DNI CONSOLIDATES AND EXPANDS BUCKTON RESOURCE TO 3.49 BILLION TONS ON ITS ALBERTA POLYMETALLIC BLACK

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | Dysprosium | Europium | Gadolinium | Lanthanum | Lithium | Nickel | Report | Thorium | Uranium | Zinc |
NEWS RELEASE - January 11, 2013
 
DNI METALS INC. (DNI : TSX-Ven)(DG7 : Frankfurt)
 
DNI CONSOLIDATES AND EXPANDS BUCKTON RESOURCE TO 3.49 BILLION TONS ON ITS ALBERTA POLYMETALLIC BLACK SHALE PROJECT
 
DNI METALS INC. (DNI:TSX-Ven)(DG7:FSE) announces results of its NI-43-101 compliant resource study just completed which consolidates, updates and expands the inferred mineral resource at its Buckton Zone on its Alberta polymetallic black shale project. The Consolidated and Updated Buckton Mineral Resource Study (the "Resource Study") successfully expands the inferred resource at the Buckton Zone to 3.49 billion short tons. This resource extends over approximately 14 square kilometres, and is hosted in two near-surface stacked black shale horizons which are mineralized with recoverable Mo-Ni-U-V-Zn-Co-Cu-Li-REEs-Y-Th-Sc and are partly exposed on surface. The Buckton Zone is one of six mineralized systems, or zones, identified on DNI's 2,720 square kilometre Property in northeast Alberta.
 
The inferred resource being announced is based on a US$10/tonne base cut-off and represents all mineralized tonnages that are under less than 75m of overburden cover, consisting of an upper, lower-grade, horizon hosted in Labiche Formation, which directly overlies a higher-grading horizon hosted in Second White Speckled Shale Formation. The two Formations together comprise a wedge of mineralized black shale, ranging approximately 13m-140m thick, extending westward from the point where they are exposed on surface along the eastern erosional edge of the Birch Mountains to a point where overburden cover above the uppermost resource blocks in the Labiche shale thickens to more than 75m.
 
The Resource Study consolidates all previous resource estimates from the Buckton Zone using more current metal prices and a higher base cut-off per recommendations of previous studies. This resource study, accordingly, supersedes and replaces all prior resource estimates announced in 2011-2012 from the Zone (DNI press October 24, 2011, January 16, 2012, and September 12, 2012). The study will be revised again in early 2013 to incorporate results from DNI's 2012 drilling to further expand the resource in preparation for a Preliminary Economic Analysis (Scoping Study) of the Zone.
 
The Consolidated and Updated Buckton Mineral Resource Study was prepared by Apex Geoscience Ltd ("Apex"), Edmonton, under the supervision of Mr.Roy Eccles PGeol, Mr.Michael Dufresne PGeol and Mr.Steven Nicholls MAIG, who are the Qualified Persons in connection with its preparation and are independent of DNI. The Study relies on DNI's 2010-2011 winter drilling over the Buckton Zone, together with historic drilling from the area from which all archived drill core were previously re-sampled and re-analyzed by DNI in 2009 and 2012. All of the foregoing drilling campaigns were implemented by Apex under the supervision of Mr.Dufresne. The Consolidated and Updated Buckton Mineral Resource Study complies with National Instrument 43-101 and CIM resource estimation guidelines.
 
This press release is a summary of salient conclusions from the Consolidated and Updated Buckton Mineral Resource Study report which is being filed to SEDAR and will be available shortly. The report, "National Instrument 43-101 Technical Report, Consolidated And Updated Inferred Resource Estimate For The Buckton Zone, SBH Property, Northeast Alberta", with effective date of January 9, 2013, will also be available from DNI's website www.dnimetals.com once it is filed.
 
The Consolidated and Updated Buckton Mineral Resource is classified as an inferred resource consisting of 3,485,011,000 short tons (3,161,549,000 metric tonnes) of mineralized black shale extending over 14 square kilometres beneath less than 75m of overburden cover. This resource is hosted in the Labiche Formation and underlying Second White Speckled Shale Formation, which are two flat-lying black shale Formations that are stacked to comprise a continuous thick zone of mineralized shale. The inferred resource is mineralized with recoverable Molybdenum (Mo), Nickel (Ni), Uranium (U), Vanadium (V), Zinc (Zn), Copper (Cu), Cobalt (Co), Lithium (Li), Scandium (Sc), Thorium (Th) and Rare Earth Elements Lanthanum (La), Cerium (Ce), Praseodymium (Pr), Neodymium (Nd), Samarium (Sm), Europium (Eu), Gadolinium (Gd), Terbium (Tb), Dysprosium (Dy), Yttrium (Y). The Study estimates that the inferred resource is overlain by 738,729,000 short tons (670,164,000 metric tonnes) of glacial till overburden.
 
The inferred resource reported by the Consolidated and Updated Buckton Mineral Resource Study is tabulated below combining the Upper and Lower Zones on a weighted basis.

Consolidated and Updated Buckton Inferred Mineral Resource

Upper (Labiche Formation) and Lower (Second White Speckled Shale) Zones Combined

Mineralized Shale (tons)

3,485,011,000

 

MoO3

Ni

U3O8

V2O5

Zn

Cu

Co

Li2CO3

Raw Grade (ppm)

25.4

68.6

11.7

616.5

175.9

40.4

14.7

378.8

Recoverable Grade (ppm)

12.8

57.9

9.9

141.0

141.5

25.5

12.3

158.0

Metal/Oxide Price* (US$/lb)

17.63

9.07

68.99

7.67

0.90

3.29

22.39

2.68

Recoverable metal/oxide (kg)

40,529,000

183,032,000

31,224,000

445,733,000

447,367,000

80,530,000

38,757,000

499,397,000

Recoverable metal/oxide (lbs)

89,351,000

403,516,000

68,837,000

982,672,000

986,274,000

177,538,000

85,444,000

1,100,981,000

 

 

La2O3

Ce2O3

Pr2O3

Nd2O3

Sm2O3

Eu2O3

Gd2O3

Tb2O3

Raw Grade (ppm)  

48.9

85.3

10.5

40.6

7.9

1.6

6.7

1.0

Recovery %

29

36

39

45

61

63

69

70

Recoverable Grade (ppm) 

14.4

30.7

4.1

18.1

4.8

1.0

4.6

0.7

Metal/Oxide Prices** US$/kg)

42.84

47.40

114.98

128.61

58.66

1,872.65

83.70

1,551.08

Recoverable Oxide (kg)

45,371,000

96,967,000

13,014,000

57,268,000

15,038,000

3,270,000

14,420,000

2,237,000

Recoverable Oxide (lbs)

100,026,000

213,775,000

28,691,000

126,254,000

33,153,000

7,209,000

31,791,000

4,932,000

 

 

 

 

 

 

 

 

 

 

Dy2O3

Ho2O3

Er2O3

Tm2O3

Yb2O3

Lu2O3

Y2O3

Sc2O3

ThO2

Raw Grade (ppm)  

5.8

1.2

3.4

0.5

3.4

0.6

39.4

22.4

12.0

Recovery %

69

58

62

60

53

50

67

34

40

Recoverable Grade (ppm) 

4.0

0.7

2.1

0.3

1.8

0.3

26.3

7.7

4.8

Metal/Oxide Prices** US$/kg)

864.09

205.82

197.35

$97.00

100.63

1,024.09

81.73

3,881.39

252.00

Recoverable Oxide (kg)

12,742,000

2,353,000

6,624,000

916,000

5,742,000

1,053,000

83,095,000

24,220,000

15,146,000

Recoverable Oxide (lbs)

28,091,000

5,187,000

14,603,000

2,019,000

12,659,000

2,321,000

183,193,000

53,396,000

33,391,000

*Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the five year trailing average to Oct/2012.

**Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the three year trailing average to Oct/2012 for La Ce Pr Nd Sm Eu Gd Tb Dy Y; three year trailing average to Aug/2011 for Tm; Th per USGS  Mineral Commodity Summaries 2009-2011, the two year trailing average to Oct/2012 for Ho Er Yb Lu Sc. Metal prices vary among various commodity information sources and, in all conflicting instances, the lower pricing was used. The 2011 drilling included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. Re-analysis of historic drill core included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. ton=short ton; lb=pound; kg=Kilogram; Recoverable metal/oxide stated to nearest 1000kg or 1000lb. Figures may not add exactly due to rounding.

 Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no guarantee that all or any part of the mineral resource reported herein will be converted into a mineral reserve. An 'Inferred Mineral Resource' is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The metal recoveries reported represent preliminary mineral recovery testing results collated from the collective bench scale laboratory testwork completed by DNI to date and may not reflect actual process recoverability that might be achieved in a mineral production operation, all of which is the subject of ongoing studies.

 
This Consolidated and Updated Buckton Mineral Resource has been classified as an inferred resource according to CIM standards, based on a number of factors, namely; limited number of drill holes and their wide spacing, good continuity of mineralization and geological control between drill holes and from section to section along approximately six kilometres of strike. The inferred resource is open to the north, northeast and south, and eastward to the erosional edge of the Birch Mountains over a large area with thin overburden cover where mineralization intermittently outcrops at surface or is intermittently exposed throughout several kilometres of valley walls.
 
The Resource Study concludes that the Consolidated and Updated Buckton mineral resource is mineralization which has a reasonable prospect for extraction in the future. This resource comprises all Labiche and Second White Speckled Shale resource blocks which are beneath less than 75m of overburden cover, and for which the combined gross value of recoverable contained Mo-Ni-U-V-Zn-Co-Cu-Li-REEs-Y-Th-Sc exceeds the base cut-off of US$10 per tonne relying on the best achieved metals recoveries as reported from the collective of DNI's leaching testwork. Metal prices used are the trailing 2yr, 3yr and 5yr year commodity price averages as tabulated below. The inferred resource is distributed between the Upper and Lower zones as follows (also tabulated separately below):
 
(a) 2.7 billion short tons (2.5 billion metric tonnes) in the Upper, lower grade, zone hosted in the Labiche Formation ranging 13m-115m in thickness (ultimate thickness of the Labiche Shale at the Property is unknown as near-surface portions of it have been locally scoured away by glaciation). Most of this tonnage was previously reported in the Buckton Labiche Resource Study announced September 12, 2012; and
 
(b) 747 million short tons (678 million metric tonnes) in the Lower, higher grade, zone hosted in the Second White Speckled Shale Formation ranging 13m-23m in thickness. A 250 million short ton portion of this tonnage was previously reported as the Buckton Initial Maiden Resource in the Buckton Maiden Resource Study and the Buckton Supplementary REE-Y-Sc-Th Resource Study announced October 24, 2011, and January 16, 2012, respectively. The Consolidated and Updated Buckton Mineral Resource Study expands the resource in the Second White Speckled Shale Formation to include additional tonnages of mineralization surrounding the Buckton Maiden resource beneath the Labiche Formation, which were previously excluded from being classified as a resource due to excessive thickness of overlying Labiche cover where the Labiche was previously believed to be waste but was subsequently demonstrated to be a mineral resource in its own right.
 

Consolidated and Updated Buckton Inferred Mineral Resource

Upper Zone Portion - in Labiche Formation

Mineralized Shale (tons)

2,737,641,000

 

MoO3

Ni

U3O8

V2O5

Zn

Cu

Co

Li2CO3

Raw Grade (ppm)

2.9

49.2

5.2

448.2

142.8

30.8

12.7

400.3

Recovery %

55%

80%

75%

10%

75%

65%

80%

40%

Recoverable Grade (ppm)

1.6

39.3

3.9

44.8

107.1

20.0

10.2

160.1

Metal/Oxide Price* (US$/lb)

17.63

9.07

68.99

7.67

0.90

3.29

22.39

2.68

Recoverable metal/oxide (kg)

4,014,000

97,674,000

9,655,000

111,312,000

265,982,000

49,751,000

25,232,000

397,618,000

Recoverable metal/oxide (lbs)

8,849,000

215,334,000

21,286,000

245,401,000

586,389,000

109,682,000

55,627,000

876,597,000

 

 

La2O3

Ce2O3

Pr2O3

Nd2O3

Sm2O3

Eu2O3

Gd2O3

Tb2O3

Raw Grade (ppm)  

46.0

82.2

9.8

37.4

7.2

1.5

5.8

0.9

Recovery    %

15%

25%

30%

35%

50%

55%

60%

60%

Recoverable Grade (ppm) 

6.9

20.6

2.9

13.1

3.6

0.8

3.5

0.5

Metal/Oxide Prices** US$/kg)

42.84

47.40

114.98

128.61

58.66

1,872.65

83.70

1,551.08

Recoverable Oxide (kg)

17,140,000

51,056,000

7,311,000

32,516,000

8,984,000

2,023,000

8,657,000

1,341,000

Recoverable Oxide (lb)

37,787,000

112,559,000

16,118,000

71,685,000

19,806,000

4,460,000

19,085,000

2,956,000

 

 

 

 

 

 

 

 

 

 

Dy2O3

Ho2O3

Er2O3

Tm2O3

Yb2O3

Lu2O3

Y2O3

Sc2O3

ThO2

Raw Grade (ppm)  

5.1

1.0

3.0

0.5

3.1

0.5

33.3

23.8

12.2

Recovery    %

60%

60%

50%

50%

45%

55%

55%

30%

30%

Recoverable Grade (ppm) 

3.1

0.6

1.5

0.2

1.4

0.3

18.3

7.2

3.6

Metal/Oxide Prices** US$/kg)

864.09

205.82

197.35

$97.00

100.63

1,024.09

81.73

3,881.39

252.00

Recoverable Oxide (kg)

7,633,000

1,519,000

3,778,000

570,000

3,479,000

699,000

45,516,000

17,769,000

9,059,000

Recoverable Oxide (lb)

16,828,000

3,349,000

8,329,000

1,257,000

7,670,000

1,541,000

100,345,000

39,174,000

19,972,000

*Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the five year trailing average to Oct/2012.

**Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the three year trailing average to Oct/2012 for La Ce Pr Nd Sm Eu Gd Tb Dy Y; three year trailing average to Aug/2011 for Tm; Th per USGS  Mineral Commodity Summaries 2009-2011, the two year trailing average to Oct/2012 for Ho Er Yb Lu Sc. Metal prices vary among various commodity information sources and, in all conflicting instances, the lower pricing was used. The 2011 drilling included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. Re-analysis of historic drill core included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. ton=short ton; lb=pound; kg=Kilogram; Recoverable metal/oxide stated to nearest 1000kg or 1000lb. Figures may not add exactly due to rounding..

  

Consolidated and Updated Buckton Inferred Mineral Resource

Lower Zone Portion - in Second White Speckled Shale Formation

Mineralized Shale (tons)

747,370,000

 

MoO3

Ni

U3O8

V2O5

Zn

Cu

Co

Li2CO3

Raw Grade (ppm)

107.7

139.9

35.3

1233.1

297.3

75.7

22.2

300.2

Recovery %

50%

90%

90%

40%

90%

60%

90%

50%

Recoverable Grade (ppm)

53.9

125.9

31.8

493.2

267.5

45.4

19.9

150.1

Metal/Oxide Price* (US$/lb)

17.63

9.07

68.99

7.67

0.90

3.29

22.39

2.68

Recoverable metal/oxide (kg)

36,515,000

85,358,000

21,569,000

334,421,000

181,385,000

30,779,000

13,525,000

101,779,000

Recoverable metal/oxide (lbs)

80,502,000

188,182,000

47,551,000

737,271,000

399,885,000

67,856,000

29,817,000

224,384,000

 

 

La2O3

Ce2O3

Pr2O3

Nd2O3

Sm2O3

Eu2O3

Gd2O3

Tb2O3

Raw Grade (ppm)  

59.5

96.7

12.9

52.2

10.5

2.2

10.0

1.5

Recovery    %

70%

70%

65%

70%

85%

85%

85%

90%

Recoverable Grade (ppm) 

41.6

67.7

8.4

36.5

8.9

1.8

8.5

1.3

Metal/Oxide Prices** US$/kg)

42.84

47.40

114.98

128.61

58.66

1,872.65

83.70

1,551.08

Recoverable Oxide (kg)

28,231,000

45,911,000

5,703,000

24,752,000

6,054,000

1,247,000

5,763,000

897,000

Recoverable Oxide (lb)

62,239,000

101,216,000

12,573,000

54,569,000

13,347,000

2,749,000

12,705,000

1,978,000

 

 

 

 

 

 

 

 

 

 

Dy2O3

Ho2O3

Er2O3

Tm2O3

Yb2O3

Lu2O3

Y2O3

Sc2O3

ThO2

Raw Grade (ppm)  

8.4

1.6

4.7

0.7

4.5

0.7

61.6

17.3

11.2

Recovery    %

90%

75%

90%

75%

75%

75%

90%

55%

80%

Recoverable Grade (ppm) 

7.5

1.2

4.2

0.5

3.3

0.5

55.4

9.5

9.0

Metal/Oxide Prices** US$/kg)

864.09

205.82

197.35

$97.00

100.63

1,024.09

81.73

3,881.39

252.00

Recoverable Oxide (kg)

5,109,000

834,000

2,847,000

346,000

2,263,000

354,000

37,578,000

6,451,000

6,087,000

Recoverable Oxide (lb)

11,263,000

1,839,000

6,277,000

763,000

4,989,000

780,000

82,845,000

14,222,000

13,420,000

*Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the five year trailing average to Oct/2012.

**Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the three year trailing average to Oct/2012 for La Ce Pr Nd Sm Eu Gd Tb Dy Y; three year trailing average to Aug/2011 for Tm; Th per USGS  Mineral Commodity Summaries 2009-2011, the two year trailing average to Oct/2012 for Ho Er Yb Lu Sc. Metal prices vary among various commodity information sources and, in all conflicting instances, the lower pricing was used. The 2011 drilling included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. Re-analysis of historic drill core included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. ton=short ton; lb=pound; kg=Kilogram; Recoverable metal/oxide stated to nearest 1000kg or 1000lb. Figures may not add exactly due to rounding.

 
Modelling and estimation of the Consolidated and Updated Buckton inferred resource was carried out using 3-dimensional block model based on geostatistical applications using commercial mine planning software MICROMINE (v12.5.4). The model relies on an aggregate of eleven vertical core holes distributed over an area of approximately 15.8 square kilometres, and spaced approximately 240m-2500m apart (averaging 1000m), and was generated using the combined drill hole data derived from drilling campaigns conducted in 1997 (6 holes) and 2011 (5 holes). There were 5 drill lines in the MICROMINE model that ranged in spacing from 670 m to 2 km between sections. Approximately 88% of the mineralized black shale within the foregoing area lies beneath less than 75m of overburden till and meet cut-off threshold criteria for classification as an inferred resource. The mineralized black shale in the area also shows good lateral uniformity for many of the contained metals over large distances across the Property. The spacing and number of holes are considered sufficient for the determination of inferred resources, and extrapolation of grades between the drill holes is supported by statistical variography examined during the Study.
 
Considering that leaching tests completed by DNI to date on samples from the Labiche and Second White Speckled Shale formations report different recoveries for the metals of interest, the resource modelling treated the two shale units separately. According to the foregoing scheme, the Buckton Zone assay file was composited using MICROMINE into separate sub-domains where the analytical data were assigned to composite sample files comprising: 269 composite samples for the Labiche sub-domain (at 2.2m intervals), 302 composite samples for the Second White Speckled Shale REE-Y-Sc-Th sub-domain (at 0.5m intervals); and 197 composite samples for the Second White Speckled Shale polymetallic sub-domain (at 1m intervals).
 
Variography was conducted on the composited drill hole data within the Labiche and Second White Speckled Shale domains to produce spherical semivariogram's. Each element was modeled individually to determine the continuity and orientation of mineralization. As a result of the wide hole spacing a parent model block size of 250 m x 250 m x 2 m was chosen for the resource estimate. The block model extents were extended far enough past the mineralized wireframe to encompass the entire domain. The recoverable grades for the metals were translated into a US$ value for each block and sub-block relying on the best metals recoveries achieved per DNI's leaching tests and trailing average metal/oxide prices as noted in footnotes to the above tables, and the values were aggregated into a collective gross recoverable value for each block and sub-block to enable testing against a block value base case cut-off of US$10 per tonne.
 
While the collective work from the Buckton Zone indicate that none of the metals present in the Buckton Zone occurs in sufficiently high enough concentration to be of economic merit by itself, the metals of interest collectively represent sufficient recoverable gross value on a combined basis to place the resources identified at the Buckton Zone within reach of economic viability provided the metals are efficiently recovered on a combined basis. DNI's leaching testwork has already demonstrated that the metals can be collectively extracted from the shale but clear communication of overall bulk grade has been a challenge considering the polymetallic nature of the mineralization of merit. In the foregoing regard, the Resource Study notes, with concurrence from DNI, that given the absence of a single metal to represent bulk of the overall recoverable value of the mineralized shale, reporting of its overall grade as a traditional "metal equivalent" would be arbitrary and misleading.
 
Of necessity, the Resource Study has, accordingly, opted instead to communicate overall grade by aggregating the individual gross recoverable values represented by each of the metals of interest into a single gross recoverable total per tonne value to characterize the resource and enable its discussion and testing against a base cut-off for the purposes of resource estimation. The reader is cautioned that disclosure of gross values discussed in this announcement and in the Resource Study does not comply with Section 2.3(1c) of National Instrument 43-101 since the figures are gross and the term may be misleading in the absence of proven production costs. The recoverable gross values are quoted for convenience of communicating overall grade and are otherwise conceptual in nature and do not represent economic worth of the resource being reported from the Buckton Zone. The reader is also reminded that the values are based on recoverable metal grades per bench scale leaching tests and do not imply that economic viability of the recoveries has been determined and they may not reflect actual recoveries which might be achieved in an ultimate mineral production operation.
 
Polymetallic black shale is an emerging deposit type which has gained recognition over the past decade mainly due to advances in application of bioleaching procedures to extract low grade metals from shale by bulk-heap leaching. Worldwide, there is one active mining operation extracting polymetals via bio-heapleaching and two other scoping stage projects that are exploring/developing polymetallic deposits in black shale. These operations provide the only resource estimation and operating cost guidelines, particularly with respect to base cut-off values, that are relevant to evaluating the mineral resource hosted in the Buckton Zone.
 
The US$10 per tonne base cut-off used by the Resource Study is considered to be a reasonable benchmark which is higher than cut-offs utilized by recent mineral resource estimates and a scoping study for other open pit mineable poly-metallic black shales in Sweden and Finland as the break-even point and lower cut-off. This base cut-off incorporates operating costs from the only available operation worldwide of bulk mining and bioheapleaching exploitation of a polymetallic black shale deposit, and includes a nominal cost for refining of REEs into final saleable final products relying on estimates from other REE projects. Considering a scenario of possible open pit mining in northeast Alberta along the eastern edge of the Birch Mountains, with potential for a low strip ratio at startup, the likely free-dig nature of the poorly consolidated shale bedrock, the potential for easy access to multiple working faces, the location of the project with respect to access, power and other important infrastructure, the US$10 per tonne base lower cut-off value is considered reasonable for the purposes of mineral resource estimation as a base case cut-off threshold which also captures a relatively continuous mineralized zone with favourable bulk mining configuration.
 
DNI's leaching testwork demonstrated that the Buckton Zone mineralization is recoverable by a single bulk leaching method from the shale and that REEs and Specialty Metals are incidentally leached from the shale as co-products of leaching of base metals. The Resource Study notes that REEs account for a significant proportion of the recoverable gross value of the resource, especially for Upper zone mineralization in the Labiche shale, and concludes that ultimate economics of the resource are, accordingly, subject to uncertainties of long term REE pricing and viability of demand, the unknown effect of new production on REE markets; and the cost of separating REEs from pregnant leaching solutions once they have been leached from the shale and their refinement into saleable final products. Although the base cut-off of US$10 per tonne used in the Resource Study includes a nominal cost for separation of REEs relying on estimates from other REE projects, a sensitivity analysis was conducted in the Resource Study to investigate sensitivity of the inferred resource to cost fluctuations by testing the resource model against progressively higher arbitrary base cut-offs.
 
The resource model was iterated and tested at progressively higher arbitrary base cut-offs to determine the commensurate tonnages that can be classified as mineral resources against any given base cut-off. The entire shale package resource model was, accordingly, tested at base cut-offs of US$12, US$14, US$16, US$16.5 and US$17 per tonne. The sensitivity analysis demonstrated that the tonnage and distribution of the shale package is virtually intact between base cut-offs of US$10 per tonne and approximately US$16 per tonne, and that the aggregate gross recoverable value of contained metals exceeds the base cut-off, but that at higher base cut-offs the tonnage of the Upper zone hosted in the Labiche shale rapidly decreases and distribution of resource blocks lose cohesion such that at a base cut-off of US$17 per tonne virtually none of the Upper zone in Labiche shale can be classified as a mineral resource since aggregate gross recoverable value of the contained metals is less than the cut-off.
 
The sensitivity analysis successfully demonstrates that as the spatial distribution of the Labiche resource decreases, progressively larger portions of Labiche would be regarded as cover waste material to be removed for the purposes of any mining operations to extract the underlying resource in the Second White Speckled Shale Formation. Considering that distribution of the Upper zone hosted in Labiche shale will affect distribution and tonnage of what might be realistically mined from the underlying Lower zone resource hosted in the Second White Speckled Shale, the resource model was tested at yet higher base cut-offs of US$30, US$40, US$50, US$60, US$70 and US$80 per tonne, to simulate a scenario for which the Upper zone hosted in Labiche shale is deemed to be waste and would have to be removed together with the overburden to gain access to the underlying higher grade mineralization in the Second White Speckled Shale. In these iterative scenarios, the Lower zone in the Speckled Shale is the only mineralization of interest and the resource identified within it remains intact between base cut-offs of US$10 per tonne and US$40 per tonne at which cut-off it comprises 265 million short tons (241 million metric tonnes) extending over 5.8 square kilometres and is similar in distribution and tonnage to the Buckton Maiden Resource announced on October 24, 2011. The resource gradually loses cohesion at base cut-offs higher than US$40 per tonne such that at a base cut-off of US$70 per tonne virtually none of it can be classified as a mineral resource since the aggregate gross recoverable value of contained metals is less than the base cut-off.
 
The Resource Study overall concludes that the per tonne of recoverable gross value represented by the Labiche and Second White Speckled Shale resource is sufficiently higher than the US$10 per tonne base cut-off used by the Resource Study, and sufficiently higher than the related iteration of the resource model at higher cut-offs up to US$16 per tonne, to reasonably conclude that the Consolidated and Updated Buckton mineral resource is mineralization that has a reasonable prospect for extraction in the future.
 
The Resource Study concludes that the inferred resource announced herein at the Buckton Zone has excellent potential for expansion with further drilling, and recommends implementation of additional exploration at the Buckton Zone, and the Property, to include additional leaching testwork (ongoing) and additional drilling to continue expanding and upgrading the Buckton Zone resource hosted within the Labiche as well as the Second White Speckled Shale Formations. The Resource Study supports DNI's decision to advance the Buckton Zone toward the Preliminary Economic Assessment study (Scoping Study) which is in progress. The Study also recommends that resources reported herein at the Buckton Zone be revised to incorporate results from DNI's 2012 drilling program.
 
The Qualified Persons in connection with the preparation of the Consolidated and Updated Buckton Mineral Resource Study are Mr. Roy Eccles PGeol, Mr. Michael Dufresne PGeol and Mr. Steven Nicholls MAIG who are independent of DNI. The Qualified Person in connection with this press release and in respect of the Alberta polymetallic black shale projects is Mr. Shah� F.Sabag PGeo, President and CEO of DNI, who is responsible for verification and quality assurance of the exploration information disclosed in connection with the projects and this release.
 
Ton=short ton; lb=pound; tonne = metric tonne = 1000kg. The 2011 drill core analyses and re-analysis of historic Labiche drill core intercepts included an appropriate number of analytical standards, blanks and duplicates, and no analytical issues were identified. Metal/Oxide commodity prices used to establish bulk recoverable values for cut-off grade thresholding tests are the five year trailing average to October 25, 2012, for Mo-Ni-U-V-Zn-Cu-Co-Li (U consolidated from www.cameco.com; Li from www.asianmetal.com; remaining metals from www.metal-pages.com); the three year trailing average to October 25, 2012, for; La-Ce-Pr-Nd-Sm-Eu-Gd-Tb-Dy-Y (consolidated from www.metal-pages.com); three year trailing average to August, 2011, for Tm (from Montviel Core Zone REE resources study 2011 by SGS Canada Inc.); Th per USGS  Mineral Commodity Summaries 2009-2011, the two year trailing average to October 25, 2012, for Ho-Er-Yb-Lu-Sc (consolidated from www.asianmetal.com). Metal prices vary among various commodity information sources and in all conflicting instances the lower pricing was used.
 
Analyses by Activation Laboratories Ltd., Ancaster, ON; Analytical results from the 2011 drilling were announced on Jul15/2011, along with details of DNI's analytical quality assurance and quality control parameters. Additional REE and Specialty Metals grades were announced on Dec2/2011. Archived drill core from some of the historic drilling was examined, re-sampled and re-analyzed by DNI as part of its verification sampling program in 2008-2009. All samples from 2011 drilling were re-analyzed for REEs in December 2011 by Activation Labs, Ancaster, ON, by Fusion and Trace Element Fusion ICP (Code 8). Labiche Formation intercepts from archived historic 1997 drill core were re-sampled and re-analyzed by Activation Labs, Ancaster, ON, by  Fusion and Trace Element Fusion ICP (Code 8) for consistency with DNI's more recent data.
 
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
 
DNI - TSX Venture
DG7 - Frankfurt
Issued: 74,857,022
 
For further information, contact:
DNI Metals Inc. - Shahe Sabag, President & CEO or Denis Clement, Chairman - 416-595-1195
email ir@dnimetals.com. Also visit www.dnimetals.com
 
We seek Safe Harbour. This announcement includes forward looking statements. While these statements represent DNI's best current judgment, they are subject to risks and uncertainties that could cause actual results to vary, including risk factors listed in DNI's Annual Information Form and its MD&As, all of which are available from SEDAR and on its website.
 
Link to news release on CanadaNewswire.com:
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Polymet Mining Corp

CODE : POM.TO
ISIN : CA7319161021
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Polymet est une société développant des projet miniers de cuivre et de nickel basée au Canada.

Polymet détient divers projets d'exploration en USA.

Son principal projet en exploration est NORTHMET en USA.

Polymet est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 909,5 millions CA$ (727,2 millions US$, 690,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 27 mars 2020 à 0,26 CA$, et son plus haut niveau récent le 04 septembre 2020 à 8,30 CA$.

Polymet possède 318 549 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Polymet Mining Corp
05/07/2008Duluth Complex: A World-Class Value Play
07/09/2006Follow up
Financements de Polymet Mining Corp
27/06/2013Reminder to Shareholders Rights Offering Closes at 5:00 pm E...
24/05/2013Announces Terms of US$60=2E5 Million Rights Offering and Fil...
06/12/2011Closes $20 Million Private Placement With Glencore
30/11/2011and Glencore Agree to Extend Debentures
18/01/2011Polymet Closes First $10 Million Tranche of Glencore Financi...
17/11/2009Modifies Terms of Existing Glencore Warrants
Nominations de Polymet Mining Corp
25/01/2011Names Brad Moore Executive VP-Environmental and Governmental...
19/02/2008 Appoints Frank Sims and Joe Scipioni to the Board
13/03/2007Appoints Chief Operating Officer and NorthMet Senior Constru...
Rapports Financiers de Polymet Mining Corp
15/06/2016Reports First Quarter Fiscal 2017 Results
22/04/2016Reports Fiscal 2016 Results
16/12/2015Reports Third Quarter Fiscal 2016 Results
04/09/2015Reports Second Quarter Fiscal 2016 R =?ISO-8859-1?Q?esults,=...
05/12/2013Reports Third Quarter Fiscal 2014 Results
11/09/2013Reports Second Quarter Fiscal 2014 Results
11/06/2013Reports First Quarter Fiscal 2014 Results-Rights Offering Ma...
07/09/2012Reports Second Quarter Fiscal 2013 Results
18/06/2012Reports First Quarter Fiscal 2013 Results
08/09/2011Reports Second Quarter Fiscal 2012 Results
06/07/2011Reports First Quarter Fiscal 2012 Results: Update on State o...
07/05/2011Announces Fiscal 2011 Full-Year Results
30/04/2008Reports Fiscal 2008 Fourth Quarter and Full Year Results
Projets de Polymet Mining Corp
14/07/2016Project Update at Shareholders' Meeting
16/12/2013Federal Wetlands Permit Application Published for PolyMet Pr...
28/08/2013and E&D: Polymetal swings to a loss and Ncondezi gets permit...
29/07/2013and Finance: Polymetal to take writedown of up to US$340m an...
30/05/2013(Northmet)Reports Further Progress at NorthMet Copper-Nickel Project R...
14/02/2013(Northmet)Improves NorthMet Project
07/11/2012Drilling Commences at the Croydon Polymetallic Project
03/02/2011(Northmet)Simplifies Metallurgical Process at NorthMet Project
26/09/2007(Northmet)Reports a 51% Interim Increase in Reserves at NorthMet
09/08/2007(Northmet) Reports a 51% Increase in Mineral Resources at NorthMet
10/07/2007(Northmet) Drill Program Confirms Expansion of "Magenta" Zone and Demo...
Communiqués de Presse de Polymet Mining Corp
14/07/2016PolyMet Project Update at Shareholders’ Meeting
11/07/2016PolyMet Submits Water-Related Permit Applications to the Sta...
15/06/2016PolyMet Reports First Quarter Fiscal 2017 Results
22/04/2016PolyMet Reports Fiscal 2016 Results
27/01/2016PolyMet Secures Additional US$11 Million Loan From Glencore
16/12/2015PolyMet Reports Third Quarter Fiscal 2016 Results
06/11/2015IIROC Trade Resumption - POM
06/11/2015PolyMet Final EIS Completed - Demonstrates Project Meets Env...
06/11/2015IIROC Trading Halt - POM
04/09/2015PolyMet Reports Second Quarter Fiscal 2016 Results, Progress...
17/07/2015PolyMet Reports Accomplishments at Annual Shareholders’ meet...
16/07/2015PolyMet Reports Accomplishments at Annual Shareholders' Meet...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results - Project ...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results Project Up...
08/10/2014PolyMet Final EIS "Early Spring" 2015
09/09/2014PolyMet Reports Second Quarter Fiscal 2015 Results
11/06/2014PolyMet Reports First Quarter Fiscal 2015 Results
25/04/2014PolyMet Reports Fiscal 2014 Results
25/04/2014PolyMet and Glencore Agree to Extend Term of US$32.2 Million...
13/03/2014IIROC Trade Resumption - POM
13/03/2014IIROC Trading Halt - POM (all issues)
24/02/2014DNI Metals - Operating in a Polymetallic Paradise
06/12/2013Achieves Key Milestone in Environmental Review Process
05/12/2013DNI REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR ITS...
06/11/2013Three-Week Federal Government Shutdown Results in Two-Week P...
11/09/2013DNI'S RESOURCE STUDY REPORT UPDATING AND EXPANDING THE MINER...
27/08/2013DNI EXPANDS BUCKTON ZONE INFERRED RESOURCE TO 4.9 BILLION TO...
26/08/2013Significant Progress for PolyMet Environmental Review
23/08/2013Minnesota DNR Announces Publication Date for PolyMet Supplem...
25/07/2013s Investors With Exclusive Interview With The Wall Street An...
10/07/2013Reports Strong Positioning at Shareholders' Meeting
05/07/2013Closes Successful Rights Offering; Financed to Complete Perm...
19/06/2013on PolyMet Rights Offering-Informationfor Those Who Have Not...
13/05/2013Reports Completion of Drafting of Preliminary EIS
23/04/2013Reports Fiscal 2013 Results
19/04/2013(Northmet)NorthMet News - PolyMet Mining, Inc.
10/04/2013US$60 Million Common Share Rights Offering to All Shareholde...
11/01/2013DNI CONSOLIDATES AND EXPANDS BUCKTON RESOURCE TO 3.49 BILLIO...
11/12/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
01/11/2012s Technical Disclosure
15/10/2012Closes $10 Million Third Tranche of Glencore Financing
10/10/2012Reports Successful Water Treatment Pilot Plant
13/09/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
11/09/2012Strengthens Permitting Expertise
17/07/2012Focuses Corporate Leadership Team in Minnesota
11/07/2012Announces Results of Shareholders' Meeting
28/06/2012Form 20-F Availability
21/06/2012Strengthens Leadership Team
15/06/2012for IMMEDIATE Dissemination - Verbatim - Kootenay and Pinecr...
14/06/2012Reports Technical Disclosure Review
23/05/2012Reports Progress on Environmental Review
01/05/2012Reports Fiscal 2012 Results
19/03/2012DNI EXTRACTS METALS FROM ITS ALBERTA POLYMETALLIC SHALES USI...
29/02/2012Acquires Control of Wetlands
13/02/2012Clarifies Status of Environmental Review Following Misleadin...
01/02/2012s Status of Environmental Review
16/01/2012DNI ANNOUNCES 250 MILLION TON INFERRED RESOURCE FOR REE-Y-Sc...
14/12/2011orate and Project Update; Third Quarter Fiscal 2012 Results
30/11/2011Agrees to Sell US$20 Million of Common Shares to Glencore
12/10/2011Everett Resources Commences Second Phase 2,500 Meter Drill P...
19/09/2011(Northmet)s Progress on NorthMet Environmental Review
15/07/2011Closes Second $10 Million Tranche of Glencore Financing
30/06/2011Closes IRRRB Loan
17/06/2011Reports Mailing of Information Circular
05/05/2011to File Financial Statements on or Before May 9, 2011
03/05/2011Announces Delay in Filing Year-End Financial Statements
15/04/2011s Status of Environmental Review
25/06/2010EIS-Path Forward to Completion Announced
15/03/2010Statement on Environmental Review Timeline
04/03/2010Environmental Review Process Clarified
23/02/2010s NorthMet Environmental Review Progress
26/01/2010Receives Second Installment From Glencore
24/11/2009Closes Financing-Project Update
17/11/2009Sells US$25 Million of Common Shares to Glencore
28/10/2009Environmental Impact Statement Published
05/10/2009Draft EIS Available the Week of October 19, 2009
01/10/2009s EIS Publication Schedule
02/09/2009Draws Fourth Tranche of Loan From Glencore
27/08/2009Files US$500 Million Universal Shelf Registration
19/06/2009Draws Third Tranche of Loan From Glencore
24/12/2008Draws Second Tranche of Loan From Glencore
22/12/2008Receives Draft EIS From Department of Natural Resources
24/09/2008EIS and Glencore Update
04/09/2008and Glencore Sign Strategic Marketing Agreement
12/08/2008Minnesota DNR Updates PolyMet EIS Progress
12/06/2008s EIS Progress
02/06/2008Present at the New York Society of Security Analysts' 8th An...
20/05/2008Capital and Operating Costs
15/02/2008Updates EIS Schedule for Its Copper-Nickel-Precious Metals P...
05/02/2008Strengthens Minnesota Focus
05/11/2007Present at Third Annual Sanders Morris Harris Investor Growt...
04/10/2007Hosts Analyst and Investor Tour
14/09/2007Quarterly Financials
04/09/2007Signs Northmet Construction Labor Agreement
21/08/2007Expands NorthMet Management Team
16/05/2007Updates NorthMet Environmental Review
07/05/2007Research Capital Report
07/05/2007Announces Retirement of Warren Hudelson Receives Approval fo...
21/03/2007Financial Adviser Engages NorthMet Independent Engineer
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (POM.TO)AMEX (PLM)
2,86+0.53%2,09-0.48%
TORONTO
CA$ 2,86
12/10 16:15 0,020
0,53%
Cours préc. Ouverture
2,84 2,82
Bas haut
2,82 2,86
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
1,03 -  2,87 14,86%
Volume var. 1 mois
4 178 0,175%
24hGold TrendPower© : 30
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20241,96%
2023-22,65%3,761,01
20220,56%6,153,05
2021-15,49%6,713,28
20201252,38%8,300,26
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :