Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Calibre Mining Corp

Publié le 26 juillet 2016

Calibre Mining Drilling Further Expands Gold-Silver Vein Systems at Eastern Borosi Project, Northeast Nicaragua

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Nicaragua |

Calibre Mining Drilling Further Expands Gold-Silver Vein Systems at Eastern Borosi Project, Northeast Nicaragua

Vancouver, British Columbia: Calibre Mining Corp. (TSX-V: CXB) (the 'Company' or 'Calibre') is pleased to announce the second set of results from the 2016 drilling program on the Eastern Borosi Project, Nicaragua which is being funded by Calibre's partner IAMGOLD Corporation ('IAMGOLD').

Highlights

  • Drilling to date in 2016 consists of 23 diamond drill holes for a total of 4,545.9 metres, with results for 11 new holes reported here
  • Diamond drilling of the Blag Gold-Silver Vein System continues to extend the defined mineralization at the Main Blag Structure with intercepts of 5.61 metres grading 11.13 g/t gold and 13.7 g/t silver including 1.03 metres grading 56.9 g/t gold and 61.9 g/t silver
  • A step out hole on the East Dome Structure has intersected 2.78 metres grading 2.69 g/t gold and 431.6 g/t silver including 0.94 metres grading 4.79 g/t gold and 659.0 g/t silver
  • Step out drilling on the Vancouver Vein Structure intersected 15.34 metres grading 1.45 g/t gold and 4.3 g/t silver including 1.50 metres grading 7.2 g/t gold and 19.8 g/t silver
  • The first drilling on the Blag Vein Swarm (BVS) has intersected 3.10 metres grading 1.57 g/t gold and 37.2 g/t silver including 0.77 metres grading 5.6 g/t gold and 56.7 g/t silver

Recent Drill Highlights from Eastern Borosi Gold-Silver Project
Hole ID Target From
m
To
m
Length
(m)
Au
(g/t)
Ag
(g/t)
Pb
ppm)
Zn
ppm)
BL16-038 Main Blag 179.82 185.43 5.61 11.13 13.7 689 962
BL16-038 Main Blag incl 184.40 185.43 1.03 56.96 61.9 1,996 2,056
BL16-038 Main Blag and 172.36 172.72 0.36 32.70 28.7 6,090 5,595
BL16-040 East Dome 162.84 165.62 2.78 2.69 431.6 5,015 2,325
BL16-040 East Dome incl 164.68 165.62 0.94 4.79 659.0 13,800 6,130
GP16-040 Vancouver 175.00 190.34 15.34 1.45 4.3 182 456
GP16-040 Vancouver incl 175.00 176.50 1.50 7.20 19.8 21 75
GP16-039 Guapinol 57.50 60.75 3.25 3.17 5.7 154 312
BL16-039 Main Blag 177.88 180.50 2.62 1.21 152.4 11,640 18,360
BL16-039 Main Blag incl 179.95 180.50 0.55 2.25 493.0 2,856 15,200
BL16-035 BVS 164.90 168.00 3.10 1.57 37.2 673 1,328
BL16-035 BVS incl 165.45 166.22 0.77 5.60 56.7 1,276 1,769

Notes:
- Intervals are core lengths / true width are estimated to be 70-80% of lengths
- Length weighted averages from uncut assays.


IAMGOLD Option -- Eastern Borosi Project
Exploration to date on the Eastern Borosi Project has outlined several tens of kilometres of highly prospective mineralized structures located in an historic gold-silver mining district. Targets have been defined by surface soil and rock sampling, trenching and drilling.

To date in 2016 holes completed include: 23 with 6 at East Dome; 5 testing the Blag Main; 3 Santos Trend; 3 BVS, 4 Vancouver; and 2 California Vein. Total meterage to date: 4,545.86 metres (1,247.27m East Dome; 911.41m Main Blag; 466.64m Santos; 621.26 BVS, 936.34m Vancouver vein; 362.94 California). Results were previously reported for 11 holes (see News Release June 8, 2016). Additional results have been received and are being reported in this news release for the further 11 holes including two holes completed at Main Blag, three holes testing the Guapinol - Vancouver area, three holes testing the Blag Vein Swarm (BVS), one hole on the East Dome, and two holes at the California Vein Structure. An additional drill hole has been completed and on-going drilling continues to test the Guapinol and Vancouver Vein System.

Diamond drilling of the Main Blag Gold-Silver Vein System continues to extend the defined mineralization with intercepts of 5.61 metres grading 11.13 g/t gold and 13.7 g/t silver including 1.03 metres grading 56.9 g/t gold and 61.9 g/t silver in drill hole BL16-038 and 2.62 metres grading 1.21 g/t gold and 152.4 g/t silver in drill hole BL16-039. A separate structure above the Main Blag Vein in hole BL16-039 returned 0.36 metres grading 32.70 g/t gold and 28.7 g/t silver (172.36 to 172.72 metres). Drilling extended the mineralization to depth a further 50 to 75 metres in the northern and southern parts of the drill tested portion. Additional drilling is planned in 2016 following up on the recent positive results at the Main Blag Structure.

A step out hole on the East Dome Structure has intersected 2.78 metres grading 2.69 g/t gold and 431.6 g/t silver including 0.94 metres grading 4.79 g/t gold and 659.0 g/t silver. The hole is the furthest southern step out to have tested the East Dome structure to date and the first to test the mineralization below the East Dome topographic high. The intercept extends the mineralization 50 metres to the south and 100 metres to depth.

Step out drilling on the Vancouver Vein Structure intersected 15.34 metres grading 1.45 g/t gold and 4.3 g/t silver including 1.50 metres grading 7.20 g/t gold and 19.8 g/t silver. The drilling extended the Vancouver Structure 50 metres to the south and 75 metres below the previous intercept. An additional new hole in the Guapinol - Vancouver area, GP16-038, intersected; 1.79 metres grading 1.64 g/t gold and 41.2 g/t silver (82.57 to 84.36 metres -- Guapinol Structure) and 0.98 metres grading 5.15 g/t gold and 2.8 g/t silver (186.77 to 187.75 metres -- Vancouver Structure). Drill hole GP16-039 intersected 3.25 metres grading 3.17 g/t gold and 5.7 g/t silver (57.50 to 60.75 metres -- Guapinol Structure). Additional follow-up drilling is currently being completed on further southern and down dip extensions.

The first drilling on the Blag Vein Swarm (BVS), located one kilometre north of the Main Blag Structure, has intersected 3.10 metres grading 1.57 g/t gold and 37.2 g/t silver including 0.77 metres grading 5.6 g/t gold and 56.7 g/t silver. Two additional holes intersected a series of narrow anomalous structures including BL16-036 with 0.93 metres grading 0.14 g/t gold and 52.6 g/t silver (72.89 to 73.82 metres), 0.87 metres grading 0.30 g/t gold and 89.2 g/t silver (75.69 to 76.56 metres), and 0.50 metres grading 0.96 g/t gold and 59.3 g/t silver (158.5 to 159.0 metres), and BL16-037 with 0.52 metres grading 0.62 g/t gold and 25.5 g/t silver (148.68 to 149.2 metres), and 1.15 metres grading 0.82 g/t gold and 1.3 g/t silver (157.0 to 158.15 metres).

Two drill holes were completed on the California Vein and while both holes intersected quartz breccia mineralization no significant precious metal values were returned in the samples.

Calibre is committed to best practice standards for all exploration, sampling and drilling activities. Drilling was completed by independent firm Kluane Drilling Ltd. Analytical quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the sample strings. Samples are placed in sealed bags and shipped directly to Acme Labs (a Bureau Veritas Group Company) in Managua, Nicaragua for sample preparation and then to Acme Labs in Vancouver, Canada for 50 gram gold fire assay and ICP-MS multi element analyses.

The technical content in this news release was read and approved by Gregory Smith, P.Geo, President and CEO of the Company who is the Qualified Person as defined by NI 43-101.

About Calibre / IAMGOLD Eastern Borosi Project
Calibre and IAMGOLD entered into an option agreement dated May 26, 2014 whereby IAMGOLD can earn a 51% interest in the Project consisting of 176 km2 within the Borosi Concessions, Northeast Nicaragua, by incurring US$5 million in exploration expenditures and making US$450,000 in payments to Calibre by May 26, 2017, the first and second anniversary US $150,000 payments having been made in May 2015 and May 2016 respectively. The total potential investment by IAMGOLD to earn a 70% interest in the Project is US$10.9 million. The Project hosts gold-silver resources in two deposits and a series of well-defined low sulphidation epithermal gold-silver targets.

About Calibre Mining Corp.
Calibre controls a 100% interest in over 340 km2 of mineral concessions in the Mining Triangle of Northeast Nicaragua. Additionally the Company has an option agreement with IAMGOLD covering 176 km2 of concessions, an option agreement with Centerra Gold on 253 km2, joint venture exploration programs underway with B2Gold Corp. on 66.1 km2 of concessions which includes the Primavera gold-copper porphyry discovery and the Monte Carmelo Gold Zone, and a joint venture on the 33.6 km2 Rosita gold-copper-silver project with Rosita Mining Corporation. Major shareholders of Calibre include gold producer B2Gold Corp, Pierre Lassonde and Management.

Calibre Mining Corp.

'Greg Smith'

Greg Smith, P.Geo.
President and CEO

For further information contact:
Ryan King
604 628-1012
www.calibremining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements

This news release contains certain forward-looking statements, Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as 'expects' or does not expect', 'is expected', anticipates' or 'does not anticipate' 'plans', 'estimates' or 'intends' or stating that certain actions, events or results ' may', 'could', 'would', 'might' or 'will' be taken, occur or be achieved) are not statements of historical fact and may be 'forward-looking statements'. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to materially differ from those reflected in the forward-looking statements.

Safe Harbor Statement under the United States Private Securities Litigation Reform Act of 1995: Except for the statements of historical fact contained herein, the information presented constitutes 'forward-looking statements' within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements including but not limited to those with respect to the price of gold, potential mineralization, reserve and resource determination, exploration results, and future plans and objectives of the Company involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of Atlas to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

View News Release in PDF Format:

Lire la suite de l'article sur www.publicnow.com
Données et statistiques pour les pays mentionnés : Nicaragua | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Nicaragua | Tous

Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Calibre Mining est une société d’exploration minière d'or et d'argent basée au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Communiqués de Presse de
26/07/2016Eastern Borosi Drill Results Compilation Map
26/07/2016Calibre Mining Drilling Further Expands Gold-Silver Vein Sys...
22/07/2016Calibre Mining and Centerra Continue to Advance the Siuna Pr...
07/07/2016Calibre Comments on Trading Activity
08/06/2016Eastern Borosi Drilling Results Compilation Map
08/06/2016Calibre Mining Drilling Continues to Expand Gold-Silver Vein...
01/06/2016Calibre Mining and Centerra Expand Project Area to 253 km2 a...
22/04/2016Calibre Closes $3,000,000 Private Placement
11/04/2016Calibre Announces $3,000,000 Private Placement
22/03/2016Calibre Mining/Centerra Gold La Luz Gold Project Compilation...
22/03/2016Calibre and Centerra Gold drill 53.7 Metres Grading 10.47 g/...
25/01/2016Calibre and B2Gold Continue to Advance the Monte Carmelo Gol...
22/10/2015Calibre And Centerra Gold Start 1500 Metre Drilling Program ...
08/10/2015Calibre Mining and B2Gold Continue Exploration on Borosi Joi...
22/09/2015Phase I - Montes De Oro Drill Results 2015 Map
22/09/2015Calibre Mining Announces Further Results from Phase I Diamon...
09/09/2015Calibre Mining Updated Borosi Concessions Project Map
09/09/2015Calibre And Centerra Gold Sign Option Agreement On The La Lu...
24/08/2015Calibre Mining Corp. Announces Results of Annual General Mee...
20/07/2015Map - Calibre Drilling Intersects 19.2 Metres Grading 223.4 ...
20/07/2015Calibre Drilling Intersects 19.2 Metres Grading 223.4 g/t Si...
02/07/2015Montes De Oro July 2015 Phase I Drilling Program Presentatio...
21/04/2015Montes de Oro Compilation
20/04/2015Calibre Mining Announces Start of Diamond Drilling Program o...
01/04/2015Calibre Drilling Discovers New High Grade Gold Veins in the ...
01/04/2015La Sorpresa Gold Zone Drilling Details
18/03/2015Calibre Mining Advances Gold Targets on 100% Owned Siuna Dis...
13/02/2015Calibre Mining and B2Gold Complete Reconnaissance Diamond Dr...
11/02/2015Calibre Mining Montes De Oro Plan Maps
04/02/2015Calibre Mining Starts 2015 Drilling Program at the Eastern B...
21/01/2015Calibre Mining Announces Additional Drilling Results from th...
14/01/2015Calibre Mining Announces Additional Trenching Results Includ...
01/12/2014Calibre Appoints Julie Lassonde to Board of Directors
04/11/2014Calibre Mining Drilling Results Plan Map
04/11/2014Calibre Mining Announces Additional Drilling Results from th...
28/10/2014Calibre Mining and B2Gold Begin Diamond Drilling Program at ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CXB.TO)
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
1,94 -  2,29 -100,00%
52 sem. b/h var. 52 sem.
1,94 -  2,29 -100,00%
Volume var. 1 mois
-100,00%
Produit
Développe
Recherche
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,65%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,13 US$+6,87%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,64 GBX-2,44%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$+0,82%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,97 CA$+1,86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,61 CA$+6,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
48,91 US$+1,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :