Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Bayswater Uranium Corp.

Publié le 29 octobre 2007

Drilling Leads to Major Uranium Discovery in Labrador

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Crosshair Exploration | K Street | Uranium |
 
 
BAYSWATER URANIUM CORPORATION
510 Burrard Street, Suite 510
Vancouver, B.C. V6C 3A8
Tel:  (604) 687-2153
www.bayswateruranium.com
 
 
NEWS RELEASE

 

Drilling Leads to Major Uranium Discovery on Bayswater�s Anna Lake Prospect, Central Mineral Belt Uranium Project, Labrador

Highlights

  • Best drill intersection to date returns 40 meters grading 0.07% U3O8 and 0.022% Mo (molybdenum)
  • Hole to hole correlation establishes main uranium mineralized zone over a 340 meter strike length, 230 meter vertical depth and approximate true widths of up to 25 meters
  • Deposit open in all directions
  • Deposit is entirely blind�overburden covered with a veneer of glacial drift and boulders

Vancouver, BC, October 29, 2007 ─ Bayswater Uranium Corporation (TSX-V: BAY) (OTC: BYSWF) is pleased to report a near surface uranium discovery with significant molybdenum credits from drilling on its Anna Lake Prospect located on the Company�s 100% owned property in the Central Mineral Belt, Labrador. Drill results include an intersection in AL07-01 grading 0.07% U3O8 over 40 metres including 0.12% U3O8 over 5 metres and 0.15% U3O8 over 6.0 metres. Also, an approximate true width intersection from AL07-25 grades 0.05% U3O8 over 25.0 metres including 0.10% U3O8 over 2.0 meters and 0.11% U3O8 over 6.0 meters.

Mr. George Leary, President of Bayswater states, "The Company is very encouraged by the drill results from its Anna Lake property to date. This discovery is an excellent start for our first drill program in Labrador and on our Canadian holdings."

To date, 62 diamond drill holes totalling approximately 13,000 meters of core recovery have been completed on several of Bayswater�s high priority targets identified during 2006. Uranium assay results have been received for 28 of 33 holes at the Anna Lake Uranium prospect, 12 of 13 holes for the Dandy and all holes for Stipec A, Stipec E and Kanairiktok Bay showings. Only partial results have been received for an ICP-42 multi-element suite. Additional results for the Anna Lake drilling are pending laboratory analysis.   Table 1 highlights drill results from the Anna Lake discovery to date.

Table 1 � Analytical Results � Uranium & Molybdenum

Anna Lake Prospect

DDH #

From

(m)

To

(m)

Interval (m)

% U3O8

% Mo

Comments

AL07-01

 

 

Including

18.69

25.69

33.69

51.69

54.69

64.69

72.96

79.69

105.69

131.69

20.69

28.69

35.69

91.69

59.69

70.69

77.69

86.69

107.69

137.69

2.0

3.0

2.0

40.0

5.0

6.0

5.0

7.0

2.0

6.0

0.09

0.07

0.06

0.07

0.12

0.15

0.06

0.09

0.10

0.07

0.0311

0.0309

0.0287

0.022

0.0234

0.0446

0.0185

0.0300

0.0315

0.0225

Designed to test main zone. True widths unknown.

AL07-02

11.5

24.0

87.5

145.2

13.4

27.35

89.6

150.0

1.9

3.35

2.1

4.8

0.06

0.06

0.08

0.07

0.0372

0.0325

0.0317

0.0114

Designed to test main zone. True widths unknown.

AL07-03

including

26.0

29.0

70.0

77.0

86.0

34.0

32.0

71.0

82.0

89.0

8.0

3.0

1.0

5.0

3.0

0.07

0.13

0.08

0.03

0.09

0.0206

0.0346

0.0111

N.S.R.

N.S.R.

Designed to test main zone. True widths unknown.

AL07-04

     

N.S.R.

Not sampled

Drilled in footwall rocks

AL07-05

     

N.S.R.

Not sampled

Designed to test separate IP target

AL07-06

     

N.S.R.

Not sampled

Drilled in footwall rocks

AL07-07

including

9.4

13.2

46.2

75.0

16.3

14.2

47.7

83.9

6.9

1.0

1.5

8.9

0.10

0.25
0.08

0.11

0.0284

0.0636

N.S.R

0.0342

Designed to test main zone.

AL07-08

including

120.0

132.4

134.0

162.6

176.5

123.0

138.7

138.7

163.0

180.5

3.0

6.3

4.7

0.4

4.0

0.03

0.07

0.08

0.19

0.08

N.S.R.

0.0208

0.0233

0.0674

0.0300

Designed to test main zone.

AL07-09

     

N.S.R.

Assays Pending

Designed to test separate IP target

AL07-10

89.6

91.6

2.0

0.05

Assays Pending

Designed to test main zone

AL07-11

     

N.S.R.

Assays Pending

Designed to test main zone

AL07-12

including

48.0

68.0

72.0

50.0

73.5

73.5

2.0

5.5

1.5

0.02

0.09

0.22

Assays Pending

Designed to test main zone.

AL07-13

108.54

146.5

117.79

147.5

9.25

1.0

0.04

0.09

Assays Pending

Designed to test main zone

AL07-14

     

N.S.R.

Assays Pending

Stopped at 14 meters. Collared in footwall rocks.

AL07-15

156.2

161.2

158.2

168.2

2.0

7.0

0.05

0.06

Assays Pending

Designed to test main zone

AL07-16

147.0

157.0

149.0

162.0

2.0

5.0

0.03

0.05

Assays Pending

Designed to test main zone

AL07-17

including

145.35

152.5

160.0

155.67

14.65

3.17

0.05

0.11

Assays Pending

Designed to test main zone

AL07-18

     

N.S.R

Assays Pending

Test east contact 1km north

AL07-19

     

N.S.R

Assays Pending

Test east contact 1km north

AL07-20

     

N.S.R

Assays Pending

Test east contact 1km north

AL07-21

     

N.S.R

Assays Pending

Test west contact 1km north

AL07-22

     

N.S.R

Assays Pending

Test north contact 1km north

AL07-23

52.9

70.9

56.0

72.5

3.10

1.60

0.04

0.07

Assays Pending

Designed to test main zone

AL07-24

78.8

80.1

1.3

0.08

Assays Pending

Designed to test main zone

AL07-25

     

N.S.R.

Assays Pending

Designed to test main zone

AL07-26

123.2

125.9

136.5

124.4

126.0

136.7

1.2

1.1

0.2

0.04

0.03

0.12

Assays Pending

Designed to test main zone

AL07-27

169.85

173.85

4.0

0.05

Assays Pending

Designed to test main zone

AL07-29

including

149.5

154.5

164.5

174.5

156.5

170.5

25.0

2.0

6.0

0.05

0.10

0.11

Assays Pending

Designed to test main zone

*N.S.R. = No significant Results

Based on drill results to date, the main mineralized zone consists of two moderate to steeply dipping, sub-parallel sheets that locally coalesce. The main zone along with numerous minor sub-parallel lenses and sheets contain significant uranium/molybdenum grades, show good hole to hole correlation, and can be delineated over a minimum strike length of 340 meters. Uranium intersections range between 1.0 and 25.0 meters in true thickness, grade between 0.02% U3O8 and 0.11% U3O8 and can be traced from surface to a vertical depth of 230 meters. Initial drill testing of the Anna Lake target appears to have encountered the mineralization in a down-dip orientation. The orientation of the drilling program was revised following the completion of drill hole AL07-08 in order to intersect the mineralization at an optimum angle. True widths of mineralized sections are unknown up to holes AL07-03. Subsequent to this, true widths are estimated from 80-95% of the core length of intersections. Currently, all holes are being drilled due west to test the north-south trending zone. Of the Anna Lake holes reported in this release, 19 were designed to cut the main mineralized zone. Seventeen of these holes hit significant mineralization for an 89% hit ratio.

The Anna Lake uranium mineralized zones occur within a poorly exposed area with a veneer of glacial drift and boulders. A 1.3 km long and 500 meter wide induced polarization/resistivity anomaly, which reflects a belt of north-south trending supracrustal rocks consisting of metasediments/metavolcanic units, was delineated from ground geophysical surveys this year. The IP/resistivity anomaly is characterized by a very distinctive and well defined zone of high chargeability and low resistivity. Sulphide content within the belt averages approximately 1% to 5% and occurs in the form of pyrite, non-magnetic pyrrhotite and lesser chalcopyrite. A large structural component to the Anna Lake deposit is also evident from ground and airborne magnetic data. Potassic alteration manifesting itself as biotite overprinting can be observed in varying degrees throughout the core samples. Uranium mineralization occurs predominantly within sulphidic, biotite/garnet schist along a possible structural contact with footwall quartz sericite schist and porphyroblastic hematized granite. The exact controls on uranium mineralization are not clearly understood. The zone remains open in all directions with many high priority geophysical, geochemical and radon gas targets remaining untested along the above mentioned IP anomaly and elsewhere on the grid area. The host rock units within the Anna Lake area are believed to be a part of the Aillik belt of supracrustal rocks associated with the Michelin, Kitts, Gear, Inda, Nash and other uranium deposits hosted in the Central Mineral Belt.

Mr. George Leary, President of Bayswater states, "Although it is very early into the drill program, the cumulative widths and grades demonstrated along with the near surface nature and continuity of the mineralization, indicate that the Anna Lake deposit may be amenable to open pit mining. Excellent potential exists for expanding the deposit near surface and for discovery of higher grade zones at depth."

The deposit is entirely open along strike and to depth. The potential, as demonstrated on other deposits in the district, of a higher grade system at depth has yet to be evaluated. Additional drilling is planned to continue until mid-November and resume again in the early spring of 2008 from a base camp to be established on site at Anna Lake. A drill hole location map with drill hole sections will be available on the Bayswater website at www.bayswateruranium.com.

Additional results have also been received from the Dandy, Stipec River A, Stipec River E and Kanairiktok Bay uranium showings identified during the 2006 prospecting program. Results from drilling on the Stipec A (6 holes), Stipec E (3 holes) and Kanairiktok Bay (3 holes) showings returned no significant values of interest. Further geological work will be required to fully evaluate these surface showings. Drilling on the Dandy Uranium prospect has returned numerous low grade intersections of uranium. Table 2 summarizes the results from the Dandy drilling.

Table 2 � Analytical Results

Dandy Prospect

DDH #

From

To

Interval (m)

% U3O8

Comments

DS07-01-02

     

N.S.R

 

DS07-03

61.0

63.0

2.0

0.024

 

DS07-04

179.95

182.95

3.0

0.02

 

DS07-05

109.85

117.0

172.0

197.82

260.5

113.0

123.0

179.95

204.72

261.48

3.15

6.0

7.95

6.9

0.98

0.03

0.02

0.012

0.02

0.034

 

DS07-06

     

N.S.R

 

DS07-07

14.05

20.06

6.01

0.02

 

DS07-08-09

     

N.S.R

 

DS07-10

32.7

35.7

3.0

0.03

Drilled main surface showing

DS07-11

52.0

123.4

56.5

132.0

4.5

8.6

0.025

0.02

Undercut of DS07-10 @-65

DS07-12

19.85

27.85

8.0

0.03

Drilled main showing 25 m SW of DS07-10

DS07-13

32.0

37.0

5.0

0.04

Undercut of DS07-12 @-65. Some assays pending.

*N.S.R= No Significant Results

Drill holes DS07-01 through to DS07-09 were collared in various locations in an attempt to intersect surficial zones of uranium mineralization. Holes DS07-10 to DS07-13 were designed to test the main Dandy uraniferous dike swarm that hosts abundant uranophane mineralization on surface. Mineralization at the Dandy prospect occurs within pegmatite dikes cutting dominantly quartzofeldspathic gneiss. The best intersection returned to date assayed 0.04% U308 over 5.0 meters from DS07-13. Surface uranium mineralization in the Dandy area is extensive over a 1.5 kilometer by 600 meter area. Surface samples returned U3O8 grades up to 0.18%. Further evaluation of this prospect will continue in 2008.

Currently, two rigs continue to drill on the main Anna Lake target. Detailed follow-up grid controlled work including soil sampling, induced polarization/resistivity and radon cup surveys have been completed over the Anna Lake prospect for 2007. Further ground magnetics surveys are ongoing. The radon cup survey targeted the Anna Lake grid along with selected reconnaissance lines over the Ghost Lake A, Ghost Lake B and a newly discovered uranium bearing sandstone boulder train identified in the Stipec River area as previously announced. Limited grid controlled surveys have also been completed over portions of the Stipec River prospects. In addition, airborne electromagnetic and radiometric surveys have been completed during the 2007 field season and results of this along with all prospecting work will be forthcoming in subsequent news releases as analytical and other data is reviewed and assessed.

Sample handling consists of shipping one half of split drill core samples to Activation Laboratories Ltd. sample preparation facility in Goose Bay, Labrador where the samples are crushed, pulverized and split. Sample pulps are then forwarded to Ancaster, Ontario for analyses. Uranium analysis is performed using the delayed neutron counting (DNC) method. A multi-element inductively coupled plasma mass spectrometry (ICP-42) is performed as well on all samples. Where uranium values exceed the upper limit of 1%, samples are re-assayed using X-ray fluorescence (XRF). A rigorous quality control/assurance program was instituted for the sampling and analytical work. Control samples, consisting of three separate standards were inserted in the sample stream approximately every 25 to 30 samples. To date, this program has shown that the analyses are reliable. The Company intends to implement a more rigorous QA/QC program during its 2008 drilling program.

The Company�s exploration activities are conducted under the supervision of George M. Leary, M.Sc. P. Eng. (BC), President of the Company, and Victor Tanaka, B.Sc. P.Geo. (B.C.), Chief Operating Officer of the Company. Both are qualified persons under NI 43-101. George Leary is the qualified person responsible for the technical information in this news release.

About the Labrador Central Mineral Belt

The Central Mineral Belt of Labrador, Canada, located approximately 135 kilometers north of Goose Bay, has a long history of uranium and base metals exploration. Uranium was first discovered in the belt in the 1950's. With further exploration in the 1960's and 1970's and rising uranium prices, exploration in the region increased significantly and several uranium deposits were discovered including the Kitts, Michelin, Inda, Nash, Rainbow
and Moran Lake deposits by Brinco. Today, exploration activity in the region is highlighted by resource drilling at the Michelin and Jacques Lake deposits by Aurora Energy Resources Inc.
(TSX: AXU) and at the Moran Lake
deposit by Crosshair Exploration & Mining Corp.
(TSX-V: CXX). Collectively, approximately 100 million pounds of NI 43-101 compliant uranium resources have been reported in the Central Mineral Belt by Aurora and Crosshair, a figure that is expected to increase significantly in the coming years through increases to existing resources, as well as new uranium discoveries. Bayswater Uranium is the largest landholder in the Central Mineral Belt with interests in 4,626 sq km of strategic landholdings; Aurora controls about 800 sq km and Crosshair approximately 640 sq km. Bayswater is aggressively exploring several uranium targets within its landholdings with the objective of discovering new uranium resources.

About Bayswater Uranium Corporation - The Super JuniorTM Uranium Company

Bayswater Uranium Corporation is a rapidly-growing international uranium exploration and development company. As the only uranium company to have major landholdings in each of Canada's most important producing and exploration regions � the Athabasca Basin, the Central Mineral Belt, and the Thelon Basin � Bayswater is a leader in uranium exploration in Canada, the world�s largest producer of uranium. The Company also owns several advanced uranium properties in the United States that are being fast tracked to production. Bayswater combines a balanced portfolio of exploration and development projects with the uranium expertise of its technical and managerial teams. The result is a Super JuniorTM Uranium Company with the share liquidity and market capitalization to provide value to both the retail and institutional investor. Bayswater is listed on the TSX Venture Exchange under the symbol "BAY".  The Company�s website is www.bayswateruranium.com.

On behalf of the Board of:

BAYSWATER URANIUM CORPORATION

George M. Leary
President
 

For further information contact:

John Gomez
Manager, Investor Relations
Telephone: (604) 687-2153

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents herein.

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Bayswater Uranium Corp.

EXPLORATEUR
CODE : BAY.V
ISIN : CA0731731067
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Bayswater est une société d’exploration minière d'uranium basée au Canada.

Bayswater détient divers projets d'exploration au Canada et au Mali.

Ses principaux projets en exploration sont AVOCA en Irlande, NORTH THELON, SOUTH THELON, ALZADA, JUNIPER PROPERTY, MOUNTAIN WEST, BRUDELL LAKE, COLLINS BAY EXTENSION, COIN CANYON, VIKING (BAYSWATER), CENTRAL MINERAL BELT (BAYSWATER), TEJANA MESA, ANNA LAKE, RENO CREEK PROJECT, WISKER VALLEY et BOITEAU LAKE au Canada, NIGER au Niger et SAMIT au Mali.

Bayswater est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 7,1 millions CA$ (5,2 millions US$, 4,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 2,47 CA$, et son plus bas niveau récent le 19 décembre 2022 à 0,02 CA$.

Bayswater possède 59 520 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Bayswater Uranium Corp.
13/10/2009 Announces Drill Results from Otis Gold Joint Venture at Kil...
18/03/2008Gold Newsletter report
Rapports annuels de Bayswater Uranium Corp.
2008 Annual report
Annual Report 2007
Financements de Bayswater Uranium Corp.
19/11/2008Closes Non-Brokered Private Placement
06/11/2008Announces Flow-Through Financing
07/08/2008Seeks Approval to Amend the Terms of its Outstanding Warrant...
Nominations de Bayswater Uranium Corp.
06/05/2008Appoints Ricardo Campoy as Advisor
Projets de Bayswater Uranium Corp.
03/06/2010(Reno Creek Project)Bayswater Commences Baseline Environmental Studies at Reno C...
05/10/2009(Reno Creek Project)Receives Positive Pre-Feasibility Study on Reno Creek Uraniu...
10/09/2009(Reno Creek Project)Commissions Pre-Feasibility Study for Reno Creek Uranium Pro...
24/08/2009(Reno Creek Project)Acquire Reno Creek Uranium Project, Wyoming
23/07/2009(Tejana Mesa)Swaps Adjoining Uranium Claims at Tejana Mesa Property in Ne...
21/07/2009(Boiteau Lake)Begins Exploration at Boiteau Lake in Central Mineral Belt, ...
15/07/2009(Collins Bay Extension)Grants Option on Collins Bay Extension Project in Athabasca ...
30/06/2009(Tejana Mesa)Tejana Mesa Property & Immediate Region has Potential for Up...
25/06/2009(Labrador)Provides Review of Land Position and Significant Results Fro...
10/06/2009(Avoca)Intersects 9.5% Zinc & 3.3% Lead over 1.8 m in Drill Hole at...
06/06/2009Encounters Anomalous Metal Values in Drill Hole at Brudell L...
03/03/2009(Elkhorn)Announces Results from Phase 4 Drilling at Elkhorn Project, ...
17/02/2009(Anna Lake)’s 2008 Drilling Program Significantly Expands Anna Lake Ura...
30/09/2008(Labrador)Commences Drilling Program on Newly Discovered Minisinakwa L...
05/08/2008(Athabasca)Confirms Discovery of Strong Uranium Targets at Brudell Lake...
07/08/2008(Elkhorn)Drilling Further Expands Elkhorn Uranium Project, Wyoming
06/08/2008(Anna Lake)Drilling Continues to Expand Anna Lake Uranium Deposit, Cent...
12/05/2008(Anna Lake)Commences Major Drilling Program on its Anna Lake Uranium Pr...
30/04/2008(North Thelon)Receives Consultant's Report Defining High Priority Targets ...
06/03/2008(Elkhorn)Launches Drilling Program at Elkhorn Project, Wyoming
20/02/2008(Athabasca)Launches Drill Program at Collins Bay Extension Project, Ath...
29/10/2007(South Quinn Lake)Drilling Leads to Major Uranium Discovery in Labrador
Communiqués de Presse de Bayswater Uranium Corp.
15/10/2009Baywater Provides Resource Estimate for the Anna Lake Deposi...
15/09/2009To Retain Dr. Robert Rich to Sell Reno Creek Uranium Product...
28/07/2009to Sell Uranium Interests in Mali
16/07/2009Advisory: Bayswater Launches New Website
30/06/2009’s Revised News Release on Tejana Mesa Property=2C New Mexic...
20/01/2009to Exhibit at Resource Conference
12/12/2008Sells Select Claims in South Dakota and Wyoming
14/11/2008and Commander Sell Uranium Royalty and Bayswater to Sell Gol...
02/09/2008to Exhibit & Present at Hard Assets Conference in Las Vegas
29/07/2008Continues to Explore Uranium Potential at Wisker Valley Proj...
28/07/2008Discovers Uranium at North Thelon Basin Project
24/07/2008Gold Joint Venture Approved
20/05/2008Completes Phase 3 Drilling at Elkhorn Project, Wyoming
09/05/2008to Present at New York Investment Conference
07/05/2008Establishes Corporate Governance System
28/04/2008Reassesses Priorities & Targets Labrador and Wyoming to Fuel...
09/04/2008Business As Usual For Bayswater On Its Labrador Central Mine...
27/03/2008Launches Corporate Video
05/03/2008 in Uranium Market Roundtable Discussion
21/02/2008Commences Drilling on Its Wisker Valley Uranium/Gold Project...
31/01/2008Purchases Balance of Interest in Uranium Properties in Saska...
08/01/2008 Aims to Significantly Increase Uranium Resources in 2008
18/12/2007Discovers Five Uranium Targets for Drill Testing on Athabasc...
10/12/2007Additional Drilling Significantly Expands Anna Lake Uranium ...
05/12/2007Expands Amanda Uranium Zone-Part of a Potentially Large Uran...
26/11/2007 Granted Two Concessions in Niger, West Africa
22/11/2007 Executes Agreement to Acquire Northern Canadian Uranium
14/11/2007 on Uranium Panel "Rebooting the Uranium Price: Navigating a...
13/11/2007Retains Windward to Expand PR
16/10/2007to Acquire Northern Canadian Uranium Inc.
15/10/2007 Resumes Drilling in Labrador with Two Rigs
04/09/2007on James Dines' Uranium Picks Panel
23/08/2007Confirms Cash Position
17/08/2007Purchases Uranium Properties in New Mexico and Utah
16/08/2007Upgraded to Tier 1 Issuer Status
03/08/2007& Silver Spruce/Universal Uranium Joint Venture Claims Cover...
02/08/2007 Provides Project and Corporate Update
01/08/2007 & Ucore Joint Venture Mutual Claims in Previously Exempt Ar...
25/07/2007Completes Merger to Acquire U.S. Uranium Assets
18/07/2007and Kilgore Shareholders Approve Merger
12/07/2007Starts Drilling for Uranium in Central Mineral Belt, Labrado...
10/07/2007Enters Into Agreement with Stornoway to Explore Diamond Targ...
10/07/2007Acquires Extensive Database for Mountain West Uranium Proper...
06/07/2007Airborne Survey Commences at Cochrane Pond Uranium Property,...
07/06/2007Signs Arrangement Agreement with Kilgore
08/05/2007Provides Update on Kilgore Merger
03/05/2007Commences Surveys in Labrador; Drilling Planned Next Month
18/04/2007Completes Major Survey at Athabasca Basin Uranium Property
13/04/2007and Commander Option Cochrane Pond Property, Newfoundland
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BAY.V)FRANKFURT (R9U1.F)
0,120+4.35%0,0570
TSX-V
CA$ 0,120
06/05 11:05 -
4,35%
Cours préc. Ouverture
0,115 0,120
Bas haut
0,120 0,120
Année b/h Var. YTD
0,060 -  0,160 100,00%
52 sem. b/h var. 52 sem.
0,030 -  0,305 166,67%
Volume var. 1 mois
23 500 -4,00%
24hGold TrendPower© : -44
Produit
Développe
Recherche Copper - Gold - Lead - Molybdenum - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024100,00%0,160,06
2023200,00%0,340,02
2022-66,67%0,080,02
202133,33%0,090,04
2020-40,00%0,120,04
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,42 AU$-0,74%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,12 US$+3,10%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-0,92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+1,93%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,57 CA$+2,77%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$-4,55%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,83 CA$+2,23%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,40 US$+1,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$-2,63%Trend Power :