======================================================================
Bjorkdal Gold Mine - Central Tunnel Drill Results
======================================================================
Gold-Ore Resources Ltd. provides further diamond drill results from the
Bjorkdal Gold Mine in Sweden. During the past 15 months the Company has
drilled 17,300 metres in 193 core holes and has completed 1,700 metres
of tunnels. Gold-Ore has an option to purchase 100% of the
gold-producing property from Minmet plc of Dublin, Ireland.
In July a drill rig was positioned in the Central Tunnel which is
located in the "Central Pit" approximately 500 metres north-west of the
previously drilled Eastern Tunnel. A total of 19 drill holes (1,640
metres) have been completed and the results for the first 11 holes are
tabled below.
The corridor hosting the gold-bearing veins at Bjorkdal has now been
confirmed across a width of 800 metres and remains open to further
expansion. Previous open pit mining and current drilling have confirmed
the length of the corridor to be at least 1,200 metres and is also open
to extension.
Central Tunnel -- Significant Drill Intersections
Drill Hole Section From To Core Interval True Width Gold Grade
(m) (m) (m) (m) (g/t)
2007-072 240 West 1.2 4.0 2.8 2.7 8.81
2007-073 240 West 2.8 6.5 3.7 3.7 38.29
including 2.8 3.7 0.9 0.9 150.5
9.0 11.3 2.3 2.3 31.42
including 9.7 10.5 0.8 0.8 90.20
16.8 23.8 7.0 6.9 17.23
including 16.8 17.5 0.7 0.7 118.00
30.7 35.0 4.3 4.2 3.01
47.0 49.0 2.0 2.0 3.24
2007-074 240 West 2.0 5.0 3.0 2.8 3.20
11.0 15.2 4.2 4.0 3.58
2007-075 180 West 7. 10.0 3.0 2.9 4.38
2007-076 180 West 12.0 15.0 3.0 2.5 4.22
2007-077 180 West 11.0 13.7 2.7 2.6 2.82
41.9 44.1 2.2 2.1 12.12
55.8 58.3 2.5 2.4 4.04
79.0 81.3 2.3 2.2 5.82
84.0 86.8 2.8 2.7 11.01
98.0 100.7 2.7 2.6 34.91
including 99.7 100.7 1.0 1.0 93.60
130.9 133.1 2.2 2.1 4.28
2007-078 180 West 0.0 2.2 2.2 2.2 4.10
16.0 18.0 2.0 2.0 6.01
37.0 39.0 2.0 2.0 7.60
59.6 62.0 2.4 2.4 14.30
70.0 72.0 2.0 2.0 2.61
2007-079 180 West 29.7 32.0 2.3 2.2 2.96
2007-080 180 West 14.0 17.0 3.0 2.9 3.6
43.1 46.0 2.9 2.8 2.5
61.0 66.0 5.0 4.8 16.37
including 63.9 65.0 1.1 1.1 62.80
2007-081 210 West 21.0 24.0 3.0 2.3 12.45
The Company only releases drill intersections deemed to be significant.
If a drill hole cuts mineralization with gold values greater than 2.5
g/t across a true width of 2.0 metres or more, it is released.
All holes drilled in the Central Tunnel have been on 30 metre-spaced
sections. Drilling will continue in the Central Tunnel and enable this
area to be incorporated into a resource calculation as part of the
feasibility study now underway.
Sample Protocol and Chain of Custody
All drill core is logged, photographed and sawn, then transported by
Company personnel to the ALS Chemex lab in Pitea, Sweden. The half core
is crushed and pulverized and a 500 gram split is assayed by an
accelerated cyanide leach (bottle roll). This method was selected as
the large sample assayed minimizes the nugget effect and provides for a
more reliable assay. A rigorous QA/QC program is employed and involves
the insertion of blanks, certified standards and field and lab
duplicates.
For more information please contact Glen Dickson or Bob Wasylyshyn at
(604) 687-8884. Bjorkdal property information is posted on the
Company's web site at www.goldoreresources.com Robert S. Wasylyshyn; P.
Geo. is the Company's Qualified Person for the Bjorkdal Project.
ON BEHALF OF THE BOARD
Glen Dickson, Chairman
The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release. This news
release may contain forward-looking statements including but not
limited to comments regarding the timing and content of upcoming work
programs, geological interpretations, receipt of property titles,
potential mineral recovery processes, etc. Forward-looking statements
address future events and conditions and therefore, involve inherent
risks and uncertainties. Actual results may differ materially from
those currently anticipated in such statements.
======================================================================
Copyright (c) 2007 GOLD ORE RESOURCES LTD. (GOZ) All rights reserved.
For more information visit our website at
http://www.goldoreresources.com/ or send
mailto:info@goldoreresources.com
======================================================================
.