Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Polymet Mining Corp

Publié le 20 mai 2008

Capital and Operating Costs

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | Dollar | Nickel | Palladium | Precious Metals |

Marketwire

 
 
PolyMet Mining Corp.
TSX:POM
AMEX:PLM
Other Recent News

May 20, 2008
PolyMet Updates Capital and Operating Costs

Revised Construction Plans Reduce Pre-Revenue Capital Costs and Time Line

Project Development Update Conference Call: May 21 at 10:30 A.M. EDT

HOYT LAKES, MINNESOTA--(Marketwire - May 20, 2008) - PolyMet Mining Corp. (TSX:POM)(AMEX:PLM) ("PolyMet" or the "Company") reported today that its board of directors has reviewed and approved revised plans and cost estimates for construction and operating costs at its northern-Minnesota copper-nickel-precious metals development-stage project. PolyMet controls 100% of the NorthMet copper-nickel-precious metals ore-body and owns the nearby Erie Plant, located near Hoyt Lakes in the established mining district of the Mesabi Iron Range in northeastern Minnesota.

The revised plans include:

- the sale of concentrate during the construction and commissioning of new metallurgical facilities resulting in a shorter pre-production construction period (under twelve months) and reduced capital costs prior to first revenues ($312 million versus $380 million)

- higher metal prices more than offset higher capital and operating costs, which include substantial additional environmental protection measures

- mine plans (based on copper at $1.25 per pound) reflect the increase in reserves and decrease in stripping ratio reported on September 26, 2007, the use of 240-ton trucks, and owner versus contract mine operations.

Since completion of the Definitive Feasibility Study ("DFS") in September 2006, PolyMet has been focused on providing information to the Minnesota Department of Natural Resources ("MDNR") and other permitting agencies in support of the MDNR's preparation of the Environmental Impact Statement. The MDNR remains on target for completion of the draft EIS at the end of June.

PolyMet has assembled a senior management team with the experience and skills to oversee construction and operation of the plant and mine. The Company has also entered into service agreements with three Minnesota-based engineering and construction firms and has undertaken a detailed review of the construction and development plans in order to optimize these activities. As a result, PolyMet believes its project is operationally and financially more robust and provides additional measures to minimize and mitigate environmental impacts.

KEY POINTS

- DFS-equivalent capital costs increase 36% to $516.8 million

- Updated development plan contemplates:

-- additional $85.1 million in measures to protect the environment, increasing the total capital to $601.9 million

-- the initial sale of concentrate during construction and commissioning of the new metallurgical facilities which requires additional handling facilities included in these totals

-- staged construction reduces pre-production capital costs to $312.3 million (including the additional environmental measures) with most of the additional $289.6 million for construction of the metallurgical facilities expected to be funded from operating cash flow

- Break-even cost of producing copper (on a co-product basis) increases to $1.05 per pound compared with $0.81 per pound in the DFS. Increase primarily driven by higher costs of fuel and general inflation. On a by-product credit basis the cost of producing copper falls to a negative $0.28 per pound.

- Based on three-year trailing average metal prices (the SEC metal price deck) the economics have improved compared with the DFS:

-- After tax internal rate of return increases to 30.6% from 26.7% in the DFS

-- After tax net present value of future cash flow discounted at 7.5% increases to $649.4 million from $595.4 million in the DFS.

-- Average EBITDA in the first five years of operation increases to $217.3 million a year from $175.3 million.

CONFERENCE CALL

PolyMet will host a conference call to discuss the Project Development Update at 10:30 a.m. Eastern Daylight Time on Wednesday May 21, 2008.


Call-in Numbers:
Canada: +1 (416) 641-6125
Toll Free: +1 (866) 542-4236
International Toll Free: + (800) 7701-8886

Playback:
Canada/International: +1 (416) 695-5800, pass code 3261847
Toll Free: +1 (800) 408-3053, pass code 3261847
 
CAPITAL COSTS

Since the September 2006 DFS, and on a like-for-like basis, the total capital cost has increased by 36% to $516.8 million. This increase reflects both cost inflation and design scope changes since the DFS, including facilities needed to ship concentrate during the construction and commissioning of the new hydrometallurgical plant.

In addition, PolyMet is anticipating $85.1 million of expenditures on measures to protect the environment, over and above the measures contemplated in the DFS. $76.6 million for mining equipment that was assumed to be provided by a mining contract in the DFS has been incorporated as an operating lease in updated operating costs.

PolyMet has previously stated that it has been reviewing the possibility of selling concentrate during the construction and commissioning of new metallurgical facilities. This staged approach shortens the initial construction period, makes the project less sensitive to the delivery schedule for long lead time equipment such as autoclave vessels, and means that PolyMet can commence operations of the mine, the existing crushing and milling plant, the existing tailings disposal facilities, and the new flotation circuit, before starting the new hydrometallurgical plant.

As a result of the staged approach, the total capital required prior to initial production and sales declines to $312.3 million, which includes $64.7 million of additional environmental safeguards for this level of activity.


Capital Costs
(US dollars, millions)

                                                                    Initial
                                               Full     Change  Concentrate
                                            Project   from DFS        Sales

Definitive Feasibility Study                  379.8                   138.7
Escalation and other scope changes            137.0         36%       108.9
                                            -------             -----------
 Total                                        516.8                   247.6

Environmental measures                         85.1                    64.7
 Total change                                 222.1         58%       173.6
                                            -------             -----------
 TOTAL                                        601.9                   312.3
                                            -------             -----------
                                            -------             -----------
 
OPERATING PLANS AND COSTS

The overall mining and operating plan remains the same as that defined in the DFS and which forms the basis of the plan being analyzed in the environmental impact statement. PolyMet intends to mine 32,000 tons of ore per day for an operating life of twenty years, processing a total of 224 million tons of ore.

The mine plan continues to be based on the following metal prices: copper - $1.25/lb, nickel - $5.60 per pound, cobalt - $15.25/lb, palladium - $210 per ounce, platinum - $800 per ounce, and gold - $400 per ounce.

Operating costs per ton of ore processed have increased to $13.33 from $11.02 in the DFS reflecting higher fuel, mine equipment, and other consumable costs, as well as general inflation. The cost of mining and delivering ore to the plant is now estimated at $4.31 per ton compared with $3.80 per ton in the DFS. The increase in mining costs has been partially offset by the lower strip ratio, larger mining equipment, and owner versus contractor operation.

The economic analysis is based on SEC-reserve standards, namely the three-year trailing average, which we calculated at April 30, 2008 (the end of our first fiscal quarter.) This price deck is: copper - $2.90/lb, nickel - $12.20/lb, cobalt - $23.50/lb, palladium - $320/oz, platinum - $1,230/oz, and gold - $635/oz. While these prices are somewhat higher than those used on the economic analysis in the DFS, each price is well below current market levels - in the first quarter of 2008, the following prices prevailed: copper - $3.52/lb, nickel - $13.09/lb, cobalt - $46.37/lb, palladium - $441/oz, platinum - $1,867/oz, and gold - $925/oz.

This translates into copper cash costs of $1.05 per pound using a co-product basis to calculate costs, compared with the DFS estimate of $0.81/lb. Taking revenues from the other metals as a deduction against costs, the co-product basis shows a cost of $(0.28) per pound compared with $0.06 per pound in the DFS.

ECONOMIC SUMMARY

Key economic metrics include earnings before interest, tax, depreciation, and amortization (EBITDA) which is projected to increase to $217.3 million on average over the first five years of operations from $175.3 million estimated in the DFS. The net present value of future cash flow (after tax) discounted at 7.5% is estimated to be $649.4 million compared with $595.4 million in the DFS, and the after tax internal rate of return is now estimated at 30.6% compared with 26.7% in the DFS. The table below also sets out the affect on EBITDA of a 10% change in each metal price.


Key Economic Highlights

                                                           Update      DFS
                                                           May-08   Sep-06

Operating plan
 Proven and probable reserves                 million t     274.7    181.7
 Ore mined - life of operation                million t     224.0    181.7
 Overburden removed (capitalized
  under site preparation)                     million t      18.5        -
 Waste                                        million t     285.3    302.3

Operating costs per ton processed
 Mining and delivery to plant                       $/t      4.31     3.80
 Processing                                         $/t      8.07     6.75
 G&A                                                $/t      0.94     0.46
  Total                                             $/t     13.33    11.02

Metal price assumptions (SEC-standard)
 Copper                                            $/lb      2.90     2.25
 Nickel                                            $/lb     12.20     7.80
 Cobalt                                            $/lb     23.50    16.34
 Palladium                                         $/oz       320      274
 Platinum                                          $/oz     1,230    1,040
 Gold                                              $/oz       635      540

Economic summary
 Annual earnings before interest, tax,
  depreciation and amortization (EBITDA)
  - average first five years                  $ million     217.3    175.3
 Net present value of future after tax
  cash flow discounted at 7.5%                $ million     649.4    595.4
 Internal rate of return (after tax)                         30.6%    26.7%

 Sensitivity: 10% +/- price equals
  $_ million in EBITDA
   Copper                                     $ million      18.6     15.7
   Nickel                                     $ million      13.3      9.3
   Cobalt                                     $ million       0.9      0.9
   Palladium                                  $ million       1.7      2.0
   Platinum                                   $ million       1.7      2.1
   Gold                                       $ million       0.3      0.5

Copper costs
 cash - co-product method                          $/lb      1.05     0.81
 cash - by-product method                          $/lb     (0.28)    0.06
 
SCHEDULE

The MDNR is on track to complete the draft EIS by the end of June 2008, after which it will be formally published in the Federal Register and State EQB Monitor. Completion of the draft EIS will be the culmination of a multi-year effort involving PolyMet, PolyMet's consultants, multiple governmental agencies and an independent EIS contractor. In addition to providing a detailed project description, PolyMet has submitted more than 100 detailed technical reports to assist those preparing the EIS to assess the environmental impacts of the project and to explore ways to avoid, minimize or mitigate the environmental impacts.

Once the draft EIS is published, non-government organizations, government agencies, and the public will have an opportunity to comment during a 30-day state and parallel 45-day federal public comment period. The final EIS will incorporate analysis and appropriate responses to comments, a process that can take several months. The final EIS also has an opportunity for public comment during a 15-day state and 30-day federal comment period. Once the EIS receives a declaration of "adequacy" from the State and "record of decision" from the federal government, the various permits required for construction can be issued. It should be noted that the government agencies that participate in preparing the EIS are the same agencies that will be responsible for preparing the permits that PolyMet will need before the Company can commence construction.

Promptly upon issuance of permits, PolyMet plans to start construction. Detailed construction scheduling shows the mine could deliver ore to the plant in less than a year from the start of construction. As production and sales of concentrate are ramped up, PolyMet plans to complete construction and commissioning of the new hydrometallurgical facilities within approximately eighteen months. Much of the capital costs of the new facilities are expected to be funded from cash flow from the sales of concentrates during this initial period.

MINNESOTA SERVICE AGREEMENTS

PolyMet has entered into service agreements with three Minnesota-based engineering and construction firms which will provide specialized expertise combined with local experience:

Barr Engineering: headquartered in Minneapolis, MN with offices in Duluth, MN and Hibbing, MN, Barr employs approximately 400 engineers and scientists with a strong emphasis on environmental matters. The firm will focus on mine pre-development such as the design and construction of haul roads, stockpile foundations, waste water treatment, overburden stripping, and tailings dams.

Ames Construction: headquartered in Burnsville, MN, the firm is one of the largest heavy civil and industrial design-build general contractors in the US, with expertise in mine development, mine facility construction, landfill construction, and environmental remediation. Ames will initially work with PolyMet and Barr in the detailed planning of mine site development, prior to the commencement of construction upon receipt of permits.

Krech Ojard: headquartered in Duluth, MN with offices throughout the U.S., the firm provided specialist advice to Bateman Engineers in connection with the DFS assessment of the railroad requirements for moving ore from the NorthMet mine site to the Erie plant site. The construction role includes design engineering services for the rail transfer hopper and the new and re-activated rail lines, both between the mine and the plant and rail within the plant site.

Joe Scipioni, President and CEO stated, "Our acquisition of the Erie Plant and our location in an established mining district reduce our exposure to capital cost inflation, which is proving to be a significant challenge for many mine development projects around the world. While we are not immune to rising energy costs and the weakness of the dollar, we believe that we are more competitive on the world stage today than we were when the DFS was completed in 2006."

He continued, "Since the completion of the DFS we have been planning the construction and start-up phase as well as optimizing the overall project. The biggest single change relates to measures to protect the environment. In planning to spend an additional $85 million on environmental protection, we believe that we are addressing concerns of the local community and the permitting agencies."

He concluded, "With completion of the draft EIS scheduled for the end of June, we will be advancing through the public review period and permitting, as well as detailed planning for construction. Everyone is working diligently to make sure that the project moves forward and is done properly."

PolyMet Mining Corp. (www.polymetmining.com) is a publicly-traded mine development company that controls 100% of the NorthMet copper-nickel-precious metals ore body through a long-term lease and owns 100% of the Erie Plant, a large processing facility located approximately six miles from the ore body in the established mining district of the Mesabi Range in northeastern Minnesota. PolyMet has completed its Definitive Feasibility Study and is seeking environmental and operating permits to enable it to commence production. The NorthMet project is expected to require approximately one million man hours of construction labor and create at least 400 long-term jobs, a level of activity that will have a significant multiplier effect in the local economy.

POLYMET MINING CORP.

Joe Scipioni, President

This news release contains certain forward-looking statements concerning anticipated developments in PolyMet's operations in the future. Forward-looking statements are frequently, but not always, identified by words such as "expects," "anticipates," "believes," "intends," "estimates," "potential," "possible," and similar expressions, or statements that events, conditions or results "will," "may," "could," or "should" occur or be achieved. These forward-looking statements may include statements regarding exploration results and budgets, reserve estimates, mineral resource estimates, work programs, capital expenditures, timelines including timelines for third-party studies and issuance of permits to operate by various government agencies, strategic plans, the market price of metals, costs, or other statements that are not a statement of fact. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements due to a variety of risks, uncertainties and other factors. PolyMet's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and PolyMet does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations and opinions should change.

Cautionary note to U.S. investors: the terms "measured and indicated resource", "mineral resource", and "inferred mineral resource" used in this news release are Canadian geological and mining terms as defined in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves. We advise U.S. investors that while such terms are recognized and required under Canadian regulations, the Securities & Exchange Commission does not recognize these terms. Mineral Resources do not have demonstrated economic viability. It cannot be assumed that all or any part of a Mineral Resource will ever be upgraded to Reserves. Under Canadian rules, estimates of inferred mineral resources may not form the basis of or be included in feasibility or other studies. U.S. investors are cautioned not to assume that any part of an inferred mineral resource exists, or is economically or legally mineable.

Specific reference is made to PolyMet's most recent Form 20-F/Annual Information Form on file with the SEC and Canadian securities authorities for a discussion of some of the risk factors and other considerations underlying forward-looking statements.


The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

PolyMet Mining Corp.
William Murray
Executive Chairman
(604) 669-4701
Email: wmurray@polymetmining.com

or

PolyMet Mining Corp.
Joe Scipioni
President & Chief Executive Officer
(218) 225-4417
Email: jscipioni@polymetmining.com

or

PolyMet Mining Corp.
Douglas Newby
Chief Financial Officer
(646) 879-5970
Email: dnewby@polymetmining.com

or

PolyMet Mining Corp.
LaTisha Gietzen
VP Public, Governmental and Environmental Affairs
(218) 225-4417
Email: lgietzen@polymetmining.com
Website: www.polymetmining.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Polymet Mining Corp

CODE : POM.TO
ISIN : CA7319161021
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Polymet est une société développant des projet miniers de cuivre et de nickel basée au Canada.

Polymet détient divers projets d'exploration en USA.

Son principal projet en exploration est NORTHMET en USA.

Polymet est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 909,5 millions CA$ (727,2 millions US$, 690,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 27 mars 2020 à 0,26 CA$, et son plus haut niveau récent le 04 septembre 2020 à 8,30 CA$.

Polymet possède 318 549 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Polymet Mining Corp
05/07/2008Duluth Complex: A World-Class Value Play
07/09/2006Follow up
Financements de Polymet Mining Corp
27/06/2013Reminder to Shareholders Rights Offering Closes at 5:00 pm E...
24/05/2013Announces Terms of US$60=2E5 Million Rights Offering and Fil...
06/12/2011Closes $20 Million Private Placement With Glencore
30/11/2011and Glencore Agree to Extend Debentures
18/01/2011Polymet Closes First $10 Million Tranche of Glencore Financi...
17/11/2009Modifies Terms of Existing Glencore Warrants
Nominations de Polymet Mining Corp
25/01/2011Names Brad Moore Executive VP-Environmental and Governmental...
19/02/2008 Appoints Frank Sims and Joe Scipioni to the Board
13/03/2007Appoints Chief Operating Officer and NorthMet Senior Constru...
Rapports Financiers de Polymet Mining Corp
15/06/2016Reports First Quarter Fiscal 2017 Results
22/04/2016Reports Fiscal 2016 Results
16/12/2015Reports Third Quarter Fiscal 2016 Results
04/09/2015Reports Second Quarter Fiscal 2016 R =?ISO-8859-1?Q?esults,=...
05/12/2013Reports Third Quarter Fiscal 2014 Results
11/09/2013Reports Second Quarter Fiscal 2014 Results
11/06/2013Reports First Quarter Fiscal 2014 Results-Rights Offering Ma...
07/09/2012Reports Second Quarter Fiscal 2013 Results
18/06/2012Reports First Quarter Fiscal 2013 Results
08/09/2011Reports Second Quarter Fiscal 2012 Results
06/07/2011Reports First Quarter Fiscal 2012 Results: Update on State o...
07/05/2011Announces Fiscal 2011 Full-Year Results
30/04/2008Reports Fiscal 2008 Fourth Quarter and Full Year Results
Projets de Polymet Mining Corp
14/07/2016Project Update at Shareholders' Meeting
16/12/2013Federal Wetlands Permit Application Published for PolyMet Pr...
28/08/2013and E&D: Polymetal swings to a loss and Ncondezi gets permit...
29/07/2013and Finance: Polymetal to take writedown of up to US$340m an...
30/05/2013(Northmet)Reports Further Progress at NorthMet Copper-Nickel Project R...
14/02/2013(Northmet)Improves NorthMet Project
07/11/2012Drilling Commences at the Croydon Polymetallic Project
03/02/2011(Northmet)Simplifies Metallurgical Process at NorthMet Project
26/09/2007(Northmet)Reports a 51% Interim Increase in Reserves at NorthMet
09/08/2007(Northmet) Reports a 51% Increase in Mineral Resources at NorthMet
10/07/2007(Northmet) Drill Program Confirms Expansion of "Magenta" Zone and Demo...
Communiqués de Presse de Polymet Mining Corp
14/07/2016PolyMet Project Update at Shareholders’ Meeting
11/07/2016PolyMet Submits Water-Related Permit Applications to the Sta...
15/06/2016PolyMet Reports First Quarter Fiscal 2017 Results
22/04/2016PolyMet Reports Fiscal 2016 Results
27/01/2016PolyMet Secures Additional US$11 Million Loan From Glencore
16/12/2015PolyMet Reports Third Quarter Fiscal 2016 Results
06/11/2015IIROC Trade Resumption - POM
06/11/2015PolyMet Final EIS Completed - Demonstrates Project Meets Env...
06/11/2015IIROC Trading Halt - POM
04/09/2015PolyMet Reports Second Quarter Fiscal 2016 Results, Progress...
17/07/2015PolyMet Reports Accomplishments at Annual Shareholders’ meet...
16/07/2015PolyMet Reports Accomplishments at Annual Shareholders' Meet...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results - Project ...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results Project Up...
08/10/2014PolyMet Final EIS "Early Spring" 2015
09/09/2014PolyMet Reports Second Quarter Fiscal 2015 Results
11/06/2014PolyMet Reports First Quarter Fiscal 2015 Results
25/04/2014PolyMet Reports Fiscal 2014 Results
25/04/2014PolyMet and Glencore Agree to Extend Term of US$32.2 Million...
13/03/2014IIROC Trade Resumption - POM
13/03/2014IIROC Trading Halt - POM (all issues)
24/02/2014DNI Metals - Operating in a Polymetallic Paradise
06/12/2013Achieves Key Milestone in Environmental Review Process
05/12/2013DNI REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR ITS...
06/11/2013Three-Week Federal Government Shutdown Results in Two-Week P...
11/09/2013DNI'S RESOURCE STUDY REPORT UPDATING AND EXPANDING THE MINER...
27/08/2013DNI EXPANDS BUCKTON ZONE INFERRED RESOURCE TO 4.9 BILLION TO...
26/08/2013Significant Progress for PolyMet Environmental Review
23/08/2013Minnesota DNR Announces Publication Date for PolyMet Supplem...
25/07/2013s Investors With Exclusive Interview With The Wall Street An...
10/07/2013Reports Strong Positioning at Shareholders' Meeting
05/07/2013Closes Successful Rights Offering; Financed to Complete Perm...
19/06/2013on PolyMet Rights Offering-Informationfor Those Who Have Not...
13/05/2013Reports Completion of Drafting of Preliminary EIS
23/04/2013Reports Fiscal 2013 Results
19/04/2013(Northmet)NorthMet News - PolyMet Mining, Inc.
10/04/2013US$60 Million Common Share Rights Offering to All Shareholde...
11/01/2013DNI CONSOLIDATES AND EXPANDS BUCKTON RESOURCE TO 3.49 BILLIO...
11/12/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
01/11/2012s Technical Disclosure
15/10/2012Closes $10 Million Third Tranche of Glencore Financing
10/10/2012Reports Successful Water Treatment Pilot Plant
13/09/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
11/09/2012Strengthens Permitting Expertise
17/07/2012Focuses Corporate Leadership Team in Minnesota
11/07/2012Announces Results of Shareholders' Meeting
28/06/2012Form 20-F Availability
21/06/2012Strengthens Leadership Team
15/06/2012for IMMEDIATE Dissemination - Verbatim - Kootenay and Pinecr...
14/06/2012Reports Technical Disclosure Review
23/05/2012Reports Progress on Environmental Review
01/05/2012Reports Fiscal 2012 Results
19/03/2012DNI EXTRACTS METALS FROM ITS ALBERTA POLYMETALLIC SHALES USI...
29/02/2012Acquires Control of Wetlands
13/02/2012Clarifies Status of Environmental Review Following Misleadin...
01/02/2012s Status of Environmental Review
16/01/2012DNI ANNOUNCES 250 MILLION TON INFERRED RESOURCE FOR REE-Y-Sc...
14/12/2011orate and Project Update; Third Quarter Fiscal 2012 Results
30/11/2011Agrees to Sell US$20 Million of Common Shares to Glencore
12/10/2011Everett Resources Commences Second Phase 2,500 Meter Drill P...
19/09/2011(Northmet)s Progress on NorthMet Environmental Review
15/07/2011Closes Second $10 Million Tranche of Glencore Financing
30/06/2011Closes IRRRB Loan
17/06/2011Reports Mailing of Information Circular
05/05/2011to File Financial Statements on or Before May 9, 2011
03/05/2011Announces Delay in Filing Year-End Financial Statements
15/04/2011s Status of Environmental Review
25/06/2010EIS-Path Forward to Completion Announced
15/03/2010Statement on Environmental Review Timeline
04/03/2010Environmental Review Process Clarified
23/02/2010s NorthMet Environmental Review Progress
26/01/2010Receives Second Installment From Glencore
24/11/2009Closes Financing-Project Update
17/11/2009Sells US$25 Million of Common Shares to Glencore
28/10/2009Environmental Impact Statement Published
05/10/2009Draft EIS Available the Week of October 19, 2009
01/10/2009s EIS Publication Schedule
02/09/2009Draws Fourth Tranche of Loan From Glencore
27/08/2009Files US$500 Million Universal Shelf Registration
19/06/2009Draws Third Tranche of Loan From Glencore
24/12/2008Draws Second Tranche of Loan From Glencore
22/12/2008Receives Draft EIS From Department of Natural Resources
24/09/2008EIS and Glencore Update
04/09/2008and Glencore Sign Strategic Marketing Agreement
12/08/2008Minnesota DNR Updates PolyMet EIS Progress
12/06/2008s EIS Progress
02/06/2008Present at the New York Society of Security Analysts' 8th An...
20/05/2008Capital and Operating Costs
15/02/2008Updates EIS Schedule for Its Copper-Nickel-Precious Metals P...
05/02/2008Strengthens Minnesota Focus
05/11/2007Present at Third Annual Sanders Morris Harris Investor Growt...
04/10/2007Hosts Analyst and Investor Tour
14/09/2007Quarterly Financials
04/09/2007Signs Northmet Construction Labor Agreement
21/08/2007Expands NorthMet Management Team
16/05/2007Updates NorthMet Environmental Review
07/05/2007Research Capital Report
07/05/2007Announces Retirement of Warren Hudelson Receives Approval fo...
21/03/2007Financial Adviser Engages NorthMet Independent Engineer
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (POM.TO)AMEX (PLM)
2,86+0.53%2,09-0.48%
TORONTO
CA$ 2,86
12/10 16:15 0,020
0,53%
Cours préc. Ouverture
2,84 2,82
Bas haut
2,82 2,86
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
1,03 -  2,87 14,86%
Volume var. 1 mois
4 178 0,175%
24hGold TrendPower© : 30
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20241,96%
2023-22,65%3,761,01
20220,56%6,153,05
2021-15,49%6,713,28
20201252,38%8,300,26
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :