ORE RESERVE AND MINERAL RESOURCE STATEMENT AS AT 30 JUNE 2015
RESOLUTE CONFIRMS 5.3 MOZ IN ORE RESERVES AND 9.0 MOZ IN MINERAL RESOURCES
HIGHLIGHTS
5.3 million ounces ("Moz") of gold in JORC Compliant Ore Reserves
9.0 Moz of gold in Total Mineral Resources (exclusive of Ore Reserves)
Ore reserves increased by 200,000 ounces after mining depletion relating to
FY2015 production of 328,684oz
New Probable Ore Reserve of 2.3Moz @ 2.8g/t Au for the Syama Underground provides mine life for the sulphide operation to at least 2028
The combination of available Ore Reserves and Mineral Resources outlined in development projects at Bibiani in Ghana and at Ravenswood in Queensland provide strong future growth opportunities for the Company
Resolute Mining Limited (ASX: RSG, "Resolute" or the "Company") is pleased to announce the updated Group Ore Reserve and Mineral Resource Statement for the year ended 30 June 2015. Group Ore Reserves have increased to 5.3Moz of gold and Group Mineral Resources (Measured, Indicated, and Inferred) stand at 9.0Moz of gold. The Company's Combined Reserve and Resource inventory as at 30 June 2015 totalled
14.3Moz of gold. The appended 2015 Reserves and Resources Statement provides a detailed breakdown of Resolute's substantial gold inventory.
Resolute Managing Director and Chief Executive Officer, Mr John Welborn, commented "Resolute has a large and robust resource and reserve base which provides the opportunity to grow our business and continue the Company's strong record of continuous gold production since 1988. It is particularly pleasing to see the upgrade of the Syama Underground Reserve to 2.3Moz @ 2.8g/t gold and increase in resources at Bibiani to 1.9Moz @ 3.7g/t gold. These new reserves and resources have been added
ASX Announcement
following highly successful and efficient drilling campaigns conducted during the 02
financial year."
"The Company's Total Reserves of 5.3Moz of gold includes approximately 400,000 ounces of gold contained in ore currently stockpiled and awaiting processing. The stockpiles are the result of highly efficient mining activity during 2014 and 2015. Processing of the stockpiles, in addition to open pit mining of the satellite oxide ore reserves, will allow for continuous gold production from Syama while a new world class
underground mining operation is developed."
Peer Re s o u rc e Inve ntory Comparison (Moz )
Reserves "Moz" Resource "Moz"
14.00
12.00
10.00
8.00
6.00
4.00
8.97
5.27
8.90 6.57 5.85
6.80 5.22
7.40
5.02 5.57
5.48
5.23
4.06
2.00
3.02 4.42 4.51 2.62 4.00
3.83 2.78 2.53
2.28 2.04
1.02
1.50
‐
1.65 1.31 0.45 0.48 0.51
Source: Company research, reports and equity market releases and disclosures
Proved and Probable Reserves
Total Proved and Probable Reserves increased by 12% to 5.3Moz of gold, after allowing for depletion relating to FY2015 production of 328,684oz.
The reserve increase is largely attributed to additional gold inventory added as a result of the independent Underground Pre‐Feasibility Study ("PFS") at Syama, announced on
8 June 2015. The PFS delivered a 2.3Moz underground reserve @ 2.8g/t gold that incorporated recent high grade results from diamond drilling and mineralisation previously incorporated in Syama Stage 2 open pit reserves.
ASX Announcement
03
Ore Re s e r ve s 30 June 2015
Koz
Measured, Indicated and Inferred Resources
Total Mineral Resources (exclusive of Ore Reserves) of 9.0Moz of gold. The major changes in the Group Resources relate to:
A 60% increase in Indicated Resource ounces and a 12% increase in overall ounces at Bibiani as announced 30 June 2015; and
The removal of 1.36Moz of gold from the Group Resources relating to the Golden Pride Mine in Tanzania following the formal handover of the site to the Government of Tanzania on 12 December 2014 after 15 years of operation and production of over 2.2Moz of gold.
ASX Announcement
04
Minera l Re s o u rc e s 30 June 2015
Koz
FY2016 Production and Cost Guidance
Resolute expects to produce 315,000 ounces of gold during the current financial year at a cash cost of A$990/oz. All‐In‐Sustaining costs are forecast to be A$1,280/oz.
There remains potential for additional gold sales and cash boost through reduction of gold in circuit and the processing of available ore stockpiles.
JOHN WELBORN
Managing Director & CEO
About Resolute:
Resolute is a successful gold miner with more than 25 years of continuous production. The Company is an experienced explorer, developer, and operator having operated nine gold mines across Australia and Africa which have produced in excess of 7 million ounces of gold. The Company currently operates two mines, the Syama gold mine in Africa and the Ravenswood gold mine in Australia, and is one of the largest gold producers listed on the Australian Securities Exchange with FY16 guidance of 315,000 ounces of gold production at a cash cost of A$990/oz.
Resolute's flagship Syama gold mine in Mali is a robust long life asset benefitting from fully operational parallel sulphide and oxide processing plants. The move to underground mining will continue the asset's history of strong cash generation and extend the mine life to out beyond 2028. The Ravenswood gold mine in Queensland demonstrates Resolute's significant underground expertise in the ongoing success
ASX Announcement
in mining the Mt Wright ore body. In Ghana, the Company is completing a feasibility study on the Bibiani 05
gold project focused on the development of an underground operation requiring very low capital and using existing plant infrastructure. Resolute also controls an extensive exploration footprint along the highly prospective Syama Shear and greenstone belts in Mali and Cote d'Ivoire and is active in reviewing new opportunities to build shareholder value.
Competent Persons Statement
The information in this report that relates to the Exploration Results, Mineral Resources and Ore Reserves is based on information compiled by Mr Richard Bray who is a Registered Professional Geologist with the Australian Institute of Geoscientists and Mr Andrew Goode, a member of The Australasian Institute of Mining and Metallurgy. Mr Richard Bray and Mr Andrew Goode both have more than 5 years' experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person, as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Richard Bray and Mr Andrew Goode are full time employees of Resolute Mining Limited Group and each hold equity securities in the Company. They have consented to the inclusion of the matters in this report based on their information in the form and context in which it appears. This information was prepared and disclosed under the JORC code 2012 except where otherwise noted. Particular Reserves and Resources remain 2004 JORC compliant and not updated to JORC code 2012 on the basis that information has not materially changed since it was last reported.
RESOLUTE GROUP RESERVES and RESOURCES
Reserves and Resources comply with the Australian code for reporting of Mineral Resources and Reserves (The JORC Code 2004 and JORC Code 2012)
Reserves and Resources Statement as at end of June 2015 30/06/2014
Gold Reserves Project Gold grade
Project
Contained
Group
Share
Group
Share Project
Gold grade
Project
Contained
Group
Share
Group
Share
(includes stockpiles) Tonnes (g/t) Ounces % Ounces Tonnes (g/t) Ounces % Ounces
RESERVES RESERVES
Comments on Differences
Reserves ( Proved)
Australia
Reserves ( Proved)
Mt Wright (insitu)3 1,644,000 2.7 144,000 100% 144,000 2,655,000 2.7 226,000 100% 226,000 Depletion due to production offset by mine extension
Sarsfield (insitu)2 28,450,000 0.8 747,000 100% 747,000 28,450,000 0.8 747,000 100% 747,000 No change - JORC code 2004
Mali
Syama Pit (insitu) 0 0.0 0 80% 0 9,026,000 2.9 856,000 80% 685,000 Depletion due to annual production and transition to Underground
Stockpiles (Sulphide) 897,000 4.4 126,000 80% 101,000 196,000 3.2 20,000 80% 16,000 Movement in operating stockpiles Syama Oxide Satellites (insitu) 3,084,000 2.2 221,000 80% 177,000 3,122,000 2.2 224,000 80% 179,000 Depletion due to annual production Syama Oxide Satellites Stockpiles 179,000 2.6 15,000 80% 12,000 0 0.0 0 80% 0 Movement in operating stockpiles Tabakoroni (insitu) 1,335,000 3.1 133,000 85% 113,000 1,335,000 3.1 133,000 85% 113,000 No change - JORC code 2004
Total (Proved) 35,589,000 1.2 1,386,000 1,294,000 44,784,000 1.5 2,206,000 1,966,000 Decrease in Proven Reserves mainly due to MTW & Syama annual production and transition to Underground
Reserves ( Probable) Reserves ( Probable)
Australia
Mt Wright (insitu)3 411,000 1.8 23,000 100% 23,000 626,000 1.8 37,000 100% 37,000 Depletion due to production offset by mine extension
Mt Wright Stockpiles3 91,000 2.4 7,000 100% 7,000 9,000 2.5 1,000 100% 1,000 Movement in operating stockpiles
Sarsfield (insitu)2 18,640,000 0.7 423,000 100% 423,000 18,640,000 0.7 423,000 100% 423,000 No change - JORC code 2004
Mali
Syama Pit (insitu) 0 0.0 0 80% 0 2,955,000 2.6 243,000 80% 194,000 Depletion due to annual production and transition to Undergroun Syama UG (insitu)5 25,500,000 2.8 2,291,000 80% 1,833,000 14,296,000 2.4 1,103,000 80% 882,000 Additional reserves from Updated Underground Pre-Feasibility Stockpiles (Sulphide) 5,313,000 1.6 265,000 80% 212,000 2,627,000 1.9 157,000 80% 126,000 Movement in operating stockpiles
Syama Oxide Satellites (insitu) 4,432,000 2.1 303,000 80% 242,000 4,986,000 2.1 337,000 80% 270,000 Depletion due to annual production Syama Oxide Satellites Stockpiles 412,000 1.2 16,000 80% 13,000 0 0.0 0 80% 0 Movement in operating stockpiles Tabakoroni (insitu) 1,821,000 2.8 163,000 85% 139,000 1,821,000 2.8 163,000 85% 139,000 No change - JORC code 2004
Tanzania
Nyakafuru JV (insitu)2 7,360,000 1.6 388,000 98% 380,000 7,360,000 1.6 388,000 98% 380,000 No change
Total (Probable) 63,980,000 1.9 3,879,000 3,272,000 53,320,000 1.7 2,852,000 2,452,000 Increase in Probable Reserves mainly from Syama Underground and
MTW
Proved and Probable 99,569,000 1.6 5,265,000 4,566,000 98,104,000 1.6 5,058,000 4,418,000 Increase in Reserves exceeds the 390 koz. 2014/15 production depletion
Mali
Tanzania
Gold Resources 1 Project Gold grade
Project
Contained
Group
Share
Group
Share Project
Gold grade
Project
Contained
Group
Share
Group
Share
Tonnes (g/t) Ounces % Ounces Tonnes (g/t) Ounces % Ounces Comments on Differences
Resources (Inferred) Resources (Inferred)
Australia
Mt Wright (insitu)3
|
1,079,000
|
3.1
|
107,000
|
100%
|
107,000
|
967,000
|
3.1
|
95,000
|
100%
|
95,000
|
Resources adjusted by mine extension
|
Sarsfield (insitu) 2
|
22,192,000
|
0.7
|
521,000
|
100%
|
521,000
|
22,192,000
|
0.7
|
521,000
|
100%
|
521,000
|
No change - JORC code 2004
|
Buck Reef West (insitu) 2
|
12,360,000
|
0.9
|
356,000
|
100%
|
356,000
|
12,360,000
|
0.9
|
356,000
|
100%
|
356,000
|
No change
|
Welcome Breccia (insitu)
|
2,036,000
|
3.2
|
208,000
|
100%
|
208,000
|
2,036,000
|
3.2
|
208,000
|
100%
|
208,000
|
No change
|
Mali
Ghana
mode elinquishment of
ment of Golden
Note :
1) Mineral resources are exclusive of the Reserves ‐ differences may occur due to rounding.
2) All Resources and Reserves are reported above 1.0 g/t cut‐off except Nyakafuru and Buck Reef West above 0.5 g/t cut off and Sarsfield above 0.4 g/t cut off.
3) Mt Wright Reserves are reported above 2.3 g/t cut off and Resources above 1.8 g/t cut off.
4) Bibiani Resources quoted above a 2.0 g/t cut off.
5) Syama Underground Reserves quoted above a 1.8 g/t cut off.