Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

SilverCrest Mines

Publié le 13 avril 2015

Announces Record Production in Q1, 2015 465,391 Ounces Silver and 13,255 Ounces Gold

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar | G Mexico | K Street | Precious Metals |

SilverCrest Announces Record Production in Q1, 2015
465,391 Ounces Silver and 13,255 Ounces Gold

Dear Eric LEMAIRE <.COM>,

VANCOUVER, BC - April 13, 2015 � SilverCrest Mines Inc. (�SilverCrest� or the �Company�) is pleased to announce record silver and gold production results for the first quarter (�Q1�) of 2015 from its 100% owned Santa Elena Mine located in Sonora, Mexico. Record production of 1,349,527 ounces silver equivalent (�AgEq�) for Q1 2015 is in line with 2015 corporate budget forecasts and the production guidance announced on January 15, 2015. For additional information and to view photos and videos of the Company�s Santa Elena Mine, please visit the Company�s website at www.silvercrestmines.com.

Production Highlights of Q1, 2015, vs. Q1, 2014;

  • Silver production record of 465,391 ounces; a 131% increase.
  • Gold production record of 13,255 ounces; a 76% increase.
  • AgEq(3) production record of 1,349,527 ounces; a 92% increase. (1,196,842 ounces AgEq(3) sold).
  • Average mill throughput of 3,015 tonnes per day (�tpd�); in line with nominal capacity of 3,000 tpd.
  • Average silver and gold recovery rates(2) of 60% and 91%, respectively.
  • Bullion inventory at the end of Q1 2015 included 82,445 ounces of silver and 2,524 ounces of gold.

N. Eric Fier, Chief Operating Officer, stated; �We are very pleased that Santa Elena has started 2015 strongly with record production of 1,349,527 AgEq(3) ounces, representing an increase of 92% over Q1, 2014, and 35% over Q4, 2014. Since the beginning of 2015, we have seen a dramatic improvement with mining of underground stopes, and consider the underground operations to have been substantially de-risked. During Q1, 2015, recovery rates for silver in the mill were lower than anticipated, but several improvements being implemented are expected to enable us to achieve our 2015 target recovery rate of 70%. We are continuing our optimization of the processes to improve efficiencies throughout every facet of the operation. Today�s announcement marks the first step of reaching our target of 4.0 � 4.4 million AgEq(3) ounces for 2015. SilverCrest remains attentive to strict cost controls to maintain positive cash flows at current metal prices.�


(1) Silver and gold ounces produced for Q1 2014 consist of ounces recovered from the leach pad which commenced decommissioning during Q2 2014.
(2) Estimated recoveries for Q1, 2015 and Q4, 2014 are as reported, based on calculated grade. 
(3) Silver equivalent (�AgEq�) ratio for Q1, 2015 of 66.7 was calculated using metal prices of $1,200/oz for gold and $18/oz for silver. For consistency with, comparative periods, the AgEq ratio reported during 2014 was changed from 60:1 to 66.7:1.

During Q1, 2015, the mill processed a quarterly record of 271,392 tonnes, with a daily average of 3,015 tpd. The plant processed 48% higher grade fresh ore (blended mix of open pit and underground ore) and 52% leach pad ore (�pad ore�). The average blended grades processed during Q1, 2015 for fresh ore were 124.78 grams per tonne (�gpt�) silver and 2.55 gpt gold, and for pad ore grades were 54.80 gpt silver and 0.85 gpt gold.  

Final shutdown of the Santa Elena open pit operations due to exhausted pit reserves is planned for Q2, 2015. After shutdown of the open pit, a mill feed blend of 50% underground ore and 50% pad ore is anticipated.

Mill recovery rates for Q1, 2015 averaged 91% (target � 92%) for gold and 60% (target � 70%) for silver. The current operational focus continues to be improving silver recoveries and underground stope production. During Q1, 2015, a daily average of 1,080 tpd was mined underground. Current development and stope production for April is approximately 1,400 tpd from multiple stopes.

Release of First Quarter, 2015 Financial Results and Conference Call
SilverCrest plans to release its unaudited first quarter financial statements and MD&A after market close on Wednesday May 13, 2015. A telephone conference call to discuss these results will be held at 10am PDT (1pm EDT) on Thursday, May 14, 2015.

The Qualified Person under National Instrument 43-101 � Standards of Disclosure for Mineral Projects for this news release is N. Eric Fier, CPG, P.Eng, Chief Operating Officer for SilverCrest Mines Inc., who has reviewed and approved its contents.

SilverCrest Mines Inc. (NYSE MKT: SVLC; TSX: SVL) is a Canadian precious metals producer headquartered in Vancouver, BC. SilverCrest�s flagship property is the 100%-owned Santa Elena Mine, located 150 kilometres northeast of Hermosillo, near Banamichi in the State of Sonora, Mexico. The mine is a high-grade, epithermal silver and gold producer, with a current reserve estimated life of mine of 8 years and average operating cash costs of $12 per ounce of silver equivalent (64.5:1 Ag:Au based on ounces sold). SilverCrest anticipates the 3,000 tonnes per day conventional mill facility at the Santa Elena Mine should recover an average of 1.6 million ounces of silver and 33,800 ounces of gold per annum over the current reserve life. Exploration programs continue to result in discoveries at Santa Elena and have advanced the definition of a large polymetallic deposit at the La Joya property in Durango State, Mexico.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains �forward-looking statements� within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. These include, without limitation, statements with respect to: the economic viability of a project; strategic plans and expectations for the development of the Company�s operations and properties; estimates of mineral reserves and mineral resources; the amount of future production of gold and silver over any period; the amount of expected grades and ounces of metals and minerals; expected processing recoveries; expected cash operating costs and outflows; life of mine; and prices of metals and minerals.

These forward-looking statements relate to analyses and other information that are based on, without limitation, the following estimates and assumptions: presence of and continuity of metals at the Company�s projects; cost of production and productivity levels at the Santa Elena Mine; availability and costs of mining equipment and skilled labour; accuracy of the interpretations and assumptions used in calculating reserve and resource estimates; operations not being disrupted or delayed by unusual geological or technical problems; and ability to develop and finance projects.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to the fluctuations in the price of consumed commodities; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company�s ability fund the exploration and development of its mineral properties; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in profitable mining operations; risks related to reserves and mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral reserves as properties are mined; and risks related to governmental regulations and obtaining necessary licenses and permits.

Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements. The Company�s forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update or revise any forward-looking statements, except as otherwise required by applicable law..

Contact: Fred Cooper
Telephone: (604) 694-1730 ext. 108
Fax: (604) 694-1761
Toll Free: 1-866-691-1730
Email: info@silvercrestmines.com
Website: www.silvercrestmines.com
Suite 501 - 570 Granville Street, Vancouver, BC Canada V6C 3P1

 


Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

SilverCrest Mines

PRODUCTEUR
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

SilverCrest Mines est une société de production minière d'argent et d'or basée au Canada.

SilverCrest Mines est en développement de projets d'argent, d'or et de zinc au Salvador, et détient divers projets d'exploration au Mexique.

Son principal projet en production est SANTA ELENA au Mexique, son principal projet en développement est EL ZAPOTE au Salvador et ses principaux projets en exploration sont SILVER ANGEL, CRUZ DE MAYO et LA JOYA DURANGO au Mexique.

SilverCrest Mines est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 287,2 millions CA$ (259,0 millions US$, 188,5 millions €).

La valeur de son action a atteint son plus bas niveau récent le 17 décembre 2002 à 0,08 CA$, et son plus haut niveau récent le 02 mars 2012 à 3,17 CA$.

SilverCrest Mines possède 107 952 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de SilverCrest Mines
01/06/2010Greg McCoach - Mining Speculator June 2010
01/06/2010Corporate Presentation - June 2010
31/03/2010 Funding In Place, Construction on Schedule for 2010 Product...
01/01/2010Why invest in SilverCrest Mines?
10/06/2009Corporate report June 2009
31/03/2008New Recommendation
22/11/2006Corporate Presentation
Dans les médias de SilverCrest Mines
14/03/2012Scott Drever=2C President of SilverCrest Interview on BNN
22/09/2008Objective Capital research
25/10/2007Analysis by David and Eric Coffin
17/11/2006Follow up N° 4
Rapports annuels de SilverCrest Mines
2009 Annual Report
2008 annual report
Annual Report 2006
Financements de SilverCrest Mines
20/05/2011Closes $30 Million Bought Deal Financing
28/04/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
20/03/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
13/03/2008Announces First Closing Of Private Placement
Attributions d'options de SilverCrest Mines
29/03/2008 Engages Marketing Consultant and Grants Stock Options
Nominations de SilverCrest Mines
13/06/2013Reports Results of AGM Announces Officer and Director Appoin...
31/01/2013Appoints Vice President, Corporate Development
15/02/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Rapports Financiers de SilverCrest Mines
13/08/2015Announces Q2, 2015 Financial Results; Operating Cash Flow of...
14/11/2013Reports Q3, 2013 Financial Results Cash Flow from Operations...
15/08/2013Reports Q2, 2013 Financial Results Cash Flow from Operations...
15/08/2013Reports Q2, 2013 Financial Results
15/05/2013Reports Q1, 2013 Financial Results Cash Flow from Operations...
14/03/2013Announces 2012 Financial Results Cash Flow from Operations o...
14/11/2012Reports Q3, 2012 Financial Results Cash Flow From Operations...
15/08/2012Reports Q2=2C 2012 Financial Results
15/05/2012Reports Q1 2012 Financial Results Cash Flow from Operations ...
10/04/2012Announces 2011 Financial Results Cash Flow from Operations o...
29/11/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
30/08/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
02/08/2011Form 40-F Registration Statement Effective
Projets de SilverCrest Mines
25/02/2014(Santa Elena)Receives US$10 Million Commitment from Sandstorm Gold for Un...
14/01/2014Evrim Options Ermita=F1o Property to SilverCrest Mines
24/12/2013Files La Joya Preliminary Economic Assessment Report
21/10/2013Announces Positive La Joya Preliminary Economic Assessment ...
15/10/2013Announces Q3 Record Silver Production 202,736 Ounces Silver-...
05/09/2013(Santa Elena)Reports Additional Drill Results at Santa Elena Mine; Anothe...
25/07/2013(Santa Elena)Announces Santa Elena Expansion Pre-Feasibility Study; Base...
17/07/2013Announces Q2 Record Silver Production 194,022 Ounces Silver ...
29/05/2013(Santa Elena)Announces Updated Santa Elena Reserves and Resources; Silver...
24/04/2013Announces Q1 Production 153,481 Ounces Silver & 7,225 Ounces...
28/03/2013Files La Joya Technical Report Updated Resources & Positive ...
29/01/2013Announces Updated La Joya Resources
16/01/2013Exceeds 2012 Production Market Guidance Announces Q4 Results...
14/01/2013(Santa Elena)Expands Santa Elena Deposit; More High Grade Intercepts 13m ...
07/01/2013(Santa Elena)Discovers Bonanza Grades and New Zone at Santa Elena 15.6m ...
13/11/2012(Santa Elena)Drilling Update for Santa Elena Mine
07/11/2012Pays Out Gold Hedge Facility Gold and Silver Production Now ...
16/10/2012Announces Q3 Production 151,368 Ounces Silver & 7,184 Ounces...
23/07/2012Announces Q2 Production 139=2C850 Ounces Silver & 8=2C584 Ou...
06/07/2012(Santa Elena)=E2??s Santa Elena Mine Expansion Continues on Schedule
19/04/2012Announces Q1 Silver and Gold Production 134=2C528 Silver Ou...
20/03/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
16/02/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
23/01/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
12/01/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
05/01/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
30/11/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
14/10/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
22/09/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
22/09/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
10/08/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
13/07/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
07/06/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
26/04/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
13/04/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
12/04/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
13/03/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
06/01/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
01/12/2010(La Joya Durango)Acquires New Major Mexico Property
14/08/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
09/06/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
15/08/2008Receives Environmental Impact Assessment Approval; NI43-10...
30/06/2008(Santa Elena)Santa Elena prefeasibility study completed
26/06/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
05/06/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
21/05/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
08/04/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
21/02/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
09/01/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
04/01/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
20/12/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
29/11/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
15/11/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
18/10/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
26/09/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
11/09/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
06/09/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
26/07/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
05/07/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
24/05/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
10/05/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Communiqués de Presse de SilverCrest Mines
24/02/2014Graduates to Toronto Stock Exchange Trading Commences Februa...
20/02/2014Announces $20 Million Bought Deal
17/02/2014(Santa Elena)Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au ...
14/12/2013Announces Grant of Stock Options
19/11/2013SilverSeek LIVE! Wed. Nov, 20th @ 2PM EST -- David Morgan (S...
21/10/2013Announces Positive La Joya Preliminary Economic Assessment B...
12/07/2013Arranges $40 Million Credit Facility with Scotiabank
27/05/2013Completes Exercise of La Joya West Option
27/05/2013Completes Exercise of La Joya West Option
25/04/2013Announces 2013 Annual Meeting and Adoption of Corporate Gove...
08/04/2013(Santa Elena)Continues to Expand Santa Elena Deposit More High Grade Inte...
30/10/2012Closes $34.5 Million Prospectus Offering, Over-Allotment Opt...
05/10/2012Announces Increase in Bought Deal to $30 Million
05/10/2012Announces $26.1 Million Bought Deal
27/09/2012Reports High Grade Surface Sampling and Additional Drill Res...
22/08/2012ANNOUNCES TRADING ON NYSE MKT TO COMMENCE AUGUST 27=2C 2012
17/07/2012Reports 50m @ 151.8 gpt Ag Eq* at La Joya Main Mineralized...
29/06/2012Reports Annual General Meeting Results
07/05/2012Reports 127.4m @ 65.6 gpt Ag Eq* at La Joya Expands Main M...
21/02/2012Files NI43=2D101 Resource Report for La Joya Property
30/01/2012Presenting At the Silverseek Online Forum
09/01/2012Retires Bank Debt Ahead of Schedule
07/10/2011Commences Trading on OTCQX
17/06/2011Announces Appointment of New Director, Reconfirmation of Sha...
31/05/2011Files Form 40-F Registration Statement with SEC
29/07/2010Initial Gold & Silver Production Imminent
06/05/2010& Goldsource Appoint Director of Communications
22/09/2009Analyst Coverage by Jennings Capital
13/07/2009New office
24/06/2009Eric Fier on Newsmakers
17/11/2008At Hard Assets Conference, San Francisco
24/09/2008New Video Tour: Underground Silver Deposits at Santa Elena
13/07/2008Report
10/07/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
21/04/2008Initiation Report
01/03/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
19/09/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
08/03/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SVL.V)Other OTC (STVZF)
2,66-0.37%1,89-4.55%
TSX-V
CA$ 2,66
21/02 17:00 -0,010
-0,37%
Cours préc. Ouverture
2,67 2,69
Bas haut
2,63 2,71
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,66 -%
Volume var. 1 mois
493 509 -%
24hGold TrendPower© : 27
Produit Gold - Silver
Développe Gold - Silver - Zinc
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :