BC Iron March 2015 Quarterly Activities Report (8 pages)

ASX RELEASE

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

ASX RELEASE - 23 APRIL 2015

MARCH 2015 QUARTERLY ACTIVITIES REPORT

1.46M wmt of Bonnie Fines shipped from the NJV (BC Iron share 1.04M wmt)

Average realised CFR price of US$54/dmt, from average CFR 62% Fe price of US$62/dmt

BC Iron all-in cash costs1 of A$57/wmt (FOB) for the quarter and A$52/wmt (FOB) for March

Iron Valley EBITDA of A$2.9M with MIN progressing beneficiation and transport initiatives

Solid balance sheet position with cash of A$107.5M and debt of A$46.9M

BC Iron Limited (ASX: BCI) ('BC Iron' or the 'Company') is pleased to present shareholders with its quarterly activities report for the period ended 31 March 2015.
Commenting on the quarter, Managing Director, Morgan Ball said, "The Nullagine Joint Venture had a strong operational quarter. Sales exceeded wet season expectations and the operation also managed to build product stockpiles to help mitigate risks during the contractor transition. Costs are continuing to improve through the contracting strategy and mine plan optimisations we are implementing.

"Market conditions remain challenging for iron ore producers. BC Iron is underpinned by a strong balance sheet with A$107.5 million cash, an improving cost position at Nullagine and ongoing cash flow from the Iron Valley operation. However, we are very cognisant of the external environment and will continue to make appropriate and pragmatic decisions."

The Nullagine Joint Venture ('NJV') reported a solid operational quarter, with mining, crushing and screening achieving a run-rate of 7Mtpa. The NJV shipped 1.46M wet metric tonnes ('wmt') (BC Iron share 1.04M wmt), which represents an average run-rate of 5.8Mtpa for the quarter. Product stockpiles also increased significantly to more than 0.5M wmt.
As previously reported, NJV C1 cash costs were A$49/wmt (FOB) and BC Iron all-in cash costs were A$57/wmt (FOB). Costs were lower in the month of March 2015 at A$43/wmt (FOB) for C1 cash costs and A$52/wmt for all-in cash costs due to reduced weather-related impacts and lower waste to ore ratios.
Going forward, costs are expected to benefit by A$2-3/wmt from the Company's contracting strategy. Viento Group has been appointed to undertake mining, crushing and screening at the Warrigal hub whilst Watpac Limited's mining, crushing and screening contract was terminated effective 1 July 2015 subsequent to the quarter-end. BC Iron is also moving towards variable only contracts and direct ownership of surface miners to increase flexibility and reduce capital-related operating charges at site.
Iron Valley generated EBITDA to BC Iron of A$2.9M from sales of 0.85M dry metric tonnes ('dmt'), which exceeded expectations due to the proportion of lump sold and its realised pricing. Operating partner, Mineral Resources Limited ('MIN'), continues to progress beneficiation and transport initiatives which are aimed at enhancing the long term viability of the Iron Valley operation.

1 BC Iron all-in cash costs include NJV C1 cash costs plus royalties, marketing and corporate costs.

BC IRON LIMITED

ABN 21 120 646 924

ASX Code: BCI

Listed: 15 December 2006

Head Office

Level 1, 15 Rheola Street

West Perth WA 6005

GPO 2811

Perth WA 6001

Registered Office

Level 1, 15 Rheola Street

West Perth WA 6005

Tel: (08) 6311 3400

Fax: (08) 6311 3449

Web: www.bciron.com.au

Page 1 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

Evaluation of the Buckland Project continued. A joint study will be undertaken with the Australian Premium Iron Joint Venture ('API') to assess potential cooperation around the mining of BC Iron's Bungaroo South deposit and API's Buckland Hills deposit, which are contiguous. BC Iron also advanced Cape Preston East port lease approvals.

1. NULLAGINE JOINT VENTURE ('NJV')

BC Iron Nullagine Pty Ltd, a wholly owned subsidiary of BC Iron, is the operator and manager of the NJV, a 75:25 unincorporated joint venture with Fortescue Metals Group Limited ('Fortescue'). The project is located approximately 140km north of Newman in the East Pilbara region of Western Australia.

Operations

Key operational statistics for the quarter were as follows (Tables 1 and 2): TABLE 1: ORE PRODUCTION, HAULAGE & SHIPPING

Mar Quarter

2015 (Mt)

Dec Quarter

2014 (Mt)

Variance

Q-o-Q (%)

Mar Quarter

2014 (Mt)

Variance

Y-o-Y (%)

FY15

YTD (Mt)

Ore Mined (dry)

1.74

1.69

3%

0.95

84%

4.32

Produced (wet)

1.77

1.42

24%

1.05

68%

3.97

Hauled (wet)

1.50

1.43

5%

1.09

37%

3.68

Railed (wet)

1.43

1.37

4%

1.08

32%

3.55

Shipped (wet)

1.46

1.38

6%

1.22

20%

3.79

TABLE 2: STOCKPILE INVENTORY

Mar Quarter

2015 (kt wet)

Dec Quarter

2014 (kt wet)

ROM1 116 253

MOC Product2 (Site) 403 1264

RLF Product3 (Christmas Creek) 94 63

Port 35 64

Low-grade Stocks (Site) 8,774 8,185

Notes: 1. Run of Mine ('ROM').

2. MOC Product - material treated and stockpiled ready for road haulage at Mine Operations Centre ('MOC').

3. RLF Product - material ready for rail haulage at the Christmas Creek Rail Loadout Facility ('RLF').

4. Restated.

Page 2 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

The March quarter falls in the Pilbara's wet season and the NJV experienced periods of wet weather which affected operations. Notwithstanding this, operational performance was strong with the targeted March quarter wet season run-rate of 4.5Mtpa (1.13Mt for the quarter) exceeded across the entire operation.
BC Iron mined 1.74M dmt of DSO during the quarter and produced 1.77M wmt of Bonnie Fines at the NJV's two crushing & screening hubs. Mining commenced at Warrigal 1 in February 2015 and this deposit will be a key source of ore moving forward. Prior to this, ore was predominantly sourced from the Outcamp 2 and 3 deposits. As part of its cost reduction efforts, BC Iron continued to focus on optimising the NJV mine plan. Waste to ore ratios declined during the quarter to average 0.6 (December 2014 quarter: 1.1). Included in 'waste' was a total of 0.58M dmt of low-grade ore that was mined and hauled to stockpiles for later processing and/or blending.
Both mining and crushing and screening achieved a run-rate of approximately 7Mtpa during the quarter and the NJV is now in a strong inventory position with total product stockpiles of 0.53M wmt.
Road haulage takes place via a private 60km bitumen haul road from the NJV mine site to Fortescue's
Christmas Creek RLF. During the quarter, 1.50M wmt was hauled.
The Pilbara Infrastructure, a wholly owned subsidiary of Fortescue, provides contract rail haulage and port services to the NJV. During the quarter, 1.43M wmt was railed from the Christmas Creek RLF to the Herb Elliott Port in Port Hedland.
The NJV shipped 1.46M wmt (5.8Mtpa run-rate) of Bonnie Fines product during the quarter on eight capesize vessels, including two shipments in excess of 200,000 wmt. BC Iron's share of tonnes shipped for the quarter was 1.04M wmt or 71% of the NJV total. BC Iron's share of sales since increasing its NJV interest to 75% in January 2013 is 74.6%.

Operational Enhancements

A key component of BC Iron's cost reduction efforts at the NJV is its contracting strategy, which the Company continued to implement during the quarter. BC Iron appointed Viento Group to undertake a two year, 2Mtpa mining, crushing and screening contract at the Warrigal hub, which is expected to deliver a A$2-3/wmt reduction in C1 cash costs in respect of Warrigal tonnes. Subsequent to the quarter-end, BC Iron terminated the NJV's mining, crushing and screening contract with Watpac Limited, which is expected to expedite the translation of the Viento contract savings across the entire NJV production base.
The NJV is also moving to direct ownership of surface miners, with one second hand Vermeer 1655 purchased from Fortescue and one to be purchased from Watpac upon contract end. This will provide greater flexibility in structuring any new contracts and reduce capital-related operating charges at site.

Marketing

Iron ore prices continued to decline, with the CFR China 62% Fe price ('CFR 62% Price') averaging
US$62/dmt for the quarter, down from US$74/dmt in the December 2014 quarter.
The average CFR sales price achieved for BC Iron's share of Bonnie Fines was US$54/dmt, with negligible pricing adjustments from shipments delivered in the previous quarter. BC Iron's price realisation against the CFR 62% Price benefited from a lower average discount compared to the December 2014
quarter and favourable quotation periods for March 2015 quarter shipments.

Page 3 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

During the quarter, BC Iron senior management visited a number of existing and prospective customers in China, which reaffirmed the attractiveness of the Bonnie Fines product. Demand continues to be strong and discounts for uncommitted shipments remained steady during the quarter.

Operating Costs

NJV C1 cash costs for the March 2015 quarter were approximately A$49/wmt (FOB) and BC Iron all-in cash costs were approximately A$57/wmt (FOB). Costs were affected by wet weather for part of the quarter and the Company notes that, for the month of March 2015, NJV C1 cash costs were A$43/wmt (FOB) and BC Iron all-in cash costs were A$52/wmt.
BC Iron remains focused on further sustainable cost reductions and expects to achieve the lower end of the NJV's C1 cash cost guidance range of A$47-51 per wmt (FOB) for the December 2014 to June 2015 period. BC Iron's all-in cash costs for this period were revised downwards again during the quarter and are now expected to be within the range of A$53-57/wmt (FOB). As the Company continues to implement and realise these cost-focused initiatives, it is targeting a further material reduction to these ranges for FY16 cost guidance.

Development and Approvals

Development works at Warrigal 1 and 2 were finalised during the quarter and all approvals were secured to support the commencement of production, which began at Warrigal 1 in February 2015.
The approvals process for Warrigal 6 was progressed during the quarter, with the Mining Proposal, Clearing Permit and Section 18 approvals on track for submission to the regulators in the June 2015 quarter.
Additional approvals to support the commencement of production at Outcamp 4 and 5 were secured during the quarter, including the Mining Proposal Amendment and the Clearing Permit.
BC Iron continues to progress the development and approvals process for potential future mining areas, including Bonnie East and Coongan. Development of these areas will depend on the iron ore price outlook at the relevant time.

Resource Development and Exploration

Resource development continues to focus on grade control drilling and refining Mineral Resource estimates at mesas which are being mined or planned to be mined in the near future. During the quarter, grade control drilling was undertaken at Warrigal 1 and Outcamp 5 to close the drill spacing to 12.5m by
12.5m (from 25m by 25m) in certain parts of the mesas where geological continuity is not present. Results from this drilling will be incorporated into the Company's annual Mineral Resources and Ore Reserves update to be released in the September 2015 quarter.
Following positive results from initial exploration drilling at Warrigal 6, infill exploration drilling was completed during the March 2015 quarter, with 51 holes drilled for a total of 1,154 metres sampled. The previous drilling was confirmed and BC Iron now plans to complete a Mineral Resource estimate at Warrigal 6, which continues to show potential as a satellite development that would extend the mine life of
the Warrigal hub.

Page 4 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

Occupational Health & Safety

Two lost time injuries were recorded during the quarter. As at the end of March 2015, the rolling 12 month lost time injury frequency rate was 2.8 (December 2014: 1.9). BC Iron continues to review key risks and improve its systems and procedures to ensure a safe working environment for staff and contractors.

2. IRON VALLEY PROJECT

The Iron Valley mine is being operated by MIN under an iron ore sale agreement with BC Iron. It is currently being operated as a DSO, truck haulage operation. During the quarter, MIN shipped 0.85M dmt of Iron Valley ore, which generated EBITDA for BC Iron of $2.9M.
MIN is currently evaluating a range of initiatives aimed at enhancing the long term viability of the Iron Valley operation in a low iron ore price environment. These initiatives include beneficiation of Iron Valley ore to increase the iron grade from 58% to +62% and the introduction of a bulk ore transport system ('BOTS') to lower transport costs and facilitate increased production rates. For further information, refer to MIN's strategy presentation which was released to the ASX on 23 February 2015.
BC Iron's agreement with MIN contemplates the implementation of these initiatives and includes mechanisms to appropriately share the upside between the companies.
BC Iron and MIN are progressing various approvals required to facilitate below water table mining at Iron
Valley. During the quarter, BC Iron commenced the preliminary environmental studies and assessments.

3. BUCKLAND PROJECT

Buckland is an iron ore development project located in the West Pilbara region, with a proposed independent infrastructure solution comprising a haul road and transhipment port at Cape Preston East. A feasibility study has been completed and all primary tenure and approvals have been secured.
During the quarter, BC Iron continued to evaluate a range of development and financing strategies for the Buckland Project to determine the optimal way forward for the project. As part of this process, BC Iron and API Management Pty Ltd, the manager of API, have agreed to undertake a joint study on the potential for cooperation in relation to the mining of BC Iron's Bungaroo South deposit and API's Buckland Hills deposit, which are contiguous. The study, which will be coordinated by API Management Pty Ltd, will assess options to maximise both parties' mineable inventory and possible synergies in extracting ore from the deposits.
BC Iron continued to advance the approvals process for the Cape Preston East port lease. All key Development Applications have now been approved by the Pilbara Ports Authority and Construction Applications are currently being prepared for submission.

Page 5 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

4. CORPORATE

Cash and Debt Position

BC Iron's cash balance was A$107.5M as at 31 March 2015.
Total debt outstanding was A$46.9M, comprising US$5M outstanding for the Henghou Facility and approximately US$31M for the Term Loan Facility with repayments scheduled every six months until maturity in December 2016.

Cash Flows

BC Iron's cash position decreased by A$2.6M during the quarter from A$110.1M to A$107.5M.
As previously noted, the Company increased NJV product stockpiles to more than 0.5M wmt during the quarter. Mining, crushing and screening operated at a run-rate of approximately 7Mtpa to achieve this, compared to a shipping run-rate of approximately 5.8Mtpa. While this impacted cash flows for the quarter, BC Iron will benefit as these stockpiles are utilised going forward.
Operating cash flows were also affected by BC Iron's share of NJV sales being 71% compared to its 75%
share of NJV costs, however benefited from net Iron Valley cash flows of A$1.1M relating to December
2014 quarter activities.
Other material cash movements during the quarter included:

Capital expenditure of A$3.9M, primarily for BC Iron's share of development and construction

costs at the Warrigal hub; and

An increase of A$1.3M on cash held in US dollars, due to depreciation of the Australian dollar.

Hedging

As at 31 March 2015, BC Iron had 20,000dmt hedged at A$75/dmt for delivery in April 2015.

Royalty Deferral

In December 2014, the Western Australian State Government announced it would provide financial assistance for small iron ore miners, in the form of a deferral of 50% of royalties payable over a 12 month period.
BC Iron worked closely with the government during the quarter and on 1 April 2015 announced it was successful in securing the royalty deferral. The deferral applies to BC Iron's NJV royalty payments for the December 2014 to September 2015 quarters, subject to BC Iron's FOB received price being less than A$90/dmt in the quarter. The deferred royalties are then repayable in seven equal quarterly instalments with the first repayment due on 31 March 2016 and the last repayment due on 30 September 2017. This will effectively defer between A$8-12M in royalties by one to two years, subject to sales prices and volumes.
- ENDS -

Page 6 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

For further information: Media enquiries:

Morgan Ball / Chris Hunt David Tasker / James Harris Managing Director / Chief Financial Officer Professional Public Relations BC Iron Limited Telephone: +61 8 9388 0944
Telephone: +61 8 6311 3400

Forward-looking Statements

Forward-looking statements can be identified by the use of terminology such as 'intend', 'aim', 'project',

'anticipate', 'estimate', 'plan', 'believe', 'expect', 'may', 'should', 'will', 'continue' or similar words. These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward looking statements. They are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this ASX update. Readers are cautioned not to put undue reliance on forward looking

statements.

Page 7 of 8

QUARTERLY ACTIVITIES REPORT MARCH 2015 QUARTER

ABOUT BC IRON LIMITED

BC Iron is an iron ore mining and development company with key assets in the Pilbara region of Western Australia, including the Nullagine Joint Venture (NJV), Buckland and Iron Valley. BC Iron is listed on the ASX under the code 'BCI'.
The NJV is an unincorporated 75:25 joint venture with Fortescue Metals Group Limited, which commenced exports in February 2011. The NJV utilises Fortescue's infrastructure at Christmas Creek,
50km south of the Nullagine mine, to rail up to 6Mtpa of ore to Port Hedland from where it is shipped directly to customers overseas.
Buckland is a development project located in the West Pilbara region. It has Ore Reserves of 134.3 Mt at
57.6% Fe, a completed and announced feasibility study, its own proposed infrastructure solution comprising a haul road and transhipment port at Cape Preston East, and all primary tenure and licences secured. BC Iron is currently evaluating all options to determine the optimal development and financing path for Buckland.
Iron Valley is a mine with Ore Reserves of 134.7 Mt at 58.5% Fe that was developed and is being operated by Mineral Resources Limited under an iron ore sale agreement.
BC Iron also has an interest in a number of other earlier stage projects in the Pilbara and potential royalties over the Koodaideri South and North Marillana tenements.

KEY STATISTICS Shares on Issue: Cash & Equivalents:

Board:

196.2 million

A$107.5 million

Tony Kiernan

as at 31 March 2015

Chairman and Non-Executive Director

Morgan Ball

Managing Director

Andy Haslam

Non-Executive Director

Brian O'Donnell

Non-Executive Director

Terry Ransted

Non-Executive Director

Anthea Bird

Hayley McNamara

Company Secretary

Company Secretary

Major Shareholders:

Wroxby Pty Ltd

19.0%

Website: www.bciron.com.au

Page 8 of 8

Lire la suite de l'article sur www.noodls.com

BC Iron Limited

EN DÉVELOPPEMENT
CODE : BCI.AX
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

BC Iron est une société développant des projet miniers basée en Australie.

BC Iron est en développement de projets de fer en Australie.

Son principal projet en développement est NULLAGINE IRON en Australie.

BC Iron est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 88,3 millions AU$ (58,0 millions US$, 54,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 07 mars 2014 à 4,87 AU$, et son plus bas niveau récent le 05 février 2016 à 0,08 AU$.

BC Iron possède 392 529 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de BC Iron Limited
01/03/2017BC Iron tries its luck in the potash industry
27/11/2014Heads roll as BC Iron forced to cut costs amid weakest price...
Rapports annuels de BC Iron Limited
I Annual Report To Shareholders 2012
Financements de BC Iron Limited
15/04/2011Regent Pacific Re-Instates Financing for Scheme of Arrangeme...
Nominations de BC Iron Limited
22/09/2016Appointment of Managing Director (2 pages)
15/03/2013Appoints New Managing Director
23/09/2011Director Appointment
Projets de BC Iron Limited
25/05/2012Achieves 5MTPA Production Milestone
02/04/2012Increases Mineral Resource at Nullagine JV - 30 March 2012
11/05/2011Presenting At The RIU Sydney Resources Round-up
09/04/2010Moves Closer To Production After Signing Key Native Title Mi...
17/12/2009(Nullagine Iron)Nullagine Iron Ore Jv - First Project Funding Installment Re...
14/12/2009(Nullagine Iron)BCI And FMG Confirm Move Into Development Of Nullagine Proje...
10/11/2009(Nullagine Iron)Nullagine JV Secures US$50 Million Project Finance
16/10/2009(Nullagine Iron)Trial Mining Supports Key Technical Aspects Of Nullagine Iro...
17/09/2009(Nullagine Iron)Commences Trial Mining at the Nullagine Iron Ore Project
24/08/2009(Nullagine Iron)Formally Enters into Nullagine JV with FMG
03/07/2009(Nullagine Iron)Board Approves Development of Nullagine Iron Ore Project
07/01/2009(Nullagine Iron)Increases DSO Resource by 64% to 46Mt, Total CID Resource 80...
30/09/2008(Nullagine Iron)Infill Drilling Completed at Nullagine Iron Ore Project
01/09/2008(Nullagine Iron)In-Fill Drilling Results Confirm Direct Shipping Resource Qu...
11/07/2008Open BriefingR - MD on Feasibility Study & Future Plans
01/07/2008(Nullagine Iron)Commits to Nullagine Feasibility Study Following Positive Sc...
31/03/2008(Nullagine Iron)Delivers Maiden 47 Million Tonne Iron Ore Resource at Nullag...
Communiqués de Presse de BC Iron Limited
14/09/2016Company Update
01/08/2016FY16 Full Year Results Release (6 pages)
01/08/2016Appendix 4E and FY16 Financial Report (61 pages)
29/07/2016Quarterly Activities Report (4 pages)
05/07/2016Response to ASX Price and Volume Query (4 pages)
27/06/2016Settlement of BC Iron Litigation
26/06/2016WTP: Settlement of BC Iron Litigation (1 pages)
24/06/2016Watpac Settlement (2 pages)
20/05/2016BCI: Iron Valley Update
20/05/2016Iron Valley Update (2 pages)
18/05/2016Management Changes (3 pages)
29/04/2016Update on litigation against Watpac (2 pages)
21/04/2016Quarterly Activities Report (7 pages)
28/01/2016Quarterly Activities Report (8 pages)
31/12/2015Appendix 3B - expiry of performance rights (12 pages)
24/12/2015Commencement of litigation against Watpac (2 pages)
22/12/2015NJV Contract Update (2 pages)
22/12/2015WTP:Update on Dispute with BC Iron - Nullagine Iron Ore Prjt...
27/11/2015Appendix 3B (13 pages)
27/11/2015Change of Director's Interest Notice - M Ball (2 pages)
26/10/2015Variation to NJV Rail and Port Tariff (3 pages)
23/10/2015NJV Awards Road Haulage Contract (2 pages)
21/10/2015Quarterly Activities Report (7 pages)
06/10/2015Managing Director Employment Terms (2 pages)
16/09/2015Change of Director's Interest Notice - M Ball (2 pages)
03/09/2015S&P DJ Indices Announces September Quarterly Rebalance (4 pa...
31/08/2015Correction to Underlying Net Loss After Tax (2 pages)
31/08/2015Updated FY15 Annual Report to shareholders (96 pages)
28/08/2015Company Secretary Resignation - A Bird (2 pages)
26/08/2015FY15 Full Year Results Presentation (24 pages)
26/08/2015FY15 Annual Report and Appendix 4E (97 pages)
26/08/2015Appendix 4G (14 pages)
25/08/2015NJV Ore Reserves and Mineral Resources (21 pages)
23/07/2015Quarterly Activities Report - June 2015 Quarter (8 pages)
11/06/2015Repayment of Term Loan Facility (2 pages)
23/04/2015NJV Warrigal Hub Contract Update 23.04.15
23/04/2015NJV Warrigal Hub Contract Update (2 pages)
22/04/2015BC Iron March 2015 Quarterly Activities Report (8 pages)
09/04/2015March 2015 Quarter Update (2 pages)
02/04/2015NJV Contracting Strategy Update (2 pages)
24/03/2015Warrigal Hub Contract Award (3 pages)
24/03/2015Mines & Money Presentation (20 pages)
09/03/2015Presentation (20 pages)
05/03/2015S&P DJ Indices Announces March Quarterly Review (9 pages)
06/09/2013Latest Headlines and New Issue Alert: Sibanye production rec...
22/10/2012September 2012 Quarterly Activities Report
21/08/2012I Forms Iron ore Stratigic Alliance in Brazil
16/08/2012I ASX Announcement - Mineral Resource and Ore Reserve 30 Jun...
05/07/2012I Achieves All Operational Guidance FY12
17/04/2012Quarterly Report for the period ending 31 March 2012
29/02/2012Half Year Results - December 2011 & Company Update
24/10/2011Quarterly Report for the period ending 30 September 2011
23/09/2011September Company Update
11/08/2011Operations Update
29/04/2010Quarterly Activities Report For The Period Ending March 31, ...
15/04/2010Welcomes New Institutional Investors
30/10/2009Quarterly Activities Report For The Period Ending 30 Septemb...
29/07/2009June 2009 Quarterly Report
19/06/2009Announces $22M Capital Raising
05/06/2009Seals Company-Making Deal with FMG
28/05/2009North West Iron Ore Alliance Congratulates BC Iron on Landma...
28/05/2009secures infrastructure deal with The Fortescue Metals Group ...
04/03/2009Open Briefing - MD on Off-take Agreement and Recent Progress
11/02/2009Secures Landmark Long-Term Off-Take Agreement for Nullagine ...
28/01/2009Quarterly Activities Report December 2008
08/01/2009Carmichael Quick Note
27/11/2008horses for courses
02/10/2008Practical Parenting Support for Families from Hedland's Juni...
08/09/2008Gearing Up For The New Iron Age
08/08/2008Plans in the Fire
06/08/2008New Access Rules for Infrastructure
06/08/2008Sunday Times Article - Hot Stock
31/07/2008June 2008 Quarterly Activities Report
29/07/2008Diggers and Dealers
24/07/2008Ocean Equities Ltd - Iron Ore Sector Update
14/07/2008Comment On Take Over Speculation
20/06/2008NCC Declaration
16/06/2008Shinier Than Gold in Stock Market
30/04/2008 Quarterly Activities Report
21/04/2008 Open BriefingR. MD Explains Nullagine Resource Upgrade.
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (BCI.AX)BERLIN (BC3.BE)
0,225-2.17%0,097+2.11%
AUSTRALIA
AU$ 0,225
29/04 17:10 -0,010
-2,17%
Cours préc. Ouverture
0,230 0,230
Bas haut
0,225 0,230
Année b/h Var. YTD
0,220 -  0,320 -19,64%
52 sem. b/h var. 52 sem.
0,205 -  0,320 -2,17%
Volume var. 1 mois
92 852 -4,26%
24hGold TrendPower© : 27
Produit
Développe Iron
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-18,18%
20231,85%0,300,20
2022-37,21%0,480,21
202143,33%0,620,29
202076,47%0,310,10
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,66 AU$-0,78%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,22 US$-0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,48 CA$+1,54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+9,52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,08 US$+0,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :