sa capitalisation boursière aujourd'hui est 2,9 millions CA$ (2,3 millions US$, 2,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 25 février 2011 à 0,65 CA$, et son plus bas niveau récent le 08 avril 2016 à 0,01 CA$.

Xtierra possède 116 370 336 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Xtierra Inc.
02/03/2010Closes first tranche of private placement
Projets de Xtierra Inc.
25/07/2013(Bilbao)Completes Successful Drilling Program on Bilbao Project
28/04/2011(Bilbao)BILBAO PROJECT UPDATE
27/04/2011(Bilbao)Bilbao Project Update
01/04/2011(Bilbao)reports a new high grade silver zone at Bilbao
29/07/2010(Bilbao)Commissions Feasibility Study
08/07/2010(Bilbao)Drills 2.2m of 11% Zn, 70.5 g/t Ag
18/05/2010(Bilbao)Commences drilling
12/05/2010(Bilbao)Starts Oxide Ore Pilot Plant Tests
04/05/2010(Bilbao)Plans new drilling
15/04/2010Intersects 11.5 g/t gold over 4 metres at El Dorado
14/01/2010(Bilbao)reports metallurgical results on oxide resources as part of ...
11/01/2010(Pinos Project)Commences drilling at Pinos gold project
27/11/2009(Pinos Project)Drilling planned for Pinos gold project, Zacatecas, Mexico
11/09/2009(El Dorado Gold Project)Options new gold project in Pinos District, Zacatecas, Mexic...
03/11/2008(Bilbao)2008 Technical report
Communiqués de Presse de Xtierra Inc.
31/07/2014Xtierra Reports Second Quarter Results
28/07/2014Xtierra Initiates Strategic Review Process in Relation to It...
28/04/2014Bilbao Silver-Lead-Zinc Project - Preliminary Economic Asses...
25/04/2014Xtierra Inc.: Conversion of US$1,075,000 Debt to Equity
12/02/2013(Bilbao)Engages Runge Pincock Minarco to Oversee Completion of Bilba...
11/09/2012(Bilbao)Bilbao Infill Drilling Results
27/06/2011(Bilbao)Reports High Grade Silver Intercepts in Drilling Immediately...
26/05/2011(Bilbao)Reports Revised Resource Estimate for Bilbao Deposit
02/03/2011Exercise of Warrants Raises $3.1 Million
05/07/2010Conquest Resources ( CQR : TSXV ) mobilizes second drill rig...
12/04/2010Signs letter of agreement with Detour Gold Corp.
15/03/2010Acquires 60% interest in Detour Lake Gold Project
25/02/2010Starts first deep hole at Alexander Property
25/01/2010Conquest Resources ( CQR : TSXV ) plans 8,000 metres of dril...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (XAG.V)
0,025+0.00%
TSX-V
CA$ 0,025
17/03 09:30 -
0%
Cours préc. Ouverture
0,025 0,025
Bas haut
0,025 0,025
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,025 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -11
Produit
Développe
Recherche Copper - Gold - Iron - Lead - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
20230,00%0,030,03
2022-37,50%0,050,02
2021-57,89%0,210,03
2020137,50%0,230,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :