Drilling of the DS Copper-Gold property is expected to resume in July, a diamond drill rig having been secured for work on the property.
The initial drill target is a large coincident Magnetic and I.P. anomaly located to the north of the DS Pit zone, where the company made a new copper-gold discovery in its 2010 work program.
The Company has submitted a work permit application for the Arrowsmith Copper-Gold prospect and is awaiting an initial response to the application. The Arrowsmith property covers four distinct historical showings which are under single ownership for the first time. Previous operators were hindered by their inability to bring these showings together under a single entity.
The continued uncertainty over the inability to obtain work permits together with significant annual holding costs associated with the Drybones Bay Diamond property has led the Company to return the property to the vendor.
Glen Macdonald P.Geol. a Qualified Person as defined in NI43-101 has approved the technical content of this news release.
Additional information on New Shoshoni is available on Shoshoni's website at http://www.newshoshoni.com .
�
NEW SHOSHONI VENTURES LTD.
Ralf Hillebrand President
For more information, please contact Mark Tommasi at 604-608-6314 or toll free at 1-877-454-0383.
�
The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.
� |