Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Troy Resources NL: Initial Resource Estimate Kamila Southeast Discovery at Casposo Project, San Juan Province, Argentina
Published : August 29, 2011
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

PERTH, WESTERN AUSTRALIA--(Marketwire - Aug. 28, 2011) - Troy Resources NL (News - Market indicators)(ASX:TRY) -

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

HIGHLIGHTS

  • Troy has completed an initial Mineral Resource Estimate incorporating 44 recently completed holes (25,681m) from the Kamila Southeast Discovery.
  • The initial Kamila Southeast Resource Estimate of 119,900oz Au_eq (Measured and Indicated – using 2.0g/t Au_eq cut-off) and 51,000oz Au_eq of Inferred Resource includes a "high grade" Measured and Indicated core zone (5g/t Au_eq cut-off) grading 6.6g/t gold, 796g/t silver or 18g/t Au_eq for 113,00oz Au_eq.
  • This represents a 19% increase in the Casposo Measured and Indicated Resource Inventory and more than doubles the contained gold equivalent ounces in the Underground Measured and Indicated Resource Inventory.

Troy Resources NL ("Troy") is pleased to announce an initial Resource Estimate of 119,900oz Au_eq of Measured and Indicated Resources and 51,000oz Au_eq of Inferred Resource (see Table 1a and Table 1b below) for the new Kamila Southeast Zone at the Casposo Project in San Juan Province in Argentina (To see Figure 1, Figure 2 and Figure 3 please visit the following link: http://media3.marketwire.com/docs/TRY828i.pdf).

Table 1a: Kamila Southeast Resource Estimate
(Using 2g/t Au_eq Cut-off)
 
Resource Classification Tonnes Gold (g/t Au ) Silver (g/t Ag ) Gold Equivalent
Au_eq (g/t
) Contained Metal
(Au_eq oz
)
Measured 96,000 6.68   770   17.68   54,600  
Indicated 161,000 4.43   572   12.61   65,300  
Total Measured & Indicated 257,000 5.27   646   14.50   119,900  
Inferred 226,000 3.00   281   7.01   51,000  
   
Note: Discrepancies may occur due to rounding  
   
Table 1b: Kamila Southeast Resource Estimate – High Grade Zone
(Above 5g/t Au_eq Cut-off)
 
Resource Classification Tonnes Gold (g/t Au ) Silver (g/t Ag ) Au_eq (ppm ) Contained
Metal
(Au_eq oz
)
Measured 87,500 7.24   832   19.13   53,500  
Indicated 109,000 6.05   767   17.00   59,600  
Total Measured & Indicated 196,000 6.58   796   17.95   113,100  
Inferred 108,000 4.72   417   10.68   37,100  
 
Note: Discrepancies may occur due to rounding

Commenting on the results Troy's CEO, Paul Benson, said: "This is a very exciting announcement. The new Measured and Indicated Resource at 257,000t and a grade of 14.50g/t Au_eq for a contained inventory of 119,900oz Au_eq represents a 19% increase in the sites M+I Resources and a near doubling of the underground inventory. Within this Resource there is a high grade zone above a 5g/t Au_eq cut-off of 196,000t at 17.95g/t Au_eq containing 113,100oz Au_eq in the Measured and Indicated categories.

"This is strategically extremely important for the Casposo operation as it should allow us to start the underground mine earlier than currently planned to access the high grade underground ore. This would allow us to avoid the drop in production in the current schedule in years 3 and 4 and maintain production above the 100,000oz Au_eq for longer and extend the mine life.

"It is worth noting that the gold equivalent estimates use the 70:1 ratio to convert silver to gold equivalent as used in our most recent NI43-101 report. If you use a ratio of 50:1, which is a closer estimate using today's metal prices, the total high grade Resource (M+I) above 5g/t cut-off would be 196,000t grading 22.49g/t Au_eq which represents an increase of about 25.3% in gold-equivalent ounces compared to the calculation at a 70:1 conversation factor.

"It is also important to remember that this Resource is just from testing the first 500m southeast along the Kamila structural corridor. We firmly believe there is good potential for additional ounces along the remaining kilometre of structure to the southeast that is untested and in the 4km gap between the Mercado and Julieta Resources to the northwest which also has not been drilled.

"We will keep the current two high productivity drill rigs in this area for the next 6 to 8 weeks to complete infill drilling. This will allow detailed mine planning to be completed and should enable us to convert some of the Resources that are currently in the Inferred category to Measured or Indicated. At this stage we expect to be able to produce a Mining Reserve for this block by early 2012. At that time we expect to update the entire Reserve and Resource and will take into account updated assumptions including the silver to gold conversion ratio. Once the infill drilling is complete we would look to use the rigs to recommence step out drilling to test the remainder of the southeast structure."

In January 2011 Diamond Core drilling commenced adjacent to the existing Kamila Resource and Reserve and in March the discovery Hole CA-11-295 was drilled and it yielded 14.70m at 7.79g/t gold and 1,292g/t silver or 26.24g/t Au_eq from 342.50m downhole.

The drilling was designed to test several of the known veins (Inca Vein and Southeast Extension Vein – "B" Vein) at depth and along strike through a series of infill and step-out extensional drill holes within the structurally complex northwest - southeast trending corridor that hosts the Kamila and Mercado Deposits.

Drilling comprised a series of southwest to northeast oriented holes planned to test B Vein/Southeast Extension Vein at shallow depths (+/- 100m) and the Inca Vein deeper in each hole (about 250m – 400m). A total of 25,681m have been drilled in 44 holes.

Drilling to date has tested only about 500m of the 1.5km long target southeast of the post mineral dyke.

The mineralisation encountered is the same style of low sulphidation epithermal vein hosted high grade gold and silver associated with the Inca Vein within the existing underground Kamila Mining Reserve. The veins are hosted within andesite and can occur as massive, banded or brecciated quartz veins with classic ginguro textures and fine grained black sulphides as well as minor amounts of pyrite-chalcopyrite, and native silver. Local minor quartz vein stockworks are common.

The Kamila Southeast Resource model was constrained by a detailed wireframe of the Low Sulphidation epithermal vein hosted mineralisation with intervals within the wireframe composited to 1m. Blocks in the model were interpolated by using an inverse distance cubed algorithm with the orientation of the search ellipsoid being adjusted to reflect the local orientation of the wireframe. The resource estimate was completed for Troy by Perth based Auralia Mining Consulting Group.

In terms of the Casposo Underground Measured and Indicated Resource Inventory, this new zone represents a 132% increase in the contained gold equivalent ounces as well as a 169% increase in terms of Underground Inferred Resources gold equivalent ounces (at 2g/t Au_eq cut-off).

On a total Casposo Project Resources basis the new discovery represents a 19% increase in Measured and Indicated Resource gold equivalent ounces.

A NI-43 101 Technical report is being compiled detailing the new Resource Estimate and will be posted on SEDAR and on the Troy Website.

Table 2: Kamila Southeast Resource Estimate Detailed Summary
(Using a Range of Au_eq Cut-offs)
Cut-Off
Ranges
Resource
Classification
Volume Tonnes Gold
 (g/t Au)
Silver
(g/t Ag)
Gold Equivalent
(g/t Au_Eq)*
Contained Metal
(oz Au_eq)
10.00 Measured 25,000 69,000 8.45 960 22.16 49,200
5.00   32,000 87,000 7.24 832 19.13 53,500
2.50 35,000 95,000 6.77 781 17.92 54,700
2.00 36,000 96,000 6.68 770 17.68 54,600
1.25 39,000 104,000 6.22 720 16.50 55,200
0.70 40,000 107,000 6.05 701 16.06 55,200
0.50 40,000 108,000 5.97 693 15.88 55,100
0.00 43,000 115,000 5.63 653 14.96 55,300
10.00 Indicated 27,000 72,000 7.70 989 21.83 50,500
5.00   40,000 109,000 6.05 767 17.00 59,600
2.50 55,000 148,000 4.75 613 13.50 64,200
2.00 60,000 161,000 4.43 572 12.61 65,300
1.25 70,000 189,000 3.85 498 10.97 66,700
0.70 79,000 212,000 3.46 449 9.87 67,300
0.50 84,000 227,000 3.25 421 9.26 67,600
0.00 98,000 264,000 2.81 364 8.00 67,900
10.00 Inferred 16,000 44,000 7.22 637 16.33 23,100
5.00   40,000 108,000 4.72 417 10.68 37,100
2.50 79,000 213,000 3.12 294 7.31 50,100
2.00 84,000 226,000 3.00 281 7.01 50,900
1.25 94,000 255,000 2.73 258 6.41 52,600
0.70 98,000 264,000 2.65 250 6.21 52,700
0.50 100,000 270,000 2.59 245 6.09 52,900
0.00 128,000 346,000 2.03 193 4.78 53,200
* Au_eq grade calculated using gold to silver ratio of 1:70, as per May 2010 Current Casposo NI-43101 Technical Report. The gold equivalent cut-off was determined according to the parameters below:
  • Au Price US$933.33/oz
  • Ag Price US$15.50/oz
  • Au processing recovery 93.7%
  • Ag processing recovery 80.6%
  Gold equivalency is determined by metal price and recovery factors.
  Metal prices are the average prices assumed in the Casposo life of mine plan.
  Processing recoveries were determined by metallurgical testwork carried out by independent consultants on diamond drill core from Casposo.
  The equivalency is calculated by the formula:
  Gold: Silver ratio = (gold price ÷ silver price) x (gold recovery ÷ silver recovery) = (933.33 ÷ 15.5) x (.937 ÷ .806) = 70.00
  Gold equivalency is calculated by the formula: Au_eq g/t = Au g/t + (Ag g/t ÷ 70.00)
  Note: Specific Gravity Estimated at 2.7.
  Discrepancies may occur due to rounding

Information of a scientific or technical nature in this report was prepared under the supervision of Peter J. Doyle, Vice President Exploration and Business Development of Troy, a "qualified person" under National Instrument 43-101 – "Standards of Disclosure for Mineral Projects", a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Doyle has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a "competent person" as defined in the 2004 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr. Doyle has reviewed and approved the information contained in this report. For further information regarding the Casposo project, including a description of quality assurance programs, quality control measures, the geology, samples collection and testing procedures in respect of the Casposo project please refer to the technical reports entitled Troy Resources NL: Casposo Project, Argentina" dated June 2009 and May 2010, which is available under the Company's profile at www.sedar.com.

This report contains forward-looking statements including those relating to expected levels of production and the timing of an updated Mineral Reserve and Resource estimate. These forward-looking statements reflect management's current beliefs based on information currently available to management and are based on what management believes to be reasonable assumptions. A number of factors could cause actual results, performance, or achievements to differ materially from the results expressed or implied in the forward looking statements. Such factors include, among others, future prices of gold, the actual results of current production, development and/or exploration activities, changes in project parameters as plans continue to be refined, variations in ore grade or recovery rates, plant and/or equipment failure, delays in obtaining governmental approvals or in the commencement of operations. 

ABOUT TROY RESOURCES

Troy Resources (News - Market indicators)(ASX:TRY) is a dividend-paying junior gold producer, with a clear growth strategy. The Company has two producing gold operations; Andorinhas Mine in Para State, Brazil and the Casposo gold and silver mine, in San Juan province, Argentina.

Troy has an experienced Board and management team with a track record of successful, fast-track mine development and low-cost operations.

Troy has an annual exploration budget in excess of $15 million and a proven track record in exploration discoveries and strategic acquisitions.

With the development of the Casposo project, Troy has entered a renewed growth phase which will again lift the Company's annual gold production above 100,000 ounces of gold per annum.

The Company is positioned to continue its path of strong growth and profitable operations, and is on track to achieve its vision of becoming a highly profitable mid-tier gold producer with a portfolio of quality long-life assets.

The Company maintains a robust balance sheet and forecasts continued strong cash flow from its current assets. Troy's gold production is unhedged; allowing its shareholders access to the full benefit of current and future gold price upside.

Troy is a responsible corporate citizen, committed to the best practice of health and safety, environmental stewardship and social responsibility.

ABN 33 006 243 750



Troy Resources NL
Mr. Paul Benson
Chief Executive Officer
(61 8) 9481 1277
(61 8) 9321 8237 (FAX)
troy@troyres.com.au
www.troyres.com.au
or
Purple Communications
Annette Ellis
Media Relations
(61 8) 6314 6300
aellis@purplecom.com.au
or
Purple Communications
Warrick Hazeldine
Media Relations
(61 8) 6314 6300

Troy Resources NL

PRODUCTEUR
CODE : TRY.AX
ISIN : AU000000TRY7
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Troy Res. est une société de production minière d'or basée en Australie.

Troy Res. est productrice d'or, d'argent au Bresil, en Australie et en Argentine, en développement de projets d'or en Australie, et détient divers projets d'exploration au Bresil, en Australie, en Argentine et en Finlande.

Ses principaux projets en production sont GOIAS VELHO / SERTAO MINE et ANDORINHAS au Bresil, BULCHINA MINE, CORNISHMAN & DOUBLE O, CORNISHMAN MINE, LORD NELSON et LORD HENRY en Australie et CASPOSO en Argentine, ses principaux projets en développement sont SANDSTONE - LORD NELSON et SERTAO en Australie et ses principaux projets en exploration sont DALY RIVER, THREE RIVERS, TWO MILE, THREE RIVERS et TROJAN JV en Australie et OIJARVI en Finlande.

Troy Res. est cotée au Canada, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 13,7 millions AU$ (9,9 millions US$, 9,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 05 octobre 2012 à 5,02 AU$, et son plus bas niveau récent le 01 septembre 2023 à 0,03 AU$.

Troy Res. possède 456 600 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Troy Resources NL
23/08/2016Investor Presentation
09/05/2016Gold Tour Presentation
27/07/2011Company Presentation-Investor Update
Rapports annuels de Troy Resources NL
: 2012 Annual Report to Shareholders
Annual Report 2011
Financements de Troy Resources NL
09/04/2013Provides Funding to Azimuth Pursuant to Convertible Note Fac...
Attributions d'options de Troy Resources NL
10/01/2012Payment of Dividend and Issuance of Shares Under the Troy Di...
Nominations de Troy Resources NL
29/07/2016Appointment of Independent Non-Executive Director
29/08/2013: Change to Directors
05/02/2013: Appointment of Company Secretary
14/03/2011Resignation of Company Director
01/02/2010Appointment of Mr David Dix
Rapports Financiers de Troy Resources NL
29/07/2016Quarterly Activities Report - June 2016
28/04/2016Quarterly Activities Report - March 2016
27/09/2012: Full Year Statutory Financial Statements-30 June 2012
Projets de Troy Resources NL
21/05/2014Australian company to open gold mine in Guyana
29/08/2011Strong Production Growth Returns Troy to Profit
27/04/2011(Kamila)Follow-up Drilling at Kamila SE Extension Zone Produces Furt...
20/03/2011(Casposo)- High Grade Drill Intercept
17/05/2010(Casposo) NI-43101 Technical Report Casposo Project San Juan, Argenti...
11/05/2010(Casposo)Casposo financing complete
06/05/2010(Casposo)Casposo updated mining reserve and production schedule
08/03/2010(Sandstone - Lord Nelson)New Nickel Sulphide Discovery at Sandstone JV
23/02/2010(Andorinhas)Andorinhas Robbery
27/01/2010(Casposo)Casposo Update
09/10/2009(Casposo)Casposo Project Update
14/09/2009(Casposo)NI43-101 Updated Technical Reports for Casposo & Sandstone
18/08/2009(Casposo)Updated Mineral Reserves and Resources
31/07/2009(Two Mile)New Inferred Resource Two Mile Hill Prospect Sandstone WA
29/07/2009(Casposo)Significant (32%) Increase in Casposo
16/07/2009(Two Mile)High Grade Results at Two Mile Hill Prospect
12/06/2009(Casposo)Files technical report for the Casposo deposit
09/09/2008(Andorinhas)Andorinhas Iron Ore Resource
04/08/2008(Andorinhas)Troy Resources NL - Andorinhas Iron Drill Results
25/07/2008(Andorinhas)Colluvial Iron Ore Study Update - Andorinhas Project Brazil
Communiqués de Presse de Troy Resources NL
23/09/2016Becoming a substantial holder from CBA
13/07/2016Operational Update
27/06/2016Director Appointment/Resignation
27/05/2016Karouni Operational Update
13/05/2016Ceasing to be a substantial holder
04/05/2016 Troy Restructures Investec Facility
03/05/2016Troy Restructures Investec Facility
01/02/2016Change of Director's Interest Notices
01/02/2016Change of Director's Interest Notices
28/01/2016Appendix 3B and Cleansing Notice
28/01/2016Results of Meeting
28/01/2016Quarterly Activities Report - December 2015
28/12/2015Change in substantial holding
28/12/2015Change in substantial holding
24/12/2015Ceasing to be a substantial holder
23/12/2015Appendix 3B and Cleansing Notice
23/12/2015Notice of General Meeting/Proxy Form
17/12/2015Troy Announces Completion of $10 million Placement
17/12/2015Capital Raising Investor Presentation
17/12/2015Capital Raising Investor Presentation
15/12/2015Trading Halt
15/12/2015Trading Halt
30/10/2015Quarterly Activities Report - September 2015 (Relodge)
30/10/2015Quarterly Activities Report - September 2015
29/10/2015Change in substantial holding
26/10/2015Commissioning Complete at Karouni Gold Project
26/10/2015Commissioning Complete at Karouni Gold Project
23/10/2015Corporate Governance and Appendix 4G
23/10/2015Annual Report to shareholders
23/10/2015Notice of Annual General Meeting/Proxy Form
23/10/2015Annual Report to shareholders
23/10/2015Notice of Annual General Meeting/Proxy Form
25/09/2015Full Year Statutory Accounts - 30 June 2015
25/09/2015Full Year Statutory Accounts - 30 June 2015
14/09/2015TRY to Convert Currency of Loan Facility and Resets Hedging
10/09/2015Change to Securities
10/09/2015Change to Securities
31/08/2015Mineral Resources and Ore Reserves Update
31/08/2015Mineral Resources and Ore Reserves Update
31/08/2015Appendix 4E - Preliminary Final Report - 30 June 2015
31/08/2015Appendix 4E - Preliminary Final Report - 30 June 2015
31/08/20152015 Financial Year Results Announcement
13/08/2015Appendix 3Y - Change of Director's Interest Notice - Jones
13/08/2015Appendix 3Y - Change of Director's Interest Notice - Jones
04/08/2015Diggers and Dealers 2015 Presentation
04/08/2015Diggers and Dealers 2015 Presentation
31/07/2015Quarterly Activities Report - June 2015
31/07/2015Quarterly Activities Report - June 2015
22/07/2015Change in substantial holding
14/07/2015Troy Chairman Leave of Absence
10/07/2015Karouni Gold Project - Operational Update
09/07/2015Becoming a substantial holder
15/06/2015Appendix 3Y - Change of Director's Interest Notice - Jones
09/06/2015Successful Completion of Placement and Share Purchase Plan
09/06/2015Appendix 3B and Cleansing Notice
04/06/2015Results of General Meeting
27/04/2015Trading Halt
24/04/2015Quarterly Activities Report - March 2015
20/04/2015Appendix 3Z - Final Director's Interest Notice - Harvey
20/04/2015Resignation of Director
20/04/2015Resignation of Director
14/04/2015UK Investor Update Presentation - April 2015
14/04/2015UK Investor Update Presentation - April 2015
14/04/2015Voluntary Delisting from Toronto Stock Exchange
14/04/2015: Voluntary Delisting From Toronto Stock Exchange
25/03/2015Notice of Initial Substantial Holder for ALY
25/03/2015Half - Year Ended 31 December 2014 Financial Results
25/03/2015Half - Year Report for the Period Ended 31 December 2014
25/03/2015ALY: Purchase of Reserve Payment from Troy
25/03/2015S&P DJ Indices Announces March Quarterly Review
25/03/2015Appendix 3Y - Change of Director's Interest Notice - Parish
25/03/2015Change in substantial holding
25/03/2015Ceasing to be a Substantial Holder for ALY
25/03/2015Half - Year Report for the Period Ended 31 December 2014
25/03/2015ALY: Purchase of Reserve Payment from Troy
25/03/2015S&P DJ Indices Announces March Quarterly Review
25/03/2015Change in substantial holding
25/03/2015Ceasing to be a Substantial Holder for ALY
20/02/2015: Investor Update Presentation, February 2015
18/12/2014Appendix 3Y - Change of Director's Interest Notice - Purvis
18/12/2014Appendix 3B - Issue of Share Appreciation Rights
20/10/2014Troy Signs Minerals Agreement for the Karouni Gold Project
14/10/2014The Dollar Rally: Where Will The Buck Stop?
25/02/2014Troy Resources to Raise Up to A$28 Million by Way of Placeme...
25/02/2014Troy to Raise Up to A$28 Million by Way of Placement and Up ...
23/02/2014Troy Resources Limited: Half Year Ended 31 December 2013 Fin...
20/02/2014Troy Resources Limited: RIU Explorers Conference Presentatio...
17/02/2014Troy Reaches Agreement to Sell Its 70% Interest in the Serta...
02/02/2014Troy Resources Limited: Investor Update, February 2014
02/02/2014Troy Resources Limited: Exceptional Channel Sample Results a...
31/01/2014Troy Resources Limited: Quarterly Activities Report December...
29/10/2013Presentation-ASX Small to Mid Caps
25/10/2013-Notice of 2013 Annual General Meeting and Explanatory Memor...
26/09/2013Full Year Statutory Accounts-30 June 2013
16/09/2013Investor Presentations-September 2013
28/08/2013: Completion of Compulsory Acquisition of Ordinary Shares in...
06/08/2013Presentation-Diggers & Dealers 2013
29/07/2013: Quarterly Activities Report June 2013
29/07/2013: Quarterly Activities Report June 2013
09/07/2013Corporate and Operational Update-BRR Webcast
27/06/2013Cuts Costs in Decisive Response to Price Volatility
24/06/2013Takeover Bid by Troy Resources Limited for Azimuth Resources...
17/06/2013Takeover Bid By Troy Resources Limited for Azimuth Resources...
07/06/2013Takeover Bid by Troy Resources Limited for Azimuth Resources...
24/05/2013: Institutional Acceptance Facility and First Supplementary ...
08/05/2013: Change to Securities
30/04/2013on Progress of Troy Takeover Offer for Azimuth
22/04/2013Secures A$40 Million Funding from Investec
03/04/2013and Azimith Resources CEOs Discuss Proposed Takeover-BRR Web...
28/03/2013: Media Conference Call Recording
25/03/2013(Kamila)Casposo Exploration Drilling Update Kamila Southeast Trend I...
30/01/2013: Quarterly Report on Activities December 2012
25/10/2012: Notice of 2012 Annual General Meeting & Proxy Form
16/10/2012Presentation: ASX Small to Mid Caps Asia
14/08/2012Announces Agreement to Sell the Sandstone Property to Southe...
08/08/2012Presentation: Diggers & Dealers
27/07/2012: Quarterly Report on Activities June 2012
12/07/2012(Casposo): Dr. J.W. Hedenquist Casposo Site Visit and Report
25/06/2012: Presentation & Webcast-The Gold Coast Resources Showcase
20/06/2012(Casposo): Reserve and Mine Plan Updated Technical Report (NI 43-101)...
30/05/2012(Casposo): Casposo Mineral Reserve Update Gold Equivalent Production ...
13/04/2012to Be Included in the S&P ASX 200 Index
04/04/2012: Company Presentation
24/02/2012(Casposo)Doubles Production & Revenue as Low Cost Casposo Hits its St...
08/02/2012: Revised December 2011 Quarterly Report
30/01/2012: Quarterly Report on Activities December 2011
09/01/2012ASX Announcement - ASIC Approves Change of Company Type and ...
15/12/2011New Corporate Office and Registered Address
12/10/2011(Casposo)Resource Update Report Released for Casposo Project San Juan...
04/10/2011(Casposo)Casposo Achieves Nameplate Throughput
29/08/2011(Kamila): Initial Resource Estimate Kamila Southeast Discovery at Ca...
24/08/2011Introduces A Shareholder Dividend Re-Investment Plan
03/08/2011Public Announcement Media Speculation
02/08/2011(Kamila)Kamila Southeast Target Drilling Update-More High Grade Resu...
20/07/2011(Casposo)ASX Announcement - High Grade Intercepts Drilling at Casposo...
21/06/2011(Kamila)Kamila Southeast Zone Drilling Continues to Deliver High Gra...
07/06/2011(Casposo)Declares Dividend as Low Cost Casposo Mine Officially Opened
19/05/2011(Kamila)Kamila Southeast Zone Step-Out Drilling Delivers High Grade ...
28/02/2011Half Year Ended December 31, 2010 Financial Results
24/01/2011 Quarterly Report on Activities December 2010
02/08/2010Diggers & Dealers 2010 Company Presentation
29/07/2010Sales of Andorinhas Iron Ore
16/07/2010Initial Inferred Resource Julieta Prospect Casposo Project
30/04/2010Quarterly Report on Activities March 2010
17/03/2010Corporate Update Presentation
10/02/2010Financing Update
04/02/2010Moving to Where the Gold Is
29/01/2010Quarterly Report on Activities December 2009
29/01/2010Aztec Vein Initial Grade Control Drilling - Casposo Project
21/01/2010 Notice of Forfeited Shares Auction
20/01/2010 Sale of Mongolian Assets
14/12/2009Form 604 -Notice of change of interests of substantial holde...
07/12/2009Share Placement and Appendix 3B
04/12/2009Entitlements Issue - Under Subscription
02/12/2009Amended Constitution
09/11/2009Troy Resources NL - Chairman's Letter to Shareholders - EGM ...
05/11/2009Shareholder Letters Re Entitlements Issue
04/11/2009Entitlements Issue 708AA Notice & Appendix 3
04/11/2009Withdrawal of Request for EGM
28/10/2009Quarterly Report on Activities September 2009
02/10/2009Notice of Shareholder Meeting
30/09/2009Full Year Statutory Accounts
25/09/2009CALL ON PARTLY PAID SHARES
27/08/2009Profit of A$16.7 Million and Builds the Foundation for Futur...
10/08/2009Declares 10th Consecutive Fully Franked Dividend
30/07/2009Quarterly Report on Activities June 2009
09/02/2009Quarterly Report and Operations Update - Audio Broadcast
23/02/2009Half Year Report
03/02/2009ASX Release - Voluntary Annual Information Form
28/01/2009Quarterly Report
20/01/2009ASX Announcement
27/11/2008AGM Results November 2008
26/11/2008Resignation of Non-Executive Director T D McKeith
13/11/2008ASX Announcement
30/09/2008ASX Announcement
29/08/2008ASX Announcement
31/07/2008Quarterly Report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (TRY.AX)TORONTO (TRY.TO)
0,030+0.00%0,430+1.18%
AUSTRALIA
AU$ 0,030
01/09 11:00 -
0%
Cours préc. Ouverture
0,030 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
0,030 -  0,030 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -26
Produit Gold - Silver
Développe Gold
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :