Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Capstone Mining Corp.

Publié le 29 octobre 2014

Capstone Mining Reports Another Quarter of Record Cash Flow

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Capstone | Copper | G Mexico | Zinc |

Capstone Mining Reports Another Quarter of Record Cash Flow

10/29/2014

Operating cash flow before changes in working capital of $57.1million
 (All amounts in US$ unless otherwise specified)

VANCOUVER, Oct. 29, 2014 - Capstone Mining Corp. ("Capstone") (TSX: CS) today announced its financial results for the three and nine months ended September 30, 2014, with operating cash flow before changes in working capital(1) for the quarter a record $57.1 million. Capstone posted a loss for the quarter of $0.1 million due to non-cash charges of $3.0 million related to a write down of inventory at Minto and a non-cash impairment charge of $8.6 million in the carrying value of the Kutcho development project. Copper production during the quarter at Capstone's three operating mines totalled 26,178 tonnes of copper in concentrates and cathode (25,270 tonnes of payable copper) at a C1 cash cost(1) of $1.84 per payable pound of copper produced.

Capstone will hold a conference call and webcast on Thursday, October 30, 2014at 11:30 am Eastern time (8:30 am Pacific time) to discuss these results; call-in details and information on associated slides are provided at the end of this release. This release should be read in conjunction with Capstone's unaudited condensed interim consolidated financial statements and management's discussion and analysis ("MD&A") for the three and nine months ended September 30, 2014, which are available on Capstone's website at http://capstonemining.com/investors/financial-reporting/default.aspx and on SEDAR. An updated corporate presentation, including results to September 30, 2014, in addition to the Q3 2014 webcast slides, will also be available at http://capstonemining.com/investors/events-and-presentations/default.aspx.

NOTE: The transaction to acquire the Pinto Valley Mine closed on October 11, 2013 and therefore its results of operations are included in the Company's reported results from that date forward. As such, there are no comparable Q3 2013 or 2013 YTD figures for the Pinto Valley Mine.

Overview







Q3 2014

Q3 2013

2014 YTD

2013 YTD

Revenue ($ millions)

183.9

79.3

516.5

195.2






Copper in concentrates produced (tonnes)

25,529

8,595

79,764

25,790

Copper cathode produced (tonnes)

649

-

1,796

-






Payable copper produced (tonnes)

25,270

8,252

78,713

24,782

C1 cash cost per payable pound of copper produced(1) ($)

1.84

1.57

1.92

1.66






Copper sold (tonnes)

29,032

10,691

80,196

25,323

Realized copper price per pound sold ($)

2.98

3.25

3.10

3.29






Net (loss) earnings ($ millions)

(0.1)

(4.6)

12.0

11.5

Net (loss) earnings per common share ($)

0.00

(0.01)

0.03

0.03






Adjusted EBITDA(1) ($ millions)

70.0

21.3

191.2

74.1

Adjusted EBITDA per common share(1)  ($)

0.18

0.06

0.50

0.20






Operating cash flow before changes in working capital(1) ($ millions)

57.1

13.6

161.8

62.9

Operating cash flow before changes in working capital per common share(1) ($)

0.15

0.04

0.42

0.17






Net debt (cash)(1) ($ millions)

121.1

(453.8)

121.1

(453.8)






(1) These are alternative performance measures; please see "Alternative Performance Measures" at the end of this release.                      

 "We posted a strong quarter operationally, with all of our mines tracking well against our 2014 cost and production guidance," said Darren Pylot , President and CEO of Capstone. "The results of the cost reductions and operating efficiencies that we are implementing at Pinto Valley were evident during the third quarter, with C1 cash costs(1) of $1.90 per pound of copper."

"This quarter also demonstrated our significant ability to generate cash, setting another quarterly record for cash flow from operations," continued Mr. Pylot. "We used our cash to reduce net debt by $60 million, ending the quarter with net debt of $121 million, which includes $176 million of cash and cash equivalents, providing Capstone with a strong balance sheet to sustain our business plan and to protect against market volatility."

Financial and Production Highlights for the Three Months Ended September 30, 2014

  • Adjusted EBITDA(1) of $70.0 million or $0.18 per common share after making adjustments for certain non-cash and other items.
  • Operating cash flow before changes in working capital(1) of $57.1 million or $0.15 per common share.
  • Net loss of $0.1 million or $0.00 per common share which included:
    o     Earnings from mining operations of $31.4 million,
    • Realized copper price of $2.98 per pound.

          o     Production costs included a $3.0 million non-cash charge related to the write-down of inventory at Minto,
          o     $8.6 million non-cash charge related to the impairment of capitalized mineral property costs at the Kutcho project, 
          o     $10.8 million tax expense.

  • Working capital increased to $152.8 million at September 30, 2014 (which included $176.1 million of cash) from $137.4 million at December 31, 2013.
  • Production of 25,270 tonnes of payable copper at a C1 cash cost(1) of $1.84 per pound of payable copper produced.
  • Revenue of $183.9 million generated primarily from the sale of 29,032 tonnes of payable copper.

Operational Highlights for the Three and Nine Months Ended September 30, 2014

Pinto Valley Mine:

  • Produced 15,812 tonnes of copper in concentrates and 649 tonnes of copper cathode during Q3 2014.   The C1 cash cost(1) was $1.90 per pound of payable copper produced.
  • Produced 49,412 tonnes of copper in concentrates and 1,796 tonnes of copper cathode during 2014 YTD at a C1 cash cost(1) of $2.03 per pound of payable copper produced.
  • Work is ongoing related to the implementation of improvements identified by the Pinto Valley Phase 2 pre-feasibility study ("PV2 PFS"), with the project execution plan in place, orders for the majority of the mine equipment placed and detailed engineering and construction underway.

Cozamin Mine:

  • Produced 4,948 tonnes of copper in concentrates during Q3 2014 at a C1 cash cost(1) of $1.29 per pound of payable copper produced.
  • Produced 15,240 tonnes of copper in concentrates during 2014 YTD at a C1 cash cost(1) of $1.25 per pound of payable copper produced.
  • Exploration drilling from surface to test structural splays off of the main Mala Noche vein system continued in Q3 2014.
  • During the quarter Capstone acquired 45 mining concessions covering 770 hectares situated along strike and surrounding current Capstone claims, giving Capstone control of the majority of the Mala Noche vein system and many of its subsidiary splays both along strike and at depth.
  • On August 5, 2014, Capstone filed a technical report updating Mineral Resource and Mineral Reserve estimates for Cozamin. Using a $35/tonne net smelter return ("NSR") cut-off grade ("COG") at December 31, 2013, the Cozamin Indicated Mineral Resources, inclusive of Mineral Reserves, totaled 395 million pounds of copper and Inferred Mineral Resources totaled 184 million pounds of copper. Probable Mineral Reserves at December 31, 2013 totaled 259 million pounds of copper using a $42.50/tonne NSR COG for the San Roberto and Mala Noche Footwall copper zones and $38/tonne for the San Rafael zinc zone, which represents an expected mine life of 6.5 years. This compares with Proven and Probable Reserves of 311 million pounds of copper as disclosed in the Company's 2013 Annual Information Form.

Minto Mine:

  • Produced 4,762 tonnes of copper in concentrates during Q3 2014 at a C1 cash cost(1) of $2.18 per pound of payable copper produced.
  • Produced 15,112 tonnes of copper in concentrates during 2014 YTD at a C1 cash cost(1) of $2.19 per pound of payable copper produced.
  • Surface mining has been suspended since the end of Q3 2014 due to delays in receipt of the Water Use License Amendment, which is required to permit pre-stripping at Minto North. Underground mining will continue along with the milling of underground and stockpiled ore.

Santo Domingo Project:

  • The Company initiated the tender process for EPC/EPCM packages for project development.
  • The government issued a second addendum request with respect to the EIS process, with a slate of 175 observations to be addressed during Q4 2014.
  • A third party objection to the Santo Domingo port concession application was rejected by the Chilean Armed Forces, clearing the way for final approval of the application.

Greenfield Exploration:

  • Exploration work continued during Q3 2014 at Project Providencia in Region II, Chile. Capstone completed extensive soil and rock geochemical surveys as well as geological mapping and also started several different Induced Polarization surveys. Eight different prospect areas have been identified for their potential to host copper gold mineralization of porphyry-type and IOCG and Manto type mineralization.  Preparations are underway to start drilling targets in Q4 2014.

Corporate:

  • On September 5, 2014 Capstone announced the launch of $300 million of Senior Notes maturing in 2022.  The Notes offering was intended to opportunistically repay borrowings under the Capstone's two existing credit facilities. As market conditions deteriorated in the week following the announcement, the Company discontinued the offering as targeted terms and conditions were not achievable. As of the date of this news release the market has not improved to a level aligned with the Company's criteria for a borrowing. The Company will continue to monitor the high yield market and is prepared to take advantage of it should conditions improve. With current liquidity, availability under existing facilities and strong cash flow from operations, the Company has more than sufficient capacity to meet its anticipated capital requirements and is under no compulsion to access the high yield market.

Production Outlook

Capstone's 2014 guidance for 102,000 tonnes ±5% of copper in concentrates, at a C1 cash cost(1) of $1.90 to $2.00 per pound of payable copper, net of by-product credits and selling costs, remains unchanged. 

Conference Call and Webcast Details
Date:  Thursday, October 30, 2014
Time:   11:30 am Eastern Time (8:30 am Pacific Time)
Dial in:   North America: 1-888-390-0546, International: +416-764-8688
Webcast:  http://www.newswire.ca/en/webcast/detail/1420970/1578324
Q3 2014 webcast slides:  http://capstonemining.com/investors/financial-reporting/default.aspx
Replay:   North America: 1-888-390-0541, International: +416-764-8677
Replay Passcode:   273766#

The conference call replay will be available until Thursday, November 13, 2014. The conference call audio and transcript will be available on Capstone's website within approximately 24 hours of the call at http://capstonemining.com/investors/conference-calls-and-webcasts/default.aspx.

About Capstone Mining Corp.

Capstone Mining Corp. is a Canadian base metals mining company, focused on copper. We are committed to the responsible development of our assets and the environments in which we operate. Our three producing mines are the Pinto Valley copper mine located in Arizona, US, the Cozamin copper-silver mine in Zacatecas State, Mexico and the Minto copper mine in Yukon, Canada. In addition, Capstone has two copper development projects; the large scale 70% owned copper-iron Santo Domingo project in Region III, Chile, in partnership with Korea Resources Corporation, and the 100% owned copper-zinc Kutcho project in British Columbia, Canada, as well as exploration properties in Chile. Using our cash flow and strong balance sheet as a platform, Capstone's strategy is to continue to grow with mineral resource and reserve expansions and exploration, and through acquisitions in politically stable, mining-friendly regions. We will pace our growth with our financial capacity, ensuring we retain, as a priority, sufficient financial flexibility to meet the requirements of our existing operations and our committed development projects, while maintaining an adequate cushion to deal with market volatility and operating risks inherent in the mining industry. Our headquarters are in Vancouver, Canada and we are listed on the Toronto Stock Exchange (TSX). Further information is available at www.capstonemining.com.

Cautionary Note Regarding Forward-Looking Information

This document may contain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking statements"). These forward-looking statements are made as of the date of this document and Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation.

Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "outlook", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. In this document, certain forward-looking statements are identified by words including "may", "future", "expected", "intends" and "estimates". By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of resources; possible variations in ore reserves, grade or recovery rates; accidents, dependence on key personnel, labour pool constraints, labour disputes; availability of infrastructure required for the development of mining projects; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; and other risks of the mining industry as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review under the Company's profile on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. The Company provides no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

National Instrument 43-101 Compliance

Unless otherwise indicated, Capstone has prepared the technical information in this news release ("Technical Information") based on information contained in the technical reports, news releases and MD&A's (collectively the "Disclosure Documents") available under Capstone Mining Corp.'s company profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by, or under the supervision of, a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101").  Readers are encouraged to review the full text of the Disclosure Documents which qualifies the Technical Information.  Readers are advised that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The technical information in this news release ("Technical Information") was prepared by, or under the supervision of, a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). The disclosure of the Technical Information contained in this news release has been reviewed and approved by Brad Skeeles , P. Eng., Vice President of North American Operations (Technical Information related to mining and production), Brad Mercer , P. Geol., Vice President, Exploration (Technical Information related to mineral exploration activities), and Gregg Bush , P. Eng., Senior Vice President and Chief Operating Officer, all Qualified Persons under NI 43-101. 

Alternative Performance Measures

The items marked with a "(1)" are alternative performance measures and readers should refer to Alternative Performance Measures in the Company's Interim Management's Discussion and Analysis for the three and nine months ended September 30, 2014 as filed on SEDAR and as available on the Company's website for further details.

Cautionary Note to United States Investors

This news release contains disclosure that has been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of U.S. securities laws. Without limiting the foregoing, this news release may refer to technical reports that use the terms "indicated" and "inferred" resources. U.S. investors are cautioned that, while such terms are recognized and required by Canadian securities laws, the SEC does not recognize them. Under U.S. standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that all or any part of indicated resources will ever be converted into reserves. U.S. investors should also understand that "inferred resources" have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of "inferred resources" will ever be upgraded to a higher category. Therefore, U.S. investors are also cautioned not to assume that all or any part of inferred resources exist, or that they can be mined legally or economically. Accordingly, information concerning descriptions of mineralization and resources contained in this news release may not be comparable to information made public by U.S.SEC.

SOURCE Capstone Mining Corp.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Capstone Mining Corp.

PRODUCTEUR
CODE : CS.TO
ISIN : CA14068G1046
CUSIP : 14067U104
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Capstone Mining est une société de production minière de cuivre basée au Canada.

Capstone Mining est productrice de cuivre, d'argent, d'or, de plomb et de zinc au Canada et au Mexique, en développement de projets d'argent, de cuivre, d'or et de zinc au Canada.

Ses principaux projets en production sont MINTO MINE au Canada et COZAMIN BACIS au Mexique et son principal projet en développement est KUTCHO au Canada.

Capstone Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 4,0 milliards CA$ (2,9 milliards US$, 2,7 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 06 décembre 2002 à 0,11 CA$, et son plus haut niveau récent le 26 avril 2024 à 10,29 CA$.

Capstone Mining possède 390 500 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Capstone Mining Corp.
31/12/2007Corporate Presentation
Dans les médias de Capstone Mining Corp.
26/11/2018Capstone Mining mulls selling stake in Chile-based copper-ir...
Rapports annuels de Capstone Mining Corp.
2007 Annual Report
Nominations de Capstone Mining Corp.
14/05/2013Capstone Appoints D. James Slattery as Chief Financial Offic...
04/06/2012Capstone Mining Appoints Director
14/09/2011Capstone Appoints Santo Domingo General Manager and Awards E...
14/04/2011Reports Change to its Board
Rapports Financiers de Capstone Mining Corp.
28/07/2015Second Quarter 2015 Financial Results
21/02/2014Capstone Mining Reports Financial Results
21/02/2014Reports Financial Results for Pivotal Year
13/01/2014Capstone Mining 2013 Fourth Quarter and Full
30/10/2013Capstone Mining 2013 Third Quarter Continues
10/10/2013Capstone Mining 2013 Third Quarter
11/07/2013Capstone Mining 2013 Second Quarter
08/05/2013Capstone Mining 2013 First Quarter Financial
11/04/2013Capstone Mining 2013 First Quarter
08/11/2012Capstone Reports 2012 Third Quarter Financial Results; Cash ...
15/08/2012Capstone Reports 2012 Second Quarter
10/05/2012Capstone Reports Solid 2012 First Quarter
15/08/2011Capstone Reports Second Quarter 2011
25/05/2011Capstone Reports First Quarter 2011 Financial Results
07/11/2008Reports Financial Results For The Third Quarter
23/07/2008To Release Second Quarter Results
09/07/2008Announces Production and Sales for the Second Quarter of 200...
30/04/2008 Reports Record Operating Profit Of $15.9 Million For The Fi...
23/04/2008To Release First Quarter Results On Tuesday April 29, 2008
16/04/2008 Announces Production And Sales For The First Quarter Of 200...
15/11/2007Year-End and Fourth Quarter Results
Projets de Capstone Mining Corp.
22/09/2014(Minto Mine)Receives Quartz Mining License Amendment for Minto Mine
03/12/2013Capstone Mining Provides Pinto Valley Production Update
11/10/2013Capstone Mining Completes Acquisition of
08/08/2013Capstone Mining Acquires Option on 350,000 Hectare Explorati...
11/06/2013Capstone Mining Provides Update on Pinto Valley Acquisition
25/10/2012Capstone adds 101 Million Pounds of Copper in Indicated Mine...
18/06/2012Capstone Completes Minto Mine Phase VI
08/02/2012Capstone Updates Mineral Resource Estimate for Footwall Zone...
02/02/2012Capstone Completes Another Successful Drill Season at Minto ...
20/06/2011Capstone Announces Initial Mineral Resource
17/06/2011Capstone Completes Acquisition of Far West Mining and Transa...
14/06/2011Capstone Mining and Far West Mining Approve Acquisition and ...
30/05/2011Capstone Adds 219 Million Pounds of Copper in M&I Mineral Re...
02/05/2011Capstone Reports Additional High Grade
14/04/2011Capstone Reports High Grade Intercepts at
14/03/2011Capstone Completes Prefeasibility Study on Phase V Expansion...
24/02/2011(Kutcho)Reports 2011 Prefeasibility Study for Kutcho Copper-Zinc Pro...
24/02/2011Capstone Reports 2011 Prefeasibility Study
17/02/2009(Minto)Reports 5th New High Grade Copper-Gold Discovery at Minto Mi...
09/02/2009Announces Robust Mineral Resource Update for High Grade Kutc...
04/02/2009(Cozamin Bacis)Reports Record Copper Production for 2008 and Increases Fore...
10/01/2008(Cozamin Bacis)Highlights Production and Sales for the Four Months Ended De...
16/10/2007(Cozamin Bacis)Capstone Increases Resources to 8.6 Million Tonnes at the Co...
11/10/2007(Cozamin Bacis) Declares Expanded Commercial Production at Cozamin and High...
Communiqués de Presse de Capstone Mining Corp.
26/07/2016Capstone reports 2Q loss
26/04/2016Capstone reports 1Q loss
19/01/2016Capstone Mining to Attend Upcoming Investor Conferences
18/01/2016Capstone Mining 2016 Operating and Capital Guidance
18/01/2016Capstone Extends Pinto Valley Mine Life to 2039
06/01/2016Edited Transcript of CS.TO earnings conference call or prese...
25/11/2015Capstone Mining to Attend Upcoming Investor Conferences
27/10/2015Capstone reports 3Q loss
13/10/2015Capstone Mining 2015 Third Quarter Production Results
09/09/2015Capstone Mining Announces Spending Cuts in Response to Marke...
08/09/2015Capstone Mining to Attend Upcoming Investor Conference
27/08/2015Edited Transcript of CS.TO earnings conference call or prese...
05/08/2015Capstone Mining Receives Water Use Licence for Minto Mine
03/08/2015Zacks Investment Ideas feature highlights: Avino Silver and ...
28/07/2015Capstone Mining Second Quarter 2015 Financial Results
13/07/2015Capstone Mining 2015 Second Quarter Production Results
08/07/2015Capstone Mining Receives Approval of Environmental Impact As...
13/04/2015Capstone Mining 2014 First Quarter Production Results
01/04/2015Capstone Mining Publishes Inaugural Sustainability Report
01/04/2015Publishes Inaugural Sustainability Report
19/02/2015to Attend Upcoming Investor Conferences
01/12/2014to Attend Upcoming Investor Conferences
29/10/2014Capstone Mining Reports Another Quarter of Record Cash Flow
14/10/2014Capstone Mining to Attend Upcoming Investor Conference
12/09/2014Discontinues Planned Offering of $300 million Senior Notes
05/09/2014Announces Launch of $300 million Senior Notes Offering
07/05/2014Reports Operating Cash Flow Increases 134% to $47.1 Million
10/04/2014Record 2014 First Quarter Production Results
26/03/2014Extends Pinto Valley Mine Life to 2026
20/01/2014Capstone Mining to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
20/01/2014to Attend Upcoming Investor Conferences
13/01/20142013 Fourth Quarter and Full Year Production Results
11/12/2013Capstone Mining Files Updated Technical Report for Pinto Val...
11/12/2013Files Updated Technical Report for Pinto Valley
14/11/2013Capstone Mining to Attend Upcoming Investor Conferences
14/11/2013to Attend Upcoming Investor Conferences
07/10/2013Capstone Mining Provides Update on Pinto
07/10/2013Provides Update on Pinto Valley Acquisition
31/07/2013Capstone Mining Delivers Consistent 2013
11/07/20132013 Second Quarter Production Results
13/06/2013Capstone Mining Files Pinto Valley 43-101 Mineral Resource E...
11/06/2013Provides Update on Pinto Valley Acquisition
30/05/2013Capstone Mining to Attend Upcoming Investor Conferences
10/05/2013Capstone Mining Reports Annual General Meeting Voting Result...
29/04/2013Capstone Mining to Purchase Pinto Valley
28/04/2013to Purchase Pinto Valley Copper Mine
13/03/2013Capstone Mining Reports 2012 Year End
18/02/2013to Present at Upcoming Investor Conferences
10/01/2013Capstone 2012 Fourth Quarter and Full Year Production Result...
10/01/20132012 Fourth Quarter and Full Year Production Results Meet Gu...
31/10/2012Capstone Reports Senior Management Change
31/10/2012Reports Senior Management Change
23/10/2012Capstone Reports Board Change
23/10/2012Reports Board Change
11/10/2012Capstone 2012 Third Quarter Production Results on Track
12/07/2012Capstone 2012 Second Quarter Production Results On Target
14/05/2012Capstone Reports Board Change
13/04/2012Capstone Mining Announces New $200 Million
12/04/2012Capstone 2012 First Quarter Production
14/03/2012Capstone Reports Strong 2011 Results
10/02/2012Capstone Mining Reports Board Change
26/01/2012Capstone 2012 Operating and Capital Guidance
17/01/2012Capstone Fourth Quarter and Full Year 2011 Production Result...
16/01/2012Capstone Awards Contract for Santo Domingo
06/10/2011Capstone Third Quarter Production Results
15/08/2011Capstone Reports Pre-Feasibility Study
10/08/2011to Hold Second Quarter and Santo Domingo PFS Conference Call...
06/07/2011Capstone Second Quarter Production Results
20/06/2011Capstone Mining Board of Director Changes
14/06/2011and Far West Mining Approve Acquisition and KORES Agreement
02/06/2011Independent Proxy Firms Recommend Capstone Shareholders Vote...
23/05/2011Mails Information Circular with Respect to Acquisition of Fa...
20/05/2011Capstone Mining Mails Information Circular
10/05/2011to Hold First Quarter Conference Call May 25, 2011
26/04/2011Capstone Reports First Quarter Production
17/04/2011Capstone Mining to Acquire Far West Mining
14/04/2011Capstone Reports Change to its Board
15/03/2011Capstone Reports Record Revenue and Strong
26/01/2009Commences US$ 3 Million Resource Expansion Drill Program at ...
22/01/2009Reports Debt Repayments, Funding of Debenture Repurchase and...
10/12/2008Reports Final Drill Intercepts of Near Surface Copper-Gold a...
25/11/2008Reports Minto Mine Connected to Yukon Electrical Grid
24/11/2008Sherwood and Capstone Announce Closing of Business Combinati...
14/11/2008Shareholders Overwhelmingly Approve Business Combination wit...
08/09/2008Announce Combination to Create Intermediate Copper Producer
29/07/2008Reports Record Revenues of $35.3 Million and Record Operatin...
15/07/2008Announces Normal Course Issuer Bid
28/02/2008December 31, 2007 Four Month Stub Period Results
21/02/2008to Release 4 Months Ended December 31, 2007 Results on Thurs...
17/01/2008Provides 2008 Expansion And Exploration Plans And Increases ...
08/11/2007 To Release 2007 Year End Results On Wednesday November 14,...
19/07/2007Provides Cozamin Mine Expansion Update
28/06/2007Reports Q3 Results: Operating Profit of $7.8 Million, $0.09 ...
05/04/2007Closes Previously Announced Agreement to Sell Cozamin Silver...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CS.TO)FRANKFURT (OUW.F)
10,29+6.96%5,45-2.68%
TORONTO
CA$ 10,29
26/04 17:00 0,670
6,96%
Cours préc. Ouverture
9,62 9,75
Bas haut
9,75 10,44
Année b/h Var. YTD
6,02 -  10,29 60,03%
52 sem. b/h var. 52 sem.
4,49 -  10,29 59,29%
Volume var. 1 mois
3 961 115 22,21%
24hGold TrendPower© : 40
Produit Copper - Gold - Silver
Développe Copper - Gold - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202469,24%
202323,08%7,254,90
2022-8,52%7,792,25
2021126,89%6,642,41
2020226,03%2,490,33
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :